URAIAN SINGKAT PEKERJAAN
Nama Paket : Peningkatan Jalan Ke Hotmix Ruas Jalan Dalam Kota Saketa
No. Mata Uraian Satuan Perkiraan Harga
Pembayaran Kuantitas Satuan
(Rupiah)
a b c d e
DIVISI 1. UMUM
1.2 Mobilisasi LS 1 ,0 1 12.298.926
DIVISI PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
SKh-1.1.22.(1c) Penyusunan pelaporan penerapan SMKK Set 1,0 5 00.000,00
SKh-1.1.22.(2g) Spanduk (Banner) Buah 1,0 5 0.000,00
Skh-1.1.22.(2h) Poster/leaflet Lembar 2,0 3 5.000,00
SKh-1.1.22.(2i) Papan Informasi Keselamatan Konstruksi Lembar 3,0 2 50.000,00
SKh-1.1.22.(3b1) Topi pelindung (Safety Helmet) Buah 5,0 3 0.000,00
Skh-1.1.22.(3b6) Pelindung pernafasan dan mulut (masker, masker respirator) Buah 5,0 1 .500,00
SKh-1.1.22.(3b7) Sarung tangan (Safety Gloves) Pasang 5,0 2 5.000,00
SKh-1.1.22.(3b8) Sepatu keselamatan ( safety shoes, rubber safety shoes and toe cap ) Pasang 5,0 3 50.000,00
SKh-1.1.22.(3b11) Rompi keselamatan (Safety Vest) Buah 5,0 1 50.000,00
SKh-1.1.22.(6a) Peralatan P3K Set 1,0 2 .000.000,00
SKh-1.1.22.(7a) Rambu petunjuk Buah 2,0 2 50.000,00
SKh-1.1.22.(7f) Rambu pekerjaan sementara Buah 2,0 2 50.000,00
Skh-1.1.22.(7q1) Alat pembatas kecepatan Buah 2,0 5 00.000,00
SKh-1.1.22.(7s) Alat penerangan sementara Buah 2,0 1 .000.000,00
SKh-1.1.22.(8b) Ahli Jalan OJ/OK 1,0 5 .000.000,00
SKh-1.1.22.(9a4) Bendera K3 Buah 1,0 2 50.000,00
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.3.(1) Penyiapan Badan Jalan
M2
2 .068,0 7 .426,17
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A
M3
2 68,8 1 .312.841,65
5.1.(2) Lapis Pondasi Agregat Kelas B
M3
3 10,2 1 .247.697,08
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 1 .654,4 2 0.107,34
6.3(3) Lataston Lapis Aus (HRS-WC) Ton 2 30,6 3 .357.084,02| Authority | |||
|---|---|---|---|
| 25 November 2024 | Pembangunan Jembatan Gantung Gayok | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 10,406,488,000 |
| 7 September 2021 | Peningkatan Jalan Tanah Ke Hot Mix Dalam Kota Weda | Kab. Halmahera Tengah | Rp 10,000,000,000 |
| 26 January 2022 | Peningkatan Jalan Lapen Ke Hotmix Ruas Jln Simp. Weda Sagea - Trans Waleh | Kab. Halmahera Tengah | Rp 9,468,500,000 |
| 18 December 2024 | Penanganan Long Segmen Ruas Samo Lalubi | Kab. Halmahera Selatan | Rp 9,250,000,000 |
| 9 May 2025 | Pembangunan Jalan Aspal Hotmix Dalam Kota Buli | Kab. Halmahera Timur | Rp 9,200,000,000 |
| 22 February 2019 | Preservasi Ruas Jalan Weda - Mafa - Matuting - Saketa | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 8,999,864,000 |
| 6 April 2022 | Pembangunan Jalan Ruas Wasile - Labi Labi | Provinsi Maluku Utara | Rp 8,853,162,000 |
| 16 September 2022 | Pembangunan Talud | Kementerian Agama | Rp 8,800,000,000 |
| 27 November 2019 | Pembangunan Pengendali Sedimen Sungai Way Ela, Desa Negeri Lima, Kab. Maluku Tengah, Provinsi Maluku[ 1 Pkt] | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 7,789,456,000 |
| 9 May 2025 | Pembangunan Jalan Aspal Lapen Ke Hotmix Lapter - Wayamli | Kab. Halmahera Timur | Rp 7,360,000,000 |