| Reason | |||
|---|---|---|---|
| 0210217923407000 | Rp 4,602,000,221 | - | |
PT Ginza Sukses Mandiri | 04*4**4****14**0 | - | - |
| 0013205190009000 | Rp 4,335,000,000 | Dalam dokumen RKK, tabel B.2 rencana Rencana tindakan (sasaran khusus & program khusus) masih mengacu pada Permen PUPR Nomor 7/PRT/M/2019 tahun 2019 | |
| 0025061441043000 | - | - | |
| 0316797737008000 | - | - | |
CV Nirwana Rahma Makmur | 09*9**6****01**0 | - | - |
| 0023334485008000 | - | - | |
PT Erista Jaya | 03*3**8****07**0 | - | - |
| 0210512778451000 | - | - | |
PT Masayu Sinar Abadi | 07*7**5****27**0 | - | - |
PT Rade Sumber Berkat | 06*5**2****08**0 | - | - |
| 0820351088418000 | - | - | |
CV Bintang Multimedia Indonesia | 02*0**3****07**0 | - | - |
CV Sihar Putra | 00*3**8****08**0 | - | - |
| 0019032317407000 | - | - | |
| 0013253141019000 | - | - | |
| 0013218458008000 | - | - | |
PT Daniel Sumber Rezeki | 09*9**3****32**0 | - | - |
CV Karunia Semesta | 08*0**5****07**0 | - | - |
| 0914537014444000 | - | - | |
| 0316596204435000 | - | - | |
| 0818064461432000 | - | - | |
CV Torgabe Artha Nugraha | 0818185761432000 | - | - |
| 0024483620002000 | - | - | |
Mutiara Syifa | 00*6**3****08**0 | - | - |
| 0013270327002000 | - | - | |
CV Nur Abadi Perkasa | 09*2**6****32**0 | - | - |
Berkah Sejahtera Mandiri | 0029711330101000 | - | - |
| 0016286619008000 | - | - | |
PT Moses Putra Perkasa | 04*6**5****32**0 | - | - |
| 0610574576728000 | - | - | |
| 0418580395023000 | - | - | |
CV Basun Tosi Mandiri | 06*9**6****08**0 | - | - |
| 0916336340117000 | - | - | |
Roy Abadi Sejahtera | 05*8**1****25**0 | - | - |
PEMERINTAH KOTA BEKASI
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
BILL OF QUANTITY (BOQ)
BELANJA MODAL PEMBANGUNAN GEDUNG SDN KALIBARU II
KEGIATAN : BELANJA MODAL PEMBANGUNAN GEDUNG SDN KALIBARU II
PEKERJAAN : PEMBANGUNAN 11 RKB 3 LT, PEMBANGUNAN PAGAR DAN GAPURA
LOKASI : KEL. KALIBARU KEC. MEDAN SATRIA
SUMBER BIAYA : APBD 2023
TOTAL
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN JUMLAH
VOLUME
1 2 3 4 5 6
I. SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA
A Penyiapan RKK : Rp -
a Pembuatan dokumen RencanKae selamatan Konstruksi 1,00 Set Rp -
B Sosialisasi, promosi dan pelatihan: Rp -
a Induksi K3 (Safety Induction) 15,00 Org Rp -
b Pengarahan K3 (Safety Briefing) 15,00 Org Rp -
c Pelatihan K3: Rp -
1 Bekerja di ketinggian 5,00 Org Rp -
d Simulasi K3 15,00 Org Rp -
e Spanduk (Banner) 1,00 Lb Rp -
f Poster 1,00 Lb Rp -
g Papan Informasi K3 1,00 Bh Rp -
C Alat Pelindung Kerja dan Alat Pelindung Diri: Rp -
a APK antara lain:
1 Jaring Pengaman (Safety Net) 1,00 Ls Rp -
2 Tali Keselamatan (Life Line) 1,00 Ls Rp -
3 Jaring Pengaman 1,00 Ls Rp -
4 Pembatas Area (Restricted Area) 1,00 Ls Rp -
b APD antara lain: Rp -
1 Topi Pelindung (Safety Helmet) 20,00 Bh Rp -
2 Tameng Muka (Face Shield) 2,00 Bh Rp -
3 Pelindung Pernafasan dan Mulu(Mt asker) 15,00 Bh Rp -
4 Sarung Tangan (Safety Gloves) 6,00 Psg Rp -
5 Sepatu Keselamatan (Safety Shoes) 10,00 Psg Rp -
6 Rompi Keselamatan (Safety Vest) 20,00 Bh Rp -
D Asuransi dan perizinan : Rp -
a Asuransi 1,00 Ls Rp -
E Personel K3 Konstruksi : Rp -
a Petugas K3 Konstruksi 1,00 OB Rp -
F Fasilitas, sarana dan prasarana kesehatan: Rp -
a Peralatan P3K (Kotak P3K, TanduO,bat Luka, Perban,dll) 1,00 Ls Rp -
G Rambu- Rambu yang diperlukan: Rp -
a Rambu petunjuk 2,00 Bh Rp -
b Rambu larangan 2,00 Bh Rp -
c Rambu peringatan 2,00 Bh Rp -
d Rambu kewajiban 2,00 Bh Rp -
e Rambu informasi 2,00 Bh Rp -
f Jalur Evakuasi (Escape Route) 1,00 Ls Rp -
H Konsultasi dengan Ahli terkait Keselamatan Konstruksi: Rp -
a Ahli K3 Konstruksi 1,00 OJ Rp -
I Lain- Lain Terkait Pengendalian Risiko Keselamatan Konstruksi: Rp -
a Alat Pemadam Api Ringan (APAR) 1,00 Bh Rp -
b Bendera K3 1,00 Bh Rp -
c Pembuatan Kartu Identitas Pekerja (KIP) 15,00 Lb Rp -
Rp -
II. PEMBANGUNAN BANGUNAN KELAS
A PEKERJAAN PENDAHULUAN
1 Listrik dan air kerja dihitung 1,00 ls Rp -
2 Laporan administrasi dan dokumentasi proyek dihitung 1,00 ls Rp -
3 Pasang papan nama proyek Digital Printing A.17. 1,00 bh Rp -
4 Pemindahan kabel listrik dan provider eksisting dihitung 1,00 ls Rp -
A Rp -
B PEKERJAAN 2 RKB, R KANTOR, TANGGA, TOILET LT. 1
TOTAL
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN JUMLAH
VOLUME
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Membersihkan lapangan dan perataan A.9. 422,95 m2 Rp -
2 Pengukuran dan pemasangan bouwplank A.4. 106,90 m' Rp -
3 Pek. Pembongkaran beton bangunan eksisting A.13. 25,93 m3 Rp -
4 Pek. Pembongkaran dinding bangunan eksisting A.14. 19,68 m3 Rp -
5 Pek. Pemagaran seng sementara A.2. 16,70 m' Rp -
I Rp -
II PEKERJAAN PONDASI TAPAK BETON
1 Galian tanah pondasi tapak beton dan pondasi tangga B.4. 124,89 m3 Rp -
2 Galian tanah tie beam dan pondasi batu B.4. 10,31 m3 Rp -
3 Urugan kembali tanah bekas galian tapak B.9. 80,94 m3 Rp -
4 Urugan pasir bawah pondasi dan tiebeam B.11. 8,80 m3 Rp -
5 Beton lantai kerja bawah tapak dan tie beam D.4. 4,00 m3 Rp -
6 Pasangan bata ringan tb 8 cm untuk pembatas pondasi tapak dan tie beam G.25.a 141,89 m3 Rp -
7 Pondasi tapak beton P1 140/140 K-225 besi 101,4 kg/m3 D.31.a 19,60 m3 Rp -
8 Pondasi tapak beton P2 90/90 K-225 besi 101,4 kg/m3 D.31.b 2,84 m3 Rp -
9 Stamp Pondasi P1 Beton (K1) 40x40 besi 242 kg/m3 D.33.a 5,02 m3 Rp -
10 Stamp Pondasi P2 Beton (K2) 25x25 besi 221,4 kg/m3 D.33.n 1,08 m3 Rp -
11 Pondasi dan leher pondasi tangga beton K-225 besi 101,4 kg/m3 D.31.b 0,44 m3 Rp -
12 Pondasi batu kali adukan 1 pc : 6 ps C.4. 3,43 m3 Rp -
II Rp -
III PEKERJAAN STRUKTUR BETON
Tie Beam Beton
1 Tie beam beton SL1 20/40 K-225 besi 151,4 kg/m3 D.32.a 8,78 m3 Rp -
2 Sloof beton SL3 15/30 K-225 besi 125,2 kg/m3 D.32.d 0,85 m3 Rp -
Kolom Beton 0,00 Rp -
3 Kolom beton type (K1) 40x40 K-225 besi 242 kg/m3 D.33.a 11,94 m3 Rp -
4 Kolom beton type (K2) 25x25 K-225 besi 221,4 kg/m3 D.33.n 2,33 m3 Rp -
Balok Beton 0,00 Rp -
5 Balok beton type (B1) 30/55 K-225 besi 184,7 kg/m3 D.34.b 11,72 m3 Rp -
6 Balok beton type (B2) 20/40 K-225 besi 169 kg/m3 D.34.d 7,96 m3 Rp -
7 Balok beton type (B3) 20/30 K-225 besi 211,4 kg/m3 D.34.e 2,05 m3 Rp -
8 Balok beton type (B4) 15/25 K-225 besi 205,2 kg/m3 D.34.f 0,16 m3 Rp -
9 Balok beton type (B5) 20/30 K-225 besi 290,4 kg/m3 D.34.g 0,80 m3 Rp -
Plat Beton 0,00 Rp -
10 Plat lantai beton tb. 12 cm K-225 besi 141,6 kg/m3 D.35.a 32,70 m3 Rp -
11 Topian beton tb. 10 cm K-225 besi 115,1 kg/m3 D.35.c 6,51 m3 Rp -
12 Janggutan beton tb. 10 cm K-225 besi 176,4 kg/m3 D.34.h 1,32 m3 Rp -
Tangga Beton 0,00 Rp -
13 Lantai, trap anak tangga K-225 besi 195,1 kg/m3 D.36.b 1,79 m3 Rp -
14 Balok tangga & kolom 20/25 K-225 besi 142,9 kg/m3 D.34.i 0,26 m3 Rp -
15 Plat bordes beton tb. 12 cm K-225 besi 155,3 kg/m3 D.36.a 0,49 m3 Rp -
III Rp -
IV PEKERJAAN PASANGAN DAN FINISHING DINDING
1 Pasangan dinding bata ringan 10 cm dengan mortar pasang G.25. 231,58 m2 Rp -
2 Plesteran dinding dengan mortar plesteran H.28. 463,16 m2 Rp -
3 Finishing acian dinding dengan mortar acian H.29. 433,16 m2 Rp -
4 Plesteran beton dengan mortar plesteran H.28. 238,14 m2 Rp -
5 Finishing acian beton kolom, topian balok, dak dengan mortar acian H.29. 298,77 m2 Rp -
6 Plesteran openingan kusen dengan mortar plesteran H.28. 23,47 m2 Rp -
7 Acian opening dinding dengan mortar acian H.29. 23,47 m2 Rp -
8 Balok lintel praktis 10x15 D.30. 49,80 m' Rp -
9 Kolom praktis type (Kp) 11x11 D.29. 24,80 m' Rp -
10 Pasang keramik dinding warna 20/40 KW 1 KM/WC t = 2 m I.54.b 30,60 m2 Rp -
Railling tangga & Voide 0,00 Rp -
11 Pasangan dinding railing bata ringan 10 cm dengan mortar pasang G.25. 7,00 m2 Rp -
12 Plesteran railling adukan 1 pc : 5 ps H.28. 16,79 m2 Rp -
13 Acian railing H.29. 16,79 m2 Rp -
14 Kolom praktis type (Kp) 11x11 D.29. 5,50 m' Rp -
15 Ring balk beton railling tangga type (RB Praktis) 10x15 D.30. 7,00 m' Rp -
16 Pasang railing tangga pipa 2.5" medium tb. 3,4 mm galvanize F.24.a 7,80 m' Rp -
IV Rp -
V PEKERJAAN PLAFOND
1 Plafond kelas dan selasar gypsum tb 9 mm rangka hollow galvanis 4x4 & 4x2 cm (60x120 cm) J.11.a 276,89 m2 Rp -
2 Plafond area toilet GRC 4 mm rangka hollow galvanis 4 x 4 & 4 x 2 cm (60 x 120 cm) J.11.b 10,65 m2 Rp -
3 List gypsum profil warna putih polos 10 cm J.10. 194,60 m' Rp -
4 List kayu profil fin cat ukuran 5 cm J.9. 27,48 m' Rp -
V Rp -
VI PEKERJAAN LANTAI
1 Pembuangan tanah bongkaran dan puing B.8. 178,00 m3 Rp -
2 Lantai dasar pasang keramik, beton K-100 tebal 10 cm dengan wiremesh M6 D.35.g 25,11 m3 Rp -
3 Pasang lantai homogeneus tile 60x60 KW 1 (polished) I.9.a 181,64 m2 Rp -
4 Pasang lantai selasar homogeneus tile 60x60 KW 1 (polished) I.9.a 59,43 m2 Rp -
5 Pasang lantai trap tangga homogeneus 60x60 KW 1 polished I.9.a 16,50 m2 Rp -
6 Step nozing trap tangga homogeneus 10x60 cm I.24.b 52,00 m' Rp -
TOTAL
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN JUMLAH
VOLUME
1 2 3 4 5 6
7 Pasang lantai KM/WC, keramik anti slip warna 25/25 KW 1 I.36.b 6,75 m2 Rp -
Pekerjaan Saluran dan Rabat Beton 0,00 Rp -
8 Lantai rabat keliling bangunan tebal 7 cm, K-100 D.1. 5,51 m3 Rp -
9 Acian rabat keliling bangunan H.27. 48,35 m2 Rp -
10 Pasangan paving blok heksagonal I.65. 88,00 m2 Rp -
11 Pasangan dinding saluran bata ringan 10 cm dengan mortar pasang G.25. 54,42 m2 Rp -
12 Pasang saluran buis beton U 1/2 lingkaran 20 cm O.35. 90,70 m' Rp -
13 Plesteran dinding saluran H.28. 45,35 m2 Rp -
14 Acian dinding saluran H.29. 45,35 m2 Rp -
VI Rp -
VII PEKERJAAN PINTU DAN JENDELA
1 Pas. Pintu P1 4,00 set
Pintu double multiplek 2x18 mm lapis HPL L.8.b 6,72 m2 Rp -
Kusen Alumunium 4" F.11.b 28,16 m' Rp -
Kaca mati bening 5 mm M.17. 1,68 m2 Rp -
Kunci tanam stainless M.2. 4,00 set Rp -
Engsel pintu stainless x 3 per daun M.5. 12,00 bh Rp -
2 Pas. Pintu P2 3,00 set 0 Rp -
Pintu double multiplek 2x18 mm lapis HPL L.8.b 4,41 m2 Rp -
Kusen Alumunium 4" F.11.b 21,12 m' Rp -
Kaca mati bening 5 mm M.17. 1,08 m2 Rp -
Kunci tanam stainless M.2. 3,00 set Rp -
Engsel pintu stainless x 3 per daun M.5. 9,00 bh Rp -
3 Pas. Kusen Jendela Type J1 3,00 set 0 Rp -
Kusen Alumunium 4" F.11.b 27,00 m' Rp -
Bingkai jendela alumunium F.11.b 16,32 m' Rp -
Kaca mati bening 5 mm M.17. 5,34 m2 Rp -
Engsel casement M.6.a 6,00 ps Rp -
Handel/grendel M.8.b 6,00 bh Rp -
4 Pas. Kusen Jendela Type J2 3,00 set 0 Rp -
Kusen Alumunium 4" F.11.b 46,56 m' Rp -
Bingkai jendela alumunium F.11.b 32,64 m' Rp -
Kaca mati bening 5 mm M.17. 10,65 m2 Rp -
Engsel casement M.6.a 12,00 ps Rp -
Handel/grendel M.8.b 12,00 bh Rp -
5 Pas. Kusen Jendela Type J3 6,00 set 0 Rp -
Kusen Alumunium 4" F.11.b 102,12 m' Rp -
Bingkai jendela alumunium F.11.b 76,32 m' Rp -
Kaca mati bening 5 mm M.17. 27,42 m2 Rp -
Engsel casement M.6.a 24,00 ps Rp -
Handel/grendel M.8.b 24,00 bh Rp -
6 Pas. Kusen Type BV 3,00 set 0 Rp -
Kusen Alumunium 4" F.11.b 9,00 m' Rp -
Kaca mati bening 5 mm M.17. 3,96 m2 Rp -
7 Pasang partisi folding gate tb. 0,6 mm finishing cat semprot 2 sisi FG 1,00 set Rp -
VII Rp -
VIII PEKERJAAN PENGECATAN
1 Pengecatan dinding dgn cat tembok interior N.10. 302,36 m2 Rp -
2 Pengecatan dinding dgn cat tembok exterior wheatershield N.10.a. 385,73 m2 Rp -
3 Pengecatan plafond/langit-langit dgn cat tembok interior N.10. 337,52 m2 Rp -
4 Pengecatan pipa handrail dengan cat minyak N.4. 1,62 m2 Rp -
VIII Rp -
IX PEKERJAAN INSTALASI LISTRIK
1 Pasang kabel gruping listrik NYY 3x4 Dihitung 56,00 m' Rp -
2 Pasang Box panel MCB 20 x 20 Q.17. 2,00 Bh Rp -
3 Pasang MCB 10 Ampere / 220 V Q.16. 4,00 Bh Rp -
4 Pasang titik cahaya + lampu PL 18 watt Q.1. 9,00 ttk Rp -
5 Pasang titik cahaya + lampu TKO 1 x 36 watt Q.8. 16,00 ttk Rp -
6 Pasang stop kontak Q.12. 11,00 ttk Rp -
6 Pasang stop kontak AC Q.12. 7,00 ttk Rp -
7 Pasang saklar double Q.15. 5,00 ttk Rp -
8 Pasang saklar single Q.14. 4,00 ttk Rp -
IX Rp -
X PEKERJAAN SANITAIR
1 Pasang kloset jongkok + instalasi pipa O.2.a 3,00 bh Rp -
2 Pasang floor drain + instalasi pipa O.14. 3,00 bh Rp -
3 Pasang wastafel lengkap kran + instalasi pipa O.5. 2,00 bh Rp -
4 Pipa drain air AC O.25.a 18,00 m' Rp -
5 Pasang kran air + instalasi pipa O.19. 3,00 bh Rp -
6 Membuat sumur bor lengkap casing pipa 4" dihitung 1,00 bh Rp -
7 Pasang pompa satelit listrik 1 HP lengkap pengkabelan dan pipa instalasi dihitung 1,00 bh Rp -
8 Pasang tabung air 1000 lt lengkap + instalasi pipa pembagi dan stop kran dihitung 1,00 unit Rp -
9 Pasang bioseptic tank kap 3 m3 dengan galian dan penutup beton dihitung 1,00 unit Rp -
10 Pasang pipa suply air bersih AW PVC 1,5" dari water torn O.28. 20,00 m' Rp -
11 Pasang pipa buangan air km dengan pipa PVC 3" ke saluran luar P.2. 12,00 m' Rp -
12 Pasang pipa air closet dengan pipa PVC 4" ke septictank P.3. 20,00 m' Rp -
X Rp -
TOTAL
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN JUMLAH
VOLUME
1 2 3 4 5 6
C PEKERJAAN 4 RKB, TANGGA, TOILET LT. 2
I PEKERJAAN STRUKTUR BETON
Kolom Beton
1 Kolom beton type (K1) 40x40 K-225 besi 242 kg/m3 D.33.a 11,52 m3 Rp -
2 Kolom beton type (K2) 25x25 K-225 besi 221,4 kg/m3 D.33.n 2,25 m3 Rp -
Balok Beton 0,00 Rp -
3 Balok beton type (B1) 30/55 K-225 besi 184,7 kg/m3 D.34.b 11,72 m3 Rp -
4 Balok beton type (B2) 20/40 K-225 besi 169 kg/m3 D.34.d 7,96 m3 Rp -
5 Balok beton type (B3) 20/30 K-225 besi 211,4 kg/m3 D.34.e 2,05 m3 Rp -
6 Balok beton type (B4) 15/25 K-225 besi 205,2 kg/m3 D.34.f 0,16 m3 Rp -
7 Balok beton type (B5) 20/30 K-225 besi 290,4 kg/m3 D.34.g 0,80 m3 Rp -
Plat Beton 0,00 Rp -
8 Membuat Plat Lantai tb. 12 cm Beton K 225 Besi 141,6 kg D.35.a 32,70 m3 Rp -
9 Membuat Plat Topian tb. 10 cm Beton K 225 Besi 115,1 kg D.35.c 6,51 m3 Rp -
10 Membuat Beton Struktur B6 Janggutan 10/60 K 225 Besi 176,4 kg D.34.h 1,32 m3 Rp -
Tangga Beton 0,00 Rp -
11 Lantai, trap anak tangga + pondasi beton K-225 besi 195,1 kg/m3 D.36.b 1,79 m3 Rp -
12 Balok tangga & kolom 20/25 K-225 besi 142,9 kg/m3 D.34.i 0,24 m3 Rp -
13 Plat bordes beton tb. 12 cm K-225 besi 155,3 kg/m3 D.36.a 0,49 m3 Rp -
I Rp -
II PEKERJAAN PASANGAN DAN FINISHING DINDING
2 Pasangan dinding bata ringan tb 10 cm dengan mortar pasang G.25. 272,17 m2 Rp -
3 Plesteran dinding dengan mortar plesteran H.28. 544,34 m2 Rp -
4 Plesteran acian dengan mortar acian H.29. 514,34 m2 Rp -
3 Plesteran acian dengan mortar acian H.28. 227,30 m2 Rp -
5 Finishing acian beton kolom, topian balok, dak dengan mortar acian H.29. 285,09 m2 Rp -
6 Plesteran openingan kusen dengan mortar plesteran H.28. 28,66 m2 Rp -
7 Acian opening dinding dengan mortar acian H.29. 28,66 m2 Rp -
8 Balok lintel praktis 10x15 D.30. 63,20 m' Rp -
9 Kolom praktis type (Kp) 11x11 D.29. 62,30 m' Rp -
10 Pasang keramik dinding warna 20/40 KW 1 KM/WC t = 2 m I.54.b 30,60 m2 Rp -
Railling tangga & selasar 0,00 Rp -
11 Pasangan dinding railing bata ringan tb 10 cm dengan mortar pasang G.25. 53,20 m2 Rp -
12 Plesteran railling adukan 1 pc : 5 ps H.28. 127,67 m2 Rp -
13 Acian railing H.29. 127,67 m2 Rp -
14 Kolom praktis type (Kp) 11x11 D.29. 13,20 m' Rp -
15 Ring balk beton railling tangga type (RB Praktis) 10x15 D.30. 53,20 m' Rp -
16 Pasang railing tangga pipa 2.5" medium tb. 3,4 mm galvanize F.24.a 53,20 m' Rp -
II Rp -
III PEKERJAAN PLAFOND
1 Plafond kelas & selasar gypsum tb 9 mm rangka hollow galvanis 4x4 & 4x2 cm (60x120 cm) J.11.a 290,66 m2 Rp -
2 Plafond area toilet GRC 4 mm rangka hollow galvanis 4x4 & 4x2 cm (60x120 cm) J.11.b 10,65 m2 Rp -
3 List gypsum profil warna putih polos 10 cm J.10. 207,30 m' Rp -
4 List kayu profil fin cat ukuran 5 cm J.9. 27,48 m' Rp -
III Rp -
IV PEKERJAAN LANTAI
1 Pasang lantai homogeneus tile 60x60 KW 1 (polished) I.9.a 224,19 m2 Rp -
2 Pasang lantai selasar homogeneus tile 60x60 KW 1 (polished) I.9.a 74,01 m2 Rp -
3 Pasang lantai trap tangga homogeneus 60x60 KW 1 polished I.9.a 16,50 m2 Rp -
4 Step nozing trap tangga homogeneus 10x60 cm I.24.b 76,30 m2 Rp -
5 Waterprofing membran lantai KM/WC I.71. 21,87 m2 Rp -
6 Pasang lantai KM/WC, keramik anti slip warna 25/25 KW 1 I.36.b 21,87 m2 Rp -
IV Rp -
V PEKERJAAN PINTU DAN JENDELA
1 Pas. Pintu P1 4,00 set
Pintu double multiplek 2x18 mm lapis HPL L.8.b 6,72 m2 Rp -
Kusen Alumunium 4" F.11.b 28,16 m' Rp -
Kaca mati bening 5 mm M.17. 1,68 m2 Rp -
Kunci tanam stainless M.2. 4,00 set Rp -
Engsel pintu stainless x 3 per daun M.5. 12,00 bh Rp -
2 Pas. Pintu P2 3,00 set 0 Rp -
Pintu double multiplek 2x18 mm lapis HPL L.8.b 4,41 m2 Rp -
Kusen Alumunium 4" F.11.b 21,12 m' Rp -
Kaca mati bening 5 mm M.17. 1,08 m2 Rp -
Kunci tanam stainless M.2. 3,00 set Rp -
Engsel pintu stainless x 3 per daun M.5. 9,00 bh Rp -
3 Pas. Kusen Jendela Type J1 4,00 set 0 Rp -
Kusen Alumunium 4" F.11.b 36,00 m' Rp -
Bingkai jendela alumunium F.11.b 21,76 m' Rp -
Kaca mati bening 5 mm M.17. 7,12 m2 Rp -
Engsel casement M.6.a 8,00 ps Rp -
Handel/grendel M.8.b 8,00 bh Rp -
4 Pas. Kusen Jendela Type J2 4,00 set 0 Rp -
Kusen Alumunium 4" F.11.b 62,08 m' Rp -
Bingkai jendela alumunium F.11.b 43,52 m' Rp -
TOTAL
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN JUMLAH
VOLUME
1 2 3 4 5 6
Kaca mati bening 5 mm M.17. 14,20 m2 Rp -
Engsel casement M.6.a 16,00 ps Rp -
Handel/grendel M.8.b 16,00 bh Rp -
5 Pas. Kusen Jendela Type J3 8,00 set 0 Rp -
Kusen Alumunium 4" F.11.b 136,16 m' Rp -
Bingkai jendela alumunium F.11.b 101,76 m' Rp -
Kaca mati bening 5 mm M.17. 36,56 m2 Rp -
Engsel casement M.6.a 32,00 ps Rp -
Handel/grendel M.8.b 32,00 bh Rp -
6 Pas. Kusen Type BV (Kusen alumunium 4", kaca 5mm) 3,00 set 0 Rp -
Kusen Alumunium 4" F.11.b 9,00 m' Rp -
Kaca mati bening 5 mm M.17. 3,96 m2 Rp -
V Rp -
VI PEKERJAAN PENGECATAN
1 Pengecatan dinding dgn cat tembok interior N.10. 476,45 m2 Rp -
2 Pengecatan dinding dgn cat tembok exterior wheatershield N.10.a. 392,86 m2 Rp -
3 Pengecatan plafond/langit-langit dgn cat tembok interior N.10. 348,45 m2 Rp -
4 Pengecatan pipa handrail dengan cat minyak N.4. 11,03 m2 Rp -
VI Rp -
VII PEKERJAAN INSTALASI LISTRIK
1 Pasang kabel penyambungan listrik ke meteran NYY 3x4 Dihitung 64,00 m' Rp -
2 Pasang Box panel MCB 20 x 20 Q.17. 1,00 Bh Rp -
3 Pasang MCB 10 Ampere / 220 V Q.16. 4,00 Bh Rp -
4 Pasang titik cahaya + lampu PL 18 watt Q.1. 9,00 ttk Rp -
5 Pasang titik cahaya + lampu TKO 1 x 36 watt Q.8. 16,00 ttk Rp -
6 Pasang stop kontak Q.12. 10,00 ttk Rp -
7 Pasang stop kontak AC Q.12. 8,00 ttk Rp -
8 Pasang saklar double Q.15. 5,00 ttk Rp -
9 Pasang saklar single Q.14. 4,00 ttk Rp -
VII Rp -
VIII PEKERJAAN SANITAIR
1 Pasang kloset jongkok + instalasi pipa O.2.a 3,00 bh Rp -
2 Pasang floor drain + instalasi pipa O.14. 3,00 bh Rp -
3 Pipa drain air AC O.25.a 24,00 m' Rp -
4 Pasang kran air + instalasi pipa O.19. 3,00 bh Rp -
5 Pasang pipa suply air bersih AW PVC 1,5" dari water torn dak O.28. 16,00 m' Rp -
6 Pasang pipa buangan air km dengan pipa PVC 3" P.2. 12,00 m' Rp -
7 Pasang pipa air closet dengan pipa PVC 4" P.3. 12,00 m' Rp -
VIII Rp -
D PEKERJAAN 4 RKB, TOILET, LT. 3
I PEKERJAAN STRUKTUR BETON
Kolom Beton
1 Kolom beton type (K1) 40x40 K-225 besi 145,7 kg/m3 D.33.f 15,20 m3 Rp -
2 Kolom beton type (K2) 25x25 K-225 besi 192,8 kg/m3 D.33.o 2,19 m3 Rp -
Ring Balok Beton 0,00 Rp -
3 Ring balk beton type (RB1) 20/30 K-225 besi 151,4 kg/m3 D.37.a 9,14 m3 Rp -
4 Ring balk beton type (RB2) 15/30 K-225 besi 173,4 kg/m3 D.37.b 2,96 m3 Rp -
5 Janggutan beton tb. 10 cm K-225 besi 176,4 kg/m3 D.34.h 1,11 m3 Rp -
6 Plat lantai dak torn beton tb. 12 cm K-225 besi 141,6 kg/m3 D.35.a 1,04 m3 Rp -
I Rp -
II PEKERJAAN PASANGAN DAN FINISHING DINDING
1 Pasangan dinding bata ringan tb 10 cm ruangan dan sofi sofi dengan mortar pasang G.25. 381,62 m2 Rp -
2 Plesteran dinding dengan mortar plesteran H.28. 763,24 m2 Rp -
3 Finishing acian dinding ruangan dan sofi sofi dengan mortar acian H.29. 733,24 m2 Rp -
4 Plesteran beton dengan mortar plesteran H.28. 130,70 m2 Rp -
5 Plesteran acian dengan mortar acian H.29. 130,70 m2 Rp -
6 Plesteran opening dinding adukan 1 pc : 5 ps H.28. 28,66 m2 Rp -
7 Finishing acian beton kolom, topian balok, dak dengan mortar acian H.29. 28,66 m2 Rp -
8 Balok lintel praktis 10x15 D.30. 63,20 m' Rp -
9 Kolom praktis type (Kp) 11x11 D.29. 59,70 m' Rp -
10 Pasang keramik dinding warna 20/25 KW 1 KM/WC t = 2 m I.54.a 30,60 m2 Rp -
Pagar Selasar 0,00 Rp -
11 Pasangan dinding selasar bata ringan tb 10 cm dengan mortar pasang G.25. 42,70 m2 Rp -
12 Plesteran pagar selasar dengan mortar plesteran H.28. 102,48 m2 Rp -
13 Acian dinding pagar selasar dengan mortar acian H.29. 102,48 m2 Rp -
14 Ring balk beton pagar selasar type (RB Praktis) 10x15 D.30. 42,70 m' Rp -
15 Pasang railing pagar selasar pipa 2.5" medium tb. 3,4 mm galvanize F.24.a 42,70 m' Rp -
II Rp -
III PEKERJAAN RANGKA DAN PENUTUP ATAP
1 Pas. rangka atap baja ringan galvanize (G.550) C-75 F.22.a 438,60 m2 Rp -
2 Pas. Penutup atap genteng bitumen 3 mm (gelombang panjang) K.32.b 438,60 m' Rp -
3 Pas. Flashing nok penutup ujung atap K.40. 61,26 m' Rp -
4 Pas. lisplank kayu motif gigi balang lb. 10 cm & 20 cm L.21.C 99,71 m' Rp -
III Rp -
TOTAL
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN JUMLAH
VOLUME
1 2 3 4 5 6
IV PEKERJAAN PLAFOND
1 Plafond kelas & selasar gypsum tb 9 mm rangka hollow galvanis 4x4 & 4x2 cm (60x120 cm) J.11.a 303,71 m2 Rp -
2 Plafond area toilet & tritisan GRC 4 mm rangka hollow galvanis 4x4 & 4x2 cm (60x120 cm) J.11.b 106,36 m2 Rp -
3 List gypsum profil warna putih polos 10 cm J.10. 213,10 m' Rp -
4 List kayu profil fin cat ukuran 5 cm J.9. 219,53 m' Rp -
IV Rp -
V PEKERJAAN LANTAI
1 Pasang lantai homogeneus tile 60x60 KW 1 (polished) I.9.a 224,19 m3 Rp -
2 Pasang lantai selasar homogeneus tile 60x60 KW 1 (polished) I.9.a 74,01 m2 Rp -
3 Waterprofing membran lantai dak torn dan lantai KM/WC I.71. 35,24 m2 Rp -
4 Pasang lantai KM/WC, keramik anti slip warna 25/25 KW 1 I.36.b 6,75 m2 Rp -
V Rp -
VI PEKERJAAN PINTU DAN JENDELA
1 Pas. Pintu P1 4,00 set
Pintu double multiplek 2x18 mm lapis HPL L.8.b 6,72 m2 Rp -
Kusen Alumunium 4" F.11.b 28,16 m' Rp -
Kaca mati bening 5 mm M.17. 1,68 m2 Rp -
Kunci tanam stainless M.2. 4,00 set Rp -
Engsel pintu stainless x 3 per daun M.5. 12,00 bh Rp -
2 Pas. Pintu P2 3,00 set 0,00 Rp -
Pintu double multiplek 2x18 mm lapis HPL L.8.b 4,41 m2 Rp -
Kusen Alumunium 4" F.11.b 21,12 m' Rp -
Kaca mati bening 5 mm M.17. 1,08 m2 Rp -
Kunci tanam stainless M.2. 3,00 set Rp -
Engsel pintu stainless x 3 per daun M.5. 9,00 bh Rp -
3 Pas. Kusen Jendela Type J1 4,00 set 0,00 Rp -
Kusen Alumunium 4" F.11.b 36,00 m' Rp -
Bingkai jendela alumunium F.11.b 21,76 m' Rp -
Kaca mati bening 5 mm M.17. 7,12 m2 Rp -
Engsel casement M.6.a 8,00 ps Rp -
Handel/grendel M.8.b 8,00 bh Rp -
4 Pas. Kusen Jendela Type J2 4,00 set 0,00 Rp -
Kusen Alumunium 4" F.11.b 62,08 m' Rp -
Bingkai jendela alumunium F.11.b 43,52 m' Rp -
Kaca mati bening 5 mm M.17. 14,20 m2 Rp -
Engsel casement M.6.a 16,00 ps Rp -
Handel/grendel M.8.b 16,00 bh Rp -
5 Pas. Kusen Jendela Type J3 8,00 set 0,00 Rp -
Kusen Alumunium 4" F.11.b 136,16 m' Rp -
Bingkai jendela alumunium F.11.b 101,76 m' Rp -
Kaca mati bening 5 mm M.17. 36,56 m2 Rp -
Engsel casement M.6.a 32,00 ps Rp -
Handel/grendel M.8.b 32,00 bh Rp -
6 Pas. Kusen Type BV 3,00 set 0,00 Rp -
Kusen Alumunium 4" F.11.b 9,00 m' Rp -
Kaca mati bening 5 mm M.17. 3,96 m2 Rp -
VI Rp -
VII PEKERJAAN PENGECATAN
1 Pengecatan dinding dgn cat tembok interior N.10. 583,08 m2 Rp -
2 Pengecatan dinding dgn cat tembok exterior wheatershield N.10.a. 383,34 m2 Rp -
3 Pengecatan plafond/langit-langit dgn cat tembok interior N.10. 303,71 m2 Rp -
4 Pengecatan listplank dan pipa handrail dengan cat minyak N.4. 48,73 m2 Rp -
VII Rp -
VIII PEKERJAAN INSTALASI LISTRIK
1 Pasang kabel penyambungan listrik ke meteran NYY 3x4 Dihitung 68,00 m' Rp -
2 Pasang Box panel MCB 20 x 20 Q.17. 1,00 Bh Rp -
3 Pasang MCB 10 Ampere / 220 V Q.16. 4,00 Bh Rp -
4 Pasang titik cahaya + lampu PL 13 watt Q.1. 8,00 ttk Rp -
5 Pasang titik cahaya + lampu TKO 1 x 36 watt Q.8. 12,00 ttk Rp -
6 Pasang stop kontak Q.12. 3,00 ttk Rp -
7 Pasang stop kontak AC Q.12. 8,00 ttk Rp -
8 Pasang saklar double Q.15. 4,00 ttk Rp -
9 Pasang saklar single Q.14. 3,00 ttk Rp -
10 Pasang Penangkal Petir Kurn R60 lengkap, Kabel BC 25 dalam conduit, dan grounding Dihitung 1,00 m' Rp -
VIII Rp -
IX PEKERJAAN SANITAIR
1 Pasang kloset jongkok + instalasi pipa O.2.a 3,00 bh Rp -
2 Pasang floor drain + instalasi pipa O.14. 3,00 bh Rp -
3 Pipa drain air AC O.25.a 24,00 m' Rp -
3 Pasang kran air + instalasi pipa O.19. 3,00 bh Rp -
5 Pasang pipa suply air bersih AW PVC 1,5" dari water torn dak O.28. 12,00 m' Rp -
6 Pasang pipa buangan air km dengan pipa PVC 3" P.2. 12,00 m' Rp -
7 Pasang pipa air closet dengan pipa PVC 4" P.3. 12,00 m' Rp -
IX Rp -
Rp -
TOTAL
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN JUMLAH
VOLUME
1 2 3 4 5 6
III. PEKERJAAN PAGAR TYPE A DENGAN BESI HOLLOW, PANJANG 11,7 M'
I PEKERJAAN PONDASI PAGAR
1 Galian tanah pondasi tapak beton dan batu kali B.1. 4,64 m3 Rp -
2 Urugan pasir bawah pondasi kali tbl 5 cm B.11. 0,42 m3 Rp -
3 Pasangan batu kosong / anstamping C.9. 1,40 m3 Rp -
4 Pasangan pasangan batu kali 1 pc : 5 ps C.3. 2,70 m3 Rp -
5 Pondasi tapak beton P 60/60 besi 103,6 kg/m3 D.31.a 0,29 m3 Rp -
6 Stamp Pondasi Tapak Beton (K1) 20x30 besi 133,8 kg/m3 D.33.v 0,18 m3 Rp -
7 Urugan kembali tanah galian pondasi tapak beton B.9. 1,60 m3 Rp -
I Rp -
II PEKERJAAN STRUKTUR BETON
1 Sloof beton SL2 15/20 K-225 besi 133,5 kg/m3 D.32.f 0,33 m3 Rp -
2 Kolom beton type (K1) 20x20 K-225 besi 133,8 kg/m3 D.33.v 0,27 m3 Rp -
3 Ring Balok beton type (RBP) 10/15 K-225 besi 214,1 kg/m3 D.37.g 0,16 m3 Rp -
II Rp -
III PEKERJAAN PASANGAN DAN FINISHING DINDING
1 Pasangan dinding 1/2 batu bata adukan 1 pc : 5 ps G.10. 4,36 m2 Rp -
2 Plesteran dinding adukan 1 pc : 5 ps H.5. 16,90 m2 Rp -
3 Acian dinding H.27. 16,90 m2 Rp -
4 Finishing beton dengan mortar H.29. 5,44 m2 Rp -
5 Pasang pagar besi hollow 40x40 tb. 1,2 mm + finishing cat F.23.c 8,40 m2 Rp -
6 Pengecatan dinding dan kolom dgn cat tembok exterior N.10. 22,34 m2 Rp -
III Rp -
Rp -
IV. PEKERJAAN GAPURA
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank A.4. 3,10 m' Rp -
I Rp -
II PEKERJAAN PONDASI BATU KALI DAN TAPAK
1 Galian tanah pondasi B.1. 2,88 m3 Rp -
2 Urugan pasir bawah pondasi tbl 10 cm B.11. 0,29 m3 Rp -
3 Pasangan pondasi batu kali 1 pc : 5 ps D.31.a 0,54 m3 Rp -
4 Stamp pondasi 20x20 besi 142,6 kg/m3 D.33.x 0,27 m3 Rp -
5 Pondasi tapak beton besi 101,4 kg/m3 D.31.a 0,72 m3 Rp -
6 Urugan kembali tanah galian pondasi batu kali B.9. 1,06 m3 Rp -
I Rp -
III PEKERJAAN STRUKTUR BETON
1 Sloof beton 15/20 besi 198,6 kg/m3 D.32.f 0,10 m3 Rp -
2 Kolom beton 20x20 besi 118,4 kg/m3 D.33.v 1,34 m3 Rp -
3 Balok beton type 15/25 besi 205,2 kg/m3 D.37.g 0,24 m3 Rp -
4 Plat beton tb. 10 cm besi 101,9 kg/m3 D.35.c 0,15 m3 Rp -
I Rp -
IV PEKERJAAN PASANGAN DAN FINISHING DINDING
1 Pasangan dinding 1/2 batu bata adukan 1 pc : 5 ps G.10. 24,96 m2 Rp -
2 Pasangan penebalan dinding 1/2 batu bata adukan 1 pc : 5 ps G.10. 1,80 m2 Rp -
3 Plesteran dinding dan list ban adukan 1 pc :5 ps H.5. 24,96 m2 Rp -
4 Acian dinding H.27. 24,96 m2 Rp -
5 Finishing kolom/balok/plat/Profil dengan mortar H.29. 24,08 m2 Rp -
I Rp -
V PEKERJAAN BESI
1 Pintu besi L=4,5 m hollow 80x40 tb 1,4 mm, 40x40 tb 1,2 mm + cat + roda rel F.23.d 8,80 m2 Rp -
2 Pasang papan gapura rangka besi hollow + plat double+ cat Dihitung 1,00 set Rp -
3 Pasang Huruf stainless steel t = 25 cm Dihitung 13,00 bh Rp -
" SDN KALIBARU II
Rp -
VI PEKERJAAN PENGECATAN
1 Pengecatan dinding/kolom dgn cat tembok exterior tahan cuaca N.10.a. 49,04 m2 Rp -
Rp -
Rp -
V. PEKERJAAN PERAPIHAN PAGAR EKSISTING DAN DINDING EKS BANGUNAN LAMA
I PEKERJAAN PENAMBAHAN STRUKTUR BETON PAGAR EKSISTING
1 Suntik kolom beton pagar type (K1) 15x20 K-225 besi 133,8 kg/m3 D.33.v 1,40 m3 Rp -
2 Ring Balok beton type (RBP) 10/15 K-225 besi 214,1 kg/m3 D.37.g 1,40 m3 Rp -
I Rp -
II PEKERJAAN PERBAIKAN DINDING
1 Pasangan dinding 1/2 batu bata peninggian pagar samping adukan 1 pc : 5 ps G.10. 0,63 m2 Rp -
2 Plesteran dinding adukan 1 pc :5 ps H.5. 51,50 m2 Rp -
TOTAL
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN JUMLAH
VOLUME
1 2 3 4 5 6
3 Acian dinding H.27. 51,50 m2 Rp -
4 Plesteran kolom balok bekas bongkaran 1 pc :5 ps H.5. 38,52 m2 Rp -
5 Finishing acian kolom balok bekas bongkaran H.27. 38,52 m2 Rp -
II Rp -
III PEKERJAAN PENGECATAN
1 Pengecatan dinding dgn cat tembok interior N.10. 196,96 m2 Rp -
III Rp -
Rp -
VI. PEKERJAAN LAIN-LAIN
1 Pembersihan Site Lokasi 1,00 ls Rp -
Rp -
JUMLAH Rp -
PPN 11% Rp -
Biaya Tambah Daya PLN 7700 VA
JUMLAH + PPN 11% + PLN Rp -
PEMBULATAN Rp -
Bekasi, 2023
Penawar
PT/CV…………………………
....................
DIREKTUR| Authority | |||
|---|---|---|---|
| 30 September 2019 | Jasa Konstruksi Peningkatan Kawasan Penanganan Xii Rpkpp Kel. Pedurenan Kec. Mustika Jaya | Pemerintah Daerah Kota Bekasi | Rp 2,810,650,000 |
| 23 July 2018 | Rehabilitasi Kampus Diklat | Kab. Karawang | Rp 2,500,000,000 |
| 25 July 2016 | Rehabilitasi/Pemeliharaan Jl.Industri | Bagian Pengadaan Barangjasa Sekretariat Daerah Kota Cimahi | Rp 2,000,000,000 |
| 23 July 2018 | Pembangunan Gedung Serba Guna Perum Lambangsari Permai Desa Lambangsari Kecamatan Tambun Selatan | Pemerintah Daerah Kabupaten Bekasi | Rp 1,998,800,000 |
| 17 June 2025 | Peningkatan Jalan Raya Jatimakmur | Kota Bekasi | Rp 1,880,000,000 |
| 25 June 2019 | Pembangunan Ruang Kelas Baru (Rkb) Sd Negeri Srimukti 02 Kecamatan Tambun Utara | Pemerintah Daerah Kabupaten Bekasi | Rp 1,798,800,000 |
| 24 February 2017 | Rehabilitasi Total Sdn Bekasi Jaya VI | Pemerintah Daerah Kota Bekasi | Rp 1,775,290,000 |
| 8 April 2015 | Lanjutan Pembangunan Smkn 7 Kota Bekasi | Rp 1,666,330,000 | |
| 24 April 2019 | Rehab Total Sdn Wanasari 05 Kelurahan Wanasari | Pemerintah Daerah Kabupaten Bekasi | Rp 1,598,800,000 |
| 24 April 2018 | Konstruksi Lanjutan Pembangunan Gedung Smpn 33 Kota Bekasi | Kota Bekasi | Rp 1,334,964,000 |