DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PENGEMBANGAN PUSKESMAS GALALA
SATUAN KERJA : DINAS KESEHATAN KOTA TIDORE
LOKASI : PUSKESMAS GALALA KECAMATAN OBA UTARA
SUMBER ANGGARAN: APBD T.A 2024
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b c d e f
I PEKERJAAN PERSIAPAN
1 Pembersihan awal 6 8,00 Ls 1 7.273,58 1 .174.603,10
2 Pembuatan/Sewa Bansal Kerja dan Gudang Bahan 4,00 M² 2 .087.669,37 8 .350.677,47
3 Papan nama proyek 2,00 M² 2 67.187,92 534.375,84
4 Biaya K3 (keamanan, keselamatan dan kesehatan kerja) 1,00 Ls 3 .990.000,00 3 .990.000,00
5 Pemasangan boplang 15,00 M 200.081,26 3 .001.218,83
6 Pembuatan laporan, dokumentasi, beckup data dan 1,00 Ls 3 .000.000,00 3 .000.000,00
7 Pembersihan Akhir 68,00 M² 1 7.273,58 1 .174.603,10
JUMLAH SUB TOTAL 2 1.225.478,33
II PEKERJAAN TANAH
1 Galian tanah untuk pondasi 1 5,16 M3 1 29.649,62 1 .965.152,45
2 Urukan kembali bekas galian 3,79 M3 8 6.367,88 327.278,32
3 Urukan pasir di bawah pondasi dan lantai 2,20 M3 6 10.950,73 1 .342.090,73
4 Urukan tanah di bawah lantai 200,69 M3 8 45.061,21 169.599.009,92
SUB TOTAL 173.233.531,42
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Batu kosong (aanstamping) 3,39 M3 1 .142.180,46 3 .875.932,28
2 Pas. Pondasi batu kali/gunung 1 pc : 4 ps 2 9,06 M3 1 .951.927,15 56.723.344,43
3 Pas. Dinding bata 1 pc : 4 ps 8 8,34 M² 3 11.760,56 27.542.330,83
4 Pek. Plesteran dinding, kolom, sloof, dan pondasi 1 pc : 4 ps 309,84 M² 8 1.604,92 25.284.174,13
5 Pek. Acian dinding, kolom, sloof, dan pondasi 309,84 M² 6 1.467,30 19.044.808,34
6 Pas. Keramik Dinding Papan Nama 4,78 M² 4 51.589,76 2 .158.960,33
7 Pas. Baja Hollow 3 0,21 M² 3 88.435,79 11.734.645,14
8 Pas. Pawing Balok 1 .985,2 M² 4 30.011,06 8 53.669.598,90
SUB TOTAL 1 .000.033.794,38
IV PEKERJAAN BETON
1 Pek. Kolom 33.025.018,60
Beton Mutu f1c = 14,5 MPa (K175) 2,14 M3 2 .716.870,71 5 .809.756,32
Besi Tulangan (SNI Ø 12) 211,46 Kg 3 2.353,87 6 .841.678,77
Besi Sengkang (SNI Ø 10) 101,93 Kg 3 2.353,87 3 .297.842,91
Bekisting 4 6,33 M2 3 68.551,77 17.075.740,61
2 Pek. Sloof 41.795.005,85
Beton Mutu f1c =14,5 MPa (K175) 4,38 M3 2 .716.870,71 11.904.580,30
Besi Tulangan (SNI Ø 12) 2 68,5 Kg 3 2.353,87 8 .685.707,00
Besi Sengkang (SNI Ø 10) 140,26 Kg 3 2.353,87 4 .538.037,93
Bekisting 5 8,42 M2 2 85.276,02 16.666.680,62
3 Pek. Reeng balk 49.745.955,62
Beton Mutu f1c = 14,5 MPa (K175) 4,38 M3 2 .716.870,71 11.904.580,30
Besi Tulangan (SNI Ø 10) 408,98 Kg 3 2.353,87 13.231.982,22
Besi Sengkang (SNI Ø 8) 242,55 Kg 3 2.353,87 7 .847.581,61
Bekisting 5 9,42 M2 2 82.076,16 16.761.811,49
SUB TOTAL 134.010.210,20
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b c d e f
V PEKRJAAN KAYU, ATAP, DAN LANGIT-LANGIT
1 Pek. Rangka kuda-kuda kayu 5 x 10 cm (kelas I) 1,12 M3 7 .620.114,67 8 .513.954,12
2 Pek. Gording dan skor angin kayu 5 x 10 cm ( kelas II A) 1,25 M3 6 .239.898,47 7 .778.033,44
3 Pek. Atap Seng Gelombang 0.30 mm (Berwarna) 170,08 M² 1 24.825,14 21.230.010,16
5 Pek. Lisplang 2 lapis/susun (papan 2/20) kayu kelas II A 1 5,99 M2 1 36.771,74 2 .187.253,71
SUB TOTAL 3 9.709.251,42
VI PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding , Kolom dan pondasi (cat dasar/alkali 309,84 M² 4 1.829,65 12.960.348,63
1 kali cat dan cat penutup 2 kali cat, cat kualitas setara deluxe)
2 Pek. Cat Baja Hollow (cat dasar 1 kali cat, dan cat penutup 2 3 0,21 M² 3 1.529,09 952.493,81
kali cat, cat kualitas baik)
3 Pek. Cat Dinding, Kolom Eksisting (cat dasar 1 kali cat, dan cat 508,16 M² 4 1.829,65 21.256.323,02
penutup 2 kali cat, cat kualitas baik)
4 Pek. Pengecatan lisplang kayu (lisplang eksiting dan baru) 1 5,99 M² 4 6.503,73 743.687,72
SUB TOTAL 3 5.912.853,19
VII PEKERJAAN ALMUNIUM
1 Pembuatan dan pasangan nama Puskesmas (stainless) 6 5,00 Bh 3 02.070,79 19.634.601,19
2 Pembuatan dan pemasangan logo ( stainless ) 1,00 Bh 5 64.270,79 564.270,79
SUB TOTAL 2 0.198.871,98