| Reason | ||||
|---|---|---|---|---|
| 0023360480101000 | Rp 344,832,267 | 82.5 | - | |
CV Trade Estimate Consultant | 09*2**3****01**0 | - | - | Tidak Memenuhi Passing Grade |
| 0723560918101000 | - | - | - | |
CV Delta Globe Consultant | 06*8**5****01**0 | - | - | - |
| 0020298709101000 | - | - | Tidak Memenuhi Passing Grade | |
| 0021015805101000 | - | - | Tidak Memenuhi Passing Grade | |
CV Zafi Engineering Consultant | 00*0**3****04**0 | - | - | Tidak Memenuhi Passing Grade |
| 0029710670101000 | - | - | Tidak Memenuhi Passing Grade | |
| 0017638941101000 | - | - | Tidak Memenuhi Passing Grade | |
| 0033133349102000 | - | - | - | |
| 0832085559103000 | - | - | - |
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : PROGRAM PENGELOLAAN SUMBER DAYA AIR
PEKERJAAN : DED PEMBANGUNAN BREAK WATER SUAK UJONG KALAK
LOKASI : KAB. ACEH BARAT
SUMBER DANA : DAU
TAHUN ANGGARAN : 2025
TOTAL
NO. URAIAN KEGIATAN
(Rp.)
A BIAYA LANGSUNG PERSONIL
I TENAGA PROFESIONAL -
II TENAGA SUB-PROFESIONAL -
B BIAYA LANGSUNG NON PERSONIL
I SEWA PERALATAN DAN KANTOR -
II KOMPUTER SUPLIES DAN ALAT TULIS KANTOR (ATK) -
III BIAYA LAPORAN TEKNIS -
TOTAL -
PPN (11%) -
GRAND TOTAL -
DIBULATKAN -
Terbilang :
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : PROGRAM PENGELOLAAN SUMBER DAYA AIR
PEKERJAAN : DED PEMBANGUNAN BREAK WATER SUAK UJONG KALAK
LOKASI : KAB. ACEH BARAT
SUMBER DANA : DAU
TAHUN ANGGARAN : 2025
HARGA SATUAN J U M L A H B I A Y A
NO. URAIAN KEGIATAN SATUAN VOLUME BULAN
(Rp.) (Rp.)
A BIAYA LANGSUNG PERSONIL
I TENAGA PROFESIONAL
1 Team Leader (Ahli Teknik Sumber Daya Air) OB 1 2.00 - -
2 Ahli Hidro-oseonografi OB 1 2.00 - -
3 Ahli K3 OB 1 1.50 - -
Sub Total I -
II TENAGA SUB-PROFESIONAL
2 Operator CAD/Drafter OB 3 2.00 - -
3 Surveyor OB 4 1.00 - -
4 Pembantu Surveyor (Tenaga Lokal) OB 4 1.00 - -
Sub Total II -
SUB TOTAL I + II -
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : PROGRAM PENGELOLAAN SUMBER DAYA AIR
PEKERJAAN : DED PEMBANGUNAN BREAK WATER SUAK UJONG KALAK
LOKASI : KAB. ACEH BARAT
SUMBER DANA : DAU
TAHUN ANGGARAN : 2025
HARGA SATUAN J U M L A H B I A Y A
NO. URAIAN KEGIATAN SATUAN VOLUME BULAN
(Rp.) (Rp.)
B BIAYA LANGSUNG NON PERSONIL
I SEWA PERALATAN DAN KANTOR
1 Sewa Laptop Unit Bulan 5.00 2.00 - -
2 Sewa Printer A3 Unit Bulan 1.00 2.00 - -
4 Sewa Total station Unit Bulan 1.00 0.67 - -
5 Sewa Waterpass Unit Bulan 1.00 0.67 - -
6 Sewa GPS dan Echosounding Unit Bulan 1.00 0.33 - -
7 Sewa GPS Geodetik Unit Bulan 1.00 0.33 - -
8 Sewa Perahu Unit Bulan 1.00 0.33 - -
9 Peilscale Unit 1.00 - -
10 Patok Beton Bench Mark (BM) Unit 2.00 - -
11 Patok Pipa PVC 4" Control Point (CP) Unit 2.00 - -
12 Biaya Penyelidikan Daya Dukung Tanah Titik 2.00 1.00 - -
Sub Total -
II KOMPUTER SUPLIES DAN ALAT TULIS KANTOR (ATK)
1 Komputer Suplies dan Alat Tulis Kantor (ATK) Bulan 1.00 2.00 - -
Sub Total -
III BIAYA LAPORAN TEKNIS
1 Gambar Bestek Eks 5.00 1.00 - -
2 Dokumen EE Eks 5.00 1.00 - -
3 Dokumen Persyaratan Teknis (RKS) Eks 5.00 1.00 - -
4 Biaya Rapat / Ekspose
- Biaya Konsumsi (Nasi+Snack) Kotak 60.00 1.00 - -
- Honor Narasumber Jam 8.00 1.00 - -
Sub Total -
SUB TOTAL I + II + III -| Authority | |||
|---|---|---|---|
| 9 December 2022 | Sid Pengendalian Banjir Sungai Kr. Pasi Lembang Kec. Kluet Selatan Kab. Aceh Selatan | Aceh | Rp 750,000,000 |
| 19 April 2018 | Sid Pembangunan Jetty Kuala Daya Kec. Jaya Kab. Aceh Jaya (Otsus Aceh) | Aceh | Rp 750,000,000 |
| 19 April 2018 | Sid Pengendalian Banjir Sungai Kr. Buloh Kab. Aceh Utara (Otsus Aceh) | Aceh | Rp 750,000,000 |
| 19 April 2018 | Sid Pengendalian Banjir Sungai Kr. Meuh Kab. Bireuen(otsus Aceh) | Aceh | Rp 750,000,000 |
| 6 April 2015 | Sid Sungai Kr. Langsa (Otsus Aceh) | LPSE Provinsi Aceh | Rp 750,000,000 |
| 13 December 2019 | Sid Rehabilitasi Jaringan Irigasi D.I. Ulee Gajah Kab. Aceh Timur | Aceh | Rp 750,000,000 |
| 19 April 2018 | Ded Pembangunan Breakwater Pelabuhan Penyeberangan Meulaboh (Oa) | Aceh | Rp 735,550,000 |
| 15 April 2025 | Review Rispam Kabupaten Bener Meriah (Otsus) | Kab. Bener Meriah | Rp 650,000,000 |
| 30 April 2013 | Pengawasan Teknis Pengairan (Otsus Kab/Kota) | Aceh Besar | Rp 645,000,000 |
| 8 June 2020 | Perencanaan Teknis Kegiatan Doka Irigasi Tahun 2021 | Kab. Aceh Tenggara | Rp 612,571,724 |