| Reason | |||
|---|---|---|---|
| 0835244591085000 | Rp 3,378,610,512 | - | |
| 0314770231001000 | Rp 3,150,652,104 | Tidak Menyampaikan Rencana Keselamatan Konstruksi (RKK) | |
| 0028354363001000 | - | - | |
| 0916336340117000 | - | - | |
Roy Abadi Sejahtera | 05*8**1****25**0 | - | - |
| 0862725025403000 | - | - | |
CV Nirwana Rahma Makmur | 09*9**6****01**0 | - | - |
| 0959301458321000 | - | - | |
CV Torgabe Artha Nugraha | 0818185761432000 | - | - |
| 0030967467008000 | - | - | |
PT Ginza Sukses Mandiri | 04*4**4****14**0 | - | - |
| 0867560534429000 | - | - | |
PT Erista Jaya | 03*3**8****07**0 | - | - |
| 0210512778451000 | - | - | |
PT Rade Sumber Berkat | 06*5**2****08**0 | - | - |
CV Bintang Multimedia Indonesia | 02*0**3****07**0 | - | - |
PT Napauli Dionma Sukses | 09*1**0****01**0 | - | - |
CV Sihar Putra | 00*3**8****08**0 | - | - |
| 0959264573005000 | - | - | |
| 0013218458008000 | - | - | |
PT Daniel Sumber Rezeki | 09*9**3****32**0 | - | - |
| 0758095327121000 | - | - | |
| 0818064461432000 | - | - | |
| 0030219976811000 | - | - | |
| 0024483620002000 | - | - | |
Mutiara Syifa | 00*6**3****08**0 | - | - |
| 0013270327002000 | - | - | |
Berkah Sejahtera Mandiri | 0029711330101000 | - | - |
PT Moses Putra Perkasa | 04*6**5****32**0 | - | - |
| 0906808555003000 | - | - | |
CV Basun Tosi Mandiri | 06*9**6****08**0 | - | - |
| 0418580395023000 | - | - |
BILL OF QUANTITY (BOQ)
PEMBERI TUGAS : DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
PEKERJAAN : LANJUTAN PEMBANGUNAN GUDANG KPU KOTA BEKASI
LOKASI : KOTA BEKASI - JAWA BARAT
TAHUN ANGGARAN : 2022
KODE HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
ANALISA SATUAN (Rp) HARGA (Rp)
a b c d e f g = (e x f)
A PEKERJAAN PENDAHULUAN DAN PERSIAPAN
A.1 PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek digital printing A.17. ls 1,00 -
2 Listrik dan Air Kerja HIT ls 1,00 -
3 SMKK (Sistem Manajemen Keselamatan Konstruksi) -
a Penyiapan RKK HIT ls 1,00 -
b Sosialisasi, Promosi dan Pelatihan HIT ls 1,00 -
c Alat Pelindung Kerja dan Alat Pelindung Diri HIT ls 1,00 -
d Asuransi dan Perizinan HIT ls 1,00 -
e Personel K3 Konstruksi HIT ls 1,00 -
f Fasilitas, Sarana dan Prasana Kesehatan HIT ls 1,00 -
g Rambu-rambu HIT ls 1,00 -
h Konsultasi dengan Ahli terkait Keselamatan Konstruksi HIT ls 1,00 -
i Lain- Lain Terkait Pengendalian Risiko Keselamatan Konstruksi HIT ls 1,00 -
Sub Total Pekerjaan Pendahuluan -
A.2 PEKERJAAN PERSIAPAN
1 Laporan administrasi dan dokumentasi HIT ls 1,00 -
Sub Total Pekerjaan Persiapan -
Total Pekerjaan Pendahuluan Dan Persiapan -
B PEKERJAAN GEDUNG TAMBAHAN
PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN STRUTUR BAWAH
I.1 Pondasi
1 Pek. Mobilisasi dan demobilisasi alat hit ls 1,00 Rp -
2 Menggali tanah biasa sedalam 2 meter b.2. m3 30,48 Rp -
3 Pondasi P1 120x120x37cm 101,4kg d.31.a m3 4,26 Rp -
4 Pek. Pondasi Batu Pecah 1:5 c.3. m3 12,05 Rp -
5 Kolom Stamp 1,5m K1 40/40 d.33.a m3 1,41 Rp -
5 Pek. Urugan pasir bawah pondasi tbl 10 cm P1 b.9. m3 1,15 Rp -
6 Pek. Urug Kembali b.9. m3 11,61 Rp -
7 mobilisasi pekerjaan beton hit ls 1,00 Rp -
Sub Total Pondasi Rp -
I.2 Tie Beam
1 Membuat Beton Struktur SL1 K 225 Sloof 20/40 Besi 154,1 kg d.32.a m3 5,12 Rp -
2 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 212,6 kg d.32.b m3 1,51 Rp -
Sub Total Tie Beam Rp -
Sub Total Pekerjaan Strutur Bawah Rp -
II PEKERJAAN STRUTUR LANTAI 1
II.1 Kolom
1 Membuat Beton Struktur K1 Kolom 40/40 Lt. 1 K 225 Besi 220,9 kg d.33.a m3 5,76 Rp -
Sub Total Kolom Rp -
II.2 Balok
1 Membuat Beton Struktur B1 Balok 30/60 K 225 Besi 157,1 kg d.34.c m3 8,00 Rp -
2 Membuat Beton Struktur B3 Balok 20/30 K 225 Besi 199 kg d.34.e m3 5,76 Rp -
Sub Total Balok Rp -
II.3 Pelat Lantai
1 Membuat lantai kerja beton K-100 (Fc = 7,4 Mpa, slump (3±6) cm, w/c =d .04..87) m3 15,50 Rp -
2 Membuat Plat Lantai tb. 12 cm Beton K 225 Besi 141,6 kg d.35.a m3 18,60 Rp -
mobilisasi pekerjaan beton hit ls 1,00 Rp -
Sub Total Pelat Lantai Rp -
Sub Total Pekerjaan Strutur Lantai 1 Rp -
III PEKERJAAN STRUTUR LANTAI 2
III.1 Kolom
1 Membuat Beton Struktur K1 Kolom 40/40 Lt. 1 K 225 Besi 220,9 kg d.33.a m3 5,76 Rp -
Sub Total Kolom Rp -
III.2 Balok
1 Membuat Beton Struktur RB1 Ring Balk 20/40 K 225 Besi 120,8 kg d.37.a m3 5,12 Rp -
Sub Total Balok Rp -
III.3 Pelat Lantai
KODE HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
ANALISA SATUAN (Rp) HARGA (Rp)
Sub Total Pelat Lantai Rp -
Sub Total Pekerjaan Strutur Lantai 2 Rp -
Total Pekerjaan Struktur Gedung Rp -
PEKERJAAN ARSITEKTUR
I PEKERJAAN ARSITEKTUR LANTAI 1
I.1 PEKERJAAN DINDING DAN PELAPIS DINDING
1 Pek. dinding Bata ringan 10 x 20 x 60 termasuk perekatnya G.25. m2 113,39 Rp -
2 Pek. Plesteran dengan mortar siap pakai H.28. m2 226,77 Rp -
3 Pek. Acian dengan mortar siap pakai H.29. m2 226,77 Rp -
4 Pek. pembuatan kolom praktis D.29. m' 35,55 Rp -
Sub Total Pekerjaan Dinding Dan Pelapis Dinding Rp -
I.2 PEKERJAAN KUSEN PINTU, JENDELA, DAN KACA
1 Pas. Kusen dan Daun Pintu Type P-02 (Wooden Door) Uk. 900 x 2700 bh
Pasang kusen pintu/jendela alumunium 4" (warna powder cFo.1a1ti.nag) m' 17,55 Rp -
Pasang pintu plywood rangkap + lapis HPL, rangka exposeL k.8a.ybu kelas ImI (2kayu singkil)3,05 Rp -
Pasang kaca , tebal 5 mm M.17. m2 0,05 Rp -
Pasang kunci tanam M.2. bh 1,00 Rp -
Pasang engsel pintu M.5. bh 6,00 Rp -
Rp -
2 Pasang pintu lipat (folding door) bahan besi 2200x2200 bh Rp -
Pasang rangka jendela besi scuare tube F.6. m1 6,60 Rp -
Pasang pintu lipat (folding door) bahan besi F.8.a m2 1,58 Rp -
Rp -
4 Pas. Jendela Type BV Uk.1300 x 600 bh Rp -
Pasang kusen pintu/jendela alumunium 3" warna coklat F.11.d m 4,40 Rp -
Pasang kaca , tebal 5 mm M.17. m2 0,78 Rp -
Sub Total Pekerjaan Kusen Pintu, Jendela, Dan Kaca Rp -
I.3 PEKERJAAN PLAFOND
1 Pek. Finishing beton dengan mortar siap pakai H.29. m2 178,25 Rp -
Sub Total Pekerjaan Plafond Rp -
I.4 PEKERJAAN PELAPIS LANTAI
2 Pek. Pelapis Lantai Keramik uk. 40x40 warna I.35.b m2 150,00 Rp -
3 Pek. Pasang plint ubin warna 10x40 I.21. m' 50,40 Rp -
Sub Total Pekerjaan Pelapis Lantai Rp -
I.5 PEKERJAAN PENGECATAN
1 Pek. Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapisN c.a1t0 p.enutup)m in2terior 113,39 Rp -
2 Pek. Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapiNs .c1a0t. ap.enutup)m e2xterior 113,39 Rp -
3 Pek. Pengecatan plafond/langit-langit dgn cat tembok interior N.10. m2 178,25 Rp -
Sub Total Pekerjaan Pengecatan Rp -
Sub Total Pekerjaan Arsitektur Lantai 1 Rp -
II PEKERJAAN ARSITEKTUR LANTAI 2
I.1 PEKERJAAN DINDING DAN PELAPIS DINDING
1 Pek. dinding Bata ringan 10 x 20 x 60 termasuk perekatnya G.25. m2 113,39 Rp -
2 Pek. Plesteran dengan mortar siap pakai H.28. m2 226,77 Rp -
3 Pek. Acian dengan mortar siap pakai H.29. m2 226,77 Rp -
4 Pek. pembuatan kolom praktis D.29. m' 35,55 Rp -
Sub Total Pekerjaan Dinding Dan Pelapis Dinding Rp -
I.2 PEKERJAAN KUSEN PINTU, JENDELA, DAN KACA
1 Pas. Kusen dan Daun Pintu Type P-02 (Wooden Door) Uk. 900 x 2700 bh
Pasang kusen pintu/jendela alumunium 4" (warna powder cFo.1a1ti.nag) m' 17,55 Rp -
Pasang pintu plywood rangkap + lapis HPL, rangka exposeL k.8a.ybu kelas ImI (2kayu singkil)3,05 Rp -
Pasang kaca , tebal 5 mm M.17. m2 0,05 Rp -
Pasang kunci tanam M.2. bh 1,00 Rp -
Pasang engsel pintu M.5. bh 6,00 Rp -
Rp -
4 Pas. Jendela Type BV Uk.1300 x 600 bh
Pasang kusen pintu/jendela alumunium 3" warna coklat F.11.d m 4,40 Rp -
Pasang kaca , tebal 5 mm M.17. m2 0,78 Rp -
Sub Total Pekerjaan Kusen Pintu, Jendela, Dan Kaca Rp -
I.3 PEKERJAAN PLAFOND
1 Pek. Finishing beton dengan mortar siap pakai H.29. m2 178,25 Rp -
Sub Total Pekerjaan Plafond Rp -
I.4 PEKERJAAN PELAPIS LANTAI
2 Pek. Pelapis Lantai Keramik uk. 40x40 warna I.35.b m2 150,00 Rp -
3 Pek. Pasang plint ubin warna 10x40 I.21. m' 50,40 Rp -
Sub Total Pekerjaan Pelapis Lantai Rp -
I.5 PEKERJAAN PENGECATAN
1 Pek. Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapisN c.a1t0 p.enutup)m in2terior 113,39 Rp -
2 Pek. Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapiNs .c1a0t. ap.enutup)m e2xterior 113,39 Rp -
3 Pek. Pengecatan plafond/langit-langit dgn cat tembok interior N.10. m2 178,25 Rp -
KODE HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
ANALISA SATUAN (Rp) HARGA (Rp)
Sub Total Pekerjaan Pengecatan Rp -
Sub Total Pekerjaan Arsitektur Lantai 2 Rp -
IV PEKERJAAN ARSITEKTUR ATAP
1 Rangka Atap Baja Ringan F.22.a m2 211,20 Rp -
2 Penutup Atap Bitumen motif genteng K.33.b m2 211,20 Rp -
3 Nok Bitumen K.37.a m' 57,30 Rp -
4 Pek. lisplang GRC double ukuran (0.9 x 30)/(0.9 x 10) cm L.21.f m' 57,30 Rp -
Sub Total Pekerjaan Arsitektur Atap Rp -
Sub Total Pekerjaan Arsitektur Atap Rp -
Total Pekerjaan Arsitektur Rp -
PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING
I PEKERJAAN ELEKTRIKAL ARUS KUAT
I.1 Elektrikal Lantai 1
1 Saklar dan Stop Kontak
- Saklar Tunggal q.14. bh 1,00 Rp -
- Saklar Ganda q.15. bh 4,00 Rp -
- Stop Kontak 200 w q.12. bh 4,00 Rp -
2 Titik Instalasi
Pasang titik lampu, TKI 1 x 36 watt komplit q.8. bh 12,00 Rp -
3 Daya
Pasang MCB 6 Ampere / 220 V q.16. bh 2,00 Rp -
Pasang box panel MCB 20 x 20 (4 Slot) q.17. bh 1,00 Rp -
Sub Total Elektrikal Lantai 1 Rp -
I.1 Elektrikal Lantai 2
1 Saklar dan Stop Kontak
- Saklar Tunggal q.14. bh 1,00 Rp -
- Saklar Ganda q.15. bh 4,00 Rp -
- Stop Kontak 200 w q.12. bh 4,00 Rp -
2 Titik Instalasi
Pasang titik lampu, TKI 1 x 36 watt komplit q.8. bh 12,00 Rp -
Sub Total Elektrikal Lantai 2 Rp -
Sub Total Pekerjaan Elektrikal Arus Kuat Rp -
Total Pekerjaan Gedung Tambahan -
C PEKERJAAN POS JAGA
1 Arsitektur Pos Jaga
1 Pek. Pasangan Bata Ringan Tb. 10 G.25. m2 37,60 -
2 Pek. Plesteran dengan mortar siap pakai H.28. m2 75,20 -
3 Pek. Acian dengan mortar siap pakai H.29. m2 61,21 -
4 Pek. Pengecatan Dinding Interior N.10. m2 29,37 -
5 Pek. Pengecatan Dinding Exterior N.10.a. m2 34,54 -
6 Pek. Galian B.1. m3 16,11 -
7 Pek. Beton Struktur PONDASI P1 K 225 Pondasi Besi 101,4 kg (tb. 37,D5 .c3m1.)a m3 1,50 -
9 Pek. Pengurugan Pasir Urug B.11. m3 0,61 -
10 Pek. Pengurugan Kembali B.9. m3 8,96 -
11 Pek. Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 kg D.31.a m3 0,76 -
12 Pek. Beton Struktur K3 Kolom 20/20 K 225 Besi 142,6 kg D.33.v m3 0,48 -
13 Pek. Plesteran dengan mortar siap pakai H.28. m2 3,60 -
14 Pek. kolom penguat beton bertulang (11 x 11) cm D.29. m 9,00 -
15 Pek. ring balok beton bertulang (10 x 15) cm D.30. m 16,85 -
-
16 Pas. Kusen dan Daun Pintu Type P-01 (Wooden Door) Uk. 800 x 2150F.26.q bh 2,00 -
17 Pas. Jendela Type J-01 Uk : 1550 x 1300 F.26.m bh 2,00 -
18 Pas. Jendela Type J-02 Uk : 775 x 1300 F.26.n bh 3,00 -
19 Pas. Jendela Type GB m.22.a bh 2,00 -
-
17 Pek. Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm + rangka hJo.1ll1o.wA galvanmis2 9,04 -
40.40 & 40.20 (120x60) -
18 Pek. Langit-langit gypsum board water resistant, uk. (120 x 240) tebal 9J .m11m.C + rangkam h2ollow g a l v1a1n,9is6 -
40.40 & 40.20 (120x60) -
19 Pek. List langit langit Profil Gypsum J.10. m' 52,80 -
20 Pek. Pengecatan plafond N.10.a. m2 21,00 -
-
21 Pek. Pasang lantai keramik 40 x 40 cm warna I.35.c m2 9,04 -
22 Pek. Pasang lantai keramik 40 x 40 cm warna Mate I.35.c m2 10,20 -
23 Pasang plint keramik 10 x 40 cm warna I.39.d m2 24,35 -
24 Pek. Pelapis Lantai Kamar Mandi 25x25 anti slip I.36.b m2 1,76 -
25 Pek. Dinding Keramik Kamar Mandi 25x40 I.54.b m2 13,99 -
-
26 Pek. Pengadaan dan pemasangan kloset Jongkok O.2. bh 1,00 -
27 Pek. Pengadaan dan pemasangan Floor Drain O.14. bh 1,00 -
28 Pek. Pengadaan dan pemasangan Kran tembok O.19. bh 2,00 -
-
KODE HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
ANALISA SATUAN (Rp) HARGA (Rp)
29 Pek. Dinding Batu Paras I.57. m2 8,76 -
30 Pek. Banbanan H.28. m2 1,46 -
-
31 Pek. Kuda-kuda dan rangka atap baja ringan profil C-75 atap bitumen F.22.c m2 27,26 -
32 Pek. Pasang atap bitumen monolayer selulosa 3 mm (atap jurai) K.32.b m2 27,26 -
33 Pek. Nok Bitumen K.37.a m' 4,85 -
34 Pek. Listplank Kayu (3 x 20 & 3 x 10) cm Pola Gigi Balang L.21.c m' 19,40 -
Sub Total Arsitektur Pos Jaga -
I.1 PEKERJAAN TITIK INSTALASI DAYA DAN ARMATUR PENERANGAN
1 Saklar dan Stop Kontak
- Saklar Tunggal Q.14. bh 1,00 -
- Saklar Ganda Q.15. bh 13,00 -
- Stop Kontak 200 w q.12. bh 16,00 -
3 Fixtures Lampu Lengkap dengan Armatur -
Pasang titik lampu, PL 18 watt (downlight dia. 4") q.4. bh 4,00 -
Pasang titik lampu, RM 2 x 36 watt komplit Q.11. bh 18,00 -
Kipas Ceilling -
2 - Ceillinf Fan 60" dihitung Unit 16,00 -
Total Pekerjaan Titik Instalasi Daya Dan Armatur Penerangan -
II PEKERJAAN PLUMBING
II.1 PEKERJAAN AIR BERSIH
Lantai 1
1 Pemipaan Polypropelyne PN.10 lengkap material bantu dan aksessoris:
- Memasang pipa PVC tipe AW diameter 1/2" O.25. m1 6,00 -
- Memasang pipa PVC tipe AW diameter 3/4" O.26. m1 40,00 -
2 Gate Valve -
- Memasang kran diameter 3/4" atau 1/2" O.19. bh 2,00 -
Sub Total Pekerjaan Air Bersih -
II.2 PEKERJAAN AIR BEKAS DAN KOTOR
Lantai 1
Pemipaan Air Kotor dan Bekas PVC Tipe AW Kelas 10 kg/cm2 :
1 Pemasangan pipa PVC dia. 3" P.2. m1 24,00 -
2 Pemasangan pipa PVC dia. 4" P.3. m1 31,00 -
3 Membuat septictank dan rembesan 2 X 1,5 X 1.5M O.37. Unit 1,00 -
Sub Total Pekerjaan Air Bekas Dan Kotor -
Total -
Total Pekerjaan Pos Jaga -
D PEKERJAAN SITE DEVELOPMENT
I PEKERJAAN PARKIR DAN JALAN
1 Pek. Mengurug Sirtu Padat B.14. m3 101,00 -
2 Pek pemadatan Sirtu per 20 cm (menggunakan Stamper) B.10.a m3 101,00 -
3 Pek. Paving Block tebal 8 cm warna I.67. m2 1.010,00 -
Pek. Struktur U-ditch 40x40x120 (PR 0 - PR 4) p : 205.2 m -
5 a Pek. Pengukuran dan Pasang Bowplank Hit m1 96,00 -
7 c Pek. Galian Tanah Biasa ≤ 1 m B.1. m3 31,68 -
8 d Pek. Pemadatan Tanah Dasar Saluran B.10. m3 5,28 -
9 e Pek. Lantai Kerja (K-100) Tebal 5 cm Hit m3 2,64 -
10 f Pek. Pemasangan U-ditch 40 X 40 X 120 (171 Unit) Hit m1 96,00 -
11 g Pek. Pemasangan CU 40 HD (342 Unit) Hit m1 96,00 -
Pek. Struktur BC 40x40x100 (PR 0 - PR 4) p : 10 m -
12 a Pek. Pengukuran dan Pasang Bowplank (10/m) Hit m1 50,00 -
14 c Pek. Galian Tanah Biasa ≤ 1 m B.1. m3 16,50 -
15 d Pek. Pengurugan Sirtu Padat B.14. m3 2,75 -
16 e Pek. Pemadatan Tanah Dasar Saluran B.10. m3 1,38 -
17 f Pek. Lantai Kerja (K-100) Tebal 5 cm Hit m3 50,00 -
18 g Pek. Pemasangan Box Culvert 40 X 40 X 100 (10 Unit) Hit m1 50,00 -
Sub Total Pekerjaan Parkir dan Jalan -
II PEKERJAAN PAGAR
1 Pagar Depan
1 Pek. Pasangan Bata Ringan Tb. 10 G.25. m2 28,39 -
2 Pek. Plesteran dengan mortar siap pakai H.28. m2 56,78 -
3 Pek. Acian dengan mortar siap pakai H.29. m2 56,78 -
4 Pek. Pengecatan Dinding Exterior N.10.a. m2 56,78 -
5 Pek. Galian B.1. m3 16,86 -
6 Pek. Beton Struktur PONDASI P1 K 225 Pondasi Besi 101,4 kg (tb. 37,D5 .c3m1.)a m3 2,25 -
7 Pek. pondasi batu belah, 1 pc : 5 ps C.3. m3 4,72 -
8 Pek. Pengurugan Pasir Urug B.11. m3 1,39 -
9 Pek. Pengurugan Kembali B.9. m3 8,51 -
10 Pek. Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 kg D.31.a m3 0,59 -
11 Pek. Membuat Beton Struktur K2 Kolom 30/30 Lt. 2 K 225 Besi 192,1 kDg.33.a m3 1,35 -
12 Pek. Plesteran dengan mortar siap pakai H.28. m2 13,50 -
13 Pek. Acian dengan mortar siap pakai H.29. m2 13,50 -
14 Pek. Pengecatan Dinding Exterior N.10.a. m2 13,50 -
15 Pek. Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 204,9 kg D.37.f m3 0,39 -
16 Pek. Plestern Banbanan H.16. m2 5,24 -
17 Pek. Acian Banbanan N.10.a. m2 5,24 -
17 Pek. Dinding Batu Paras I.57. m2 6,50 -
KODE HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
ANALISA SATUAN (Rp) HARGA (Rp)
18 Logo KPU HIt bh 1,00 -
19 Huruf t12cm Stainless Mirror 'KOMISI PEMILIHAN UMUM KOTA BEKASHI'It bh 29,00 -
17 Pek. Motif Gigi Balang plester H.28. m2 5,24 -
17 Pek. Motif Gigi Balang acian H.16. m2 5,24 -
20 Gerbang N.10.a. m2 26,50 -
-
2 Pagar Samping jalan -
1 Pek. Pasangan Bata Ringan Tb. 10 G.25. m2 165,88 -
2 Pek. Plesteran dengan mortar siap pakai H.28. m2 331,76 -
3 Pek. Acian dengan mortar siap pakai H.29. m2 289,86 -
4 Pek. Pengecatan Dinding Exterior N.10.a. m2 289,86 -
5 Pek. Galian B.1. m3 97,20 -
6 Pek. Beton Struktur PONDASI P1 K 225 Pondasi Besi 101,4 kg (tb. 37,D5 .c3m1.)a m3 11,25 -
7 Pek. pondasi batu belah, 1 pc : 5 ps C.3. m3 27,14 -
8 Pek. Pengurugan Pasir Urug B.11. m3 7,42 -
9 Pek. Pengurugan Kembali B.9. m3 47,99 -
10 Pek. Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 kg D.31.a m3 3,39 -
11 Pek. Membuat Beton Struktur K2 Kolom 30/30 Lt. 2 K 225 Besi 192,1 kDg.33.a m3 6,53 -
12 Pek. Plesteran dengan mortar siap pakai H.28. m2 65,25 -
13 Pek. Acian dengan mortar siap pakai H.29. m2 91,35 -
14 Pek. Pengecatan Dinding Exterior N.10.a. m2 91,35 -
15 Pek. Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 204,9 kg D.37.f m3 2,26 -
16 Pek. Plestern Banbanan H.16. m2 30,16 -
17 Pek. Acian Banbanan N.10.a. m2 30,16 -
17 Pek. Dinding Batu Paras I.57. m2 41,91 -
17 Pek. Motif Gigi Balang plester H.16. m2 30,16 -
17 Pek. Motif Gigi Balang acian N.10.a. m2 30,16 -
-
2 Pagar Samping warga -
1 Pek. Pasangan Bata Ringan Tb. 10 G.25. m2 377,00 -
2 Pek. Plesteran dengan mortar siap pakai H.28. m2 754,00 -
3 Pek. Acian dengan mortar siap pakai H.29. m2 754,00 -
4 Pek. Pengecatan Dinding Exterior N.10.a. m2 754,00 -
5 Pek. Galian B.1. m3 97,20 -
6 Pek. Beton Struktur PONDASI P1 K 225 Pondasi Besi 101,4 kg (tb. 37,D5 .c3m1.)a m3 11,25 -
7 Pek. pondasi batu belah, 1 pc : 5 ps C.3. m3 27,14 -
8 Pek. Pengurugan Pasir Urug B.11. m3 7,42 -
9 Pek. Pengurugan Kembali B.9. m3 47,99 -
10 Pek. Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 kg D.31.a m3 3,39 -
11 Pek. Beton Struktur K1 Kolom 40/40 Lt. 1 K 225 Besi 232,5 kg D.33.a m3 23,20 -
12 Pek. Plesteran dengan mortar siap pakai H.28. m2 130,50 -
13 Pek. Acian dengan mortar siap pakai H.29. m2 130,50 -
14 Pek. Pengecatan Dinding Exterior N.10.a. m2 130,50 -
15 Pek. Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 204,9 kg D.37.f m3 4,52 -
16 Pek. Plestern Banbanan H.16. m2 30,16 -
17 Pek. Acian Banbanan N.10.a. m2 30,16 -
16 Pek. Kawat Duri D45cm + Tiang besi siku 4x4 bentuk Y + Sling Galvanis h4imt m m1 96,70 -
-
3 Pagar Belakang -
1 Pek. Pasangan Bata Ringan Tb. 10 G.25. m2 104,00 -
2 Pek. Plesteran dengan mortar siap pakai H.28. m2 208,00 -
3 Pek. Acian dengan mortar siap pakai H.29. m2 208,00 -
4 Pek. Pengecatan Dinding Exterior N.10.a. m2 208,00 -
5 Pek. Galian B.1. m3 24,90 -
6 Pek. Beton Struktur PONDASI P1 K 225 Pondasi Besi 101,4 kg (tb. 37,D5 .c3m1.)a m3 2,63 -
7 Pek. pondasi batu belah, 1 pc : 5 ps C.3. m3 7,49 -
8 Pek. Pengurugan Pasir Urug B.11. m3 1,95 -
9 Pek. Pengurugan Kembali B.9. m3 12,84 -
10 Pek. Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 kg D.31.a m3 0,94 -
11 Pek. Beton Struktur K1 Kolom 40/40 Lt. 1 K 225 Besi 232,5 kg D.33.a m3 5,60 -
12 Pek. Plesteran dengan mortar siap pakai H.28. m2 37,80 -
13 Pek. Acian dengan mortar siap pakai H.29. m2 37,80 -
14 Pek. Pengecatan Dinding Exterior N.10.a. m2 37,80 -
15 Pek. Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 204,9 kg D.37.f m3 1,25 -
16 Pek. Plestern Banbanan H.16. m2 8,32 -
17 Pek. Acian Banbanan N.10.a. m2 8,32 -
16 Pek. Kawat Duri D45cm + Tiang besi siku 4x4 bentuk Y + Sling Galvanis h4imt m m1 25,00 -
-
4 Pagar Fasilitas Warga -
1 Pek. Pasangan Bata Ringan Tb. 10 G.25. m2 208,00 -
2 Pek. Plesteran dengan mortar siap pakai H.28. m2 416,00 -
3 Pek. Acian dengan mortar siap pakai H.29. m2 416,00 -
4 Pek. Pengecatan Dinding Exterior N.10.a. m2 416,00 -
5 Pek. Galian B.1. m3 66,00 -
6 Pek. Beton Struktur PONDASI P1 K 225 Pondasi Besi 101,4 kg (tb. 37,D5 .c3m1.)a m3 7,50 -
7 Pek. pondasi batu belah, 1 pc : 5 ps C.3. m3 18,72 -
8 Pek. Pengurugan Pasir Urug B.11. m3 5,12 -
9 Pek. Pengurugan Kembali B.9. m3 34,66 -
10 Pek. Beton Struktur SL2 K 225 Sloof 15/30 Besi 226,5 kg D.31.a m3 4,68 -
KODE HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
ANALISA SATUAN (Rp) HARGA (Rp)
11 Pek.Membuat Beton Struktur K3 Kolom 20/20 K 225 Besi 142,6 kg D.33.v m3 3,20 -
12 Pek. Plesteran dengan mortar siap pakai H.28. m2 90,00 -
13 Pek. Acian dengan mortar siap pakai H.29. m2 90,00 -
14 Pek. Pengecatan Dinding Exterior N.10.a. m2 90,00 -
15 Pek. Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 204,9 kg D.37.f m3 1,56 -
Sub Total Pekerjaan Pagar -
III PEKERJAAN MEKANIKAL
III.1 PEKERJAAN APAR dan CCTV
Pemasangan 1 buah lampu PJU LED 40 Watt hit bh 6,00 -
Pemasangan 1 buah Tiang Galvaniz-Oktagonal Parabolic Sinhgilte 9 Meterb inhclude P o n d 6a,0si0 -
Fire Extinguisher Dry chemical type ABC
1 - Class ABC 6 Kg c/w include Bracket hit Unit 4,00 -
CCTV
3 - Pemasangan Instalasi CCTV Hit titik 10,00 -
4 - Pemasangan Instalasi Kabel Fo 12core Hit m 90,00 -
5 - Pemasangan Switch Hub Poe 12 Hit titik 1,00 -
6 - Pemasangan DVR + Hard Drive Hit titik 1,00 -
7 - Pemasangan CCTV IP Camera Outdoor Hit titik 10,00 -
Sub Total Pekerjaan Apar Dan Cctv -
Total Pekerjaan Mekanikal -
Total Pekerjaan Site Development -
E PEKERJAAN LAIN-LAIN
1 Pek. Jalan Depan Akses
1 Pek. Membuat beton K-250 (Fc = 21,7 Mpa, slump (12±2) cm, w/c = 0.56d).8. m3 25,14 -
2 Wire Mesh M,10 /m3 Beton d.20. m3 25,14 -
-
13 Pek. Pembersihan dan Perapihan HIT ls 1,00 -
Sub Total Pek. Jalan Depan Akses -
Total Pekerjaan Lain-Lain -
TOTAL BIAYA PEKERJAAN -
-
-
-
Bekasi, 2023
PT/CV………………………………………
……………………………
DIREKTUR
BILL OF QUANTITY (BOQ)
SISTEM MANAJEMEN KESELEMATAN KONSTRUKSI
NO. ITEM VOLUME SATUAN HARGA SATUAN HARGA
1 Penyiapan RK3K terdiri atas :
Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja 1,00 ls
Pembuatan Kartu Identitas Pekerja (KIP);
2 Sosialisasi dan Promosi K3 terdiri atas:
Simulasi K3; 1,00 ls
Spanduk (banner) ; 1,00 ls
Poster; 1,00 ls
Papan Informasi K3. 1,00 ls
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan
(Safety Talk dan/atau Tool Box Meeting) ; setiap hari
Alat Pelindung Kerja dan Alat Pelindung Diri
3 Alat Pelindung Kerja terdiri atas:
Tali Keselamatan (Life Line); 1,00 ls
4 Alat Pelindung Diri terdiri atas:
Topi Pelindung (Safety Helmet) ; 5,00 Bh
Pelindung Pernafasan Dan Mulut (Masker); 1,00 Psg
Sepatu Keselamatan (Safety Shoes); untuk Staf 5,00 Psg
Sepatu Keselamatan (Rubber Safety Shoes_and toe cap) 1,00 Psg
Rompi Keselamatan (Safety Vest); 1,00 Bh
5 Asuransi dan Perijinan
BPJS Ketenagakerjaan Dan Kesehatan Kerja; 1,00 ls
(BERDASARKAN KEPMENAKER NOMOR :
KEP-196/MEN/1999, untuTke naga harian Proyek)
6 Personil K3 terdiri dari:
Petugas K3 Konstruksi 1,00 bln
7 Fasilitas sarana kesehatan :
PK3 ( Kotak P3K Tandu Tabung Oksigen, Obat luka, Perban, dll) 1,00 Ls
8 Rambu- Rambu terdiri atas :
Rambu Larangan; 1,00 Bh
Rambu Peringatan; 1,00 Bh
Rambu Kewajiban; 1,00 Bh
Rambu Informasi; 1,00 Bh
9 Konsultasi dengan Ahli terkait Keselamatan Konstruksi:
Ahli K3 Konstruksi 1,00 ls
10 Lain- Lain Terkait Pengendalian Risiko Keselamatan Konstruksi:
Alat Pemadam Api Ringan (APAR) 1 Bh
Bendera K3 1 Bh
Program Inspeksi 1 Ls
Pelaporan dan Penyelidikan Insiden 1 Ls
Pembuatan Kartu Identitas Pekerja (KIP) 15 Lb
TOTAL Rp. -