KOMANDO DAERAH MILITER V/BRAWIJAYA
Lampiran 3 ( Harga Perkiraan Sendiri ) pada
ZENI Renlakgiat Rehab Kantor Staf Makodam V/Brw
TA. 2024
URAIAN SINGKAT PEKERJAAN
REHAB KANTOR STAF MAKODAM V/BRAWIJAYA
HARGA SATUAN JUMLAH TOTAL
NO URAIAN PEKERJAAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5
A PEKERJAAN PERSIAPAN 41.132.880,09
Direksi Keet 1 ,00 Ls 4 1.132.880,09 41.132.880,09
B SAYAP KIRI
LANTAI I
1 RUANG TRO 23.275.032,62
2
Bongkar Plafon 24,00 M 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
2
Pas. Plafond Gypsum 24,00 M 53.290,05 1.278.961,08
2
Cat plafon 24,00 M 30.826,54 739.836,91
2
Wallpaper 48,00 M 136.784,39 6.565.650,55
2
Pas. HPL Dinding 15,20 M 733.924,66 11.155.654,76
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
2 RUANG TUR MIN 38.658.041,39
2
Bongkar Plafon 24,00 M 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
2
Pas. Plafond Gypsum 24,00 M 53.290,05 1.278.961,08
2
Cat plafon 24,00 M 30.826,54 739.836,91
2
Wallpaper 60,00 M 136.784,39 8.207.063,19
2
Sekat ruangan lapis HPL T.2 M 6,00 M 1.356.542,21 8.139.253,26
2
Pas. HPL Dinding 15,28 M 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
3 RUANG KASETUM 50.058.539,95
2
Bongkar Plafon 48,00 M 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
2
Pas. Plafond Gypsum 48,00 M 53.290,05 2.557.922,16
2
Pas. Plafond drop ceiling 13,20 M 177.962,36 2.349.103,10
2
Cat plafon 61,20 M 30.826,54 1.886.584,13
2
Wallpaper 87,80 M 136.784,39 12.009.669,13
2
Pas. HPL Dinding 24,08 M 733.924,66 17.672.905,70
Instalasi listrik 12,00 ttk 231.548,40 2.778.580,80
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
4 RUANG STAF UM 55.698.104,21
2
Wallpaper 99,20 M 136.784,39 13.569.011,14
2
Pas. HPL Dinding 27,36 M 733.924,66 20.080.178,57
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 7,00 ttk 85.346,00 597.422,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
2
1 2 3 4 5
5 RUANG STAF BEN 81.600.389,41
2
Bongkar Plafon 48,00 M 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
2
Pas. Plafond Gypsum 48,00 M 53.290,05 2.557.922,16
2
Cat plafon 63,60 M 30.826,54 1.960.567,82
2
Wallpaper 75,20 M 136.784,39 10.286.185,86
2
Sekat ruangan lapis HPL 18,60 M 1.356.542,21 25.231.685,12
2
Pas. HPL Dinding 21,68 M 733.924,66 15.911.486,53
Instalasi listrik 14,00 ttk 231.548,40 3.241.677,60
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 8,00 ttk 85.346,00 682.768,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
6 RUANG SEKERTARIS 54.813.572,10
2
Bongkar Plafon 48,00 M 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
2
Pas. Plafond Gypsum 48,00 M 53.290,05 2.557.922,16
2
Cat plafon 48,00 M 30.826,54 1.479.673,83
2
Wallpaper 75,20 M 136.784,39 10.286.185,86
2
Pas. HPL Dinding 21,68 M 733.924,66 15.911.486,53
Instalasi listrik 11,00 ttk 231.548,40 2.547.032,40
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 5,00 ttk 85.346,00 426.730,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
7 RUANG DANTON URDAL 27.477.933,48
2
Bongkar Plafon 16,00 M 9.033,14 144.530,24
2
Ts. Rangka plafon 8,00 M 118.880,93 951.047,43
2
Pas. Plafond Gypsum 16,00 M 53.290,05 852.640,72
2
Cat plafon 16,00 M 30.826,54 493.224,61
2
Wallpaper 60,00 M 136.784,39 8.207.063,19
2
Pas. HPL Dinding 12,80 M 733.924,66 9.394.235,59
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
8 BATI TUUD DAN URSUS 90.755.411,02
2
Bongkar Plafon 48,00 M 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
2
Pas. Plafond Gypsum 48,00 M 53.290,05 2.557.922,16
2
Cat plafon 48,00 M 30.826,54 1.479.673,83
2
Wallpaper 84,00 M 136.784,39 11.489.888,47
2
Pas. HPL Dinding 39,28 M 733.924,66 28.828.560,46
2
Sekat ruangan lapis HPL 15,60 M 1.356.542,21 21.162.058,48
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 7,00 ttk 110.561,10 773.927,70
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 6,00 ttk 85.346,00 512.076,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
9 RUANG PAK TIR 57.612.778,92
2
Bongkar Plafon 24,00 M 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
2
Pas. Plafond Gypsum 24,00 M 53.290,05 1.278.961,08
2
Cat plafon 24,00 M 30.826,54 739.836,91
2
Wallpaper 60,00 M 136.784,39 8.207.063,19
2
Pas. HPL Dinding 21,68 M 733.924,66 15.911.486,53
Rak surat HPL 1,00 Ls 21.600.000,00 21.600.000,00
3
1 2 3 4 5
Instalasi listrik 6,00 ttk 231.548,40 1.389.290,40
Lampu XL 4,00 ttk 110.561,10 442.244,40
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Saklar tunggal 1,00 ttk 112.654,00 112.654,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
10 RUANG KAUR MINU 52.840.300,84
2
Bongkar Plafon 48,00 M 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
2
Pas. Plafond Gypsum 48,00 M 53.290,05 2.557.922,16
2
Cat plafon 48,00 M 30.826,54 1.479.673,83
2
Wallpaper 60,00 M 136.784,39 8.207.063,19
2
Sekat ruangan lapis HPL 6,00 M 1.356.542,21 8.139.253,26
2
Pas. HPL Dinding 20,96 M 733.924,66 15.383.060,77
Instalasi listrik 6,00 ttk 231.548,40 1.389.290,40
Lampu XL 4,00 ttk 110.561,10 442.244,40
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 4,00 Bh 2.771.814,45 11.087.257,80
C SAYAP KANAN
LANTAI II
11 RUANG SANDI 93.666.127,95
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 4 8,00 M2 53.290,05 2.557.922,16
Pas. Plafond drop ceiling 15,60 M2 177.962,36 2.776.212,75
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 84,00 M2 136.784,39 11.489.888,47
Sekat ruangan lapis HPL 6,00 M2 1.356.542,21 8.139.253,26
Pas. HPL Dinding 43,36 M2 733.924,66 31.822.973,05
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 4,00 ttk 110.561,10 442.244,40
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 5,00 ttk 85.346,00 426.730,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Rak dinding lapis HPL 1,00 Bh 16.000.000,00 16.000.000,00
Meja kerja 4,00 Bh 2.771.814,45 11.087.257,80
12 PABANDYA REN OPS 56.923.451,26
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 53.290,05 2.557.922,16
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 84,00 M2 136.784,39 11.489.888,47
Pas. HPL Dinding 22,40 M2 733.924,66 16.439.912,28
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 4,00 ttk 85.346,00 341.384,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
13 PABANDYA OPS 54.357.150,27
2
Bongkar Plafon 48,00 M 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
2
Pas. Plafond Gypsum 48,00 M 53.290,05 2.557.922,16
2
Cat plafon 48,00 M 30.826,54 1.479.673,83
2
Wallpaper 68,00 M 136.784,39 9.301.338,28
2
Pas. HPL Dinding 22,40 M 733.924,66 16.439.912,28
Instalasi listrik 11,00 ttk 231.548,40 2.547.032,40
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 5,00 ttk 85.346,00 426.730,00
4
1 2 3 4 5
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
14 PABANDYA LAT OPS 56.669.255,46
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 53.290,05 2.557.922,16
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 84,00 M2 136.784,39 11.489.888,47
Pas. HPL Dinding 22,40 M2 733.924,66 16.439.912,28
Instalasi listrik 11,00 ttk 231.548,40 2.547.032,40
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 5,00 ttk 85.346,00 426.730,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
15 RUANG TU OPS 68.663.862,29
2
Bongkar Plafon 48,00 M 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
2
Pas. Plafond Gypsum 48,00 M 53.290,05 2.557.922,16
2
Cat plafon 48,00 M 30.826,54 1.479.673,83
2
Sekat ruangan lapis HPL 6,00 M 1.356.542,21 8.139.253,26
Wallpaper 84,00 M2 136.784,39 11.489.888,47
2
Pas. HPL Dinding 43,36 M 733.924,66 31.822.973,05
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 4,00 ttk 85.346,00 341.384,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
16 RUANG WAASINTEL 37.913.070,38
2
Bongkar Plafon 24,00 M 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
2
Pas. Plafond Gypsum 24,00 M 53.290,05 1.278.961,08
2
Pas. Plafond drop ceiling 10,80 M 177.962,36 1.921.993,44
2
Cat plafon 34,80 M 30.826,54 1.072.763,53
Wallpaper 60,00 M2 136.784,39 8.207.063,19
2
Pas. HPL Dinding 21,68 M 733.924,66 15.911.486,53
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
17 RUANG PABANDYA MIN INTEL 108.198.915,59
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 4 8,00 M2 53.290,05 2.557.922,16
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 75,20 M2 136.784,39 10.286.185,86
Sekat ruangan lapis HPL 27,60 M2 1.345.548,63 37.137.142,13
Pengecatan besi sekat ruangan 10,00 M2 65.360,92 653.609,23
Pas. HPL Dinding 43,36 M2 733.924,66 31.822.973,05
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 4,00 ttk 85.346,00 341.384,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
18 RUANG PABANDYA LID 71.061.773,46
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 4 8,00 M2 53.290,05 2.557.922,16
5
1 2 3 4 5
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 75,20 M2 136.784,39 10.286.185,86
Pengecatan besi sekat ruangan 10,00 M2 65.360,92 653.609,23
Pas. HPL Dinding 43,36 M2 733.924,66 31.822.973,05
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 4,00 ttk 85.346,00 341.384,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
19 PABANDYA PAM 101.010.196,95
Bongkar Plafon 72,00 M2 9.033,14 650.386,08
2
Ts. Rangka plafon 36,00 M 118.880,93 4.279.713,45
Pas. Plafond Gypsum 4 8,00 M2 53.290,05 2.557.922,16
Pas. Plafond drop ceiling 15,60 M2 177.962,36 2.776.212,75
Cat plafon 72,00 M2 30.826,54 2.219.510,74
Wallpaper 68,00 M2 136.784,39 9.301.338,28
Pengecatan besi sekat ruangan 10,00 M2 65.360,92 653.609,23
Pas. HPL Dinding 41,92 M2 733.924,66 30.766.121,55
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 8,00 ttk 110.561,10 884.488,80
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 8,00 ttk 85.346,00 682.768,00
Stop kontak AC + instalasi 3,00 ttk 450.000,00 1.350.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
Almari arsip lapis HPL 1,00 Ls 25.000.000,00 25.000.000,00
20 RUANG TU STAF INTEL 34.200.671,46
2
Bongkar Plafon 24,00 M 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
2
Pas. Plafond Gypsum 24,00 M 53.290,05 1.278.961,08
2
Cat plafon 24,00 M 30.826,54 739.836,91
2
Wallpaper 44,00 M 136.784,39 6.018.513,01
Pengecatan besi sekat ruangan 5,00 M2 65.360,92 326.804,62
2
Pas. HPL Dinding 15,28 M 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 4,00 Bh 2.771.814,45 11.087.257,80
21 RUANG PABANDYA GAL 73.951.522,53
2
Bongkar Plafon 48,00 M 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
2
Pas. Plafond Gypsum 48,00 M 53.290,05 2.557.922,16
2
Pas. Plafond drop ceiling 21,60 M 177.962,36 3.843.986,89
2
Cat plafon 48,00 M 30.826,54 1.479.673,83
2
Wallpaper 68,00 M 136.784,39 9.301.338,28
2
Pas. HPL Dinding 43,36 M 733.924,66 31.822.973,05
Instalasi listrik 12,00 ttk 231.548,40 2.778.580,80
Lampu XL 8,00 ttk 110.561,10 884.488,80
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 4,00 ttk 85.346,00 341.384,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
D SAYAP KANAN
LANTAI III
22 RUANG WAASLOG 33.045.342,58
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 2 4,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
2
Wallpaper 60,00 M 136.784,39 8.207.063,19
6
1 2 3 4 5
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
23 PABANDYA SISLOG 32.603.098,18
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 24,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
2
Wallpaper 60,00 M 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
24 PABANDYA BMN 62.193.305,64
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 46.181,30 2.216.702,16
Cat plafon 48,00 M2 30.826,54 1.479.673,83
2
Wallpaper 84,00 M 136.784,39 11.489.888,47
Pas. HPL Dinding 30,56 M2 733.924,66 22.428.737,46
Instalasi listrik 11,00 ttk 231.548,40 2.547.032,40
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 5,00 ttk 85.346,00 426.730,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
25 PABANDYA FASKON 69.075.850,59
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 46.181,30 2.216.702,16
Cat plafon 48,00 M2 30.826,54 1.479.673,83
2
Wallpaper 132,00 M 136.784,39 18.055.539,02
Pas. HPL Dinding 30,56 M2 733.924,66 22.428.737,46
Instalasi listrik 12,00 ttk 231.548,40 2.778.580,80
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 6,00 ttk 85.346,00 512.076,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
26 RUANG PABANDYA BEKANG 102.449.501,92
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 4 8,00 M2 46.181,30 2.216.702,16
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 68,00 M2 136.784,39 9.301.338,28
Sekat ruangan lapis HPL 24,00 M2 1.345.548,63 32.293.167,07
Pas. HPL Dinding 43,36 M2 733.924,66 31.822.973,05
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 7,00 ttk 85.346,00 597.422,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
7
1 2 3 4 5
27 RUANG PABANDYA ALPAL 102.449.501,92
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 4 8,00 M2 46.181,30 2.216.702,16
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 68,00 M2 136.784,39 9.301.338,28
Sekat ruangan lapis HPL 24,00 M2 1.345.548,63 32.293.167,07
Pas. HPL Dinding 43,36 M2 733.924,66 31.822.973,05
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 7,00 ttk 85.346,00 597.422,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
28 STAF TU SLOG 33.452.919,19
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 24,00 M2 46.181,30 1.108.351,08
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 3,00 Bh 2.771.814,45 8.315.443,35
29 RUANG SISLOG 28.430.045,92
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 2 4,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.108.351,08
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 1.389.290,40
Lampu XL 2,00 ttk 110.561,10 442.244,40
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 3,00 Bh 2.771.814,45 1.500.000,00
30 RUANG BATI TANAH 32.270.171,57
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 2 4,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 24,00 M2 30.826,54 739.836,91
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
31 RUANG TU SPERS 43.891.807,03
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 2 4,00 M2 46.181,30 1.108.351,08
Cat plafon 24,00 M2 30.826,54 739.836,91
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
8
1 2 3 4 5
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 4,00 Bh 2.771.814,45 11.087.257,80
Rak arsip HPL 1,00 Ls 8.000.000,00 8.000.000,00
32 PABANDYA SAHLUR PERS 64.412.610,81
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 2 4,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 24,00 M2 30.826,54 739.836,91
Sekat ruangan lapis HPL 12,00 M2 1.345.548,63 16.146.583,54
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 4,00 ttk 85.346,00 341.384,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Rak arsip HPL 1,00 Ls 8.000.000,00 8.000.000,00
Meja kerja 4,00 Bh 2.771.814,45 11.087.257,80
33 PABANDYA RENDIAGA + STAF 112.720.646,71
Bongkar Plafon 72,00 M2 9.033,14 650.386,08
2
Ts. Rangka plafon 36,00 M 118.880,93 4.279.713,45
Pas. Plafond Gypsum 7 2,00 M2 46.181,30 3.325.053,24
Pas. Plafond drop ceiling 21,60 M2 177.962,36 3.843.986,89
Cat plafon 72,00 M2 30.826,54 2.219.510,74
Wallpaper 144,00 M2 136.784,39 19.696.951,66
Sekat ruangan lapis HPL 12,00 M2 1.345.548,63 16.146.583,54
Pas. HPL Dinding 37,68 M2 733.924,66 27.654.281,01
Instalasi listrik 17,00 ttk 231.548,40 3.936.322,80
Lampu XL 8,00 ttk 110.561,10 884.488,80
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 9,00 ttk 85.346,00 768.114,00
Stop kontak AC + instalasi 3,00 ttk 450.000,00 1.350.000,00
Meja kerja 10,00 Bh 2.771.814,45 27.718.144,50
34 PABANDYA DIK PERS & STAF 108.894.472,73
Bongkar Plafon 72,00 M2 9.033,14 650.386,08
2
Ts. Rangka plafon 36,00 M 118.880,93 4.279.713,45
Pas. Plafond Gypsum 7 2,00 M2 46.181,30 3.325.053,24
Pas. Plafond drop ceiling 21,60 M2 177.962,36 3.843.986,89
Cat plafon 72,00 M2 30.826,54 2.219.510,74
Wallpaper 144,00 M2 136.784,39 19.696.951,66
Sekat ruangan lapis HPL 6,00 M2 1.345.548,63 8.073.291,77
Pas. HPL Dinding 44,08 M2 733.924,66 32.351.398,80
Instalasi listrik 17,00 ttk 231.548,40 3.936.322,80
Lampu XL 8,00 ttk 110.561,10 884.488,80
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 9,00 ttk 85.346,00 768.114,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 10,00 Bh 2.771.814,45 27.718.144,50
35 RUANG PABANDYA WATPERS + STAF 118.800.000,89
Bongkar Plafon 72,00 M2 9.033,14 650.386,08
2
Ts. Rangka plafon 36,00 M 118.880,93 4.279.713,45
Pas. Plafond Gypsum 7 2,00 M2 46.181,30 3.325.053,24
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 82,80 M2 30.826,54 2.552.437,35
Sekat ruangan lapis HPL 18,00 M2 1.345.548,63 24.219.875,30
Wallpaper 144,00 M2 136.784,39 19.696.951,66
Pas. HPL Dinding 36,96 M2 733.924,66 27.125.855,26
Instalasi listrik 17,00 ttk 231.548,40 3.936.322,80
Lampu XL 8,00 ttk 110.561,10 884.488,80
9
1 2 3 4 5
Saklar ganda 3,00 ttk 123.555,00 370.665,00
Stop kontak 9,00 ttk 85.346,00 768.114,00
Stop kontak AC + instalasi 3,00 ttk 450.000,00 1.350.000,00
Meja kerja 10,00 Bh 2.771.814,45 27.718.144,50
36 RUANG PABANDYA BINKAR 33.384.884,38
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 2 4,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 6,00 ttk 231.548,40 1.389.290,40
Lampu XL 6,00 ttk 110.561,10 663.366,60
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
37 STAF BINKAR 90.567.023,83
Bongkar Plafon 72,00 M2 9.033,14 650.386,08
2
Ts. Rangka plafon 36,00 M 118.880,93 4.279.713,45
Pas. Plafond Gypsum 7 2,00 M2 46.181,30 3.325.053,24
Cat plafon 72,00 M2 30.826,54 2.219.510,74
Wallpaper 96,00 M2 136.784,39 13.131.301,10
Sekat ruangan lapis HPL 12,00 M2 1.345.548,63 16.146.583,54
Pas. HPL Dinding 28,80 M2 733.924,66 21.137.030,07
Instalasi listrik 18,00 ttk 231.548,40 4.167.871,20
Lampu XL 8,00 ttk 110.561,10 884.488,80
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 10,00 ttk 85.346,00 853.460,00
Stop kontak AC + instalasi 3,00 ttk 450.000,00 1.350.000,00
Meja kerja 8,00 Bh 2.771.814,45 22.174.515,60
E SAYAP KANAN
LANTAI IV
38 RUANG STAF TU SANSI 92.570.552,47
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 46.181,30 2.216.702,16
Pas. Plafond drop ceiling 21,60 M2 177.962,36 3.843.986,89
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 84,00 M2 136.784,39 11.489.888,47
Sekat ruangan lapis HPL 24,00 M2 1.345.548,63 32.293.167,07
Pas. HPL Dinding 21,68 M2 733.924,66 15.911.486,53
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 7,00 ttk 85.346,00 597.422,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
39 RUANG KATIM DAK SIBER 32.603.098,18
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 24,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
10
1 2 3 4 5
40 RUANG KATIM KAL SIBER 48.749.681,72
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 24,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Sekat ruangan lapis HPL 12,00 M2 1.345.548,63 16.146.583,54
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
41 RUANG STAF SIBER 94.798.620,23
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 46.181,30 2.216.702,16
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 84,00 M2 136.784,39 11.489.888,47
Sekat ruangan lapis HPL 24,00 M2 1.345.548,63 32.293.167,07
Pas. HPL Dinding 22,40 M2 733.924,66 16.439.912,28
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 6,00 ttk 110.561,10 663.366,60
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 7,00 ttk 85.346,00 597.422,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 8,00 Bh 2.771.814,45 22.174.515,60
42 RUANG KASI ANALIS 51.645.051,17
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 24,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Sekat ruangan lapis HPL 12,00 M2 1.345.548,63 16.146.583,54
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 3,00 Bh 2.771.814,45 8.315.443,35
43 RUANG KASI SIBER 32.726.653,18
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 24,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Sekat ruangan lapis HPL 12,00 M2 1.345.548,63
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
44 RUANG KASI SISPAL 32.726.653,18
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 24,00 M2 46.181,30 1.108.351,08
11
1 2 3 4 5
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
45 RUANG TU MAKODAM 38.421.469,90
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
2
Pas. Plafond Gypsum 24,00 M 46.181,30 1.108.351,08
2
Cat plafon 24,00 M 30.826,54 739.836,91
2
Wallpaper 60,00 M 136.784,39 8.207.063,19
Sekat ruangan lapis HPL 6,00 M2 1.345.548,63 8.073.291,77
2
Pas. HPL Dinding 15,28 M 733.924,66 11.214.368,73
Instalasi listrik 4,00 ttk 231.548,40 926.193,60
Lampu XL 2,00 ttk 110.561,10 221.122,20
Saklar ganda 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
46 RUANG KASI AKUNTANSI 41.150.423,49
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
2
Pas. Plafond Gypsum 24,00 M 46.181,30 1.108.351,08
2
Pas. Plafond drop ceiling 13,20 M 177.962,36 2.349.103,10
2
Cat plafon 37,20 M 30.826,54 1.146.747,22
2
Wallpaper 54,80 M 136.784,39 7.495.784,38
Sekat ruangan lapis HPL 6,00 M2 1.345.548,63 8.073.291,77
2
Pas. HPL Dinding 15,28 M 733.924,66 11.214.368,73
Instalasi listrik 6,00 ttk 231.548,40 1.389.290,40
Lampu XL 4,00 ttk 110.561,10 442.244,40
Saklar tunggal 1,00 ttk 123.555,00 123.555,00
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Meja kerja 2,00 Bh 2.771.814,45 5.543.628,90
47 RUANG PPABP 87.902.769,61
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 46.181,30 2.216.702,16
Pas. Plafond drop ceiling 21,60 M2 177.962,36 3.843.986,89
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 68,00 M2 136.784,39 9.301.338,28
Sekat ruangan lapis HPL 18,00 M2 1.345.548,63 24.219.875,30
Pas. HPL Dinding 21,68 M2 733.924,66 15.911.486,53
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 8,00 ttk 110.561,10 884.488,80
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 5,00 ttk 85.346,00 426.730,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 8,00 Bh 2 .771.814,45 22.174.515,60
48 RUANG PAKU 87.902.769,61
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 46.181,30 2.216.702,16
Pas. Plafond drop ceiling 21,60 M2 177.962,36 3.843.986,89
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 68,00 M2 136.784,39 9.301.338,28
Sekat ruangan lapis HPL 18,00 M2 1.345.548,63 24.219.875,30
Pas. HPL Dinding 21,68 M2 733.924,66 15.911.486,53
12
1 2 3 4 5
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 8,00 ttk 110.561,10 884.488,80
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 5,00 ttk 85.346,00 426.730,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 8,00 Bh 2.771.814,45 22.174.515,60
49 RUANG PAKU MAKODAM 58.523.477,34
Bongkar Plafon 24,00 M2 9.033,14 216.795,36
2
Ts. Rangka plafon 12,00 M 118.880,93 1.426.571,15
Pas. Plafond Gypsum 24,00 M2 46.181,30 1.108.351,08
Pas. Plafond drop ceiling 10,80 M2 177.962,36 1.921.993,44
Cat plafon 34,80 M2 30.826,54 1.072.763,53
Sekat ruangan lapis HPL 6,00 M2 1.345.548,63 8.073.291,77
Wallpaper 60,00 M2 136.784,39 8.207.063,19
Pas. HPL Dinding 16,00 M2 733.924,66 11.742.794,48
Instalasi listrik 6,00 ttk 231.548,40 1.389.290,40
Lampu XL 4,00 ttk 110.561,10 442.244,40
Stop kontak 2,00 ttk 85.346,00 170.692,00
Stop kontak AC + instalasi 1,00 ttk 450.000,00 450.000,00
Pas. HPL Dinding 15,28 M2 733.924,66 11.214.368,73
Meja kerja 4,00 Bh 2.771.814,45 11.087.257,80
50 RUANG BP MAKODAM 93.437.898,33
Bongkar Plafon 48,00 M2 9.033,14 433.590,72
2
Ts. Rangka plafon 24,00 M 118.880,93 2.853.142,30
Pas. Plafond Gypsum 48,00 M2 46.181,30 2.216.702,16
Pas. Plafond drop ceiling 21,60 M2 177.962,36 3.843.986,89
Cat plafon 48,00 M2 30.826,54 1.479.673,83
Wallpaper 86,11 M2 136.784,39 11.778.378,38
Sekat ruangan lapis HPL 24,00 M2 1.345.548,63 32.293.167,07
Pas. HPL Dinding 22,40 M2 733.924,66 16.439.912,28
Instalasi listrik 13,00 ttk 231.548,40 3.010.129,20
Lampu XL 8,00 ttk 110.561,10 884.488,80
Saklar ganda 2,00 ttk 123.555,00 247.110,00
Stop kontak 5,00 ttk 85.346,00 426.730,00
Stop kontak AC + instalasi 2,00 ttk 450.000,00 900.000,00
Meja kerja 6,00 Bh 2.771.814,45 16.630.886,70
F PEKERJAAN KORIDOR/LORONG
1 LANTAI I SAYAP KIRI 24.318.038,54
Bongkar Plafon 240,00 M2 9.033,14 2.167.953,60
Pas. Plafond Gypsum 240,00 M2 46.181,30 11.083.510,80
Pengecatan plafon 240,00 M2 30.826,54 7.398.369,14
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
2 LANTAI II SAYAP KIRI 24.318.038,54
Bongkar Plafon 240,00 M2 9.033,14 2.167.953,60
Pas. Plafond Gypsum 240,00 M2 46.181,30 11.083.510,80
Pengecatan plafon 240,00 M2 30.826,54 7.398.369,14
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
3 LANTAI III SAYAP KIRI 24.318.038,54
Bongkar Plafon 240,00 M2 9.033,14 2.167.953,60
Pas. Plafond Gypsum 240,00 M2 46.181,30 11.083.510,80
Pengecatan plafon 240,00 M2 30.826,54 7.398.369,14
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
13
1 2 3 4 5
4 LANTAI IV SAYAP KIRI 24.318.038,54
Bongkar Plafon 240,00 M2 9.033,14 2.167.953,60
Pas. Plafond Gypsum 240,00 M2 46.181,30 11.083.510,80
Pengecatan plafon 240,00 M2 30.826,54 7.398.369,14
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
5 LANTAI I SAYAP KANAN 24.318.038,54
Bongkar Plafon 240,00 M2 9.033,14 2.167.953,60
Pas. Plafond Gypsum 240,00 M2 46.181,30 11.083.510,80
Pengecatan plafon 240,00 M2 30.826,54 7.398.369,14
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
6 LANTAI II SAYAP KANAN 24.318.038,54
Bongkar Plafon 240,00 M2 9.033,14 2.167.953,60
Pas. Plafond Gypsum 240,00 M2 46.181,30 11.083.510,80
Pengecatan plafon 240,00 M2 30.826,54 7.398.369,14
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
7 LANTAI III SAYAP KANAN 24.318.038,54
Bongkar Plafon 240,00 M2 9.033,14 2.167.953,60
Pas. Plafond Gypsum 240,00 M2 46.181,30 11.083.510,80
Pengecatan plafon 240,00 M2 30.826,54 7.398.369,14
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
8 LANTAI IV SAYAP KANAN 24.318.038,54
Bongkar Plafon 240,00 M2 9.033,14 2.167.953,60
Pas. Plafond Gypsum 240,00 M2 46.181,30 11.083.510,80
Pengecatan plafon 240,00 M2 30.826,54 7.398.369,14
Instalasi listrik 10,00 ttk 231.548,40 2.315.484,00
Lampu XL 10,00 ttk 110.561,10 1.105.611,00
Saklar ganda 2,00 ttk 123.555,00 247.110,00
JUMLAH 3.386.883.620,35
Ppn 11% 372.557.198,24
JUMLAH 3.759.440.818,58
PEMBULATAN 3.759.440.000,00
Surabaya, - - 2024
a.n. Kuasa pengguna Anggaran
Kepala Zidam V/Brawijaya
( Selaku PPK ),
Noor Arif Khusaini
Kolonel Czi NRP 11010057320679| Authority | |||
|---|---|---|---|
| 27 May 2024 | Renovasi Kantor Ppad | Kementerian Pertahanan | Rp 552,980,000 |
| 13 June 2025 | Harbang Swakelola Pangkalan/Rumdis Rumkit Tk. II Dr. Soepraoen Kesdam V/Brw | Kementerian Pertahanan | Rp 500,000,000 |