KOMANDO DAERAH MILITER V/BRAWIJAYA
ZENI
URAIAN SINGKAT
KEBUTUHAN BAHAN MATERIAL
REHAB RUMDIS K-45/12 KK DI YONIF 512/QY MALANG
NO NAMA BAHAN VOLUME SAT HARGA JUMLAH
1 2 3 4 5
1 Acersoris joint + pengantung 9 54,00 Unit 8.228,00 7.849.512,00
2 Alumunium 3" polos 5 18,00 M' 95.205,00 49.316.190,00
3 Amplas/kertas gosok 2 18,00 Lbr 4.801,50 1.046.727,00
4 Atap spandek 0.35 1 69,00 M2 80.731,00 13.643.539,00
5 Bak cuci piring stenless 1 2,00 Bh 263.752,00 3.165.024,00
6 Bak Cat 1 8,00 Bh 25.000,00 450.000,00
7 Bata merah 24.715,00 Bh 1.056,00 26.099.040,00
8 Batu kali/gunung belah 15/20 cm 2 0,00 M3 201.997,20 4.039.136,01
9 Batu pecah mesin 2/3 cm 1 5,00 M3 326.654,00 4.898.576,06
10 Batu gilang/lempeng ex jember acak 1 10,00 M2 139.861,00 15.384.710,00
11 Baut driling 2 3,00 Dos 165.000,00 3.795.000,00
12 Besi beton polos 3.079,18 Kg 13.000,00 40.029.295,15
13 Besi siku 70.70.6 3 0,00 Btg 437.880,00 13.136.400,00
14 Besi siku 50.50.06 6 0,00 Btg 166.100,00 9.966.000,00
15 Besi holow 4/4 3 2,00 Btg 214.000,00 6.848.000,00
16 Besi holow 2/4 6 0,00 Btg 112.000,00 6.720.000,00
17 Box MCB 1 2,00 Bh 54.813,00 657.756,00
18 Buis beton dia 30 cm - 1/2 U 8 6,00 Bh 44.987,80 3.868.950,80
19 Cat cotting 1 5,00 Kg 72.358,00 1.085.370,00
20 Cat dasar siler 6 5,00 Kg 42.625,00 2.770.795,50
21 Cat dasar tembok warna putih altex 4 48,00 Kg 20.944,00 9.382.834,51
22 Cat genteng 5 8,00 Kg 52.000,00 3.016.000,00
23 Cat kayu gardek 7 3,00 Kg 84.000,00 6.132.168,00
24 Cat meni kayu setara Pedang 5 3,00 Kg 19.360,00 1.026.080,00
25 Cat tembok exterior setara nipon pain 5 34,00 Kg 77.440,00 41.353.268,21
26 Cat tembok setara vinilek 1.405,00 Kg 25.954,50 36.466.134,79
27 Dolken d = 8 cm - 4 m / Kayu gelam 1 44,00 Btg 54.695,00 7.875.970,61
28 Dynabolt 8 64,00 Pcs 4.831,53 4.174.441,92
29 Engsel pintu stenleis 2 04,00 Bh 24.865,00 5.072.460,00
30 Fitting plafond 9 6,00 Bh 16.415,00 1.575.840,00
31 Floor drain Stenlees 1 2,00 Bh 65.000,00 780.000,00
32 Galvalum C 75 tebal 0.75 mm 5 52,00 Btg 114.660,87 63.292.797,48
33 Genteng multiroof 6 20,00 Bh 135.008,54 83.705.297,41
34 Genteng Bubungan / Nok Multiroof 1 06,00 Bh 64.130,00 6.797.780,00
35 Genteng bubung beton 9 2,00 Bh 17.561,00 1.615.612,00
36 Granit Crem 60 x 60 3 60,00 Dos 180.832,61 65.099.286,80
37 Granit kasar 60 x 60 8 9,00 Dos 241.009,00 21.449.801,00
38 Granit Hitam 60 x 60 4 6,00 Dos 246.513,00 11.340.008,86
39 GWT 1 M3 1 2,00 Bh 2.750.000,00 33.000.000,00
40 Gypsum board (120x240x9) mm 3 20,00 Lbr 63.425,00 20.296.000,00
41 Hollow galvalum 2/4 T: 0.5 mm 2 80,00 Btg 24.200,00 6.776.080,67
42 Hollow galvalum 4/4 T: 0.5 mm 2 11,00 Btg 29.920,00 6.313.219,73
43 Isolator 4 24,00 Bh 2.795,10 1.185.122,40
44 Jet washer 1 2,00 Set 212.000,00 2.544.000,00
45 Jendela kaca aluminium kecil lengkap 6 8,00 Bh 750.000,00 51.000.000,00
46 Kabel NYA 2 x 1,5 mm 2.840,00 M' 8.509,86 24.168.002,40
47 Kabel NYA 3 x 4 mm 4 8,00 M' 57.898,50 2.779.128,00
48 Kaca es/buram 5 mm 8,00 M2 189.840,00 1.518.340,32
49 Kawat bendrat 7 0,00 Kg 19.061,00 1.334.246,17
50 Kawat licin 2 00,00 M' 20.000,00 4.000.000,00
51 Kayu terentang balok (begisting) 2,00 M3 4.192.650,00 8.399.806,57
52 Kayu terentang papan (begisting) 3,00 M3 4.192.650,00 12.563.527,28
53 Keramik dinding 30 x 60 2 60,00 Dos 122.447,00 31.835.975,11
54 Kloset duduk 1 2,00 Bh 2.200.000,00 26.400.000,00
55 Kompon ub 888 5 0,00 Zak 99.825,00 4.991.250,00
56 Kran air 1/2 stainles 2 4,00 Bh 77.431,20 1.858.348,80
57 Kran leher angsa 1 2,00 Bh 52.275,84 627.310,07
58 Kran shower 1 2,00 Unit 450.000,00 5.400.000,00
59 Kuas 4" 2 4,00 Bh 25.218,00 605.232,00
60 Kuas roll 1 8,00 Bh 47.306,00 851.508,00
2
1 2 3 4 5
61 Kunci tanam 5 6,00 Bh 226.931,00 12.708.136,00
62 Lampu XL 12 watt setara Phillip 9 6,00 Bh 53.373,10 5.123.817,60
63 Las doof 9 36,00 Bh 1.064,80 996.652,80
64 MCB 6 Amp 2 4,00 Bh 65.751,40 1.578.033,60
65 Minyak cat/afduner 2 0,00 Ltr 20.514,00 410.337,44
66 Multiplek 9 mm 3 0,00 Lbr 135.818,00 4.075.205,51
67 Paku biasa 5"-10" 5 0,00 Kg 17.050,00 852.424,98
68 Paku biasa 2" - 5" 5 0,00 Kg 17.050,00 852.500,00
69 Pasir beton 1 0,00 M3 264.403,20 2.644.080,91
70 Pasir pasang 1 15,00 M3 240.403,20 27.646.608,16
71 Pasir urug 5,00 M3 205.131,00 1.025.655,00
72 Pipa Besi 1.5" - 6M (T : 2mm) 1 05,00 Btg 140.154,30 14.716.201,50
73 Pipa PVC 1/2" Setara Maspion - 4M 6 0,00 Btg 29.842,00 1.790.520,00
74 Pipa PVC 2" Setara Maspion - 4M 1 44,00 Btg 125.571,00 18.082.224,00
75 Pipa PVC 3/4" Setara Maspion - 4M 1 66,00 Btg 36.128,00 5.997.248,00
76 Pipa union buis 5/8 - 4M 1 91,00 Btg 9.450,10 1.804.969,10
77 Pintu Pabrikasi semi solid 5 6,00 Bh 1.250.000,00 70.000.000,00
78 Pintu Pabrikasi KM/WC aluminium isi ACP 1 2,00 Bh 1.950.000,00 23.400.000,00
79 Plamir kayu setara pedang 5 0,00 Kg 20.800,00 1.040.000,00
80 Plamir tembok 2 84,00 Kg 81.400,00 23.117.600,00
81 Plat bracing 5 20,00 M' 12.378,30 6.436.716,00
82 Pompa air 1 2,00 Unit 450.000,00 5.400.000,00
83 Reng baja ringan galvalum 0.55 mm 1.250,00 Btg 46.200,00 57.750.000,00
84 Saklar ganda (panasonic, philips, toshiba) 2 4,00 Bh 82.782,00 1.986.768,00
85 Saklar tunggal (panasonic, philips, toshiba) 3 6,00 Bh 71.881,00 2.587.716,00
86 Screw 6.464,00 Pcs 865,15 5.592.329,60
87 Sekrup 3.891,00 Bh 998,25 3.884.190,75
88 Semen portland (40 kg) 1.274,00 Zak 63.811,00 81.294.948,74
89 Semen warna 1.344,00 Kg 12.028,00 16.165.583,89
90 Stop kontak (panasonic/philips/thosiba) 6 0,00 Bh 38.853,00 2.331.180,00
91 T dos PVC 3 72,00 Bh 5.720,00 2.127.840,00
92 Tekstil tip 8 7,00 Rol 23.292,50 2.026.447,50
93 Watertorn 1000 L lengkap 1 2,00 Unit 1.250.000,00 15.000.000,00
94 Waterproofing 1 0,00 Kg 59.132,00 591.320,00
95 Woodplank 20 cm (motif) 4 m 6 3,00 Lbr 75.291,00 4.742.956,55
96 Woodplank 30 cm (motif) 4 m 2 8,00 Lbr 75.291,00 2.108.242,11
JUMLAH 1.261.261.354,37
Ppn 11% 138.738.748,98
JUMLAH 1.400.000.103,35
PEMBULATAN 1.400.000.000,00
Surabaya , - - 2024
a.n. Kuasa pengguna Anggaran
Wakazidam V/Brawijaya
( Selaku PPK ),
Edward Rindang Samuel
Letnan Kolonel Czi NRP 11990055781076