REKAPITULASI BOQ
S K P D : DINAS PEKERJAAN UMUM DAN TATA RUANG
: PEMBANGUNAN, PEMANFAATAN, PELESTARIAN DAN PEMBONGKARAN BANGUNAN
NAMA KEGIATAN
GEDUNG UNTUK KEPENTINGAN STRATEGIS DAERAH KABUPATEN/KOTA
PEKERJAAN : GEDUNG PERTEMUAN DESA PARIWANG
L O K A S I : DESA PARIWANG KEC.MAIWA
TAHUN ANGGARAN : 2024
No U R A I A N K E G I A T A N TOTAL HARGA
I. PEKERJAAN PERSIAPAN DAN PEKERJAAN LAIN Rp. -
II. PEKERJAAN TANAH Rp. -
III PEKERJAAN PONDASI Rp. -
IV. PEKERJAAN BETON STRUKTUR Rp. -
V. PEKERJAAN ATAP DAN PLAFOND Rp. -
Real Cost Rp. -
PPn 11 % Rp. -
Jumlah Rp. -
Dibulatkan Rp. -
Enrekang, ……………………….. 2024
PENAWAR
PT/CV….............
….................
Direktur
BILL OF QUANTITY
S K P D : DINAS PEKERJAAN UMUM DAN TATA RUANG
: PEMBANGUNAN, PEMANFAATAN, PELESTARIAN DAN PEMBONGKARAN BANGUNAN GEDUNG UNTUK KEPENTINGAN STRATEGIS
NAMA KEGIATAN
DAERAH KABUPATEN/KOTA
PEKERJAAN : GEDUNG PERTEMUAN DESA PARIWANG
L O K A S I : DESA PARIWANG KEC.MAIWA
TAHUN ANGGARAN : 2024
KODE VOLUME HARGA SAT. TOT. HARGA
No. JENIS PEKERJAAN
ANALISA JUMLAH SAT. (Rp.) (Rp.)
I. PEKERJAAN PERSIAPAN DAN PEKERJAAN LAIN
1 Tanda Pengenal Proyek - 1,00 Ls - -
2 Pek. Pengukuran dan Pemasangan Bouwplank CK-A.1.2.1.4 6 ,00 M¹ - -
3 Biaya Administras Built Drawingi, As & Dokumentasi Proyek - 1,00 Ls - -
5 Biaya SMK3 Kontruksi - 1,00 Ls - -
-
II. PEKERJAAN TANAH
1 Pek. Galian Tanah Biasa CK-A.1.5.1.1 16,80 M³ - -
2 Pek. Pengurugan Kembali Galian Tanah CK-A.1.5.1.9 5 ,60 M³ - -
3 Pek. Pemadatan Tanah CK-A.1.5.1.10 5 ,60 M³ - -
-
III PEKERJAAN PONDASI
1 Pek. Pemasangan Batu Kosong CK-A.3.2.1.9 3 ,60 M³ - -
2 Pek. Pemasangan Pondasi Batu Belah 1 PC : 4 PP CK-A.3.2.1.2 9 ,60 M³ - -
3 Pek. Urugan Pasir Bawah Pondasi CK-A.1.5.1.11 1,44 M³ - -
4 Pek. Beton Poer , mutu f' = 19,3 Mpa CK-A.4.1.1.7 0 ,86 M³ - -
Pek. Besi Poer CK-A.4.1.1.17 111,60 Kg - -
Pek. Rabat Beton Lantai Kerja T. 5 cm, f' = 7,4 Mpa CK-A.4.1.1.1 0 ,22 M³ - -
-
IV. PEKERJAAN BETON STRUKTUR
1 Pek. Beton Sloef 20/30, mutu f' = 19,3 Mpa/K225 CK-A.4.1.1.7 2 ,89 M³ - -
Pek. Besi Sloef CK-A.4.1.1.17 331,89 Kg - -
Pek. Bekisting Sloef CK-A.4.1.1.21 9 ,62 M² - -
2 Pek. Beton Kolom Pedestal 25/25, mutu f' = 19,3 Mpa/K225 CK-A.4.1.1.7 0 ,98 M³ - -
Pek. Besi Kolom CK-A.4.1.1.17 9 2,80 Kg - -
Pek. Bekisting Kolom CK-A.4.1.1.22 3 ,80 M² - -
3 Pek. Beton Kolom 25/25, mutu f' = 19,3 Mpa/K225 CK-A.4.1.1.7 3 ,75 M³ - -
Pek. Besi Kolom CK-A.4.1.1.17 4 88,40 Kg - -
Pek. Bekisting Kolom CK-A.4.1.1.22 17,00 M² - -
4 Pek. Beton Ringbalk 15/20, mutu f' = 19,3 Mpa/K225 CK-A.4.1.1.7 1,33 M³ - -
Pek. Besi Kolom CK-A.4.1.1.17 201,35 Kg - -
Pek. Bekisting Kolom CK-A.4.1.1.22 6,81 M² - -
-
V. PEKERJAAN ATAP DAN PLAFOND
1 Pek. Pemasangan Rangka Baja Ringan C.75. 75, t. 0,75 mm Reng 25.40 CK-A.4.2.1.22 172,09 M² - -
2 Pek. Pemasangan Atap Alluminium tebal 0.35 mm CK-A.4.5.2.41b 198,00 M² - -
3 Pek. Pemasangan Nok Alluminium CK-A.4.5.2.42 18,00 M¹ - -
-| Authority | |||
|---|---|---|---|
| 19 May 2024 | Konsolidasi Pemb/Rehab Sdn 129 Bunu (Dak) 2024 | Kab. Enrekang | Rp 1,419,000,000 |
| 19 May 2024 | Konsolidasi Pemb/Rehab Sdn 125 Datte Bola (Dak) 2024 | Kab. Enrekang | Rp 1,242,872,000 |
| 3 July 2024 | Pembangunan Pustu Pangandaran | Kab. Mamasa | Rp 408,400,000 |
| 24 September 2023 | Rehab Gedung Pusdiklat Olahraga Natiro Mata | Pemerintah Daerah Kabupaten Enrekang | Rp 350,000,000 |
| 13 June 2024 | Pembangunan Unit Pengolahan Pakan Silase Pentawanan | Kab. Enrekang | Rp 200,000,000 |
| 23 November 2025 | Peningkatan Jalan Ruas Lumbaja - Garassik | Kab. Enrekang | Rp 200,000,000 |
| 10 September 2024 | Pembangunan Tangki Septik Skala Individual Perdesaan Paket 4 | Kab. Enrekang | Rp 170,000,000 |
| 10 September 2024 | Pembangunan Tangki Septik Skala Individual Perdesaan Paket 5 | Kab. Enrekang | Rp 170,000,000 |
| 6 September 2024 | Pengecoran Jalan Lingkungan Pekuburan Galotok-Jawi Jawi Kel. Baraka | Kab. Enrekang | Rp 150,000,000 |
| 17 September 2024 | Talud Salu Mandalan Desa Pasui | Kab. Enrekang | Rp 150,000,000 |