| 0311677629128000 | Rp 1,938,946,516 | |
| 0759722218122000 | - | |
| 0317559029119000 | - | |
| 0951882281122000 | - | |
| 0024949646128000 | - | |
| 0312952336113000 | - | |
| 0015380603119000 | - | |
| 0739881811119000 | - | |
| 0314931403124000 | - | |
| 0917409021116000 | - | |
| 0210086633122000 | - | |
Hakey Jaya Konstruksi | 04*0**0****19**0 | - |
| 0834083339101000 | - | |
| 0421636226121000 | - | |
| 0390222867121000 | - | |
| 0020480521215000 | - | |
| 0803248004119000 | - | |
| 0800975997101000 | - | |
CV Js Group | 08*3**6****19**0 | - |
| 0412479651115000 | - | |
| 0749903399105000 | - | |
| 0311801161128000 | - | |
| 0017906967125000 | - | |
| 0026260281122000 | - | |
| 0945223022121000 | - |
PEMERINTAH KOTA BINJAI
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA BINJAI
URAIAN SINGKAT PEKERJAAN
Peningkatan Jalan Pada Jl. Ismail
Kec. Binjai Barat
TA. 2023
URAIAN SINGKAT PEKERJAAN
1. Nama Paket Pekerjaan : Peningkatan Jalan Pada Jl. Ismail Kecamatan Binjai Barat
2. Nilai Total HPS : Rp1.968.538.748,- (Satu milyar sembilan ratus enam puluh
delapan juta lima ratus tiga puluh delapan ribu tujuh
ratus empat puluh delapan rupiah)
3. Sumber Dana : APBD Pemerintahan Kota Binjai Pada Dinas Pekerjaan Umum
dan Penataan Ruang Tahun Anggaran 2023
4. Lingkup Pekerjaan : Peningkatan Jalan Pada Jl. Ismail Kecamatan Binjai Barat
direncanakan menggunakan Perkerasan Beton Semen (Tanpa
paver) dengan ketebalan 30 cm dan Lapisan Beton Kurus
sebagai Lantai Kerja dengan ketebalan 10 cm, dengan
rincian item pekerjaan yang akan dilaksanakan adalah
sebagai berikut :
a. Divisi 1. Umum
- Mobilisasi = 1 Ls
- Topi pelindung (Safety Helmet) = 5 Bh
- Pelindung mata (Goggles, Spectacles) = 5 Bh
- Pelindung pernafasan dan mulut (masker, masker
respirator) = 5 Bh
- Sarung tangan (Safety Gloves) = 5 Psg
- Sepatu keselamatan (Safety Shoes, rubber safety
shoes and toe cap) = 5 Psg
- Rompi keselamatan (Safety Vest) = 5 Bh
- Petugas pengatur lalu lintas = 3 Org
- Rambu petunjuk = 1 Bh
- Rambu larangan = 2 Bh
- Rambu peringatan = 2 Bh
- Rambu informasi = 1 Bh
- Kerucut lalu lintas (traffic cone) = 5 Bh
- Tongkat Pengatur Lalu Lintas (Warning Lights
Stick) = 2 Bh
- Lampu/alat penerangan sementara = 1 Bh
b. Divisi 3. Pekerjaan Tanah dan Geosintetik
- Galian perkerasan berbutir = 168,0 M3
- Galian perkerasan beton = 462,0 M3
d. Divisi 5. Perkerasan Berbutir
- Perkerasan beton semen (tanpa paver) = 472,5 M3
- Lapis Fondasi bawah beton kurus = 157,5 M3 -
d. Divisi 6. Perkerasan Aspal
- Lapis Resap Pengikat = 228,0 Ltr
- Laston Lapis Aus (AC-WC) = 51,3 Ton
5. Tenaga Kerja : Tenaga utama yang dipersyaratkan :
a. Pelaksana, memiliki SKTK – Pelaksana Jalan
b. Ahli K3 Konstruksi, memiliki SKA Ahli K3 Konstruksi
Muda/Madya
6. Peralatan Utama
Pekerjaan : Peralatan Utama yang dibutuhkan :
a. Asphalt Finisher
b. Pneumatic Tired Roller
c. Tandem Roller
d. Motor Grader
e. Vibrator Roller
f. Dump Truck
g. Trux Mixer
h. Excavator
i. Concrete Breaker
7. Waktu Pelaksanaan : Jangka Waktu pelaksanaan pekerjaan ditetapkan selama 150
Seratus Lima Puluh) hari kalender, terhitung sejak
tanggal dikeluarkannya Surat Perintah Mulai Kerja
(SPMK).