| Reason | |||
|---|---|---|---|
| 0020629556032000 | Rp 4,777,440,000 | - | |
| 0024929424077000 | Rp 5,852,364,000 | Bukan Penawaran terendah | |
| 0021435425064000 | Rp 5,374,447,950 | Bukan Penawaran terendah | |
| 0905499190067000 | Rp 5,602,882,620 | Bukan Penawaran terendah | |
CV Gitang Care | 00*7**7****42**0 | - | - |
PT Prospero Optima Solusindo | 08*8**7****11**0 | - | - |
Dirk Dan Jo Grup | 03*3**9****41**0 | - | - |
| 0966358442507000 | - | - | |
| 0021856240016000 | - | - | |
| 0029787231022000 | - | - | |
| 0026488718411000 | - | - | |
| 0033201054403000 | - | - | |
| 0315692772418000 | - | - | |
| 0723348025061000 | - | - | |
PT Trans Telekomunikasi Indonesia | 09*4**2****64**0 | - | - |
PT Aplika Data Nusantara | 09*3**3****14**0 | - | - |
| 0021436589016000 | - | - | |
| 0423867704429000 | - | - | |
PT Media Tama Elektronik | 08*1**4****07**0 | - | - |
| 0313375545542000 | - | - | |
| 0019980077086000 | - | - | |
CV Artomoro Barokah | 05*0**7****31**0 | - | - |
| 0027483502008000 | - | - | |
Bersama Aneka Proaktif | 06*5**7****37**0 | - | - |
RUANG LINGKUP PEKERJAAN
1. Bagian-bagian yang menjadi ruang lingkup pemeliharaan meliputi :
Lokasi Data Center Cikeas (pembelian perangkat tahun 2017)
No Lingkup Pekerjaan VOL SAT
I Pemeliharaan Ruang DC, Sistem Rak dan Kabel Data
1 Network Rack 4 unit
2 Server Rack 16 unit
3 Koneksi Fiber Optik dari Rack Server ke Rack Network 864 Core
4 Koneksi Fiber Optik dari Tiap Lantai ke Data Center 36 Core
5 Koneksi Fiber Optik dari Gedung Pusdiklat dan Asrama ke DC 24 Core
6 Koneksi Kabel UTP Horizontal & Device to device 432 titik
II Pemeliharaan Sistem Elektrikal
A Penerangan dan Socket Outlet
1 Socket Outlet Mobile 32A 1phase 120 set
2 Socket Outlet Mobile 32A 3phase 10 set
3 Socket Outlet 16A 1phase 20 set
4 Socket Outlet 16A 1phase 4 set
5 RLMO M1 + TL LED (Lantai 3) 70 set
6 RLMO M1 + TL LED Emergency Light (Lantai 3) 15 set
7 RLMO M1 + TL LED (Lantai 2) 14 set
8 RLMO M1 + TL LED Emergency Light (Lantai 2) 3 set
9 Exit Sign Lamp 3 set
B Grounding System
1 Grounding Sistem 1 lot
Grounding sistem untuk Genset
Grounding sistim untuk peralatan UPS, Battery dan Panel
Grounding bonding setiap Rack, Tray, Panel dan dibawah
C PANEL LISTRIK Merk Gathergates
Panel Lantai 2
1 Indoor Freestanding Panel CPGS-A 1 set
2 Indoor freestanding Panel LVMDP 1 set
3 Indoor freestanding Panel MSB A & B 2 unit
4 Indoor freestanding Panel UMSB A & B 2 unit
Panel Lantai 3
5 Indoor freestanding Panel DB PAC A & B 2 unit
6 Indoor Wallmount Panel DB UTILITY A& B 2 unit
7 Indoor Wallmount Panel DB SERVER A& B 2 unit
8 Indoor Wallmount Panel DB ELEC A & B 2 unit
9 Panel ATS PAC PAC 1,2,3,4,5,6 & VRV 1,2 8 unit
10 Indoor Wallmount Panel PDU 1-3 A&B 6 unit
III Pemeliharaan Sistem Genset
1 Genset Kapasitas 800 kVA merk Perkin Stanford 1 unit
2 Tangki harian kapasitas 1000 liter 1 unit
3 Tangki bulanan kapasitas 5000 liter 1 unit
4 Genset Gedung Kapasitas 1000 kVA merk Mitsubishi +Tangki 1 unit
Bahan Bakar
VI Pemeliharaan UPS
UPS Modular System Frame 200kVA Merk Eaton 9PHD +
1 2 unit
Battery Bank
IV Pemeliharaan Sistem Elektronik dan Monitoring
A ENVIROMENT MONITORING SYSTEM
1 Perangkat Integrated Monitoring System 1 set
B ACCESS CONTROL SYSTEM
1 Finger Print RFID , PoE ,IP65 Vandal Resistant 10 unit
2 Exit Button & Emergency Breakglass 10 unit
3 Electromagnetic 600LBS EM Lock & U Bracket 9 unit
4 Electromagnetic 1200LBS EM Lock & U Bracket 8 unit
C CCTV
1 IP Camera 32 unit
2 NVR (Network Video Recorder) 1 set
3 Switch 24 Port -PoE+ 180W 1 unit
D MONITOR DISPLAY
LCD Samsung KU7000 4K UHD 4 set
E PERANGKAT PC FOR NOC
Personal Computer All in One 3 unit
V Pemeliharaan Sistem Pencegah Kebakaran
A LANTAI 2
ELECTRICAL ROOM & BATERY ROOM
VOLUME 16.5m x 4.5m x 5.8m = 430.65m³ 3 LAYERS
PROTECTION
NOVEC 1230 EQUIPMENT
1 NOVEC 1230 Cylinder & Valve Assy, Capacity 900lb 1 unit
2 NOVEC1230 Agent 623 lbs
3 Cylinder Strap #900 2 unit
4 Electric Control Head 1 unit
5 Pressure Switch 1 unit
6 Nozzle 9 unit
DETECTION EQUIPMENT merk KIDDE FENWAL
1 Aries Control Unit 1 unit
2 Suppression Key Maintenance Switch 1 unit
3 Intelligent Photoelectric Smoke detector w/base 15 unit
4 AI Monitor Module (ACID) 3 unit
5 Addressable Manual Pull Station 1 unit
6 Abort Station 1 unit
7 Multitone w/strobe 2 unit
8 Fire Alarm Bell 1 unit
9 “EVACUATED AREA” Sign Lamp 2 unit
10 “GAS DISCHARGE DO NOT ENTER” Sign Lamp 1 unit
B LANTAI 3
SERVER ROOM , UTILITY ROOM 1, ENTERANCE ROOM
VOLUME 1.460,73m³ 3 LAYERS PROTECTION
NOVEC 1230 EQUIPMENT
1 NOVEC 1230 Cylinder & Valve Assy, Capacity 900lb 3 unit
2 NOVEC1230 Agent 2,106 lbs
3 Cylinder Strap #900 6 unit
4 Electric Control Head 1 unit
5 Pressure Operated Control Head 2 unit
6 Master Cylinder Adapter Kit 1 unit
7 Male Connector 2 unit
8 Pressure Switch 3 unit
9 Nozzle 18 unit
DETECTION EQUIPMENT
1 Suppression Key Maintenance Switch 1 unit
2 Remote Releasing Module 1 unit
3 Intelligent Photoelectric Smoke Detector w/base 28 unit
4 Intelligent Photoelectric Smoke Detector w/base (u/R. NOC) 3 unit
5 AI Monitor Module 5 unit
6 AO Control Module 2 unit
7 Addressable Double Action Manual Pull Station 1 unit
8 Suppression Abort Station 1 unit
9 Alarm Signal Module 2 unit
10 Multitone w/strobe 3 unit
11 Fire Alarm Bell 3 unit
12 “EVACUATED AREA” Sign Lamp 3 unit
13 “GAS DISCHARGE DO NOT ENTER” Sign Lamp 3 unit
TABUNG APAR
Tabung Apar MH235 Clean Agent 2.27 Kg 3 unit
VII Pemeliharaan Sistem Pendingin
A PRECISION AIR CONDITIONING
1 PAC Cooling Unit 60 kW Merk Libert 4 unit
B COMFORT AIR CONDITIONING
1 AC VRV IV R410A Daikin untuk Lantai 2 :
- Outdoor Unit, Kap 154.000 Btu/h 1 Unit
- Indoor Unit, Kap 54.600 Btu/h 1 Unit
- Indoor Unit, Kap 95.500 Btu/h 1 Unit
-Refinet Joint 1 Unit
2 AC VRV IV R410A Daikin Lantai 3 :
- Outdoor Unit, Kap 76.000 Btu/h 1 Unit
- Indoor Unit, Kap 38.200 Btu/h 2 Unit
Lokasi Disaster Recovery Center Jakarta (pembelian perangkat
tahun 2013)
No. Lingkup Pekerjaan Qty
I Pemeliharaan Ruang Data Center
Rack Server 16 unit
II Pemeliharaan Sistem Elektrikal
1 Panel LVMDP 50x150x60cm 1 unit
Pilot Light (LED) ø 22mm, 220Vac, AD22-22xDS ( 6 unit)
Miniature Fuse Link 10 x 38 x 2A, 3OZM3802 (12 unit)
Fuse RT-18-1PL, 30ZFHR8L (6 unit)
Digital Power Meter
CT 400/5A, Cl 0,5 ( 5A ), ref HG 40-400 (3 unit)
MCCB 4P 160-400 A 36KA + Micrologic 2.3
Mtr MT400/630 for NSX 400/630, 220/240VAC, 50/60Hz
UVT (MN) 220/240VAC, 50/60Hz
ATS Open Transition 400A c/w Controller
2 Panel PKG Genset 70x160x60 1 unit
Pilot Light (LED)ø 22mm, 220Vac (6 unit)
Miniature Fuse Link 10 x 38 x 2A, 3OZM3802 (18 unit)
Fuse RT-18-1PL, 30ZFHR8L (9 unit)
Digital Power Meter (2 unit)
CT 400/5A, Cl 0,5 ( 5A ), ref HG 40-400 (6 unit)
MCCB 4P 160-400 A 36KA + Micrologic 2.3 (2 unit)
Mtr MT400/630 for NSX 400/630, 220/240VAC (2 unit)
Shunt Trip ( MX ) 220/240VAC, 50/60 Hz (2 unit)
MCCB 4P 160-400 A 36KA + Micrologic 2.3
Modul AMF (2 unit)
CT 400/5A, Cl 0,5 ( 5A ), ref HG 40-400 (8 unit)
Automatic Battery Charger BC 0624, 24VDC/6A (2 unit)
3 Panel MDP Data Center 50X105X30 1 unit
Pilot Light (LED) ø 22mm, 220Vac (3 unit)
Miniature Fuse Link 10 x 38 x 2A, 3OZM3802 (12 unit)
Fuse RT-18-1PL, 30ZFHR8L (6 unit)
Digital Power Meter
CT 400/5A, Cl 0,5 ( 5A ), ref HG 40-400 (3 unit)
MCCB 3P 400A 36KA
MCCB 4P/3T 112-160 A 25KA + TM160D (2 unit)
MCB 3P 63A, iC60N, Kurva C, 10 KA (3 unit)
MCB 1P 16A, iC60N, Kurva C, 10 KA (6 unit)
4 Panel SDP I/O UPS 60X125X30 1 unit
Pilot Light (LED) ø 22mm, 220Vac (12 unit)
Miniature Fuse Link 10 x 38 x 2A, 3OZM3802 (24 unit)
Fuse RT-18-1PL, 30ZFHR8L (12 unit)
Digital Power Meter
CT 250/5A, Cl 0,5 ( 5VA ), ref HG 30l-250 (3 unit)
MCCB 3P/3T 175-250 A 25KA + TM160D
MCCB 3P/3T 112-160 A 25KA + TM160D
MCCB 4P/3T 112-160 A 25KA + TM160D
MCCB 4P/3T 112-160 A 25KA + TM160D
MCB 3P 32A, iC60N, Kurva C, 10 KA
MCB 1P 32A, iC60N, Kurva C, 10 KA (4 unit)
MCB 1P 16A, iC60N, Kurva C, 10 KA (8 unit)
MCB 1P 10A, iC60N, Kurva C, 10 KA
MCCB 3P/3T 112-160 A 25KA + TM160D
MCCB 4P/3T 112-160 A 25KA + TM160D
MCCB 4P/3T 112-160 A 25KA + TM160D
MCB 3P 32A, iC60N, Kurva C, 10 KA
MCB 1P 32A, iC60N, Kurva C, 10 KA
MCB 1P 16A, iC60N, Kurva C, 10 KA (11 unit)
MCB 1P 10A, iC60N, Kurva C, 10 KA (3 unti)
5 Panel Battery 60X60X25 2 unit
MCCB 2P 250A 36KA
6 Lighting 25 unit
Downlight Essential 13W (15 unit)
RM 120x60 2x32W ( 10 unit)
7 Cee-form 32A. 1P legrand (under Raised floor) 32 unit
8 Cee-form 32A. 3P legrand (under Raised floor) 3 unit
III Pemeliharaan UPS
a EATON 9E UPS 100 KVA + Battery 2 unit
IV Pemeliharaan Genset
1 Perkins Stamford Genset 250 KVA 2 Unit
2 Tangki Bahan bakar 500 liter 1 Unit
V Pemeliharaan Sistem Elektronik dan Monitoring
1 Unitron Enviromux EMSa 1 lot
2 Infinity CCTV System 1 lot
Indoor Dome IP Camera (10 unit)
NVR Server + Monitor
3 Suprema Access Control System 4 set
Finger Print
EM Lock
Push Button
Emergency Break Glass
VI Pemeliharaan Sistem Pencegah Kebakaran
1 Fenwal FM 200 Fire Protection 1 lot
Fenwalnet 6000 Control Panel
FM 200 Cylinder 350 lbs
Nozzle ( 4 unit)
Fire Detector (8 unit)
Suppression Abort Station (1 unit)
Double Action Manual Pull Station (1 unit)
Multitone w/Strobe ( 2 unit)
Fire Alarm Bell (1 unit)
" EVACUATE AREA " Sign Lamp ( 2 unit)
" GAS DISCHARGE DO NOT ENTER " Sign Lamp (2
VII Pemeliharaan Sistem Pendingin
1 Liebert PEX P2060 PAC 3 unit
2 Sharp AC SPLIT 1 pk 2 unit
2. Ruang lingkup pekerjaan Pemeliharaan Fasilitas pendukung Data Center dan
Disaster Recovery Center meliputi :
a) Pemeliharaan ruang Data Center dan Disaster Recovery Center ,
Sistem Rak dan Kabel Data, Pemeliharaan kondisi kebersihan dan
kerapihan Data Center dan Disaster Recovery Center dengan
melakukan hal-hal sebagai berikut :
Peletakan perangkat agar tetap berada pada lokasi yang sudah
ditentukan.
Memastikan tidak ada barang-barang yang bukan perangkat Data
Center dan Disaster Recovery Center berada didalam ruang Data
Center dan Disaster Recovery Center .
Memastikan rak selalu dalam kondisi aman dan terkunci.
Menjaga kebersihan ruangan termasuk raised floor dan bagian
bawah raised floor dari debu dan kotoran lainnya.
Pengecekan sirkulasi udara dibawah raised floor dan rack.
Pengecekan suhu dan kelembaban udara normal dalam ruang Data
Center dan Disaster Recovery Center pada kisaran 19’C sampai
dengan maksimal 22’C dan kelembaban udara antara 40% sampai
dengan 60%.
Menjaga dan memperbaiki bila ada kebocoran air diruangan DC
Melakukan perbaikan pada dinding yang retak
Melakukan perbaikan pada dak yang bocor dan rembes
Melakukan perbaikan pada plafon yang rusak.
Pengecekan kerapihan pengkabelan untuk data ataupun listrik
sesuai pada tempatnya.
Pengecekan koneksi jaringan kabel data.
b) Pemeliharaan Sistem Elektrikal
Menjaga pasokan listrik ke perangkat Data Center dan Disaster Recovery
Center dengan melakukan pemeliharaan Panel-panel listrik di ruang Data
Center dan Disaster Recovery Center dan pemeliharaan Lighting serta Outlet
Power dengan melakukan hal-hal sebagai berikut :
Melakukan pengukuran Tegangan dan Arus pada masing-masing
Panel.
Melakukan Pengecekan dan perbaikan serta penggantian suku
cadang (spare part) Panel bila mengalami kerusakan.
Melakukan kalibrasi dan setting untuk komponen yang memerlukan
kalibrasi.
Melakukan Thermal scanning Check pada masing-masing Panel
Memeriksa kekencangan baut dan konektor serta melakukan
perbaikan bila di temukan yang kurang kencang.
Melakukan pembersihan Panel.
Membuat laporan update single line diagram Panel dan Pelabelan.
Melakukan Pengecekan kondisi fisik dan perbaikan serta
penggantian komponen/perangkat lighting dan power outlet apabila
rusak.
Melakukan pembersihan lighting dan power outlet
c) Pemeliharaan System Genset
Menjaga pasokan listrik cadangan yang bersumber dari Genset dengan
melakukan perawatan pada perangkat yang meliputi meliputi :
Memeriksa dan melakukan uji secara berkala untuk memastikan
fungsi beralih otomatis pada genset dapat berfungsi dengan baik
apabila pasokan listrik dari PLN terputus;
Memeriksa secara visual kondisi fisik Genset, apakah terdapat
kebocoran, over noise (vibration), dan korosi;
Membersihkan bagian body engine dan air filter;
Melakukan pengukuran ketinggian level, yaitu pada air radiator
coolant, lube oil, dan fuel tank;
Memeriksa tegangan v-belt.
d) Pemeliharaan UPS
Menjaga pasokan listrik cadangan yang bersumber dari
UPS dengan melakukan perawatan pada perangkat yang
meliputi :
Memeriksa nilai tegangan, arus, frekuensi, daya,
beban, backup time dan kapasitas UPS apakah masih
dalam batas standar operasi.
Kalibrasi pembacaan tegangan pada display UPS,
dibandingkan dengan alat ukur.
Melakukan pengujian UPS dan pengujian beban pada
battery.
Pengujian UPS meliputi test Display untuk memastikan
apakah display berfungsi dengan baik.
Membersihkan kotoran / debu terutama pada Fan dan
Heat Sink, permukaan block battery, dan cabinet.
Pemeriksaan secara visual keseluruhan UPS dan
battery. Mulai dari keadaan masing - masing board,
koneksitas antar board dan pemeriksaaan apakah ada
bad contact. Juga pemeriksaan battery secara fisik;
e) Pemeliharaan Sistem Elektronik dan Monitoring
Pemeliharaan peralatan-peralatan elektronik dan monitoring
sebagai system keamanan Data Center dan Disaster Recovery
Center seperti Environment Monitoring System (EMS), CCTV
System dan Access Control System yang meliputi :
Pembersihan dari debu dan kotoran setiap perangkat
elektronik dan sensor
Memeriksa kondisi fisik seluruh peralatan elektronika.
Memeriksa History Log Report pada aplikasi untuk
memeriksa histori kejadian sebagai indikator jika terjadi
sesuatu di ruang Data Center dan Disaster Recovery
Center .
Memeriksa kondisi probe/sensor EMS apakah sesuai
pada posisi dan berfungsi dengan baik.
Melakukan pemeliharaan Camera CCTV dengan
membersihkan bagian kaca lensa dan mengembalikan
arah Camera ke posisi semula.
Membersihkan Monitor Display.
Memeriksa kapasitas penyimpanan data video record
pada server cctv.
Melakukan pemeliharaan Access Door pada unit Finger
Print dan EM Lock.
Melakukan pemeliharaan EM Lock di setiap pintu dan
melakukan penyetelan posisi EM lock jika diperlukan.
f) Pemeliharaan Sistem Pencegah Kebakaran
Pemeliharaan Fire Protection System ( NOVEC 1230 ) agar
tetap berfungsi dengan baik yag meliputi :
Pemeriksaan awal kondisi system, baik system deteksi,
Hardware and auxiliary equipment dan penyesuaian
dengan lay out awal.
Simulation Detection test system, meliputi Detector,
Alarm Bell, Horn Stobe, Module, dan Control Panel.
Pengechekan Mechanical Perangkat, seperti check
Electric control head, Piping, hose dan pressure switch.
Pemeriksaan tekanan dalam cylinder.
Penimbangan cylinder.
g) Pemeliharaan Sistem Pendingin
Pemeliharaan terhadap perangkat pendingin ruangan yang
meliputi :
Melakukan monitoring history Log PAC untuk
mengetahui histori kejadian sebagai indikator jika terjadi
sesuatu pada sisten pendingin ruang Data Center dan
Disaster Recovery Center .
Pengukuran kondisi sumber listrik, tegangan, arus listrik
dan frekuensi.
Pemeriksaan dan testing pada system : Cooling, De-
Humidification, Heating
Setting dan Kalibrasi pada control system
Melakukan Pengecekan baik unit Indoor maupun unit
Outdoor dan penggantian suku cadang (spare part) jika
diperlukan.
Pembersihan rutin pada bagian condenser, drainage
system dan filtering.