| 0022885172451000 | Rp 4,906,781,322 | |
| 0024239758451000 | - | |
| 0022878391451000 | - | |
| 0658077227418000 | - | |
| 0011360575451000 | - | |
| 0022395214416000 | - | |
| 0417427226416000 | - | |
| 0532854122419000 | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - |
| 0717910657416000 | - | |
Cvharvistjayabersama | 08*4**0****08**0 | - |
| 0020935433418000 | - | |
| 0626906457403000 | - | |
| 0013977178021000 | - | |
| 0030794101009000 | - | |
| 0013566013015000 | - | |
| 0614948222009000 | - | |
| 0026908566437000 | - | |
| 0026260281122000 | - | |
| 0840217434521000 | - | |
| 0964880603326000 | - | |
| 0838477875402000 | - | |
PT Jasiandra Sejahtera Abadi | 09*6**6****06**0 | - |
| 0313609950416000 | - | |
| 0948299649423000 | - | |
PT Agrotech Mitra Utama | 07*2**6****63**0 | - |
| 0316606961451000 | - | |
| 0926257130711000 | - | |
Sesfranvio Putra Mandiri | 04*7**4****47**0 | - |
RENCANA ANGGARAN BIAYA (BLANK)
JUDUL KEGIATAN : Rehab Selasar dan Sapras Lapangan Upacara Maulana Yudha Kabupaten Tangerang
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN KODE ANALISA VOLUME SATUAN
PEKERJAAN (a) (b)
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek A.2.2.1.0 1.00 Unit
2 Biaya Operasional Listrik & Air Kerja Proyek - 1.00 ls
3 Penyelenggaraan K3 dan BPJS
- Helm Proyek SNI - 25.00 bh
- Sarung Tangan Pelindung - 25.00 bh
- Sepatu Karet (Sepatu Boot) - 25.00 bh
- Rompi Jaring - 25.00 bh
- Sabuk Pengaman Full Body Double Hook Setara Legion - 6.00 set
- Spanduk k3 - 1.00 Unit
- Bendera K3 - 1.00 Unit
- BPJS Ketenagakerjaan dan kesehatan kerja - 1.00 Paket
- Alat P3K - 1.00 Paket
4 Pekerjaan Bongkaran
- Pek. Bongkaran Beton Bertulang A.2.2.1.13. 9.88 m3
- Pek. Bongkaran Atap + Rangka - 287.52 m2
- Pek. Bongkaran Keramik - 858.16 m2
5 Pekerjaan Barak/los Kerja A.2.2.1.7.a 24.00 m2
B PEKERJAAN STRUKTUR BAWAH
1 Pek. Pengukuran dan Pemasangan Bauwplank A.2.2.1.4. 175.20 m1
2 Pek. Pondasi Plat Beton Setempat uk. 60x60 cm (P1)
- Pek. Galian Tanah Pondasi A.2.3.1.1. 56.88 m3
- Pek. Lantai Kerja Bawah Pondasi, tebal 5 cm SNI G.04 56.88 m2
- Pembesian (Besi Ulir) A.4.1.1.17.2 1,843.72 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 14.22 m3
3 Pek. Kolom Pedestal 25x25 (K1)
- Bekisting Multiplek 9 mm A.4.1.1.24.1 118.50 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 625.55 kg
- Tul. Tengah (Besi Polos) A.4.1.1.17.1 533.01 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 321.68 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 7.41 m3
4 Pek. Sloof Beton 15/20
- Pek. Galian Tanah u/ Sloof A.2.3.1.1. 15.24 m3
- Bekisting Multiplek 9 mm A.4.1.1.24.1 203.20 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 1,803.93 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 748.59 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 15.24 m3
C PEKERJAAN STRUKTUR ATAS
1 Pek. Kolom 25x25 (K1)
- Bekisting Multiplek 9 mm A.4.1.1.24.1 316.00 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 2,107.11 kg
- Tul. Tengah (Besi Polos) A.4.1.1.17.1 1,795.41 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 750.58 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 19.75 m3
2 Pek. Plat Besi T=12 mm ( base plate ) A.4.2.1.1. 775.19 kg
3 Pas. Angkur dia 16 mm - 632.00 bh
4 Pas. Tiang Besi Kotak Hollow Galvanis 10/10 A.4.2.1.1.a 3,033.60 kg
5 Pas. Rangka Atap Besi Kotak Hollow Galvanis 5/10 A.4.2.1.22. 914.40 m2
6 Pek. Melubang dengan Bor A.4.2.1.5.2 632.00 titik
7 Pas. Baut Mur (dia) 16 mm, 12 mm, 10 mm - 632.00 titik
8 Pek. Plafon Kisi-Kisi Hollow Galvanis 2/4 + Fimish Cat 609.60 m2
9 Pas. Atap Dengan Kaca Tempered 8 mm Warna Gelap + Kaca Film A.4.6.2.24.a 914.40 m2
10 Pas. Atap Dengan Atap Onduvilla A.4.5.2.31.b 287.52 m2
11 Pas. Nok Bitumen Selulosa Ridge Standard A.4.5.2.35. 90.20 m1
12 Pek. Rangka Atap Baja Ringan Zincalume Channel 75 mm, tebal 0,75 mm A.4.5.2.43. 287.52 m2
13 Pek. Plafon PVC Shunda (Polos/Alur) + Rangka A.4.5.1.8.a 144.00 m2
14 Lisplang GRC, Superplank, lebar 30 cm, tebal 9 mm (Type Susun) A.4.5.2.44. 127.00 m1
15 Alat Bantu Stegger/Schafolding F.1 103.68 m2
D PEKERJAAN ARSITEKTUR
1 Pek. Acian Permukaan Beton A.4.4.2.30. 316.00 m2
2 Pas. Profil Kolom A.4.4.2.16. 158.00 m2
3 Pas. Lantai Granit Tekstur Kasar (Type Stone), Uk. 60 x 60 cm, Outdoor/KM A.4.4.3.66.a 858.16 m2
4 Pas. ACP Eksterior, Polos, Coating PVDF + Rangka + Stegger (Schafolding) Empiris . 7a 64.80 m2
5 Pek. Perforasi/Cutting ACP Empiris . 9 64.80 m2
6 Pengecatan Tembok Baru Setara ICI/DULUX - EXTERIOR, Semua Warna A.4.7.1.11.a 444.00 m2
E PEKERJAAN MEKANIKAL & ELEKTRIKAL
1 Pengadaan dan Pemasangan Panel Grouping (AC, Stop Kontak, Penerangan) L.10 2.00 Unit
2 Pas. Box Sikring (MCB), Standard L.11 2.00 Unit
3 Pek. Instalasi Kabel NYM 2 x 2,5 mm A.6.2.1.1.b 58.00 titik
4 Pas. Saklar Lampu - Seri/Double A.6.2.1.7. 8.00 bh
5 Pek. Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 26.00 titik
6 Pas. Stop Kontak Tanam/Timbul, setara BROCO A.6.2.1.9.a 26.00 bh
7 Pas. Lampu downlight LED Flat 15 Watt, setara phillips A.6.2.1.20.b 16.00 Unit
8 Pas. Lampu Dinding Bulat A.6.2.1.20.4 42.00 set
F PEKERJAAN PERBAIKAN PAVING BLOCK 0.00
1 Lapis Pondasi Macadam / Stell Slag (Jalan Lingkungan) A.7.1.1.6.b 40.04 m3
2 Paving Block, Model Conbloc 4, Tinggi 6 cm, warna Merah, Kuning, Hitam + AbuA .B7a.1tu.1 t. 1=. 25 cm 200.20 m2
3 Pas. Kanstin Model DKI uk.15.30.40, K-300, warna Abu-Abu A.7.1.1.2.1 182.00 m1
G PEKERJAAN FINISHING
1 Pek. Buang Puing + Pengangkutan - 15.00 rit
2 Pek. Perapihan & Pembersihan - 1.00 ls
JUMLAH
TOTAL (a) + (b)
DIBULATKAN
Tigaraksa, .................................. 2024
PT/CV ….............
…......................................
Direktur
REKAPITULASI TOTAL (BLANK)
JUDUL KEGIATAN : Rehab Selasar dan Sapras Lapangan Upacara Maulana Yudha Kabupaten Tangerang
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
JUMLAH HARGA
NO URAIAN PPN 11%
(Rp)
A PEKERJAAN PERSIAPAN
B PEKERJAAN STRUKTUR BAWAH
C PEKERJAAN STRUKTUR ATAS
D PEKERJAAN ARSITEKTUR
E PEKERJAAN MEKANIKAL & ELEKTRIKAL
F PEKERJAAN PERBAIKAN PAVING BLOCK
G PEKERJAAN FINISHING
JUMLAH
TOTAL
DIBULATKAN| Authority | |||
|---|---|---|---|
| 21 March 2025 | 72. Pembangunan Gedung Mako Polsek Sepatan | Kab. Tangerang | Rp 13,075,251,554 |
| 23 September 2021 | Rehabiliitasi Jalan Legok - Pagedangan - Gading | Kab. Tangerang | Rp 2,500,000,000 |
| 8 September 2022 | Rehabilatasi Jl. Perumahan Legok Permai Kec. Legok | Kab. Tangerang | Rp 2,425,000,000 |
| 10 April 2022 | Rehabilitasi Jalan Kukun - Daon - Jambu | Kab. Tangerang | Rp 2,000,000,000 |
| 1 October 2018 | Lanjutan Peningkatan Jalan Carenang - Jayanti | Kab. Tangerang | Rp 1,990,445,000 |
| 8 September 2022 | Rehabilitasi Jl. Serdang Wetan - Babat (Ciangir) Kec. Panongan | Kab. Tangerang | Rp 1,969,100,000 |
| 29 September 2023 | Pembangunan/Renovasi Gedung Dan Bangunan Kejaksaan Negeri Kabupaten Tangerang | Kejaksaan Republik Indonesia | Rp 1,936,400,000 |
| 18 September 2025 | Peningakatan Jalan Syech Nawawi (Bojong - Bugel) Segmen 1 Sisi Kiri | Kab. Tangerang | Rp 1,684,966,000 |
| 10 April 2022 | Pedesterian Kawasan Puspem | Kab. Tangerang | Rp 1,500,000,000 |
| 5 October 2024 | 33. Pembangunan Hanggar Upt Bmd Bpkad Kabupaten Tangerang | Kab. Tangerang | Rp 1,500,000,000 |