MARKAS BESAR TNI ANGKATAN DARAT
DETASEMEN MARKAS
PEKERJAAN PEMELIHARAAN AC KOMPLEK MABESAD
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
I PEMELIHARAAN DAN PERBAIKAN AC CHILLER
GEDUNG C
A Service Ac Central
1 Chiller Daikin 377 TR 1 Unit
B Service water Pump
1 Model : ETA . N Kapasitas : 360 GPM 2 unit
Type : End Suction Centryfugal Pump
C Service Air Handling Unit
1 Lantai 1 3 Unit
2 Lantai 2 2 Unit
3 Lantai 3 2 Unit
4 Lantai 4 2 Unit
5 Lantai 5 2 Unit
6 Lantai 6 2 Unit
7 Lantai 7 2 Unit
8 Lantai 8 2 Unit
9 Lantai 9 2 Unit
10 Lantai 10 2 Unit
D Service Fan Coil Unit
1 Lantai 1 3 Unit
2 Lantai 2 3 Unit
3 Lantai 3 3 Unit
4 Lantai 4 3 Unit
5 Lantai 5 3 Unit
6 Lantai 6 3 Unit
7 Lantai 7 3 Unit
8 Lantai 8 3 Unit
9 Lantai 9 3 Unit
10 Lantai 10 3 Unit
E Material Penunjang
1 Fan Belt 12 buah
2 Contact Cleaner 14 tube
3 Refrigerant R - 134a 90 Kg
4 Grease 17 kg
5 Karet Kopel 17 buah
6 Sikat Kuningan 15 buah
7 Hampelas 15 lembar
8 Majun 18 kg
JUMLAH I
II PEMELIHARAAN AC FLOOR STANDING
DAN SPLIT DUCT
A GEDUNG UTAMA
1 Ruang Lobby
R. Lobby 20 1 Unit
2 R. Aula Jatikusumo
Area Jatikusumo Unit Oudoor 15 5 Unit
Unit Indoor 30 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
Unit Indoor 15 3 Unit
B Gedung A.H. Nasution
Unit Outdoor 15 25 Unit
Unit Indoor 75 6 Unit
C Masjid At-Taqwa
Masjid At-Taqwa 1 0,0 5 Unit
D Lantai X Gedung C
R. Rapat 5 3 Unit
E Lantai 8 Gedung D
Lapangan Tembak 3 1 Unit
F Gedung Denma
R. Rapat 3 2 Unit
G Gedung Satbekang
R. Persit 3 1 Unit
H Harga Satuan Bahan Baku / Suku Cadang
1 Refrigerant R-22 20 Kg
2 Refrigerant R-410 60 Kg
3 Hampelas 12 Lembar
4 Sikat Kuningan 10 Buah
5 Majun 10 Kg
6 Contact Cleaner 10 tube
7 Grease 10 Kg
JUMLAH II
III PEMELIHARAAN AC SPLIT WALL DAN CASSETTE
A GEDUNG UTAMA
1 Kasad
R. Tamu 4 1 Unit
R. Sespri 2 2 Unit
R. Dokter (AC Cassette) 2 1 Unit
R.Tuud 2 4 Unit
R. Korspri (AC Cassette) 2 1 Unit
R. Istirahat Sespri Korad 2 1 Unit
R. Pagasus 2 1 Unit
R. Staf Pagasus 1 1 Unit
R. Musholla 2 1 Unit
2 Wakasad
R. Kerja 3 2 Unit
R. Istirahat 1 1 Unit
R. Tamu 5 1 Unit
R. Dapur 1 ,5 1 Unit
R. Sespri 2 1 Unit
R. Tuud 2 1 Unit
R. Komputer 2 1 Unit
R. Pantry 1 1 Unit
3 As Intel Kasad
R. Kerja 1 ,5 2 Unit
R. Istirahat 1 1 Unit
R. Sespri 1 ,5 2 Unit
R. Rapat 1 ,5 2 Unit
R. Istrirahat Ajudan 1 1 Unit
4 Asops Kasad
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
R. Kerja 2 1 Unit
R. Istirahat 1 ,5 1 Unit
R. Sespri 1 1 Unit
5 Aspers Kasad
R. Kerja 2 1 Unit
R. Istirahat 1 1 Unit
R. Sespri 2 1 Unit
6 Aslog Kasad
R. Kerja 2 1 Unit
R. Istirahat 1 ,5 1 Unit
R. Sespri 1 ,5 1 Unit
R. Komputer 2 1 Unit
7 Asrena Kasad
R. Kerja (AC Cassette) 2 1 Unit
R. Istirahat 1 1 Unit
R. Staf 1 ,5 2 Unit
R. Rapat 2 3 Unit
R. Tamu 1 ,5 1 Unit
8 Aster Kasad
R. Kerja 2 1 Unit
R. Tamu 1 ,5 1 Unit
R. Istirahat 1 1 Unit
R. Staf 2 1 Unit
R. Rapat 2 2 Unit
R. Loby 1 1 Unit
9 Lobby Gd. Utama
Lobby bawah 3 2 Unit
R. Tunggu Tamu 2 1 Unit
R. Server 1 ,5 1 Unit
1 0 Aslat
R. Kerja Aslat 2 2 Unit
R. Server 1 ,5 1 Unit
R. Staf Aslat 2 1 Unit
1 1 Protokol Kasad dan Koorspri
R. Protokol Kasad 2 1 Unit
R. Komputer 1 ,5 1 Unit
R. Sahli 2 1 Unit
R. Makan 1 1 Unit
R. Tamu 1 ,5 1 Unit
R. Mushola 1 1 Unit
R. Tonyan 1 1 Unit
R. Istirahat Tonyan 1 1 Unit
R. Gudang Tonyan 1 1 Unit
1 2 Serbaguna
R. Pati Khusus 2 3 Unit
R. Sahli 2 3 Unit
R. Kerja Kasetumad 2 1 Unit
R. Istirahat Kasetumad 1 1 Unit
R. Sespri 1 1 Unit
R. Gudang 1 ,5 1 Unit
1 3 R. TUUD Kasad
Lantai Atas 2 3 Unit
Lantai Bawah 2 2 Unit
1 4 Gedung Denma
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
R. Dandenma (AC Cassette) 3 1 Unit
R. Kerja 1 1 Unit
R. Rapat Denma 1 ,5 3 Unit
R. Staf Danma 2 1 Unit
R. Tamu Denma 1 1 Unit
R. Musholla 1 1 Unit
R. Kerja Wadan Denma 2 1 Unit
R. Staf TU 2 1 Unit
R. Istrihat Wadan 1 1 Unit
R. Kasipers 1 ,5 1 Unit
R. Istirahat Kasipers 1 1 Unit
R. Staf Kasipers 1 ,5 1 Unit
R. Kasilog 1 ,5 1 Unit
R. Staff Kasilog 1 1 Unit
R. Kasipamops 1 1 Unit
R. Staf Kasipamops 1 1 Unit
R. Piket Denma 2 3 Unit
1 5 Piket Mabesad
R. Piket (AC Cassette) 2 3 Unit
1 6 Gedung Provost
R. Tamu 1 1 Unit
R. Istirahat 1 1 Unit
R. Dansatprov 1 ,5 1 Unit
R. Kaur Hartib 1 1 Unit
R. Danton Hartib 1 1 Unit
R. Batimin 1 1 Unit
R. Staf 2 2 Unit
R. Bariksa 2 1 Unit
1 7 Gd. Satbekang
R. Dansatbek 2 1 Unit
R. Penjagaan 1/2 1 Unit
R. Staf 2 1 Unit
R. Staf 1 ,5 4 Unit
R. Piket 1 ,5 1 Unit
R. Sopir 2 2 Unit
R. Dapur 2 4 Unit
R. Juru Bayar 2 1 Unit
R. Asatri 1 2 Unit
1 8 Gd. Satpal
R. Dansat 2 1 Unit
R. Sespri 2 1 Unit
R. Staf 2 3 Unit
R. Perwira 2 1 Unit
R. Kantin 2 2 Unit
R. Gudang 2 1 Unit
R. Gudang 2 1 Unit
R. Mushola 1 2 Unit
R. Dinotes Sal Pal 1 1/2 2 Unit
R. Sat Pal Gedung Baru Atas 1 ,5 8 Unit
R. Sat Pal Gedung Baru Bawah 1 ,5 7 Unit
1 9 Gedung KDM
R. Mini Market 1 ,5 2 Unit
R. Mini Market 2 3 Unit
2 0 Gd. Parkir (Gedung D)
Lantai VIII :
Lapangan tembak 2 6 Unit
Lapangan tembak 1 ,5 6 Unit
R. Lift 2 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
R. Lift 1 3 Unit
Lantai VII :
R. Dansatkon 1 1 Unit
R. Istirahat Dansatkon 1 1 Unit
R. Kaur 1 2 Unit
R. Staff 2 1 Unit
R. Staff 1 1 Unit
R. Tamu 2 1 Unit
R. Rapat 1,5 1 Unit
R. Mushola 1 1 Unit
R. Kabintal 1 1 Unit
R. Staf Bintal 2 2 Unit
R. Perpustakaan 1 ,5 3 Unit
R. Siaga 2 5 Unit
R. Dansatma 2 1 Unit
2 1 Gedung C
Lantai I
R. Operator 2 1 Unit
R. Hub 2 1 Unit
R. Hub 1 ,5 2 Unit
R. Posmil 1 2 Unit
R. Server Stumad 1 1 Unit
2 2 Lantai II
R. Waaslog Bid. Ren Bin Minlog (AC Cassette) 4 1 Unit
R. Waaslog Bid. Ren Bin Minlog (AC Cassette) 2 1 Unit
R. Waaslog Bid. Ren Bin Minlog 1 2 Unit
R. Paban VI Alpal 1 1 Unit
R. Staf Paban VI Alpal (AC Cassette) 2 1 Unit
R. Komputer 1 1 Unit
R. Waaslog Bid. Bek Pal Kes 2 1 Unit
R. Waaslog Bid. Bek Pal Kes 1 1 Unit
R. Paban I Ren 1 1 Unit
R.Rapat Paban I Ren 1 1 Unit
R. Rapat Slogad 2 2 Unit
2 3 Lantai III
R. Paban VII/Kes 1 1 Unit
R. Staf 2 1 Unit
R. Staf 1 1 Unit
R. Rapat 1 1 Unit
R. Paban V/Bek 1 1 Unit
R. Staf 2 1 Unit
R. Komputer 1 1 Unit
R. Rapat 2 1 Unit
R. Kerja Waaslog Bid Faskon (AC Cassette) 3 1 Unit
R. Paban III Faskon 1 ,5 1 Unit
R. Paban IV BMN 1 1 Unit
R. Staf Paban IV BMN (AC Cassette) 3 1 Unit
R. Paban II Bin Min Log 2 1 Unit
R. Staf (AC Cassette) 2 1 Unit
2 4 Lantai IV
R. Rapat (AC Cassette) 2 1 Unit
R. Paban VI KERMALAT 1 1 Unit
R. Paban VI KERMALAT 2 1 Unit
R. Persit 1 1 Unit
R. Spaban III / Bin Prog Lasi 2 1 Unit
R. Spaban III / Bin Prog Lasi 1 1 Unit
R. Padya 2 Jaskes 2 1 Unit
R. Paban V Kermalat Asean 2 1 Unit
R. Paban VII/Jahril 2 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
R. Minpes (AC Cassette) 2 1 Unit
R. Paban IV / Bin Non Proglatsi (AC Cassette) 2 1 Unit
R. Paban IV / Bin Non Proglatsi 2 1 Unit
R. Spaban II Minlat (AC Cassette) 2 1 Unit
R. Spaban II Minlat 1 1/2 1 Unit
R. Wa Aslad / Bid Renlat 1 1 Unit
R. Paban I Ren (AC Cassette) 2 1 Unit
2 5 Lantai V
R. Waas / Bid Bin Wat Pers 1 2 Unit
R. Bin Jarah 1 1/2 1 Unit
R. Paban VIII / Bin Kum Tal 1 1 Unit
R. Padya Kowad / Persit 1 1 Unit
R. Rapat (AC Cassette) 5 2 Unit
R. Paban VI / Bin PNS 1 1 Unit
R. Paban I Anev (AC Cassette) 2 2 Unit
R. Paban I Anev 1 2 Unit
R. Paban I/Ren (AC Cassette) 3 2 Unit
R. Paban I/Ren 1 3 Unit
R. Paban VII/Bin Jahril 1 2 Unit
R. TUUD Spersad 2 1 Unit
R. Minku 2 1 Unit
R. Wa Aspers / Bid Renpes (AC Cassette) 3 1 Unit
R. Wa Aspers / Bid Renpes 1 2 Unit
R. Padya 3 / Minu Turjuk 2 1 Unit
R. Spaban II Min Anef 1 2 Unit
2 6 Lantai VI
R. Paban III/Bin Te Man 1 1 Unit
R. Sis Kar 1 ,5 1 Unit
R. Sis Kar 1 1 Unit
R. Assesmen 2 1 Unit
R. Bin Kar 2 1 Unit
R. Bin Kar 1 1 Unit
R. Padya 1 ,5 1 Unit
R. Padya Jakat 1 1 Unit
R. Paban IX Sahlur 1 1 Unit
R. Staf Paban IX Sahlur 1 3 Unit
R. Padya Paban IX Sahlur 1 1/2 1 Unit
R. Wa Aspes / Bid Minpes 2 1 Unit
R. Wa Aspes / Bid Minpes 1 1 Unit
R. Paban VI / DN 2 1 Unit
R. Rapat 1 1 Unit
R. Paban 1 1 Unit
R. Pabandya Dik LN 2 1 Unit
R. Waasops Bid Siap Ops 1 3 Unit
R. Paban VI / Ops DN 2 1 Unit
R. Paban IV / BINDIK 1 1 Unit
2 7 Lantai VII
R. Paban IV Bin Sis Op 1 2 Unit
R. Padya 1 1 Unit
R. Rapat 1 3 Unit
R. Paban III Bin Siapsad 1 1/2 1 Unit
R. Waasops Kasad Bid Ren 1 1 Unit
R. Tuud 1 1 Unit
R. Paban V/Dok Ops 1 1 Unit
R. Paban I Ren Sop Sat 2 1 Unit
R. Paban I Ren Sop Sat 1 1/2 1 Unit
R. Paban II Minops 1 1 Unit
R. Perpustakaan 1 1 Unit
R. Wa Asop Bid Siapsad (AC Cassette) 3 1 Unit
R. Wa Asop Bid Siapsad 1 1 Unit
R. Paban VII Ops LN 1 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
2 8 Lantai VIII
R. Paban I Ren 1 1 Unit
R. Paban V/Bakti TNI 2 1 Unit
R. Paban V/Bakti TNI 1 1 Unit
R. Kaur Minku 1 1 Unit
R. Waaster Bid Wanmil Kermater 1 1 Unit
R. Rapat (AC Cassette) 2 1 Unit
R. Rapat 2 1 Unit
R. Paban 7 Kermater 2 1 Unit
R. Wa Aster 2 (AC Cassette) 3 1 Unit
R. Tamu 1 1 Unit
R. Persit (AC Cassette) 3 1 Unit
1 1
2 9 Lantai IX
R. Paban III Bid Agri 1 1 Unit
R. Padya 1 2 Unit
R. Komputer 2 1 Unit
R. Paban IV Spamad 1 1 Unit
R. Komputer 1 1 Unit
R. Padya 1/2 1 Unit
R. Waas Intel Bid Bin Intel 2 1 Unit
R. Sepri 1 1 Unit
R. Pamad 1 2 Unit
R. Rapat Sintelad (AC Cassette) 5 2 Unit
R. Paban VI Wanmil 2 2 Unit
R. Paban III Tahwil 1 1 Unit
R. Padya 1 1 Unit
R. Paban II Puanter / Sterad 1 1 Unit
R. Waaster Bid Puanter 1 1 Unit
R. Litpers 2 1 Unit
Bagian B
3 0 Lantai X
R. Paban I Ren / Sintelad 2 1 Unit
R. Komputer 1 1 Unit
R. Padya 1 3 Unit
R. Waas Intel Bid Intel Tek Hub Lu 1 2 Unit
R. Siper 1 1 Unit
R. Waas Intel Bid Jemen 1 2 Unit
R. Urdal 2 1 Unit
R. Minku 1 2 Unit
R. Tuud 1 1 Unit
R. Paban 1 1 Unit
R. Server 2 1 Unit
R. Piket 1 1 Unit
3 1 Lantai XI
R. Lift 1 3 Unit
R. Lift 2 1 Unit
R. Rajawali 2 1 Unit
GEDUNG E
DISADA - AD LT.4
1 R. Rapat
AC Cassette
Kapasitas 3 2 Unit
2 R. Piket
AC Cassette
Kapasitas 2 1 Unit
3 R. Operator
AC Split Wall Mounted
Kapasitas 1 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
4 R. Lobby
AC Cassette
Kapasitas 3 3 Unit
5 R. Persit
AC Cassette
Kapasitas 3 1 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
6 R. KADISADA
AC Cassette
Kapasitas 4 1 Unit
AC Split Wall Mounted
Kapasitas 1 1 Unit
7 R. LPSE
AC Cassette
Kapasitas 3 1 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
8 R. Paku
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
9 R. Server
AC Split Wall Mounted
Kapasitas 1 1 Unit
10 R. Sekretariat
AC Cassette
Kapasitas 2 2 Unit
AC Split Wall Mounted
Kapasitas 1 1 Unit
11 R. Matpal
AC Cassette
Kapasitas 5 1 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
12 R. Mat Pesud
AC Cassette
Kapasitas 2 2 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
13 R. SUBDISADA
AC Cassette
Kapasitas 2 2 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
14 R. Mathub / Matsus
AC Cassette
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
Kapasitas 3 2 Unit
AC Split Wall Mounted
Kapasitas 1 1 Unit
15 R. Matzikon
AC Cassette
Kapasitas 2 2 Unit
AC Split Wall Mounted
Kapasitas 1 1 Unit
IRJENAD LT.4
1 R. Loby
AC Cassette
Kapasitas 3 3 Unit
2 R. IRJEN
AC Cassette
Kapasitas 2 1 Unit
AC Cassette
Kapasitas 4 1 Unit
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
3 R. IRSUS ITJENAD
AC Cassette
Kapasitas 3 1 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
4 R. IRTER ITUM ITJENAD
AC Cassette
Kapasitas 3 2 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
5 R. IRPES ITUM ITJENAD
AC Cassette
Kapasitas 3 2 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
6 R. Sekretaris
AC Cassette
Kapasitas 4 1 Unit
AC Split Wall Mounted
Kapasitas 2 1 Unit
7 R. Wa Asren Bid Jemen
AC Split Wall Mounted
Kapasitas 1 1 Unit
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
AC Cassette
Kapasitas 2 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
8 R. Wa Asren Bid Dal
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
AC Split Wall Mounted
Kapasitas 1 1 Unit
AC Cassette
Kapasitas 2 1 Unit
9 R. Paban VI RB
AC Cassette
Kapasitas 3 2 Unit
AC Split Wall Mounted
Kapasitas 1 1 Unit
10 R. Paban VI BINSISFO
AC Cassette
Kapasitas 3 2 Unit
AC Split Wall Mounted
Kapasitas 1 2 Unit
SRENAD Lt 5
1 R. Lobby V1
AC Split Wall Mounted
Kapasitas 2 2 Unit
2 R. Paban I
AC Split Wall Mounted
Kapasitas 1 1/2 2 Unit
Kapasitas 3/4 2 Unit
3 R. Staff Paban I
AC Cassette
Kapasitas 3 3 Unit
4 R. Paban II
AC Split Wall Mounted
Kapasitas 1 1/2 2 Unit
5 R. Staff Paban II
AC Cassette
Kapasitas 3 3 Unit
6 R. Paban III
AC Split Wall Mounted
Kapasitas 1 1/2 2 Unit
7 R. Staff Paban III
AC Cassette
Kapasitas 3 3 Unit
8 R. Paban 5
AC Cassette
Kapasitas 3 3 Unit
9 R. Waasrena
AC Split Wall Mounted
Kapasitas 2 2 Unit
10 R. Paban 6
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
AC Split Wall Mounted
Kapasitas 1 1/2 2 Unit
11 R. Koridor
AC Cassette
Kapasitas 2 4 Unit
12 Musholla
AC Split Wall Mounted
Kapasitas 1 1/2 2 Unit
13 Gudang Arsip
AC Split Wall Mounted
Kapasitas 1 1/2 2 Unit
14 R. Tamu
AC Cassette
Kapasitas 2 1 Unit
15 R. Lobby
AC Split Wall Mounted
Kapasitas 2 2 Unit
16 R. Koordinasi
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
17 R. Lift
AC Split Wall Mounted
Kapasitas 1 1/2 2 Unit
IT JENAD Lt 6
1 R. Irdya
AC Cassette
Kapasitas 2 1/2 1 Unit
2 R. Ir Pers
AC Split Wall Mounted
Kapasitas 1 1 Unit
3 R. Ir Staff Pers
AC Split Wall Mounted
Kapasitas 2 1/2 1 Unit
4 R. Irdya
AC Cassette
Kapasitas 3 1 Unit
5 R. Ir Intel
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
6 R. Staff. R intel
AC Cassette
Kapasitas 3 1 Unit
7 R. Ir Log
AC Split Wall Mounted
Kapasitas 1 1 Unit
8 R. Irdya Penerbad
AC Cassette
Kapasitas 3 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
9 R. Staff Ir. Log
AC Cassette
Kapasitas 3 1 Unit
10 R. Ir Ops
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
11 R. Irdya
AC Cassette
Kapasitas 3 1/2 1 Unit
12 R. Staff Ir. Ops
AC Cassette
Kapasitas 3 1/2 1 Unit
13 R. Ir Ter
AC Split Wall Mounted
Kapasitas 1 1 Unit
14 R. Irdya
AC Cassette
Kapasitas 3 1 Unit
15 R. Staff Ir. Ter
AC Cassette
Kapasitas 3 1 Unit
16 R. Ir Renprogar
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
17 R. Irdya
AC Cassette
Kapasitas 3 1/2 1 Unit
18 R. Staff R. Renprogar
AC Cassette
Kapasitas 3 1/2 1 Unit
19 R. Ir Um
AC Split Wall Mounted
Kapasitas 1/2 1 Unit
Kapasitas 1 1 Unit
20 R. Spri
AC Split Wall Mounted
Kapasitas 1/2 1 Unit
21 R. Staff Ir Um
AC Split Wall Mounted
Kapasitas 3/4 1 Unit
22 R. Ir Ben
AC Split Wall Mounted
Kapasitas 1/2 1 Unit
1 1/2 1 Unit
23 R. Spri
AC Split Wall Mounted
Kapasitas 1/2 1 Unit
24 R. Kordinasi
AC Cassette
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
Kapasitas 2 1 Unit
25 R. Lobby Ir Jenad
AC Cassette
Kapasitas 3 1 Unit
26 R. Koperasi
AC Cassette
Kapasitas 2 1/2 1 Unit
27 R. TGC
AC Cassette
Kapasitas 4 1 Unit
28 R. Operator
AC Split Wall Mounted
Kapasitas 1 1 Unit
29 Gudang
AC Split Wall Mounted
Kapasitas 3/4 1 Unit
30 Gudang Arsip
AC Split Wall Mounted
Kapasitas 2 1 Unit
31 R. Data Perpus
AC Split Wall Mounted
Kapasitas 1 1 Unit
32 R. Makan
AC Cassette
Kapasitas 2 1 Unit
33 R. Tamu
AC Cassette
Kapasitas 2 1/2 1 Unit
34 R. Rapat
AC Cassette
Kapasitas 4 1 Unit
35 R. Kabag Irjen
AC Split Wall Mounted
Kapasitas 2 1 Unit
36 R. Staff Irjen
AC Split Wall Mounted
Kapasitas 2 1 Unit
37 R. kabag Anev
AC Split Wall Mounted
Kapasitas 2 1 Unit
38 R. Staff Anev
AC Split Wall Mounted
Kapasitas 2 1 Unit
39 R. Kabag Ir Um
AC Split Wall Mounted
Kapasitas 2 1 Unit
40 R. Staff Ir Um
AC Split Wall Mounted
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
Kapasitas 2 1 Unit
41 R. Arsip Ir Um
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
42 R. Paku satker
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
43 R. Staff Paku
AC Split Wall Mounted
Kapasitas 2 1 Unit
44 R. Kabag Rengar
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
45 R. Staff Rengar
AC Split Wall Mounted
Kapasitas 2 1 Unit
46 R. Kabag TUUD
AC Split Wall Mounted
Kapasitas 2 1 Unit
47 R. Staff TUUD
AC Split Wall Mounted
Kapasitas 2 1/2 1 Unit
48 R. Arsip TUUD
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
48 R. Koridor
AC Cassette
Kapasitas 2 1 Unit
PUSANSIAD DAN PUSKODAL Lt 7
1 R. Persit
AC Cassette
Kapasitas 2 2 Unit
2 R. Lobby
AC Cassette
Kapasitas 3 4 Unit
3 R. Dir Bin Mat
AC Cassette
Kapasitas 2 1 Unit
4 R. Kerja
AC Split Wall Mounted
Kapasitas 2 1 Unit
5 R. Rapat
AC Split Wall Mounted
Kapasitas 2 1 Unit
6 R. Komandan
AC Cassette
Kapasitas 3 2 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
7 R. Komandan
AC Split Wall Mounted
Kapasitas 2 1 Unit
8 R. Staf Bag Um
AC Cassette
Kapasitas 3 2 Unit
9 R. Kabag Bag Um
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
10 R. Istirahat Bag Um
AC Split Wall Mounted
Kapasitas 1 1 Unit
11 R. Sat Lak Dak Siber
AC Cassette
Kapasitas 2 2 Unit
12 R. Kerja Sat Lak Dak Siber
AC Split Wall Mounted
Kapasitas 1 1 Unit
13 R. Isirahat Sat Lak Dak Siber
AC Split Wall Mounted
Kapasitas 1 1 Unit
14 R. Sat Kal
AC Cassette
Kapasitas 2 2 Unit
15 R. Dir Bin Fung
AC Cassette
Kapasitas 3 2 Unit
16 R. Kabag Bin Sat
AC Split Wall Mounted
Kapasitas 2 1 Unit
17 R. Kabag Dur Tujuk
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
18 R. Direktur
AC Split Wall Mounted
Kapasitas 2 1 Unit
Kapasitas 1 1 Unit
19 R. Direktur Dir Litbang
AC Split Wall Mounted
Kapasitas 2 2 Unit
20 R. Staf Dir Litbang
AC Cassette
Kapasitas 2 1 Unit
21 R. Dir Bin Diklat
AC Cassette
Kapasitas 2 2 Unit
22 R. Dir Bin Diklat
AC Split Wall Mounted
Kapasitas 1 1/2 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
Kapasitas 1 1 Unit
23 R. Wadan
AC Split Wall Mounted
Kapasitas 2 2 Unit
24 R. Wadan
AC Cassette
Kapasitas 3 1 Unit
25 R. Pok Analis
AC Cassette
Kapasitas 3 1 Unit
26 R. Kerja Pok Analis
AC Split Wall Mounted
Kapasitas 1 2 Unit
27 R. Rapat Puskodal
AC Split Wall Mounted
Kapasitas 2 2 Unit
28 R. Lobby Puskodal
AC Cassette
Kapasitas 3 4 Unit
29 R. Server Puskodal
AC Split Wall Mounted
Kapasitas 2 2 Unit
LANTAI 8
1 R. Lift
AC Split Wall Mounted
Kapasitas 2 1 Unit
Kapasitas 1 1/2 1 Unit
HARGA SATUAN BAHAN BAKU / SUKU CADANG
1 Refrigerant R-22 14 Kg
2 Refrigerant R-32 17 Kg
3 Refrigerant R-410A 20 Kg
4 Kapasitor 30 ɱF 14 Buah
5 Kapasitor 35 ɱF 11 Buah
6 Kapasitor 45 ɱF 12 Buah
7 Hampelas 13 Lembar
8 Sikat Kuningan 11 Buah
9 Majun 11 Kg
1 0 Contact Cleaner 11 tube
1 1 Grease 11 Kg
Jumlah III
IV PEMELIHARAAN AC VRV
A GEDUNG UTAMA
1 R. Kerja Kasad
Indoor Unit VRV
Kapasitas 6 2 Unit
10 2 Unit
9 4 Unit
1 1 Unit
Outdoor Unit VRV
Kapasitas 20 1 Unit
2 R. RBY 1
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
Indoor Unit VRV
Kapasitas 6 1 Unit
5 1/2 4 Unit
1 1/2 2 Unit
Outdoor Unit VRV
Kapasitas 12 2 Unit
14 1/2 1 Unit
3 R. RBY 2
Indoor Unit VRV
Kapasitas 10 4 Unit
9 6 Unit
3 2 Unit
2 1 Unit
Indoor Unit VRV (Wall Mounted) 3 1 Unit
Outdoor Unit VRV
Kapasitas 17 2 Unit
21 2 Unit
12 2 Unit
19 1 Unit
R. RBY 2
Indoor Unit VRV Split 2 1 Unit
HARGA SATUAN BAHAN BAKU / SUKU CADANG
1 Refrigerant R-410A 50 Kg
2 Hampelas 15 Lembar
3 Sikat Kuningan 15 Buah
4 Majun 15 Kg
5 Contact Cleaner 15 tube
Jumlah IV
V Pemeliharaan AC Gedung B
Lantai Basement
1 R. Operator (Indoor Unit)
AC Split Wall Mounted
Kapasitas 1 1 Unit
2 R. Juru Bayar (Indoor Unit)
AC Split Wall Mounted
Kapasitas 1 1 Unit
3 R. Damkar (Indoor Unit)
AC Split Wall Mounted
Kapasitas 2 1 Unit
4 R.Panel (Indoor Unit)
AC Split Wall Mounted
Kapasitas 1 1 Unit
AC VRF
A Lantai Basement
1 R.Lobby (Indoor Unit)
AC Cassette
Kapasitas 2 1 Unit
B Lantai 1
1 Outdoor Unit VRF
Kapasitas 31 1 Unit
19 1 Unit
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
2 Indoor Unit VRF
FCU
Kapasitas 10 2 Unit
AC Cassette
Kapasitas 2 7 Unit
C Lantai 2
1 Outdoor Unit VRF
Kapasitas 23 1 Unit
11 1 Unit
2 Indoor Unit VRV
AC Cassette
Kapasitas 2 7 Unit
D Lantai 3
1 Outdoor Unit VRF
Kapasitas 23 1 Unit
19 1 Unit
2 Indoor Unit VRF
AC Cassette
Kapasitas 2 7 Unit
E Lantai 4
1 Outdoor Unit VRF
Kapasitas 23 1 Unit
21 1 Unit
2 Indoor Unit VRF
AC Cassette
Kapasitas 2 7 Unit
F Lantai 5
1 Outdoor Unit VRF
Kapasitas 23 1 Unit
21 1 Unit
2 Indoor Unit VRF
AC Cassette
Kapasitas 2 7 Unit
G Lantai 6
1 Outdoor Unit VRF
Kapasitas 19 1 Unit
23 1 Unit
2 Indoor Unit VRF
AC Cassette
Kapasitas 2 7 Unit
H Lantai 7
1 Outdoor Unit VRF
Kapasitas 19 1 Unit
23 1 Unit
2 Indoor Unit VRF
AC Cassette
Kapasitas 2 7 Unit
I Lantai 8
1 Outdoor Unit VRF
KAP. HARGA JUMLAH HARGA
NO URAIAN VOL. SATUAN
(PK) SATUAN (Rp) (Rp)
1 2 3 4 5 7 8
Kapasitas 19 1 Unit
23 1 Unit
2 Indoor Unit VRF
AC Cassette
Kapasitas 2 7 Unit
HARGA SATUAN BAHAN BAKU / SUKU CADANG
1 Refrigerant R-410A 50 Kg
2 Hampelas 20 Lembar
3 Sikat Kuningan 20 Buah
4 Majun 20 Kg
5 Contact Cleaner 20 tube
Jumlah VI
VI Perbaikan AC VRF Gedung B
1 Penggantian PCB INVERTER 1 Buah
2 Penggantian PCB MAIN HUB 1 Buah
Jumlah VI
VII Perbaikan AC Gedung E
Ruang Puskodal
1 Penggantian Compressor RNE50MV14 2 Buah
2 Penggantian Compressor RNE60MV14 1 Buah
Jumlah VII
VIII Perbaikan AC Gedung Utama
1 Penggantian Compressor RM71JV14 1 Buah
Jumlah VIII
IX Perbaikan AC AULA NASUTION
1 Remote Wired BRC51D64 3 Buah
2 Contactor PAK-26J 3 Buah
Jumlah IX
X Perbaikan Chiller Daikin
1 Temp Sensor NTC 10MT 1 Buah
Jumlah X
Jumlah I+II+III+IV+V+VI+VII+VIII+IX+X -
PPN 11% -
Jumlah Total -
Pembulatan -
Pejabat Pembuat Komitmen
Denmabesad,
Ardianto, S.I.P
Kolonel Inf NRP 11940013090579| Authority | |||
|---|---|---|---|
| 4 February 2022 | Penggantian Chiller Ac Central Gedung Mahkamah Agung | Mahkamah Agung | Rp 9,091,998,000 |
| 4 April 2024 | Pemeliharaan Ac Central Mabesad | Kementerian Pertahanan | Rp 2,595,765,000 |
| 28 November 2022 | Penyedia Tenaga Operator Dan Pemeliharaan Rutin Alat Pengkondisi Udara | Mahkamah Agung | Rp 2,527,891,000 |
| 27 November 2023 | Pemilihan Penyedia Jasa Tenaga Operator Dan Pemeliharaan Ac Sentral, Ac Split Dan Dehumidefier | Mahkamah Agung | Rp 2,383,272,000 |
| 10 March 2023 | Pengadaan Coil Ahu Pada Gedung Ppatk Tahun Anggaran 2023 | Pusat Pelaporan Dan Analisis Transaksi Keuangan | Rp 2,000,000,000 |
| 19 January 2021 | Relokasi Pipa Air Bersih Dan Hydrant Gedung C Mabesad | Kementerian Pertahanan | Rp 1,800,000,000 |
| 4 September 2019 | - Pengadaan Dan Pemasangan Capacitor Bank 300 Kva Dan Harmonic Filter 60 Ampere | Kementerian Perhubungan | Rp 1,734,000,000 |
| 9 September 2024 | Pemeliharaan Ac Central Mabesad (Lanjutan) | Kementerian Pertahanan | Rp 1,570,765,000 |
| 13 April 2021 | Har Ac Komplek Mabesad | Kementerian Pertahanan | Rp 1,476,726,000 |
| 28 March 2023 | Har Ac Komplek Mabesad | Kementerian Pertahanan | Rp 1,460,650,000 |