| 0853312460452000 | Rp 1,450,250,571 | |
| 0926257130711000 | - | |
| 0022878391451000 | - | |
| 0961246840009000 | - | |
| 0011360575451000 | - | |
| 0022395214416000 | - | |
| 0417427226416000 | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - |
| 0020935433418000 | - | |
PT Karyamas Prima Sempurna | 06*8**7****16**0 | - |
CV Eureka Sukses Event | 00*7**6****51**0 | - |
| 0613831957418000 | - | |
| 0315093930544000 | - | |
| 0210798070411000 | - | |
| 0626906457403000 | - | |
| 0316606961451000 | - | |
| 0313901340419000 | - | |
| 0013205190009000 | - | |
| 0945574531419000 | - | |
| 0719041246419000 | - | |
| 0714044021419000 | - | |
| 0020242798419000 | - | |
| 0838477875402000 | - | |
| 0635065840412000 | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - |
| 0023390248412000 | - | |
| 0317993517451000 | - | |
| 0027555556451000 | - |
RENCANA ANGGARAN BIAYA
JUDUL KEGIATAN Pembangunan Sarpras dan Penataan Lingkungan RTH Balaraja
ANGGARAN APBD Th. 2024
LOKASI Kab. Tangerang
PPK DEKI KUSUMAYADI, S.IP
HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN KODE ANALISA SPESIFIKASI VOLUME SATUAN
PEKERJAAN
(a) (b)
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek A.2.2.1.0 Plang Nama Proyek Cetak Banner 1,00 Unit
2 Biaya Operasional Listrik & Air Kerja Proyek - 1,00 ls
3 Penyelenggaraan K3 dan BPJS
- Helm Proyek SNI - 20,00 bh
- Sarung Tangan Pelindung - 20,00 bh
- Sepatu Karet (Sepatu Boot) - 5,00 bh
- Rompi Jaring - 20,00 bh
- Bendera K3 - 1,00 Unit
- BPJS Ketenagakerjaan dan kesehatan kerja - 1,00 Paket
- Alat P3K - 1,00 Paket
4 Mobilasi dan Demobilasi Alat/Material
- Dump Truck 3-4 m³, 100 HP, Kap. 6 ton (Truck Engkel) XXII.52 3,00 Unit
- Gerobak XXII.58 1,00 Unit
B PEKERJAAN BAK TAMAN
1 Pek. Bak Taman, Type - 1
- Pek. Bouplank A.2.2.1.4. 40,00 m1
- Pek. Galian Pondasi A.2.3.1.1. 6,06 m3
- Pas. Bata/Kerb Pinggir A.4.4.1.10. 40,42 m2
- Pek. Plesteran + Acian Pas. Bata/Kerb Pinggir A.4.4.2.5. 40,42 m2
- Timbunan Tanah Merah Super untuk Pertamanan A.2.3.1.16.a 43,34 m3
- Hamparan Media Tanam Permukaan dgn Tanah Fermentasi A.2.3.1.15.c Tanah Fermentasi + Pupuk 433,40 m2
- Penanaman Pohon Sutra Bombay - jarak tanam 30-40 cm - 300,00 bag
- Penanaman Pohon Rambat Sirih Gading Kuning - 300,00 bag
2 Pek. Bak Taman + Bangku, Type - 2
- Pek. Galian Pondasi A.2.3.1.1. 4,22 m3
- Pas. Batu Kali/ Batu Belah, ad. 1Pc : 5 Ps A.3.2.1.3. 23,33 m3
- Pek. Plesteran + Acian - Sisi Luar Dinding Bak Taman A.4.4.2.5. 55,68 m2
- Timbunan Tanah Merah Super untuk Pertamanan A.2.3.1.16.a 16,56 m3
- Hamparan Media Tanam Permukaan dgn Tanah Fermentasi A.2.3.1.15.c Tanah Fermentasi + Pupuk 16,56 m2
- Penanaman Pohon Sutra Bombay - jarak tanam 30-40 cm - 60,00 bag
- Pas. Tempat Duduk WPC Decking KA + Rangka + Fin. Plitur/Vernis A.4.4.3.47.a KA 138DL22 / KA 150K25 C : L 140 x T 25 x P 2900 mm 10,80 m2
C PEKERJAAN KIOS / KANTIN
1 Pek. Pemindahan Plang Nama Sekolah MAN 2 Tangerang - 1,00 ls
2 Pek. Bouplank A.2.2.1.4. 24,00 m1
3 Pek. Pondasi Plat Beton Setempat 60 x 60 cm
- Pek. Galian Pondasi A.2.3.1.1. 10,75 m3
- Pek. Bekisting Pas. Bata A.4.4.1.10. 11,52 m2
- Pek. Pembesian Pondasi Plat Setempat A.4.1.1.17.2 260,05 kg
- Pek. Pondasi Beton f'c = 18,68 Mpa, K-225 A.4.1.1.7. 1,73 m3
3 Pek. Kolom Beton Pedestal 25x25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 14,40 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 100,02 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 100,02 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 40,72 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,90 m3
4 Pek. Sloof Beton 15/20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 13,50 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 239,70 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 81,75 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 2,03 m3
5 Pas. Plat Dudukan, tebal 10 mm A.4.2.1.1. 117,75 kg
6 Pas. Angkur Ø 16 mm - 96,00 bh
7 Pas. Baut Mur Ø 16 mm - 96,00 bh
8 Pek. Tiang Besi Kotak Hollow Galvanis 100x100x3,2 mm A.4.2.1.1. 542,59 kg
9 Pek. Rangka Besi Kotak Hollow Galvanis 100x100x3,2 mm A.4.2.1.1. 1.280,12 kg
10 Pek. Gording Besi Kotak Hollow Galvanis 100x50x3,2 mm A.4.2.1.1. 961,59 kg
11 Pek. Pengelasan A.4.2.1.5.1 7.720,00 cm
12 Pek. Pengecatan Sincromate Besi, Warna Hitam Dop A.4.7.1.24. 110,84 m2
13 Pas. Kaso Channel 75 mm + Reng Baja Ringan A.4.5.2.43.b 119,00 m2
14 Pas. Lisplang GRC, L= 30 cm, t= 9 mm (Type Susun) + Fin Cat A.4.5.2.44. 75,00 m1
15 Pas. Atap Onduline Tile Bitumen Selulosa A.4.5.2.31. uk. 2000x950 mm, warna ; red, green, brown, black 125,80 m2
16 Pekerjaan Lantai Kios/Kantin
- Pek. Bekisting Pas. Bata/Kerb Pinggir A.4.4.1.10. 15,70 m2
- Pek. Plesteran + Acian Bekisting Pas. Bata/Kerb Pinggir A.4.4.2.5. 15,70 m2
- Pas. Plastik Cor - 199,50 m2
- Lantai Kerja Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 9,98 m3
- Pas. Lantai Batu Andesit uk. 40x40 cm, Tebal 1-2 cm + Finishing Vernis A.4.4.3.71. Batu Andesit, Tebal 1-2 cm 199,50 m2
17 Pekerjaan Mekanika Elektrikal
- Kabel Tanam NYFGBY 4 x 6 mm + NYA 6 mm - dari Panel Utility/Grouping di Gd. Pengelola ke-
L.4 16,00 m1
MCB Kantin
- Pas. Box Sikring (MCB), Standard L.11 1,00 Unit
- Instalasi Kabel Lampu & Stop Kontak, Supreme NYY 3 x 2,5 mm + Klem A.6.2.1.1.b termasuk Fitting/soket Lampu 33,00 titik
- Pas. Saklar Tunggal A.6.2.1.6. kabel 2 x 1,5 mm 11,00 bh
- Pas. Stop Kontak Timbul, setara BROCO A.6.2.1.9.a kabel 3 x 2,5 mm 11,00 bh
- Pas. Lampu Bohlam LED -SL, 10-25 Watt, setara phillips A.6.2.1.20.c Neon Bohlam/Spiral 22,00 bh
18 Pekerjaan Tempat Cuci Tangan & Sanitasi Kios
- Pek. Kolom Beton Praktis 15x15 BOW I.19 0,25 m3
- Pek. Ringbalk Beton 15/15 BOW I.38 0,35 m3
- Pek. Plat Meja Beton BOW I.22 0,32 m3
- Pas. Dinding Bata A.4.4.1.10. 5,40 m2
- Pas. Dinding Batu Koral Tempel + Finishing Vernis A.4.4.3.71.c batu koral di tempel dinding 9,66 m2
- Pas. Batu Koral Kupang alas T. Cuci Tangan - 12,00 krg
- Instalasi Pipa Air Kotor Ø 2" ke- saluran A.5.1.1.29. 16,00 m1
- Instalasi Pipa Air Bersih Ø 1" dari Torn Air A.5.1.1.27. 80,00 m1
- Pas. Kran Air Ø ½" Stainless Setara ONDA A.5.1.1.19. ONDA kran air tembok A 801 T size 1/2" inch 8,00 bh
- Pas. Bak Cuci Piring/Kitchen Sink Portable Stainless (Single) A.5.1.1.12. Uk. 48 x 42, dalam 20 cm / stainless sus 304 11,00 Unit
- Pas. Kran Air Kitchen Sink Ø ½" A.5.1.1.19.a HCG, type Amazona Series KF3511, warna standar 11,00 bh
D PEKERJAAN GEDUNG PENGELOLA
1 Pek. Bouplank A.2.2.1.4. 26,00 m1
2 Pek. Pondasi Plat Beton Setempat 60 x 60 cm
- Pek. Galian Pondasi A.2.3.1.1. 4,61 m3
- Pek. Bekisting Pas. Bata A.4.4.1.10. 4,32 m2
- Pek. Pembesian Pondasi Plat Setempat A.4.1.1.17.2 97,52 kg
- Pek. Pondasi Beton f'c = 18,68 Mpa, K-225 A.4.1.1.7. 0,65 m3
3 Pek. Pondasi Batu Kali
- Pek. Galian Pondasi A.2.3.1.1. 5,05 m3
- Pas. Batu Kali/ Batu Belah, ad. 1Pc : 5 Ps A.3.2.1.3. 4,04 m3
4 Pek. Sloof Beton 15/20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 13,76 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 122,16 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 39,77 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 1,03 m3
5 Pek. Kolom Beton 25x25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 31,80 m2
- Tul. Utama (Besi Ulir) A.4.1.1.17.2 272,56 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 75,33 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 1,99 m3
6 Pek. Balok Beton 15/30
- Bekisting Multiplek 9 mm A.4.1.1.24.1 21,99 m2
- Tul. Utama (Besi Ulir) A.4.1.1.17.2 229,11 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 59,37 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 1,65 m3
7 Pek. Pelat Beton, tebal 15 cm
- Stegger/Schafolding F.1 25,92 m2
- Bekisting Multiplek 9 mm A.4.1.1.24.1 24,50 m2
- Pembesian Pelat (Besi Polos) A.4.1.1.17.1 159,67 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 2,81 m3
- Pek. Water Proofing Anti Bocor/Groutting Dak Beton, SIKA TOP 107 Plus A.4.7.1.22. SIKA TOP 107 ( A+B ) PLUS WATER PROOFING 4 KG 24,50 m2
8 Pek. Balok Lintle atas Kusen 15/20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 5,36 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 47,58 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 15,91 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,40 m3
9 Pas. Dinding Bata Ringan & Finishing
- Pas. Dinding Bata Ringan + Semen Perekat A.4.4.1.26. 57,50 m2
- Pek. Plesteran 1Pc : 5Ps + acian A.4.4.2.5. 114,99 m2
- Pek. Pengecatan Dinding, Type Propan Decor Acrylic Enamel OW-7-2 Helios : ver. 9.12.3 Base A +
A.4.7.1.11.d ( 1 lapis cat dasar sealer, 2 lapis cat penutup ) 114,99 m2
Pasta
10 Pekerjaan Plafon
- Pek. Rangka Plafon Hollow Galvanis 40/40 & 20/30 A.4.2.1.21. 22,78 m2
- Pas. Plafon - Gypsum, tebal 9 mm A.4.5.1.7. 22,78 m2
- Pas. List Plafon - Gypsum Profil + Finish Cat A.4.5.1.13. 27,00 m1
- Pengecatan Plafond Setara Vinilex - Cat Dasar Finish Cat Penutup A.4.7.1.25. 22,78 m2
11 Pekerjaan Lantai Granit
- Pek. Urugan Sirtu A.2.3.1.14. 3,44 m3
- Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 NIRO type GMA 26 Antique W - 3 Pcs/Dos 24,32 m2
12 Pek. Pintu dan Jendela
a Pek. Pintu Aluminium P.1
- Pas. Rangka Kusen Alumunium 4" Warna Coklat A.4.2.1.11. YKK/Alexindo 4 inch 10,66 m1
- Pasang Cassing Daun Pintu - Aluminium Casement A.4.2.1.12. 13,90 m1
- Pasang Kaca Bening 5 mm A.4.2.1.13. 3,59 m2
- Pasangan Engsel Pintu Stainless A.4.6.2.5. Setara Dekson 3" 6,00 bh
- Pas. Kunci + Handle, Kwalitas Baik A.4.6.2.2. Silinder Kunci Dekkson DC KK DL60MM SN SUS 304 2,00 bh
b Pek. Jendela Aluminium - J.1
- Pas. Rangka Kusen Alumunium 4" Warna Coklat A.4.2.1.11. YKK/Alexindo 4 inch 17,48 m1
- Pas. Kaca Bening 5 mm untuk Kusen Aluminium A.4.2.1.13. 6,78 m2
c Pek. Jendela Aluminium - J.2
- Pas. Rangka Kusen Alumunium 4" Warna Coklat A.4.2.1.11. YKK/Alexindo 4 inch 40,11 m1
- Pas. Kaca Bening 5 mm untuk Kusen Aluminium A.4.2.1.13. 14,13 m2
13 Pek. Rangka Auning Besi Kotak Hollow Galvanis 100x100x3,2 mm A.4.2.1.1. 560,68 kg
14 Pek. Konsol Auning Besi Kotak Hollow Galvanis 60x40x2 mm A.4.2.1.1. 126,07 kg
15 Pek. Pengelasan A.4.2.1.5.1 1.260,00 cm
16 Pek. Pengecatan Sincromate Besi, Warna Hitam Dop A.4.7.1.24. 30,35 m2
17 Pas. Atap Auning Kain Sunberella/Kain Kanvas Warna Merah-Putih + Ongkos Jahit & Pasang - 34,44 m2
18 Pekerjaan Lantai Andesit Teras
- Pek. Bekisting Pas. Bata/Kerb Pinggir A.4.4.1.10. 2,73 m2
- Pek. Plesteran + Acian Bekisting Pas. Bata/Kerb Pinggir A.4.4.2.5. 2,73 m2
- Pas. Plastik Cor - 23,20 m2
- Lantai Kerja Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 3,48 m3
- Pas. Lantai Batu Andesit uk. 40x40 cm, Tebal 1-2 cm + Finishing Vernis A.4.4.3.71. Batu Andesit, Tebal 1-2 cm 23,20 m2
19 Pekerjaan Mekanika Elektrikal
- Pengadaan dan Pemasangan Panel Utility/Grouping (Lampu, Stop Kontak, AC) L.8 1,00 Unit
- Pek. Instalasi Kabel Lampu - NYM 2 x 1,5 mm A.6.2.1.1.a termasuk Fitting plafon/soket Lampu 11,00 titik
- Pek. Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 3,00 titik
- Pas. Saklar Lampu - Seri/Double A.6.2.1.7. kabel 2 x 2,5 mm 2,00 bh
- Pas. Lampu downlight LED Flat 15 Watt, setara phillips A.6.2.1.20.b Color: White - Yellow - Warm White 2,00 Unit
- Pas. Stop Kontak Timbul, setara BROCO A.6.2.1.9.a kabel 3 x 2,5 mm 3,00 bh
- Pas. Lampu Hias Gantung Kaca Retro Lighting Vintage - L575 + Bohlam A.6.2.1.20.4 3,00 set
- Pas. Lampu Downlight COB 3-5 watt, Spotlight Yellow A.6.2.1.20.6 Uk : 90 x 40 mm, Lubang : 75 mm, Lumen : 225 Lm 6,00 bh
20 Pekerjaan Meja Kitchen Sink
- Pek. Plat Meja Beton BOW I.22 0,16 m3
- Pas. Dinding Bata A.4.4.1.10. 1,68 m2
- Pas. Dinding Granit Double Loading (Polished), Uk. 60/60, 30/60 cm A.4.4.3.74 2,76 m2
- Instalasi Pipa Air Kotor Ø 2" ke- saluran A.5.1.1.29. 12,00 m1
- Instalasi Pipa Air Bersih Ø 1" dari Torn Air A.5.1.1.27. 20,00 m1
- Pas. Bak Cuci Piring/Kitchen Sink Portable Stainless (Single) A.5.1.1.12. Uk. 48 x 42, dalam 20 cm / stainless sus 304 1,00 Unit
- Pas. Kran Air Kitchen Sink Ø ½" A.5.1.1.19.a HCG, type Amazona Series KF3511, warna standar 1,00 bh
21 Pekerjaan Plumbing
- Pek. Pengeboran Sumber Air Bersih Kedalaman ± 40 m + Instalasi Pemipaan B.1 Pengeboran Max. 40 meter 1,00 ls
- Pengadaan dan Pemasangan Mesin Pompa Submersible, Setara Wasser SD-P307-2 [3/4 HP, 3
B.2 Pompa Satelit 1/2 atau 3/4 PK 1,00 Unit
Inch/Stainless]
- Water Tank Setara Pinguin Kap. 2000 Liter + Instalasi Automatis B.11 1,00 Unit
- Pas. Pompa Transfer/Booster dari Torn ke- Kios/Kantin (Ebara 50 x 40 FS2HA 52.2 Filter,
B.4 1,00 Unit
Centrifugal - GP, Cap : 0,1 m³/m – 0,3 m³/m)
E PEKERJAAN AREA PLAYGROUND & OUTDOOR GYM
1 Pas. Under Layer Drainage Cell utk. Rumput Sintetis A.4.4.3.45.a 1 pcs ; Pjg :50 cm, Lebar :50 cm, Tebal :3 cm 279,98 m2
2 Pas. Rumput Sintetis Swiss, tebal 3 cm A.4.4.3.44.a Tebal 30 mm 279,98 m2
F PEKERJAAN AREA TEMPAT WUDHU
1 Pek. Bouplank A.2.2.1.4. 6,00 m1
2 Pek. Pondasi Plat Beton Setempat 60 x 60 cm
- Pek. Galian Pondasi A.2.3.1.1. 2,69 m3
- Pek. Bekisting Pas. Bata A.4.4.1.10. 2,88 m2
- Pek. Pembesian Pondasi Plat Setempat A.4.1.1.17.2 65,01 kg
- Pek. Pondasi Beton f'c = 18,68 Mpa, K-225 A.4.1.1.7. 0,43 m3
3 Pek. Kolom Beton Pedestal 25x25
- Bekisting Multiplek 9 mm A.4.1.1.24.1 3,60 m2
- Tul. Sudut (Besi Ulir) A.4.1.1.17.2 25,01 kg
- Tul. Tengah (Besi Ulir) A.4.1.1.17.2 25,01 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 10,18 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,23 m3
4 Pek. Sloof Beton 15/20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 3,25 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 57,70 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 19,89 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,49 m3
5 Pas. Plat Dudukan, tebal 10 mm A.4.2.1.1. 29,44 kg
6 Pas. Angkur Ø 16 mm - 24,00 bh
7 Pas. Baut Mur Ø 16 mm - 24,00 bh
8 Pek. Tiang Besi Kotak Hollow Galvanis 100x100x3,2 mm A.4.2.1.1. 132,63 kg
9 Pek. Rangka Besi Kotak Hollow Galvanis 100x100x3,2 mm A.4.2.1.1. 307,97 kg
10 Pek. Gording Besi Kotak Hollow Galvanis 100x50x3,2 mm A.4.2.1.1. 87,42 kg
11 Pek. Pengelasan A.4.2.1.5.1 820,00 cm
12 Pek. Pengecatan Sincromate Besi, Warna Hitam Dop A.4.7.1.24. 21,02 m2
13 Pas. Kaso Channel 75 mm + Reng Baja Ringan A.4.5.2.43.b 24,50 m2
14 Pas. Lisplang GRC, L= 30 cm, t= 9 mm (Type Susun) + Fin Cat A.4.5.2.44. 21,00 m1
15 Pas. Atap Onduline Tile Bitumen Selulosa A.4.5.2.31. uk. 2000x950 mm, warna ; red, green, brown, black 25,90 m2
16 Pekerjaan Lantai Batu Andesit
- Pek. Bekisting Pas. Bata/Kerb Pinggir A.4.4.1.10. 5,28 m2
- Pek. Plesteran + Acian Bekisting Pas. Bata/Kerb Pinggir A.4.4.2.5. 5,28 m2
- Pas. Plastik Cor - 32,96 m2
- Lantai Kerja Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 1,65 m3
- Pas. Lantai Batu Andesit uk. 40x40 cm, Tebal 1-2 cm + Finishing Vernis A.4.4.3.71. Batu Andesit, Tebal 1-2 cm 32,96 m2
17 Pekerjaan Mekanika Elektrikal
- Pek. Instalasi Kabel Lampu - NYM 2 x 1,5 mm A.6.2.1.1.a termasuk Fitting plafon/soket Lampu 2,00 titik
- Pas. Saklar Tunggal A.6.2.1.6. kabel 2 x 1,5 mm 1,00 bh
- Pas. Lampu Bohlam LED -SL, 10-25 Watt, setara phillips A.6.2.1.20.c Neon Bohlam/Spiral 2,00 bh
18 Pekerjaan Tempat Berwudhu
a Pek. Pondasi Plat Beton Setempat 60 x 60 cm
- Pek. Galian Pondasi A.2.3.1.1. 1,15 m3
- Pek. Bekisting Pas. Bata A.4.4.1.10. 1,44 m2
- Pek. Pembesian Pondasi Plat Setempat A.4.1.1.17.2 32,51 kg
- Pek. Pondasi Beton f'c = 18,68 Mpa, K-225 A.4.1.1.7. 0,22 m3
b Pek. Kolom Beton 20x20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 4,32 m2
- Tul. Utama (Besi Ulir) A.4.1.1.17.2 25,01 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 10,16 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,22 m3
c Pek. Sloof Beton 15/20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 1,12 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 19,89 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 6,63 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,17 m3
d Pek. Ringbalk Beton 15/20
- Bekisting Multiplek 9 mm A.4.1.1.24.1 1,12 m2
- Tul. Utama (Besi Polos) A.4.1.1.17.1 19,89 kg
- Sengkang (Besi Polos) A.4.1.1.17.1 6,63 kg
- Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,17 m3
e Pas. Dinding Bata Hebel dipasang 1 Bata Penuh/Tidur + Semen Perekat A.4.4.1.26.a 5,60 m2
f Pas. Dinding Batu Koral Tempel + Finishing Vernis A.4.4.3.71.c batu koral di tempel dinding 12,40 m2
g Instalasi Pipa Air Kotor Ø 3" ke- saluran A.5.1.1.31. 12,00 m1
h Instalasi Pipa Air Bersih Ø 1" dari Torn Air A.5.1.1.27. 8,00 m1
i Pas. Kran Air Ø ½" Stainless Setara ONDA A.5.1.1.19. ONDA kran air tembok A 801 T size 1/2" inch 6,00 bh
G PEKERJAAN REHAB TOILET
1 Pekerjaan Bongkaran & Bobokan - 1,00 ls
2 Pekerjaan Plafon
- Pek. Rangka Plafon Hollow Galvanis 40/40 & 20/30 A.4.2.1.21. 19,25 m2
- Pas. Plafon - Gypsum, tebal 9 mm A.4.5.1.7. 19,25 m2
- Pas. List Plafon - Gypsum Profil + Finish Cat A.4.5.1.13. 35,40 m1
- Pengecatan Plafond Setara Vinilex - Cat Dasar Finish Cat Penutup A.4.7.1.25. 19,25 m2
3 Pas. Lantai Granit Tekstur Kasar (Type Stone), Uk. 60 x 60 cm A.4.4.3.66.a NIRO type GTR01 GRIGIO MIST - 3 Pcs/Dos 20,02 m2
4 Pekerjaan Lantai Andesit Jalan ke- Toilet
- Pek. Bekisting Pas. Bata/Kerb Pinggir A.4.4.1.10. 3,60 m2
- Pek. Plesteran + Acian Bekisting Pas. Bata/Kerb Pinggir A.4.4.2.5. 3,60 m2
- Pas. Plastik Cor - 10,56 m2
- Lantai Kerja Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 0,53 m3
- Pas. Lantai Batu Andesit uk. 40x40 cm, Tebal 1-2 cm + Finishing Vernis A.4.4.3.71. Batu Andesit, Tebal 1-2 cm 10,56 m2
5 Pekerjaan Mekanika Elektrikal
- Pek. Instalasi Kabel Lampu - NYM 2 x 1,5 mm A.6.2.1.1.a termasuk Fitting plafon/soket Lampu 8,00 titik
- Pas. Saklar Lampu - Seri/Double A.6.2.1.7. kabel 2 x 2,5 mm 2,00 bh
- Pas. Lampu downlight LED Flat 15 Watt, Warna Putih A.6.2.1.20.b Color: White - Yellow - Warm White 2,00 Unit
- Pas. Lampu downlight LED Flat 7 Watt, Warna Kuning A.6.2.1.20.a Color: White - Yellow - Warm White 6,00 Unit
6 Pekerjaan Plumbing
- Pek. Septic Tank Baru Uk. 2 x 1,5 x 1,5 m + Rembesannya Empiris . 15 uk. Untuk Kantor Type Kecil 1,00 Unit
- Pek. Instalasi Pipa Pembagi/Cabang Air Kotor Ø 4" dari Pipa Kloset Lama ke- Septicktank Baru A.5.1.1.32. 8,00 m1
- Instalasi Pipa Air Kotor Floor Drain Ø 3" ke- Saluran A.5.1.1.31. 20,00 m1
- Instalasi Pipa Air Bersih Ø 1" dari Torn Air A.5.1.1.27. 12,00 m1
- Pas. Kran Air Ø ½" Stainless Setara ONDA A.5.1.1.19. ONDA kran air tembok A 801 T size 1/2" inch 6,00 bh
- Pas. Floor Drain Ø 3" Stainless A.5.1.1.14. 6,00 bh
7 Pek. Pengecatan Dinding, Type Propan Decor Acrylic Enamel OW-7-2 Helios : ver. 9.12.3 Base A +
A.4.7.1.11.e 88,00 m2
Pasta
H PEKERJAAN LANDSCAPE
1 Pekerjaan Lantai Andesit Depan Panggung
- Pek. Bekisting Pas. Bata/Kerb Pinggir A.4.4.1.10. 3,48 m2
- Pek. Plesteran + Acian Bekisting Pas. Bata/Kerb Pinggir A.4.4.2.5. 3,48 m2
- Pas. Plastik Cor - 53,76 m2
- Lantai Kerja Beton f'c = 18,68 Mpa, (K-225) A.4.1.1.7. 2,69 m3
- Pas. Lantai Batu Andesit uk. 40x40 cm, Tebal 1-2 cm + Finishing Vernis A.4.4.3.71. Batu Andesit, Tebal 1-2 cm 53,76 m2
2 Penanaman Pohon Tabebuya Rosea Bunga Pink Ø Batang ± 15 cm - jarak tanam 4 meter + (ongkos
- 29,00 phn
kirim, upah tanam & perawatan siram)
3 Penanaman Pohon Cemara Angin/Gymnostroma Sumatranum, tinggi 2 s.d 3 meter - jarak tanam 4
- 44,00 phn
meter + (ongkos kirim, upah tanam & perawatan siram)
4 Penanaman Pohon Sutra Bombay - jarak tanam 30-40 cm - 240,00 bag
5 Penghamparan Pupuk - 100,00 krg
6 Pek. Bongkar-Pasang & Perbaikan Pintu Gerbang - 1,00 ls
7 Instalasi Pipa Penyiraman Ø 1" dari Torn Air A.5.1.1.27. 64,00 m1
8 Pas. Kran Air Ø ½" Stainless Setara ONDA A.5.1.1.19. ONDA kran air tembok A 801 T size 1/2" inch 2,00 bh
9 Gulungan Selang 1/2" inch + Selang 25 meter & Mesin Semprotan Air - 1,00 set
JUMLAH
Pemasangan Listrik PLN 5500 Watt (Token) - dipasang di Gedung Pengelola
TOTAL (a) + (b) + (Pemasangan Listrik PLN)
PEMBULATAN| Authority | |||
|---|---|---|---|
| 14 June 2022 | Pembangunan Gerbang Utama Urban Culture Ketapang Mauk | Kab. Tangerang | Rp 2,000,000,000 |
| 4 July 2023 | Penataan Gerbang Utama Urban Culture Ketapang Mauk | Pemerintah Daerah Kabupaten Tangerang | Rp 1,000,000,000 |
| 23 October 2025 | Pekerjaan Penataan Ruang Sekretaris Dan Area Rapat Internal Wamen 1 | Kementerian Pendidikan Dasar dan Menengah | Rp 546,264,000 |
| 28 June 2021 | Pembangunan Gerbang Perbatasan Di Kec. Teluknaga | Kab. Tangerang | Rp 500,000,000 |
| 13 November 2025 | Pekerjaan Penataan Partisi Dinding Dan Build In Furniture Rumah Dinas Cokro | Kementerian Pendidikan Dasar dan Menengah | Rp 400,000,000 |
| 13 June 2025 | Renovasi Gedung Kantin (Pemeliharaan Gedung Kantor Tetuko) | Kementerian Perhubungan | Rp 280,000,000 |
| 26 October 2025 | Pembangunan Balai Warga RT. 04 RW. 05 Desa Suradita Kecamatan Cisauk | Kab. Tangerang | Rp 200,000,000 |
| 26 October 2025 | Pembangunan Gapura RW 09 Ds.Suradita | Kab. Tangerang | Rp 150,000,000 |
| 9 December 2024 | Pemelihraan Gedung Workshop | Kementerian Perhubungan | Rp 121,000,000 |
| 9 December 2024 | Pemeliharaan Ruang Kelas 1 Dan 2 | Kementerian Perhubungan | Rp 100,000,000 |