| Reason | |||
|---|---|---|---|
| 0857785554808000 | Rp 2,388,285,784 | - | |
| 0316927417808000 | Rp 2,403,413,978 | Surat perjanjian sewa peralatan tidak valid | |
| 0813863214801000 | - | - | |
| 0021532536808000 | - | - | |
| 0028547156808000 | - | - | |
| 0969711894803000 | - | - | |
| 0016298846808000 | - | - | |
| 0630140242808000 | - | - | |
PT Basam Mitra Sejati | 08*7**9****05**0 | - | - |
| 0661022400808000 | - | - | |
| 0033260175802000 | - | - | |
| 0957688849808000 | - | - | |
| 0028543130807000 | - | - | |
| 0757253703808000 | - | - | |
| 0749794129803000 | - | - |
URAIAN SINGKAT PEKERJAAN
Nama Paket : Rehabilitasi Jaringan Irigasi DI. Lamasewanua Desa Lamasewanua Kec.
Majauleng (DAK)
Lokasi : Desa Lamasewanua Kec. Majauleng (DAK)
Nilai Pagu : Rp 2.417.100.000
Sumber Dana : Dana Alokasi Khusus (DAK)
PPK : FIRMAN TAHIR, ST.
Tahun Anggaran : 2024
Lingkup Pekerjaan :
PEKERJAAN PERSIAPAN
Basecamp / Direksi Keet
Papan Proyek
Survey Mutual Check, Shop Drawing dan As Built Drawing
Sewa Lahan untuk Material
Mobilisasi dan Demobilisasi Peralatan
PENYELENGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN
KONSTRUKSI
Keselamatan Kerja ( SMK3 )
PEKERJAAN KONSTRUKSI
Pekerjaan Intake Bendung
Pekerjaan Dewatering
Galian Tanah Normalisasi Sungai Area Genangan ( Alat )
Galian Tanah Konstruksi ( Alat )
Pasangan Batu 1 : 4
Pemasangan Pipa Resapan
Siaran 1 : 3
Plesteran 1 : 3
Pekerjaan Beton Mutu fc' 15 Mpa (
Penulangan
Perancah
Bekisting
Pasangan Bronjong Pengaman
Cerucuk Bambu pada dasar Pasangan Bronjong
Rehab Pintu Sorong Baja Roda Gigi
Pemasangan Pintu Sorong Baja Roda Gigi (Stang Tunggal Intake)
Pemasangan Pintu Sorong Baja Roda Gigi (Stang Tunggal Bendung)
Pekerjaan Saluran dan Bangunan Bagi
Galian Tanah (Manual)
Pasangan Batu 1 : 4
Plesteran 1 : 3
Siaran 1 : 3
Pintu angkat B=500 mm, H=600 mm, H1=1200 mm, TR=1750 mm
PEKERJAAN LAIN-LAIN
Timbunan Tanah dan Perapihan
Pembersihan Lokasi