| 0921352795706000 | Rp 6,850,007,247 | |
CV Berkah Jasa Konstruksi | 10*1**1****69**2 | - |
| 0768069502701000 | - | |
| 0014062988701000 | - | |
CV Adhipramana Dimitra Surya | 06*5**2****06**0 | - |
CV Zaimo Group | 10*0**0****94**0 | - |
| 0016286619008000 | - | |
| 0032690497701000 | - | |
| 0624190971707000 | - | |
CV Putra Sandi | 07*0**7****01**0 | - |
| 0817620875701000 | - | |
| 0315694687701000 | - | |
PT Tardilo Borneo Konstruksi | 01*8**0****04**0 | - |
| 0429049885707000 | - | |
| 0026319608706000 | - | |
| 0861145209701000 | - | |
| 0926269499701000 | - | |
CV Heora Istiqomah | 04*1**7****07**0 | - |
| 0026321307706000 | - | |
| 0942879214705000 | - | |
| 0026885145706000 | - | |
| 0020511556706000 | - | |
PT Royal Inti Mahiro | 07*6**9****09**0 | - |
CV Sazi Bertuah | 08*4**3****14**0 | - |
CV Zahra Aulia Perkasa | 00*6**7****29**0 | - |
| 0025168022701000 | - | |
| 0020862090701000 | - | |
| 0625129937701000 | - | |
| 0722646908706000 | - | |
CV Keren Mandiri Niaga | 06*7**1****07**0 | - |
URAIAN SINGKAT PEKERJAAN
Pembangunan Ruang Cathlab dan Bangunan Kesehatan Gedung B lantai 2&3
1) Subtansi ruang lingkup pekerjaan ini adalah melakukan Pembangunan Ruang Cathlab dan
Bangunan Kesehatan Gedung B lantai 2&3 dan memenuhi ketentuan sebagaimana diatur
dalam Menurut Peraturan Menteri Pekerjaan Umum No. 45/PRT/M/2007 tentang Pedoman
Teknis Pembangunan Bangunan Gedung Negara dan sesuai peraturan yang berlaku. Secara
garis besar ruang lingkup pekerjaan ini meliputi:
Pekerjaan Pembangunan Ruang Cathlab dan Bangunan Kesehatan Gedung B lantai
2&3
➢ Pembangunan Gedung B lantai 2&3
I. PEKERJAAN PERSIAPAN
- Pekerjaan Papan Nama Proyek
- Pekerjaan Sewa Direksikeet
- Pekerjaan Air Kerja
- Pekerjaan Listrik Kerja
- Pekerjaan Penyelenggaraan SMK3 Konstruksi
II. PEKERJAAN PASANGAN LANTAI
- LANTAI DUA
- Screeding leveling lantai vinyl
- LANTAI TIGA
- Lantai homogeneus tile 60 x 60 cm (Polished)
- Lantai homogeneus tile 60 x 60 cm (Unpolished)
- Lantai border homogeneus tile 60 x 60 cm (Polished)
III. PEKERJAAN PASANGAN PINTU DAN JENDELA
- LANTAI DUA
- PINTU TIPE
- D 1
- D 2
- D 1A
- D 2B
- PNL
- SHF 2
- TOI
IV. PEKERJAAN PENGECATAN
- LANTAI DUA
- Pengecatan dinding interior (Emultion Paint)
- Pengecatan plafond interior (Emultion Paint)
- Pengecatan dinding interior (Anti Bakteri)
- Pengecatan plafond interior (Anti Bakteri)
V. PEKERJAAN RAILLING DAN HAND RAILLING
- LANTAI SATU
- Railling tangga ø 2" mm stainless steel
- Hand railling tangga ø 2" mm stainless steel
- LANTAI DUA
- Railling tangga ø 2" mm stainless steel
- Hand railling tangga ø 2" mm stainless steel
VI. PEKERJAAN PANEL DAN KABEL FEEDER
- LANTAI DUA
- Panel Listrik
- SDP-2
- LP-2
- PP-2
- PP-ICCU.A
- PP-ICU.A
- PP-FCU.2
- PP-AC.2
- Unitruptable Power Supply (UPS)
- Unitruptable Power Supply (UPS) Kapasitas 10 kVA 1 Phase, back Up 15 menit
- UPS.PP-ICCU.A
- Unitruptable Power Supply (UPS)
- Unitruptable Power Supply (UPS) Kapasitas 10 kVA 1 Phase, back Up 15 menit
- UPS.PP-ICCU.A
- Kabel Feeder
- Dari MDP-IGD ke SDP-2, NYY 4 x 50 mm2 + Grounding
- Dari SDP-2 ke LP-2, NYY 4 x 6 mm2 + Grounding
- Dari SDP-2 ke PP-2, NYY 4 x 16 mm2 + Grounding
- Dari SDP-2 ke UPS 10kVA (PP-ICCU.A), NYY 3 x 50 mm2 + Grounding
- Dari UPS 10kVA (PP-ICCU.A) ke PP-ICCU.A, NYY 3 x 50 mm2 + Grounding
- Dari SDP-2 ke UPS 10kVA (PP-ICU.A), NYY 3 x 50 mm2 + Grounding
- Dari UPS 10kVA (PP-ICU.A) ke PP-ICU.A, NYY 3 x 50 mm2 + Grounding
- Dari SDP-AC.IGD ke PP-FCU.2, NYY 4 x 50 mm2 + Grounding
- Dari PP-FCU.2 ke PP-AC.2, NYY 4 x 6 mm2 + Grounding
VII. PEKERJAAN PASANGAN PELAPIS DINDING DAN LANTAI
- LANTAI SATU
- Pemasangan batu marmer polish finish (garda pintu lift)
- LANTAI DUA
- Lantai vinyl sheet
- Pemasangan batu marmer polish finish (garda pintu lift)
- Multipleks 18 mm lapis HPL (penutup Curtain Wall)
- LANTAI TIGA
- Pemasangan batu marmer polish finish (garda pintu lift)
- LANTAI EMPAT
- Pemasangan batu marmer polish finish (garda pintu lift)
VIII. PEKERJAAN AIR CONDITIONING
- LANTAI DUA
- Outdoor Unit VRF
- OU.2A kapasitas : 136 500 BTU/h
- OU.FCU.2.1 kapasitas : 95 500 BTU/h
- OU.AHU.2.1 kapasitas : 152.900 BTU/h
- Fan Coil Unit (FCU)
- FCU.2.1, Kapasitas : 95 500 BTU/h dan accesorisnya
- AHU.2.1, Kapasitas : 142.118 BTU/h dan accesorisnya
IX. PEKERJAAN JALAN DAN PARKIR
- Lapisan pondasi pasir urug tebal 10 cm
- Cor Beton K-250
- Kansteen 60 x 30 x 15 cm
- Plesteran dudukan dan sambungan kansteen
- Acian semen
- Pengecatan kansteen
➢ Ruang Cathlab
I. PEKERJAAN DINDING
- Dinding bata ringan 200 x 600 x 100 mm
- ALMAR PB Lead Sheet 2mm Thickness for Wall - 7600mmW x12650mmL x 3000mmH
- PB Lead Sheet 2mm with Certificated Lolos Uji Perisai Radiasi
- Pure Thickness 2mm - PB Original
- Certificated with Material Tested - Passed by BATAN
- Warranty Radiation Leakage
- Plesteran semen instan
- Acian Semen Instan
- Kolom praktis 11/11 cm
- Balok praktis 10/15 cm
II. PEKERJAAN PINTU
- ALMAR Sliding Single Hermetic XRAY Auto Door - (AL-OTDM-02) Kusen : ALMAR
Hermetic XRAY Door System - [AL-OTDM-02]
- Door Leaf :
- Stainless Steel SUS 304 Door with XRAY glass ex. ALMAR
- XRAY Glass cell : 15mm thick 400mm x 400mm Curving at corner ex. ALMAR
- Stainless Steel SUS 304 Door Panel / Door Leaf
- With PB Lead Sheet 2mm all Surface - Certificated By BATAN
- ALMAR Foot Switch 1 pairs (2pcs) - Labor Assistant Switch
- ALMAR Safety Sensor 2 pairs (2set)
- Stainless Steel Emergency Handle Ex ALMAR
- Automatic Sliding Hermetic Ex ALMAR - [AL-OTDM-02]
- With Curving Cover Machine Hermetic Door ex. ALMAR
- Dimension : 1600*2150mm (W*H)
- ALMAR Pb Lead Sheet - "Lolos Uji Perisai Radiasi" – Certificated
- ALMAR Xray Door - "Lolos Uji Perisai Radiasi" – Certificated
- Warranty Radiation Leakage - Garansi Uji Kebocoroan Radiasi
- Warranty Radiation Leakage - Garansi Uji Kebocoroan Radiasi
- Full Warranty 1 year for service & spare part
- ALMAR SS SUS 304 - Swing Stainless Steel Single Varian Manual With PB Lead Sheet
2mm
- Dimension Size 1000mmW x 2150mmH
- Frame Door with Stainless Steel SUS 304, with Rubber for 4 side
- Stainless Steel Finished
- With PB Lead Sheet 2mm all Surface - Certificated By BATAN
- Inner Insulation with solid surface
- Thickness of Door Leaf is 40-50mm
- Door Hardware Completed ( Hinges, Handle, Door Closer, Lockcase, Cylinder )
- With Xray Mortise by ALMAR
- ALMAR Pb Lead Sheet - "Lolos Uji Perisai Radiasi" – Certificated
- LMAR Xray Door - "Lolos Uji Perisai Radiasi" – Certificated
- Warranty Radiation Leakage - Garansi Uji Kebocoroan Radiasi
- Warranty 1 year for sparepart & services
III. PEKERJAAN KACA ANTIRADIASI
- Glass Pb 15mm & Frame Stainless Steel Finish Hairline
- Dimension Size 2000mmW x 800mmH
- Glass Pb 15mm Thickness (Equal Pb 2mm thicknes)
- Frame Stainless Steel Finish Hairline, With Pb 2mm
- Consumable Accessories for Window Pb
- Almar Pb Lead Sheet - "Lolos Uji Perisai Radiasi" – Certificated
- Almar Glass - "Lolos Uji Perisai Radiasi" – Certificated
- Pb Lead Sheet 100% Original - Certificated "Lolos Uji"
- Pb Lead Sheet 100% Original - Certificated "Lolos Uji"
IV. PEKERJAAN LIFT
- Hospital Lift (Terpasang)
- Kapasitas : 1600 Kg
- Kecepatan : 60 MPM
- Lintasan : 4 Lantai
- Model SEB 1600 (Machine Room)
- Type Bed Elevator (SEB)
- Loading (Kg) 1600 Kg
- Speed (m/s) 1.0 m/s
- Control System Simplex
- Floor 4
- Stop No. 4
- Opening No. 4
- Cabine Size (W*D*H) (mm) = 1400mm x 2400mm x 2300mm
- Door Opening Type Slide Opening
- Door Opening Size (W*H) (mm) = 1300mm x 2100mm
- Hoistway Size (W*D) (mm) = 2350mm x 2950mm
- Wall Finishing (Hairline Stainless Steel)
- Overhead = 1500mm
- Motor Power = 10,5 KW / 3 Phase
a) Tahap Persiapan
• Mempersiapkan sumber daya berupa : tenaga kerja, peralatan dan perlengkapan,
bahan bangunan, informasi, dana, program Quality Assurance/Quality Control,
dan program kesehatan dan keselamatan kerja (K3);
• Penyusunan jadwal pekerjaa yang akan dilaksanakan, agar tidak terjadi pekerjaan
yang terlambat.
b) Tahap Pelaksanaan
(1) Melakukan peleksanaan pekerjaan yang terdiri atas:
▪ Melaksanakan pekerjaan sesuai dengan gambar dan RAB (rencana Anggaran
Biaya).
▪ Memeriksa material atau bahan yang sesuai dengan keperluan dilapangan.
▪ Menyiapkan material dan tenaga kerja sesuai dengan jadwal pelaksanaan pekerjaan
dilapangan.
▪ Melaksanakan pekerjaan sesuai dengan item-item pekerjaan yang terdapat didalam
gambar kerja dan di RAB (Rencana Anggaran Biaya).
▪ Berkoordinasi dengan pengawas dan Pejabat Pembuat Komitmen apabila ada yang
harus diselesaikan bersama dan mendapatkan keputusan yang disepakai bersama.
(2) Menyusun laporan Konstruksi
▪ Penyusunan format laporan dikonsultasikan kepada konsultan pengawas dan pejabat
pembuat komitmen. Agar hasil laporan dapat dipergunakan sebagai laporan
pekerjaan dan melampirkan sebagai berikut :
▪ Laporan harian
▪ Laporan mingguan
▪ Laporan bulanan
▪ Laporan schedulle
▪ Dokumentasi pekerjaan (0%-100%)
▪ Laporan pencairan
2) Data dan fasilitas yang dapat disediakan oleh PA/KPA/PPK adalah:
a) Data Perencanaan (Detail Engineering Design);
b) Surat menyurat kepada instansi terkait
Putussibau, 19 Mei 2025
Dinas Kesehatan, Pengendalian Penduduk Dan Keluarga
Berencana Kabupaten Kapuas Hulu
Pejabat Pembuat Komitmen
NANANG PADLI, SKM., SE, M.Si.
NIP. 19790807 200604 1 012