Ded Pembangunan Break Water Suak Ujong Kalak

Basic Information
Type: Public Tender
Tender Code: 10082089000
Date: 12 September 2025
Year: 2025
KLPD: Kab. Aceh Barat
Work Unit: Dinas Pekerjaan Umum Dan Penataan Ruang
Procurement Type: Jasa Konsultansi Badan Usaha Konstruksi
Method: Seleksi - Prakualifikasi Dua File - Pagu Anggaran
Contract Type: Lumsum
Financial Information
Value (Nilai Pagu): Rp 350,000,000
Estimated Value (Nilai HPS): Rp 349,943,817
Winner (Pemenang): PT Hidroteknik Andalan
NPWP: 023360480101000
RUP Code: 60503896
Work Location: Kabupaten Aceh Barat - Aceh Barat (Kab.)
Participants: 11
Applicants
Reason
0023360480101000Rp 344,832,26782.5-
CV Trade Estimate Consultant
09*2**3****01**0--Tidak Memenuhi Passing Grade
0723560918101000---
CV Delta Globe Consultant
06*8**5****01**0---
0020298709101000--Tidak Memenuhi Passing Grade
0021015805101000--Tidak Memenuhi Passing Grade
CV Zafi Engineering Consultant
00*0**3****04**0--Tidak Memenuhi Passing Grade
0029710670101000--Tidak Memenuhi Passing Grade
0017638941101000--Tidak Memenuhi Passing Grade
0033133349102000---
0832085559103000---
Attachment
REKAPITULASI                                  
                   RENCANA ANGGARAN  BIAYA (RAB)                         
                                                                         
   PROGRAM      : PROGRAM PENGELOLAAN SUMBER DAYA AIR                    
   PEKERJAAN    : DED PEMBANGUNAN BREAK WATER SUAK UJONG KALAK           
   LOKASI       : KAB. ACEH BARAT                                        
   SUMBER DANA  : DAU                                                    
   TAHUN ANGGARAN : 2025                                                 
                                                                         
                                                                         
                                                      TOTAL              
    NO.              URAIAN KEGIATAN                                     
                                                      (Rp.)              
    A  BIAYA LANGSUNG PERSONIL                                           
    I  TENAGA PROFESIONAL                                      -         
    II TENAGA SUB-PROFESIONAL                                  -         
                                                                         
    B  BIAYA LANGSUNG NON PERSONIL                                       
    I  SEWA PERALATAN DAN KANTOR                               -         
    II KOMPUTER SUPLIES DAN ALAT TULIS KANTOR (ATK)            -         
    III BIAYA LAPORAN TEKNIS                                   -         
                                                                         
       TOTAL                                                   -         
       PPN (11%)                                               -         
                                                                         
       GRAND TOTAL                                             -         
       DIBULATKAN                                              -         
          Terbilang :                                                    
                     RENCANA ANGGARAN BIAYA (RAB)                        
  PROGRAM    : PROGRAM PENGELOLAAN SUMBER DAYA AIR                       
  PEKERJAAN  : DED PEMBANGUNAN BREAK WATER SUAK UJONG KALAK              
  LOKASI     : KAB. ACEH BARAT                                           
  SUMBER DANA : DAU                                                      
  TAHUN ANGGARAN : 2025                                                  
                                                                         
                                               HARGA SATUAN J U M L A H B I A Y A
  NO.        URAIAN KEGIATAN   SATUAN VOLUME BULAN                       
                                                  (Rp.)    (Rp.)         
   A BIAYA LANGSUNG PERSONIL                                             
   I TENAGA PROFESIONAL                                                  
   1 Team Leader (Ahli Teknik Sumber Daya Air) OB 1 2.00 -      -        
   2 Ahli Hidro-oseonografi      OB   1    2.00        -        -        
   3 Ahli K3                     OB   1    1.50        -        -        
                                                Sub Total I     -        
                                                                         
   II TENAGA SUB-PROFESIONAL                                             
   2 Operator CAD/Drafter        OB   3    2.00        -        -        
   3 Surveyor                    OB   4    1.00        -        -        
   4 Pembantu Surveyor (Tenaga Lokal) OB 4 1.00        -        -        
                                                Sub Total II    -        
                                                                         
                         SUB TOTAL I + II                       -        
                     RENCANA ANGGARAN BIAYA (RAB)                        
                                                                         
PROGRAM     : PROGRAM PENGELOLAAN SUMBER DAYA AIR                        
PEKERJAAN   : DED PEMBANGUNAN BREAK WATER SUAK UJONG KALAK               
LOKASI      : KAB. ACEH BARAT                                            
SUMBER DANA : DAU                                                        
TAHUN ANGGARAN : 2025                                                    
                                                 HARGA SATUAN J U M L A H B I A Y A
 NO.         URAIAN KEGIATAN     SATUAN VOLUME BULAN                     
                                                   (Rp.)     (Rp.)       
                                                                         
 B  BIAYA LANGSUNG NON PERSONIL                                          
  I SEWA PERALATAN DAN KANTOR                                            
 1  Sewa Laptop                 Unit Bulan 5.00 2.00    -         -      
 2  Sewa Printer A3             Unit Bulan 1.00 2.00    -         -      
 4  Sewa Total station          Unit Bulan 1.00 0.67    -         -      
 5  Sewa Waterpass              Unit Bulan 1.00 0.67    -         -      
 6  Sewa GPS dan Echosounding   Unit Bulan 1.00 0.33    -         -      
 7  Sewa GPS Geodetik           Unit Bulan 1.00 0.33    -         -      
 8  Sewa Perahu                 Unit Bulan 1.00 0.33    -         -      
 9  Peilscale                     Unit  1.00            -         -      
 10 Patok Beton Bench Mark (BM)   Unit  2.00            -         -      
 11 Patok Pipa PVC 4" Control Point (CP) Unit 2.00      -         -      
 12 Biaya Penyelidikan Daya Dukung Tanah Titik 2.00 1.00 -        -      
                                                  Sub Total       -      
                                                                         
 II KOMPUTER SUPLIES DAN ALAT TULIS KANTOR (ATK)                         
 1  Komputer Suplies dan Alat Tulis Kantor (ATK) Bulan 1.00 2.00 - -     
                                                  Sub Total       -      
                                                                         
 III BIAYA LAPORAN TEKNIS                                                
 1  Gambar Bestek                 Eks   5.00 1.00       -         -      
 2  Dokumen EE                    Eks   5.00 1.00       -         -      
 3  Dokumen Persyaratan Teknis (RKS) Eks 5.00 1.00      -         -      
 4  Biaya Rapat / Ekspose                                                
    - Biaya Konsumsi (Nasi+Snack) Kotak 60.00 1.00      -         -      
    - Honor Narasumber            Jam   8.00 1.00       -         -      
                                                  Sub Total       -      
                                                                         
                        SUB TOTAL I + II + III                    -
Tenders also won by PT Hidroteknik Andalan
Authority
9 December 2022Sid Pengendalian Banjir Sungai Kr. Pasi Lembang Kec. Kluet Selatan Kab. Aceh SelatanAcehRp 750,000,000
19 April 2018Sid Pembangunan Jetty Kuala Daya Kec. Jaya Kab. Aceh Jaya (Otsus Aceh)AcehRp 750,000,000
19 April 2018Sid Pengendalian Banjir Sungai Kr. Buloh Kab. Aceh Utara (Otsus Aceh)AcehRp 750,000,000
19 April 2018Sid Pengendalian Banjir Sungai Kr. Meuh Kab. Bireuen(otsus Aceh)AcehRp 750,000,000
6 April 2015Sid Sungai Kr. Langsa (Otsus Aceh)LPSE Provinsi AcehRp 750,000,000
13 December 2019Sid Rehabilitasi Jaringan Irigasi D.I. Ulee Gajah Kab. Aceh TimurAcehRp 750,000,000
19 April 2018Ded Pembangunan Breakwater Pelabuhan Penyeberangan Meulaboh (Oa)AcehRp 735,550,000
15 April 2025Review Rispam Kabupaten Bener Meriah (Otsus)Kab. Bener MeriahRp 650,000,000
30 April 2013Pengawasan Teknis Pengairan (Otsus Kab/Kota)Aceh BesarRp 645,000,000
8 June 2020Perencanaan Teknis Kegiatan Doka Irigasi Tahun 2021Kab. Aceh TenggaraRp 612,571,724