Konstruksi Bangunan Gedung Dprd DIY

Basic Information
Type: Public Tender
Tender Code: 20008013
Date: 8 November 2024
Year: 2025
KLPD: Provinsi DI Yogyakarta
Work Unit: Sekretariat Dprd
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Gabungan Lumsum dan Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 371,005,029,205
Estimated Value (Nilai HPS): Rp 336,140,029,163
Winner (Pemenang): PT Waskita Karya (Persero) Tbk
NPWP: 010016145093000
RUP Code: 52745908
Work Location: Jalan Kenari - Yogyakarta (Kota)
Participants: 151
Applicants
Reason
0010016145093000Rp 293,786,385,000-
0010016129093000Rp 317,044,260,000-
0010016137093000Rp 325,741,400,000-
0709382949505000--
Mustika Mataram Adikarya
08*4**0****41**0--
PT Jaya Engineering
03*2**8****17**0Rp 326,055,828,344Tidak menyampaikan Dokumen Penawaran sebagaimana ketentuan Dokumen Pemiihan Bab III. IKP poin 17
PT Rejeki Madani Sejahtera
02*9**8****11**0--
0415374008543000--
0026529842331000--
CV Dewantara Bintang Utama
02*1**8****42**0--
0709309579645000--
0011321197441000--
0013626437054000Rp 302,478,250,1251. Surat dukungan Nomor : 202412006/SDJK-PMM/XI/2024 tanggal 27 Desember 2024 dari PT Pratama Motivasi Mandiri selaku aplikator menyatakan kesediaan sebagai Subkontraktor untuk pekerjaan CCTV. Sedangkan CCTV bukanlah pekerjaan yang disubkontrakkan melainkan termasuk dalam Daftar Barang Impor, sehingga surat dukungan yang disampaikan tidak sesuai dengan ketentuan dalam Dokumen Pemilihan Bab IV LDP. 2. Uraian metode pelaksanaan yang disampaikan dalam tahapan pekerjaan pengecoran tangga struktur menyatakan bahwa pengecoran tangga beton menggunakan beton ready mix dengan mutu beton K-300 sedangkan dalam RKS disyaratkan mutu beton struktur (pondasi telapak, sloof, balok, kolom pelat lantai, tangga hingga atap gedung) menggunakan mutu beton 30 Mpa (mutu beton K300 lebih rendah daripada mutu beton 30 Mpa).
0010600039093000Rp 325,900,000,000Tidak dievaluasi lebih lanjut
0010016111093000Rp 334,692,977,504Tidak dievaluasi lebih lanjut
CV Zulfar Pratama Jaya
01*9**4****16**0--
0026233338061000Rp 319,329,336,1131. Uraian metode pelaksanaan pada pekerjaan pondasi bored pile D 60 cm hanya menyampaikan tahapan/substansi terkait dengan pengujian PDA test sehingga tidak sesuai dengan ketentuan dalam RKS. 2. Metode struktur pada pekerjaan pile cap di kolom keterangan menyampaikan pernyataan bahwa “urutan pekerjaan pilecap di pekerjaan konstruksi site preparation dalam pengadaan peralatan disaster victim identification (DVI) Dokpol dan laboratorium DNA Sumber Pembiayaan PLN T.A.2021 ...” (halaman 44) sehingga tidak relevan dengan paket ini. 3. Surat dukungan (supporting letter) untuk CCTV Nomer 001.1/CCTVJATIM/2025 tanggal 3 Januari 2025 dari PT CCTV Jatim Teknologi tidak sesuai yang dipersyaratkan dalam Dokumen Pemilihan Bab III. IKP angka 7.9 dan Bab IV. LDP huruf F angka 6
0395253131542000--
0021282934432000Rp 268,912,023,3301. Paket pekerjaan tertinggi yang diusulkan untuk perhitungan KD (Konstruksi Terintegrasi Rancang dan Bangun Pembangunan Gedung Tahti Beserta Fasilitas Lainnya di Cikeas Bogor T.A. 2018) memiliki SBU yang berbeda dengan SBU yang dipersyaratkan pada paket pekerjaan ini sehingga paket pekerjaan tersebut tidak dapat dipergunakan dalam perhitungan KD sebagaimana dengan ketentuan Dokumen Pemilihan Bab V. LDK angka 7.b, sedangkan paket tertinggi berikutnya yang SBU nya sesuai dengan SBU yang dipersyaratkan (Pembangunan Gedung Kantor Kejaksaan Negeri Kota Balikpapan) setelah dilakukan perhitungan tidak memenuhi ketentuan KD (nilai KD kurang dari nilai HPS). 2. Hasil klarifikasi teknis sebagaimana tertuang dalam Berita Acara Klarifikasi/Verifikasi peralatan utama Nomor B/00.3.3.4/219/BR.5 tanggal 20 Januari 2025 dan Berita Acara Klarifikasi/Verifikasi Pekerjaan subkontrak Nomor B/00.3.3.4/221/BR.5 tanggal 20 Januari 2025 terhadap CV Daha Bore Pile (selaku pemberi sewa alat bored pile berdasarkan perjanjian sewa Nomor : 14.001/02/SPSW/DBP-WSK-CTR,KSO/1/2024 tanggal 2 Januari 2025 dan subkontraktor pekerjaan tiang borpile berdasarkan Surat Dukungan Subkontraktor Nomor 06.002/24/SURDUK/DBP-CSK-WGR,KSO/XII/2024) menyatakan bahwa Ahmad Nanang Zuaini selaku Direktur CV Daha Bore Pile tidak menandatangani Surat Perjanjian Sewa dan Surat Dukungan Subkontraktor sehingga kelengkapan dokumen peralatan dan pekerjaan subkontrak yang disampaikan oleh CSK-WGR KSO tidak memenuhi persyaratan. 3. Uraian metode pelaksanaan yang disampaikan pada tahapan pengecatan besi/baja tidak terdapat uraian pekerjaan terkait penggunaan cat dasar Zinc Chromate (Hal 70)., sedangkan di RKS disyaratkan untuk seluruh material besi/baja harus dilindungi dengan cat dasar Zinc Chromate.
0629975616542000--
0719898124544000--
0010000198093000--
0011403490541000--
PT Kayla Indah Group
09*6**8****09**0--
CV Sinar Pratama
07*0**3****45**0--
0019757715631000--
0940631294505000--
0833082407525000--
0022057848542000--
0414877308542000--
0954884292542000--
0025420175543000--
0010613651093000--
0016506834432000--
Metafora Group Consultan
09*5**3****41**0--
0668000300541000--
0029614732541000--
0955027099543000--
CV Utilindo Perkasa
00*7**0****41**0--
0311539027614000--
Gesang Minulyo
04*4**5****01**0--
PT Niaga Artha Chemcons
08*2**8****32**0--
0836583385544000--
0023980923542000--
PT Epithu Logica Sembada
09*5**4****15**0--
0210199626623000--
0019206580008000--
0026094276609000--
CV Inspirasi Arsitektur Indonesia
02*3**8****43**0--
Keibu Rahaja Nusantara
04*2**1****05**0--
0410387260626000--
Arga Karya Sena
01*6**8****07**0--
CV Raka Raka Madura
02*5**4****44**0--
PT Sarana Infotekno Mitra Solusi
08*1**5****41**0--
0029614914541000--
0837629625543000--
0661654483544000--
0033489089543000--
0314477399543000--
0411827967529000--
0026561464515000--
Adhiatama Makmur Sejahtera
05*5**4****15**0--
0763564424543000--
CV Surya Cahaya Pelangi
08*4**6****11**0--
0022055230544000--
0414219428542000--
0033228511086000--
0919843680545000--
CV Kartijo Sido Karya
03*1**5****43**0--
0746590181543000--
PT Gunung Baja Permata
09*1**9****35**0--
0632947826542000--
0033277518542000--
0012074159511000--
0210663373545000--
0661672444545000--
0033489469543000--
0210051793542000--
0650992928545000--
0631487923521000--
PT Adhitama Persada Indonesia
09*3**9****05**0--
PT Mitramanunggal Karya Mandiri
09*6**6****42**0--
Eka Mina Lestari
00*7**2****28**0--
0416689701804000--
PT Elghania Gemilang Persada
06*8**5****07**0--
CV Kencana Global
04*8**5****41**0--
0014913537522000--
0017240094526000--
Indrajaya Sejahtera
00*5**9****33**0--
Asbikun
06*8**2****42**0--
0313697427542000--
CV Mitra Graha Putera
03*2**6****26**0--
0017956400522000--
Twins-Co Teknikal
07*6**7****02**0--
PT Kuda Kuda Totalprima
00*6**5****41**0--
0027781327544000--
CV Lestari Babar Konstruksi
06*0**3****27**0--
0022059471544000--
0600424212001000--
Cakra Bimantara Konstruksi
06*4**4****28**0--
CV Satria Laksana
06*6**3****45**0--
0864332572542000--
PT Defani Energi Indonesia
07*8**3****09**0--
0663307312525000--
0814918942541000--
0024714081812000--
CV Persada Batu Mulia
06*9**6****41**0--
PT Rahayu Karya Utama
0019925262543000--
0014647481541000--
0314896655504000--
0022059299544000--
0033080631701000--
CV Dominan Konsultan
06*2**9****29**0--
0903107605517000--
0211343439543000--
CV Segitiga
02*0**2****42**0--
CV Deka Multi Karya
07*5**1****42**0--
CV Wnj
09*1**8****43**0--
0031167273915000--
CV Multi Persada Mandiri
02*7**9****42**0--
CV Karya Nugraha
0313949422527000--
Bintang Sembilan Indah
0311585392623000--
0967217878435000--
0312470651411000--
0027919612044000--
CV Alkhalifi Konstruksi
04*2**7****42**0--
0210560165527000--
0867818981542000--
0721444446542000--
PT Hary Prisma Technofo
06*5**9****43**0--
PT Phi Home Indonesia
06*3**5****43**0--
0011342144812000--
0313671513013000--
0313519415544000--
PT Sinar Inti Persada
00*6**5****19**0--
0902361971542000--
0013220157009000--
0966295867542000--
0016063471524000--
0021046909543000--
PT Yura Mitra Mandiri
09*8**2****07**0--
0014355556541000--
PT Geo Indogreen Karya
07*0**9****52**0--
0019210913542000--
PT Bangkit Triputra Langgeng
02*5**3****42**0--
PT Graha Kencana Konsultan
08*6**4****04**0--
0317076057609000--
PT Varia Usaha Beton
00*4**2****41**0--
CV Solusi Inti Pembangunan
08*2**3****06**0--
0905301719617000--
0741558662518000--
Tenders also won by PT Waskita Karya (Persero) Tbk
Authority
16 February 2022Pembangunan Jalan Dan Jembatan Provinsi Untuk Kepentingan Strategis Daerah Provinsi Sumatera UtaraProvinsi Sumatera UtaraRp 2,700,000,000,000
9 June 2022Jalan Tol Ikn Segmen Sp. Tempadung - Jembatan Pulau BalangKementerian Pekerjaan Umum dan Perumahan RakyatRp 2,248,837,906,000
22 September 2025Pembangunan Bangunan Gedung Dan Kawasan Lembaga Dpr I Di Ibu Kota NusantaraOtorita Ibu Kota Nusantara (OIKN)Rp 2,023,100,000,000
6 March 2023Pembangunan Bendungan Cibeet Paket III; Jawa Barat; Kab. Bogor; 0 Unit; 0 Juta M3; F; K; MycKementerian Pekerjaan Umum dan Perumahan RakyatRp 1,536,000,000,000
7 July 2022Pembangunan Bangunan Gedung Sekretariat Presiden Dan Bangunan Pendukung Pada Kawasan Istana Kepresidenan Di Ibu Kota NegaraKementerian Pekerjaan Umum dan Perumahan RakyatRp 1,380,713,000,000
12 April 2023Pembangunan Jalan Di Dalam Kipp: Paket Pembangunan Jalan Feeder (Distrik) Di Kawasan IknKementerian Pekerjaan Umum dan Perumahan RakyatRp 1,320,243,988,000
18 September 2025Pembangunan Sekolah Rakyat Provinsi Sulawesi Selatan 1Kementerian Pekerjaan UmumRp 1,235,383,867,000
19 October 2018Pembangunan Bendungan Rukoh Di Kabupaten Pidie Paket II (Myc)Kementerian Pekerjaan Umum dan Perumahan RakyatRp 1,182,982,000,000
13 October 2025Pembangunan Sekolah Rakyat Provinsi Jawa Timur 1Kementerian Pekerjaan UmumRp 1,180,305,735,000
18 April 2023Konstruksi Terintegrasi Rancang Dan Bangun Pembangunan Rumah Susun Asn 3Kementerian Pekerjaan Umum dan Perumahan RakyatRp 1,145,990,000,000