URAIAN SINGKAT PEKERJAAN
1. Nama Paket Pekerjaan : Pengadaan Perbaikan Incenerator Tipe Statik & Moving Grate
RSPAL dr. Ramelan
2. Nilai Total HPS : Rp. 518.670.200,- (Lima ratus delapan belas juta enam
ratus tujuh puluh ribu dua ratus rupiah)
sudah termasuk PPn 11 %.
3. Sumber Dana : Kegiatan ini berasal dari BLU RSPAL dr. Ramelan TA. 2025.
NO URAIAN PEKERJAAN
MELIPUTI :
I PERBAIKAN INCENERATOR STATIS
A SHELL INCENERATOR
1. Plat mild steel 3 mm
2. Plat mild steel 4 mm
3. Plat stainless steel 304 3 mm
4. Plat stainless steel 304 4 mm
5. UNP 100 mild steel
6. Siku 50 mild steel
7. AS 1 1/2" mild steel
8. Bearing UCF 203 (Engsel Pintu)
9. Material bantu, barang habis
10. Cat shynthetic enamel silver
11. Cat shynthetic enamel hitam
12. Cat heat resistance black (2,5 liter)
13. Cat heat resistance silver (2,5 liter)
14. Thinner
B REFRAKTORI
1. Ceramic fiber blanket
2. Air setting mortar
3. Castable
C SISTEM PENGUMPAN
1. Oli hidrolik
2. Seal aktuator hidrolik
D UNIT BURNER & BLOWER INCENERATOR
1. Elektroda
2. Kabel elektroda
3. Photocell
4. Trafo
5. Control box
6. Elemen filter BBM
7. Pipa udara 4"
E ELEKTRIKAL (KONTROL PANEL)
1. Termokopel ruang bakar
2. Termokopel air water Scrubber
F WET SCRUBBER
1. Penggantian cerobong by-pass
- Plat stainless steel 304 3 mm
- Roundbar stainless steel 304 12 mm
- Material bantu, barang habis (consumable)
2. Perbaikan pompa semprot (Groundfos CM-10)
- Kit seal pompa
- Kit impeller
3. Impeller IDF
4. Perbaikan baik air scrubber
- Resin, Fibreglass, semen, sealer
G ALAT BANTU, BARANG HABIS, APD
1. WD 40, Contact cleaner, lap, elektroda las, dll
II PERBAIKAN INCENERATOR MOVING GRADE
A SHELL INCENERATOR
1. Plat mild steel 3 mm
2. Plat mild steel 4 mm
3. Plat stainless steel 304 4 mm
4. Bearing UCF 203 (Engsel Pintu)
5. Material bantu, barang habis
6. Cat shynthetic enamel silver
7. Cat shynthetic enamel hitam
8. Cat heat resistance black (2,5 liter)
9. Cat heat resistance silver (2,5 liter)
10. Thinner
B REFRAKTORI
1. Ceramic fiber blanket
2. Air setting mortar
C SISTEM PENGUMPAN & PENGELUARAN ABU
1. Oli hidrolik
2. Seal aktuator hidrolik
3. Selang hidrolik
4. Rantai conveyor RS 40
5. Bearing conveyor
D UNIT BURNER & BLOWER INCENERATOR
1. Elektroda
2. Kabel elektroda
3. Photocell
4. Trafo
5. Control box
6. Elemen filter BBM
E ELEKTRIKAL (KONTROL PANEL)
1. Termokopel ruang bakar
2. Termokopel air water Scrubber
F WET SCRUBBER
1. Penggantian cerobong by-pass
- Plat stainless steel 304 2 mm
- Material bantu, barang habis (consumable)
2. Perbaikan pompa semprot (Groundfos CM-10)
a Kit seal pompa
b Kit impeller
c Gulung motor pompa
G ALAT BANTU, BARANG HABIS, APD
1. WD 40, Contact cleaner, lap, elektroda las, dll| Authority | |||
|---|---|---|---|
| 20 May 2016 | Pengadaan Incinerator | Kementerian Kesehatan | Rp 5,895,278,000 |
| 8 July 2022 | Pengadaan Incenerator Moving Grate 100Kg/Jam(16 Jam/Hari) Rspal Dr.Ramelan | Kementerian Pertahanan | Rp 4,670,880,000 |
| 9 June 2021 | Pengadaan Incinerator | Kab. Labuhanbatu | Rp 4,500,000,000 |
| 31 July 2019 | Pekerjaan Penggantian Incinerator Tipe Moving Grate | Kementerian Kesehatan | Rp 4,125,000,000 |
| 8 April 2020 | Pengadaan Incenerator | Kementerian Pertahanan | Rp 3,778,941,000 |
| 8 July 2020 | Pengadaan Satu Unit Incinerator Type Static | Kementerian Kesehatan | Rp 3,639,140,000 |
| 26 April 2017 | Pengadaan Incenerator Rumah Sakit Dan Tps Lb3 Rsud Latemmamala Soppeng T.A. 2017 | Kab. Soppeng | Rp 3,400,000,000 |
| 27 April 2018 | Belanja Modal Pengadaan Konstruksi Sarana Kesehatan (Modifikasi Incenerator Dengan Wet Scrubber) | Kab. Lamongan | Rp 1,600,000,000 |
| 4 November 2025 | Belanja Jasa Sertifikasi/Slo Incenerator | Kab. Lamongan | Rp 258,200,000 |
| 16 September 2025 | Belanja Pemeliharaan Incinerator | Kab. Lamongan | Rp 250,000,000 |