| Reason | |||
|---|---|---|---|
| 0020629556032000 | Rp 4,378,136,000 | - | |
PT Sintesis Xtramile Solusindo | 08*2**2****03**0 | - | - |
| 0020766523047000 | - | - | |
Anp Cipta Inovasi | 04*4**0****17**0 | - | - |
PT Syncore Indonesia | 03*2**7****43**0 | - | - |
| 0024929424077000 | Rp 3,896,480,000 | Tidak memiliki pengalaman kontrak 1 tahun terakhir. | |
PT Trans Telekomunikasi Indonesia | 09*4**2****64**0 | - | - |
| 0723348025061000 | - | - | |
PT Kalpika Loka Persada | 08*0**7****13**0 | - | - |
| 0312111511428000 | - | - | |
| 0701697278003000 | - | - | |
PT Westindo Esa Perkasa | 00*3**0****46**0 | - | - |
| 0021435425064000 | - | - | |
| 0821010295447000 | - | - | |
| 0025344086017000 | - | - | |
Trisaka Multi Karya | 0815508015411000 | - | - |
| 0414374181603000 | - | - | |
| 0026043430018000 | - | - | |
PT Usaha Gedung Mandiri | 00*0**1****93**0 | - | - |
Mahakarya Bangun Jaya | 04*7**6****48**0 | - | - |
Cantika Dian Semesta | 09*1**6****52**0 | - | - |
| 0026488718411000 | - | - | |
| 0720111772008000 | - | - | |
| 0031250954044000 | - | - | |
PT Sigma Presisi Nusantara | 10*0**0****24**4 | - | - |
Terravision Geospasial Servis | 01*8**3****49**0 | - | - |
| 0854283876432000 | - | - | |
| 0011044518428000 | - | - | |
| 0029801917404000 | - | - | |
| 0669612608424000 | - | - | |
We Borneo Indonesia | 09*2**3****07**0 | - | - |
| 0023140650009000 | - | - | |
| 0839811882067000 | - | - | |
| 0025619719101000 | - | - | |
| 0753545607104000 | - | - | |
CV Cahaya Berkah | 07*7**0****45**0 | - | - |
| 0021436589016000 | - | - | |
| 0030471395039000 | - | - |
RUANG LINGKUP PEKERJAAN
Bagian-bagian yang menjadi ruang lingkup pemeliharaan meliputi :
1. Lokasi Data Center Cikeas (pembelian perangkat tahun 2017)
No Lingkup Pekerjaan Vol Sat
I Pemeliharaan Ruang DC, Sistem Rak dan Kabel Data
1 Network Rack 4 unit
2 Server Rack 21 unit
3 Wallmount Rack 6 unit
4 Koneksi Fiber Optik dari Rack Server ke Rack Network 864 Core
5 Koneksi Fiber Optik dari Tiap Lantai ke Data Center 36 Core
6 Koneksi Fiber Optik dari Gedung Pusdiklat dan Asrama ke DC 24 Core
7 Koneksi dan perapihan Kabel UTP Horizontal & Device to device 432 titik
II Pemeliharaan Sistem Elektrikal
A Penerangan dan Socket Outlet
1 Socket Outlet Mobile 32A 1phase 120 set
2 Socket Outlet Mobile 32A 3phase 10 set
3 Socket Outlet 16A 1phase 20 set
4 Socket Outlet 16A 1phase 4 set
5 RLMO M1 + TL LED (Lantai 3) 70 set
6 RLMO M1 + TL LED Emergency Light (Lantai 3) 15 set
7 RLMO M1 + TL LED (Lantai 2) 14 set
8 RLMO M1 + TL LED Emergency Light (Lantai 2) 3 set
9 Exit Sign Lamp 3 set
B Grounding System
1 Grounding Sistem 1 lot
Grounding sistem untuk Genset
Grounding sistim untuk peralatan UPS, Battery dan Panel
Grounding bonding setiap Rack, Tray, Panel dan dibawah
C PANEL LISTRIK Merk Gathergates
Panel Gedung Power
1 Indoor Freestanding Panel CPGS-A 1 set
2 Indoor freestanding Panel LVMDP 1 set
Panel Lantai 2
3 Indoor freestanding Panel MSB A & B 2 unit
4 Indoor freestanding Panel UMSB A & B 2 unit
Panel Lantai 3
5 Indoor freestanding Panel DB PAC A & B 2 unit
6 Indoor Wallmount Panel DB UTILITY A& B 2 unit
7 Indoor Wallmount Panel DB SERVER A& B 2 unit
8 Indoor Wallmount Panel DB ELEC A & B 2 unit
9 Panel ATS PAC PAC 1,2,3,4,5,6 & VRV 1,2 8 unit
10 Indoor Wallmount Panel PDU 1-3 A&B 6 unit
III Pemeliharaan Sistem Genset
1 Genset Data Center Kapasitas 800 kVA 1 unit
2 Genset Gedung Kapasitas 1000 kVA 1 unit
3 Tangki harian kapasitas 500 liter 1 unit
4 Tangki harian kapasitas 1000 liter 1 unit
5 Tangki bulanan kapasitas 5000 liter 2 unit
IV Pemeliharaan UPS
1 UPS Modular System Frame 200kVA Merk Eaton 9PHD + Battery 2 unit
Bank
V Pemeliharaan Sistem Elektronik dan Monitoring
A ENVIRONMENT MONITORING SYSTEM
1 Perangkat Integrated Monitoring System 1 set
B ACCESS CONTROL SYSTEM
1 Finger Print RFID, PoE, IP65 Vandal Resistant 11 unit
2 Exit Button & Emergency Breakglass 11 unit
3 Electromagnetic 600LBS EM Lock & U Bracket 10 unit
4 Electromagnetic 1200LBS EM Lock & U Bracket 8 unit
C CCTV
1 IP Camera 32 unit
2 NVR (Network Video Recorder) 2 set
3 Switch 24 Port -PoE+ 180W 2 unit
D MONITOR DISPLAY
LCD Samsung KU7000 4K UHD 4 unit
E PERANGKAT PC FOR NOC
Personal Computer All in One 3 unit
VI Pemeliharaan Sistem Pencegah Kebakaran
A LANTAI 2
ELECTRICAL ROOM & BATERY ROOM
VOLUME 16.5m x 4.5m x 5.8m = 430.65m³ 3 LAYERS
PROTECTION
NOVEC 1230 EQUIPMENT
1 NOVEC 1230 Cylinder & Valve Assy, Capacity 900lb 1 unit
2 NOVEC 1230 Agent 623 lbs
3 Cylinder Strap #900 2 unit
4 Electric Control Head 1 unit
5 Pressure Switch 1 unit
6 Nozzle 9 unit
DETECTION EQUIPMENT KIDDE FENWAL
1 Aries Control Unit 1 unit
2 Suppression Key Maintenance Switch 1 unit
3 Intelligent Photoelectric Smoke detector w/base 15 unit
4 AI Monitor Module (ACID) 3 unit
5 Addressable Manual Pull Station 1 unit
6 Abort Station 1 unit
7 Multitone w/strobe 2 unit
8 Fire Alarm Bell 1 unit
9 “EVACUATED AREA” Sign Lamp 2 unit
10 “GAS DISCHARGE DO NOT ENTER” Sign Lamp 1 unit
LANTAI 3
B SERVER ROOM , UTILITY ROOM 1, ENTERANCE ROOM
VOLUME 1.460,73m³ 3 LAYERS PROTECTION
NOVEC 1230 EQUIPMENT
1 NOVEC 1230 Cylinder & Valve Assy, Capacity 900lb 3 unit
2 NOVEC 1230 Agent 2,11 lbs
3 Cylinder Strap #900 6 unit
4 Electric Control Head 1 unit
5 Pressure Operated Control Head 2 unit
6 Master Cylinder Adapter Kit 1 unit
7 Male Connector 2 unit
8 Pressure Switch 3 unit
9 Nozzle 18 unit
DETECTION EQUIPMENT
1 Suppression Key Maintenance Switch 1 unit
2 Remote Releasing Module 1 unit
3 Intelligent Photoelectric Smoke Detector w/base 28 unit
4 Intelligent Photoelectric Smoke Detector w/base (u/R. NOC) 3 unit
5 AI Monitor Module 5 unit
6 AO Control Module 2 unit
7 Addressable Double Action Manual Pull Station 1 unit
8 Suppression Abort Station 1 unit
9 Alarm Signal Module 2 unit
10 Multitone w/strobe Fire 3 unit
11 Alarm Bell 3 unit
12 “EVACUATED AREA” Sign Lamp 3 unit
13 “GAS DISCHARGE DO NOT ENTER” Sign Lamp 3 unit
14 PENIMBANGAN
Tabung Novec 1230 4 unit
VII Pemeliharaan Sistem Pendingin
A PRECISION AIR CONDITIONING
1 PAC Cooling Unit 60 kW Merk Libert 4 unit
B COMFORT AIR CONDITIONING
1 AC VRV IV R410A Daikin untuk Lantai 2 :
- Outdoor Unit, Kap 154.000 Btu/h 1 Unit
- Indoor Unit, Kap 54.600 Btu/h 1 Unit
- Indoor Unit, Kap 95.500 Btu/h 1 Unit
- Refinet Joint 1 Unit
2 AC VRV IV R410A Daikin Lantai 3 :
- Outdoor Unit, Kap 76.000 Btu/h 1 Unit
- Indoor Unit, Kap 38.200 Btu/h 2 Unit
2. Lokasi Disaster Recovery Center Jakarta (pembelian perangkat tahun 2013)
No. Lingkup Pekerjaan Vol Sat
I Pemeliharaan Ruang Data Center
Rack Server 16 unit
II Pemeliharaan Sistem Elektrikal
1 Panel LVMDP 50x150x60cm 1 unit
Pilot Light (LED) ø 22mm, 220Vac, AD22-22xDS ( 6 unit) Miniature
Fuse Link 10 x 38 x 2A, 3OZM3802 (12 unit) Fuse RT-18-1PL,
30ZFHR8L (6 unit)
Digital Power Meter
CT 400/5A, Cl 0,5 ( 5A ), ref HG 40-400 (3 unit) MCCB 4P 160-400 A
36KA + Micrologic 2.3
Mtr MT400/630 for NSX 400/630, 220/240VAC, 50/60Hz UVT (MN)
220/240VAC, 50/60Hz
ATS Open Transition 400A c/w Controller
2 Panel PKG Genset 70x160x60 1 unit
Pilot Light (LED)ø 22mm, 220Vac (6 unit)
Miniature Fuse Link 10 x 38 x 2A, 3OZM3802 (18 unit) Fuse RT-18-
1PL, 30ZFHR8L (9 unit)
Digital Power Meter (2 unit)
CT 400/5A, Cl 0,5 ( 5A ), ref HG 40-400 (6 unit)
MCCB 4P 160-400 A 36KA + Micrologic 2.3 (2 unit) Mtr MT400/630
for NSX 400/630, 220/240VAC (2 unit)
Shunt Trip ( MX ) 220/240VAC, 50/60 Hz (2 unit) MCCB 4P 160-400 A
36KA + Micrologic 2.3
Modul AMF (2 unit)
CT 400/5A, Cl 0,5 ( 5A ), ref HG 40-400 (8 unit)
Automatic Battery Charger BC 0624, 24VDC/6A (2 unit)
3 Panel MDP Data Center 50X105X30 1 unit
Pilot Light (LED) ø 22mm, 220Vac (3 unit)
Miniature Fuse Link 10 x 38 x 2A, 3OZM3802 (12 unit) Fuse RT-18-
1PL, 30ZFHR8L (6 unit)
Digital Power Meter
CT 400/5A, Cl 0,5 ( 5A ), ref HG 40-400 (3 unit) MCCB 3P 400A 36KA
MCCB 4P/3T 112-160 A 25KA + TM160D (2 unit) MCB 3P 63A,
iC60N, Kurva C, 10 KA (3 unit) MCB 1P 16A, iC60N, Kurva C, 10 KA
(6 unit)
4 Panel SDP I/O UPS 60X125X30 1 unit
Pilot Light (LED) ø 22mm, 220Vac (12 unit)
Miniature Fuse Link 10 x 38 x 2A, 3OZM3802 (24 unit)
Fuse RT-18-1PL, 30ZFHR8L (12 unit)
Digital Power Meter
CT 250/5A, Cl 0,5 ( 5VA ), ref HG 30l-250 (3 unit)
MCCB 3P/3T 175-250 A 25KA + TM160D
MCCB 3P/3T 112-160 A 25KA + TM160D
MCCB 4P/3T 112-160 A 25KA + TM160D
MCCB 4P/3T 112-160 A 25KA + TM160D
MCB 3P 32A, iC60N, Kurva C, 10 KA
MCB 1P 32A, iC60N, Kurva C, 10 KA (4 unit)
MCB 1P 16A, iC60N, Kurva C, 10 KA (8 unit)
MCB 1P 10A, iC60N, Kurva C, 10 KA
MCCB 3P/3T 112-160 A 25KA + TM160D
MCCB 4P/3T 112-160 A 25KA + TM160D
MCCB 4P/3T 112-160 A 25KA + TM160D
MCB 3P 32A, iC60N, Kurva C, 10 KA
MCB 1P 32A, iC60N, Kurva C, 10 KA
MCB 1P 16A, iC60N, Kurva C, 10 KA (11 unit)
MCB 1P 10A, iC60N, Kurva C, 10 KA (3 unti)
5 Panel Battery 60X60X25 2 unit
MCCB 2P 250A 36KA
6 Lighting 25 unit
Downlight Essential 13W (15 unit)
RM 120x60 2x32W ( 10 unit)
7 Cee-form 32A. 1P legrand (under Raised floor) 32 unit
8 Cee-form 32A. 3P legrand (under Raised floor) 3 unit
III Pemeliharaan UPS
a EATON 9E UPS 100 KVA + Battery 2 unit
IV Pemeliharaan Genset
1 Perkins Stamford Genset 250 KVA 2 Unit
2 Tangki Bahan bakar 5000 liter 1 Unit
V Pemeliharaan Sistem Elektronik dan Monitoring
1 Unitron Enviromux EMSa Infinity CCTV System 1 lot
Indoor Dome IP Camera (10 unit) NVR Server + Monitor
Suprema Access Control System
2 Finger Print EM Lock Push Button 1 lot
3 Emergency Break Glass 4 set
VI Pemeliharaan Sistem Pencegah Kebakaran
1 Fenwal FM 200 Fire Protection Fenwalnet 6000 Control Panel FM 200 1 lot
Cylinder 350 lbs Nozzle ( 4 unit)
Fire Detector (8 unit)
Suppression Abort Station (1 unit)
Double Action Manual Pull Station (1 unit)
Multitone w/Strobe ( 2 unit) Fire Alarm Bell (1 unit)
" EVACUATE AREA " Sign Lamp ( 2 unit)
" GAS DISCHARGE DO NOT ENTER " Sign Lamp (2)
PENIMBANGAN 1 Unit
FENWAL FM200
VII Pemeliharaan Sistem Pendingin
1 Liebert PEX P2060 PAC 3 unit
2 Sharp AC SPLIT 1 pk 2 unit
Ruang lingkup pekerjaan Pemeliharaan Fasilitas pendukung Data Center dan Disaster Recovery Center meliputi
:
1. Pemeliharaan ruang, Sistem Rak dan Kabel Data,
Pemeliharaan kondisi kebersihan dan kerapihan Data Center dan Disaster Recovery Center dengan
melakukan hal-hal sebagai berikut :
a) Peletakan perangkat agar tetap berada pada lokasi yang sudah ditentukan.
b) Memastikan tidak ada barang-barang yang bukan perangkat Data Center dan Disaster Recovery
Center berada didalam ruang Data Center dan Disaster Recovery Center .
c) Memastikan keamanan Data Center dan Disaster Recovery Center, rack selalu dalam kondisi aman
dan terkunci serta akses keluar masuk harus selalu menggunakan fingerprint dan terpantau CCTV
aktif.
d) Menjaga kebersihan ruangan termasuk raised floor dan bagian bawah raised floor dari debu dan
kotoran lainnya.
e) Pengecekan sirkulasi udara dibawah raised floor dan rack.
f) Pengecekan suhu dan kelembaban udara normal dalam ruang Data Center dan Disaster Recovery
Center pada kisaran 19’C sampai dengan maksimal 22’C dan kelembaban udara antara 40% sampai
dengan 60%.
g) Menjaga dan memperbaiki bila ada kebocoran air diruangan DC
h) Melakukan perbaikan pada dinding yang retak
i) Melakukan perbaikan pada dak yang bocor dan rembes
j) Melakukan perbaikan pada plafon yang rusak.
k) Pengecekan kerapihan dan labeling, serta pengkabelan baik itu kabel data ataupun kabel listrik
sesuai standar.
l) Pengecekan koneksi jaringan kabel data.
2. Pemeliharaan Sistem Elektrikal
Menjaga pasokan listrik ke perangkat Data Center dan Disaster Recovery Center dengan melakukan
pemeliharaan Panel-panel listrik di ruang Data Center dan Disaster Recovery Center dan pemeliharaan
Lighting serta Outlet Power dengan melakukan hal-hal sebagai berikut :
a) Melakukan pengukuran Tegangan dan Arus pada masing-masing Panel.
b) Melakukan Pengecekan dan perbaikan serta penggantian suku cadang (spare part) Panel bila
mengalami kerusakan.
c) Melakukan kalibrasi dan setting untuk komponen yang memerlukan kalibrasi.
d) Melakukan Thermal scanning Check pada masing-masing Panel
e) Memeriksa kekencangan baut dan konektor serta melakukan perbaikan bila di temukan yang kurang
kencang.
f) Melakukan pembersihan Panel.
g) Membuat laporan update single line diagram Panel dan Pelabelan.
h) Melakukan Pengecekan kondisi fisik dan perbaikan serta penggantian komponen/perangkat lighting
dan power outlet apabila rusak.
i) Melakukan pembersihan lighting dan power outlet
3. Pemeliharaan System Genset
Menjaga pasokan listrik cadangan yang bersumber dari Genset dengan melakukan perawatan pada
perangkat yang meliputi meliputi :
a) Memeriksa dan melakukan uji secara berkala untuk memastikan fungsi beralih otomatis pada genset
dapat berfungsi dengan baik apabila pasokan listrik dari PLN terputus;
b) Memeriksa secara visual kondisi fisik Genset, apakah terdapat kebocoran, over noise (vibration),
dan korosi;
c) Membersihkan bagian body engine dan air filter;
d) Melakukan pengukuran ketinggian level, yaitu pada air radiator coolant, lube oil, dan fuel tank;
e) Memeriksa tegangan v-belt.
4. Pemeliharaan UPS
Pemeliharaan UPS agar tetap berfungsi dengan baik yang meliputi:
a) Menjaga pasokan listrik cadangan yang bersumber dari UPS dengan melakukan perawatan pada
perangkat yang meliputi :
b) Memeriksa nilai tegangan, arus, frekuensi, daya, beban, backup time dan kapasitas UPS apakah
masih dalam batas standar operasi.
c) Kalibrasi pembacaan tegangan pada display UPS, dibandingkan dengan alat ukur.
d) Melakukan pengujian UPS dan pengujian beban pada battery.
e) Pengujian UPS meliputi test Display untuk memastikan apakah display berfungsi dengan baik.
f) Membersihkan kotoran / debu terutama pada Fan dan Heat Sink, permukaan block battery, dan
cabinet.
g) Pemeriksaan secara visual keseluruhan UPS dan battery. Mulai dari keadaan masing - masing board,
koneksitas antar board dan pemeriksaaan apakah ada bad contact. Juga pemeriksaan battery secara
fisik;
5. Pemeliharaan Sistem Elektronik dan Monitoring
Pemeliharaan peralatan-peralatan elektronik dan monitoring sebagai system keamanan Data Center dan
Disaster Recovery Center seperti Environment Monitoring System (EMS), CCTV System dan Access
Control System yang meliputi :
a) Pembersihan dari debu dan kotoran setiap perangkat elektronik dan sensor
b) Memeriksa kondisi fisik seluruh peralatan elektronika.
c) Memeriksa History Log Report pada aplikasi untuk memeriksa histori kejadian sebagai indikator
jika terjadi sesuatu di ruang Data Center dan Disaster Recovery Center .
d) Memeriksa kondisi probe/sensor EMS apakah sesuai pada posisi dan berfungsi dengan baik.
e) Melakukan pemeliharaan Camera CCTV dengan membersihkan bagian kaca lensa dan
mengembalikan arah Camera ke posisi semula.
f) Membersihkan Monitor Display.
g) Memeriksa kapasitas penyimpanan data video record pada server cctv.
h) Melakukan pemeliharaan Access Door pada unit Finger Print dan EM Lock.
i) Melakukan pemeliharaan EM Lock di setiap pintu dan melakukan penyetelan posisi EM lock jika
diperlukan.
6. Pemeliharaan Sistem Pencegah Kebakaran
Pemeliharaan Fire Protection System ( NOVEC 1230 ) agar tetap berfungsi dengan baik yang meliputi
:
a) Pemeriksaan awal kondisi system, baik system deteksi, Hardware and auxiliary equipment dan
penyesuaian dengan lay out awal.
b) Simulation Detection test system, meliputi Detector, Alarm Bell, Horn Stobe, Module, dan Control
Panel.
c) Pengechekan Mechanical Perangkat, seperti check Electric control head, Piping, hose dan pressure
switch.
d) Pemeriksaan tekanan dalam cylinder.
e) Penimbangan cylinder.
7. Pemeliharaan Sistem Pendingin
Pemeliharaan terhadap perangkat pendingin ruangan yang meliputi :
a) Melakukan monitoring history Log PAC untuk mengetahui histori kejadian sebagai indikator jika
terjadi sesuatu pada sisten pendingin ruang Data Center dan Disaster Recovery Center .
b) Pengukuran kondisi sumber listrik, tegangan, arus listrik dan frekuensi.
c) Pemeriksaan dan testing pada system : Cooling, De-Humidification, Heating
d) Setting dan Kalibrasi pada control system
e) Melakukan Pengecekan baik unit Indoor maupun unit Outdoor dan penggantian suku cadang (spare
part) jika diperlukan.
f) Pembersihan rutin pada bagian condenser, drainage system dan filtering.
8. Laporan pemeliharaan yang meliputi :
a) Laporan Pemeriksaan awal kegiatan yang dibuat 2 (dua) rangkap, berisikan Laporan Performance
Data Center dan Disaster Recovery Center dan kondisi awal.
b) Laporan Pemeliharaan Bulan Pertama yang dibuat 2 (dua) rangkap
c) Laporan kegiatan Pemeliharaan Data Center dan Disaster Recovery Center Bulan Pertama.
d) Laporan Pertengahan Tahun Kegiatan dibuat 2 (dua) rangkap
e) Laporan Akhir dibuat rangkap 3 (tiga) berisi laporan hasil akhir Kegiatan.