| 0816156392017000 | Rp 7,991,122,000 | |
| 0961892056017000 | Rp 7,993,441,250 | |
| 0533492583447000 | Rp 7,995,104,000 | |
| 0017708603014000 | - | |
| 0312999873657000 | - | |
| 0027915826044000 | - | |
| 0762260099609000 | - | |
| 0717730063422000 | - | |
| 0405983297413000 | - | |
PT Bumi Aceh Citra Persada | 0026864527101000 | - |
| 0028231439606000 | - | |
| 0016106734631000 | - | |
| 0623046091401000 | - | |
| 0026734145523000 | - | |
| 0025845751071000 | - | |
| 0719924227609000 | - | |
CV Anezka Indonesia | 0313218174657000 | - |
MARKAS BESAR TNI ANGKATAN DARAT
PUSAT PERHUBUNGAN
URAIAN PEKERJAAN
VIDEOTRON PUSTERAD
NO NAMA BARANG BANYAKNYA
1 2 3
Videotron Pusterad 1 Paket
Tiap-tiap terdiri Paket dari :
I Ruang Aula Gajah Mada
1 Videotron Indoor P 2.5 ukuran 2,88 x 5,76 meter fixed dan
kelengkapannya
a. LED display screen P 2.5 Alumunium Diecasting 74 Kabinet
b. LED Video Processor 2 Set
c. Receiving Card 74 Buah
d. PC AMD RAM 8GB SSD 240GB 1 Buah
e. Laptop i7 RAM 16 Gb SSD 512 1 Buah
f. Panel Listrik 1 Buah
g. Genset 60 Kva 1 Unit
h. Kabel Power LED @ 1 meter 74 Unit
i. Kabel Power Distribusi @50meter/roll 1 Buah
j. Kabel Tufur, 4x6mm @100meter/roll 1 Roll
k. Kabel UTP antar Kabinet 74 Roll
l. Kabel UTP to Controller @50 Meter 4 Buah
2 Framework Rigging 1 Roll
II Ruang RBY
3 Videotron Indoor P 1.8 ukuran 3,84 x 1,92 meter fixed dan
kelengkapannya
a. LED display screen P 1.8 Alumunium Diecasting 24 Kabinet
b. LED Video Processor 1 Set
c. Receiving Card 24 Buah
d. Laptop i7 RAM 16 Gb SSD 512 1 Buah
e. Panel Listrik 1 Buah
f. Kabel Power LED @ 1 meter 24 Buah
g. Kabel Power Distribusi @50meter/roll 2 Roll
h. Kabel Tufur, 4x6mm @100meter/roll 1 Roll
i. Kabel UTP antar Kabinet 24 Buah
j. Kabel UTP to Controller @50 Meter 4 Roll
2
2
1 2 3
4 Framework Rigging 1 Paket
III Teras Atas Pusterad
5 Videotron outdoor P4 Uk. 5x3 meter Fixed dan kelengkapannya
a. LED display screen P 4 Iron Fan Less 15 Kabinet
b. Sending Box 1 Set
c. Receiving Card 15 Buah
d. Laptop i7 RAM 16 Gb SSD 512 1 Buah
e. Panel Listrik 1 Buah
f. Kabel Power LED @ 1 meter 15 Buah
g. Kabel UTP antar Kabinet 15 Buah
h. Kabel UTP to Controller 15 Meter
i. Kabel Power Distribusi, 3x4mm @50 meter 1 Roll
j. Kabel Tufur, 4x6mm @100meter/roll 1 Roll
6 Framework permanent 1 Set
7 Sound System
a. Compact 2-way passive 10” Line Array Speaker, 700 watt program 8 Buah
handling, 1400 watt peak
b. High Power Compact Subwoofer 18”, 1250 watt program handling 6 Buah
2500 watt peak
c. 2-way passive 12” monitor speaker, 450 watt program handling 900 2 Buah
watt peak
d. Power Amplifier 2 ch x 2000 watt 8 Ohm 2 Buah
e. Power Amplifier 4ch x 1200 watt 8 Ohm 2 Buah
f. Digital Mixer 32 Channel 1 Set
g. Stage Box 32 Input 16 Output 1 Set
h. Audio Processor 4 input 8 output 1 Buah
i. Gooseneck Microphone 2 Buah
j. Dual Handheld Wireless Microphone 1 Set
k. Dual Bodypack dan Clip On Wireless Mic 1 Set
l. Dynamic Microphone Vocal Kabel 2 Buah
m. Antena Sirip Booster + Antena Distributor 1 Set
n. Fly Bar Line Array 2 Set
o. Stand Microphone Vocal Boom Floor 2 Buah
p. Wiring & Konektor
1) Kabel Speaker 2x2.5 mm @ 100 m 4 Roll
2) Jack Speakon 28 Buah
3) Kabel Mini Jack @1.5m 2 Lot
4) Kabel System XLR Male Female @1m 16 Lot
5) Kabel System XLR Male Female @10m 4 Lot
6) Kabel Instrumen Jack to Jack Mono @10m 4 Lot
q. Power sequencer Audio Control 18 output 1 Buah
r. Stabilizer 3 KVA 1 Buah
s. Custom Flight Case Digital Mixing Console 32 ch 1 Buah
3
3
1 2 3
t. Custom Flight case Receiver mikrofon wireless 6U 1 Buah
u. Custom Rak System 16U 1 Buah
8 Instalasi dan Setting 1 Lot
9 Testing dan Komisioning 1 Lot
Kepala Pusat Perhubungan TNI AD
Selaku
Pejabat Pembuat Komitmen,
Nurcahyo Utomo, M.Pm.
Mayor Jenderal TNI| Authority | |||
|---|---|---|---|
| 18 April 2025 | Pekerjaan Konstruksi Pembangunan Fasilitas Dan Infrastruktur Yonif Tp 847 Di Kab. Bengkulu Utara | Kementerian Pertahanan | Rp 40,289,208,000 |
| 8 June 2022 | Videotron Kotama 3 Set | Kementerian Pertahanan | Rp 21,067,142,255 |
| 26 January 2024 | Videotron Kotama 3 Set | Kementerian Pertahanan | Rp 21,061,356,000 |
| 8 June 2022 | Videotron Kopassus Outdoor Dan Indoor | Kementerian Pertahanan | Rp 16,750,000,000 |
| 21 February 2023 | Videotron Kopassus Outdoor Dan Indoor | Kementerian Pertahanan | Rp 14,614,530,000 |
| 30 May 2022 | Sound System Lapangan 7 Set | Kementerian Pertahanan | Rp 7,914,530,000 |
| 4 February 2021 | Rehab Kantor Itdam Jaya 2Lt, Pemb. Duikers Dan Jalan Aspal Halaman Itdam Jaya Cawang Jakarta Timur | Kementerian Pertahanan | Rp 6,211,191,000 |
| 21 January 2020 | Renov.Rumdis K.38 Menjadi K.45-36kk Brigif Mekanis-1 Pik/Js (Paket-3) | Kementerian Pertahanan | Rp 4,773,091,000 |
| 6 April 2021 | Genset 500 Kva Dan Perlengkapannya 1 Paket (3 Unit). | Kementerian Pertahanan | Rp 3,927,612,000 |
| 13 October 2023 | Videotron Kopassus Outdoor Dan Indoor | Kementerian Pertahanan | Rp 2,137,820,000 |