| Reason | |||
|---|---|---|---|
| 0024237372451000 | Rp 1,464,133,750 | - | |
| 0664288743451000 | Rp 1,414,830,771 | Tidak Melampirkan BAST Kedua (FHO), Tidak Melampirkan Referensi Kinerja Baik dari PPK, Tidak Melampirkan bukti Screen Shoot KSWP Terbaru | |
| 0022878391451000 | - | - | |
| 0658077227418000 | - | - | |
| 0011360575451000 | - | - | |
| 0022395214416000 | - | - | |
| 0417427226416000 | - | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - | - |
| 0020935433418000 | - | - | |
PT Karyamas Prima Sempurna | 06*8**7****16**0 | - | - |
| 0315093930544000 | - | - | |
| 0835260829411000 | - | - | |
| 0722947751034000 | - | - | |
| 0532854122419000 | - | - | |
| 0026908566437000 | - | - | |
| 0623170859451000 | - | - | |
| 0901999649451000 | - | - | |
| 0838477875402000 | - | - | |
| 0635065840412000 | - | - | |
CV Mandiri Nusantara Konstruksi | 03*9**7****16**0 | - | - |
| 0316606961451000 | - | - | |
| 0837730878451000 | - | - | |
| 0392834883412000 | - | - | |
| 0926257130711000 | - | - |
RENCANA ANGGARAN BIAYA
JUDUL KEGIATAN Pembangunan RTH Kecamatan Sukamulya
ANGGARAN APBD Th. 2024
LOKASI Kab. Tangerang
PPK DEKI KUSUMAYADI, S.IP
HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN KODE ANALISA SPESIFIKASI VOLUME SATUAN
PEKERJAAN
(a) (b)
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek A.2.2.1.0 1,00 Unit
2 Biaya Operasional Listrik & Air Kerja Proyek 1,00 ls
3 Penyelenggaraan K3 dan BPJS
- Helm Proyek SNI 15,00 bh
- Sarung Tangan Pelindung 10,00 bh
- Sepatu Karet (Sepatu Boot) 5,00 bh
- Rompi Jaring 15,00 bh
- Bendera K3 1,00 Unit
- BPJS Ketenagakerjaan dan kesehatan kerja 1,00 Paket
- Alat P3K 1,00 Paket
4 Mobilasi dan Demobilasi Alat/Material
- Dump Truck 3-4 m³, 100 HP, Kap. 6 ton (Truck Engkel) XXII.52 2,00 Unit
- Baby Walles, 2-4 T XXII.63 1,00 Unit
- Gerobak XXII.58 2,00 Unit
B PEKERJAAN JOGGING TRACK
1 Pas. Kanstin Type K.04.1, uk. 60.30.15 (dipasang tidur) A.7.1.1.2.5 333,30 m1
2 Pas. Plastik Cor - 816,00 m2
3 Lantai Kerja Beton f'c = 18,68 Mpa, (K-225) - Tebal 10 cm A.4.1.1.7. 81,60 m3
4 Pas. Lantai Batu Andesit uk. 40x40 cm, Tebal 1-2 cm + Finishing Vernis A.4.4.3.71. 816,00 m2
C PEKERJAAN LAPANGAN
1 Pek. Base Course SIRDAM (Pemadatan Baby Wales 2 - 4 Ton) A.2.2.1.12. 150,00 m3
2 Pas. Under Layer Drainage Cell utk. Rumput Sintetis A.4.4.3.45.a 1.451,50 m2
3 Pas. Rumput Sintetis Swiss, tebal 3 cm A.4.4.3.44.a 1.451,50 m2
4 Pek. Pemindahan Tiang Bendera (Pondasi Cor Beton) - 1,00 ls
5 Pas. Mahkota Beton GRC Cetak + Pengecatan - bawah Tiang Bendera - 1,00 ls
D PEKERJAAN KOMUNAL
1 Pek. Bouplank A.2.2.1.4. 6,00 m1
3 Pek. Pondasi Plat Beton Setempat 80 x 80 cm
- Pek. Galian Pondasi A.2.3.1.1. 3,00 m3
- Pek. Bekisting Pas. Bata A.4.4.1.10. 2,40 m2
- Pek. Pembesian Pondasi Plat Setempat A.4.1.1.17.2 56,26 kg
- Pek. Pondasi Beton f'c = 18,68 Mpa, K-225 A.4.1.1.7. 0,48 m3
4 Pek. Kolom 25x25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 10,05 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 51,26 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 51,26 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 36,58 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,63 m3
5 Pek. Sloof Beton 20/30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 3,30 m2
- Tul. Utama (Besi Ulir) A.4.1.1.17.2 45,84 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 10,18 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,33 m3
6 Pek. Ringbalk 20/30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 3,30 m2
- Tul. Utama (Besi Ulir) A.4.1.1.17.2 45,84 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 10,18 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,33 m3
7 Pas. Dinding Bata Hebel dipasang 1 Bata Penuh/Tidur + Semen Perekat A.4.4.1.26.a 13,20 m2
8 Pek. Plesteran ad. 1Pc : 5Ps + acian A.4.4.2.5. 33,00 m2
9 Pengecatan Dinding Setara Propan (EXTERIOR) A.4.7.1.11.d 33,00 m2
10 Pek. Dinding Motif Bata Terakota + Finishing Vernis A.4.4.3.73.b 6,00 m2
11 Pekerjaan Huruf (Letter Sign)
- Pas. Huruf (Letter Sign) tinggi = 30 & 20 cm, Bahan Acrylic + Instalasi Lampu + Sensor (On - Off) E.8 1,00 ls
- Kabel NYFGBY 3 x 2,5 mm (Kabel Tanam) L.5 1,00 ls
JUMLAH
TOTAL (a) + (b) + (c)
PEMBULATAN