| Reason | ||||
|---|---|---|---|---|
| 0751095746833000 | Rp 74,400,000 | 75.18 | - | |
| 0748544491833000 | Rp 73,700,000 | - | Dokumen Penawaran tidak melampirkan dokumen penawaran teknis. | |
| 0810748574833000 | Rp 73,700,000 | 65.02 | tidak lulus passing grade sebesar 70 point. | |
| 0032632119822000 | Rp 72,490,000 | - | Jangka waktu surat penawaran kurang dari yang disyaratkan dalam dokumen pengadaan | |
| 0746741867831000 | - | - | - | |
| 0029393634942000 | - | - | - | |
CV Rr Karya | 08*6**8****31**0 | - | - | - |
Aryfa Warna Consultant | 0316611094833000 | - | - | - |
CV Rava Engineering Consultant | 0748525623833000 | - | - | - |
CV Matrix Engineering Consultant | 0748523883833000 | - | - | - |
CV Adcenter Grafis Konsultan | 0029211836833000 | - | - | - |
Tanjung Kramat | 0025825142833000 | - | - | - |
| 0802189951822000 | - | - | - | |
| 0816126262833000 | - | - | - | |
CV Draftech Engineer | 0719638165822000 | - | - | - |
| 0747944676831000 | - | - | - | |
| 0811296599822000 | - | - | - |
| Authority | |||
|---|---|---|---|
| 16 March 2017 | Perencanaan Teknis Pembangunan Sentra Ikm Meubel | Pemerintah Daerah Kabupaten Tojo Una-Una | Rp 100,000,000 |
| 15 March 2024 | Perencanaan Dau Smpn 2 Banawa Tengah, Smpn Satap 3 Banawa Tengah Dan Smpn Satap 4 Banawa Tengah | Kab. Donggala | Rp 21,600,000 |
| 15 March 2024 | Perencanaan Dau Smpn 1 Banawa Selatan, Smpn Satap 6 Banawa Selatan, Smpn Satap 8 Banawa Selatan Dan Smpn 7 Rio Pakava | Kab. Donggala | Rp 19,627,200 |