Pekerjaan Kontrak Service Alat Instalasi Radiologi Tahun 2025 Di Rs Adam Malik

Basic Information
Type: Public Tender
Tender Code: 10049071000
Date: 22 January 2025
Year: 2025
KLPD: Kementerian Kesehatan
Work Unit: Rumah Sakit Umum H Adam Malik Medan
Procurement Type: Jasa Lainnya
Method: Penunjukan Langsung
Contract Type: Lumsum
Financial Information
Value (Nilai Pagu): Rp 4,179,260,000
Estimated Value (Nilai HPS): Rp 144,993,750
Winner (Pemenang): PT Siemens Healthineers Indonesia
NPWP: 030986491027000
RUP Code: 56106698
Work Location: JL. Bunga Lau No. 17 Medan - Medan (Kota)
Participants: 1
Attachment
Lampiran Uraian Pekerjaan                                                 
Pekerjaan Kontrak Service Pemeliharaan Unit Alat X Ray Flouroscopy Luminos Fusion VE FD Di Instalasi Radiologi
RS Adam Malik Tahun Anggaran 2025                                         
                                                                          
No.                  Nama Alat dan Uraian Pekerjaan    Volume Merek       
                                                                          
                                                              Siemens-    
1 Maintenance dan Kontrak Service Unit Fluoroscopy LUMINOS Fusion VE FD: Type Performance TOP 1 Unit
                                                            Luminos Fusion
                                                              VE FD SN.   
  Specifications :                                                        
                                                              31203       
   ● Suku cadang Normal : Semua suku cadang yang ada pada unit Luminos Fusion VE FD
                      : (Tidak Termasuk X-Ray Tube, Detector dan Aksesoris)
   ● Preventive Maintenance (PM) : 2 (dua) kali per tahun                 
   ● Corrective Maintenance (CM) : Tidak terbatas (pada saat alat bermasalah atau mengalami
                       kerusakan)                                         
   ● Tenaga kerja dan perjalanan CM : Termasuk                            
   ● Tenaga kerja dan perjalanan PM : Termasuk                            
   ● tenaga kerja jarak jauh : Termasuk                                   
   ● Dukungan telepon teknis : Termasuk                                   
   ● Waktu respons awal : 2 (dua) jam                                     
   ● Waktu respon di tempat (on-site) : Hari kerja berikutnya             
   ● Waktu pengiriman suku cadang : 14 (empat belas) hari kerja           
   ● Layanan jarak jauh teknisi (remote) : Remote pro-active support include
                                                                          
   ● Safety dan Update Software : Termasuk (jika ada instruksi dari pabrik)
     Jendela Pemeliharaan Perbaikan                                       
   ●                  : Setiap hari kerja dan jam kerja                   
     (CM                                                                  
     Jendela   Pemeliharaan                                               
   ●                  : Setiap hari kerja dan jam kerja                   
     Direncanakan (PM)                                                    
   ● Kalibrasi oleh instansi kalibrasi : Tidak Termasuk                   
     yang berwenang dilengkapi                                            
     dengan sertifikat, hasil uji serta                                   
     label kalibras                                                       
  Preventive Maintenance Rutin, meliputi :                                
   I General Visual Check : Visual Check per IEC 62353                    
                      : Checking the cover panels                         
                      : Required operator documents present               
                      : Checking the Cables, Corrugated Hoses             
                      : Check the cable corrugated hoses (of mobile components)
                      : Check the radiation protective panels             
                                                                          
                      : Check warning labels                              
                                                                          
   II Cleaning the component : Inpection of internal heat dissipation and cleaning
                                                                          
   III Polydoros :    : Inspection and Maintance                          
                      : Checking the external Voltage                     
                      : Checking The shelding on the HV Cables            
                      : Radiation Indicator : Radiation Light Check       
                      : Performing Tube adjustment Conditioning The X-ray Tube (s)
                                                                          
   IV Luminos Fusion VE FD : : Check of the Basic Unit for Damage         
                                                                          
                      : Evaluating the error log                          
                      : Check the cables and corrugated hoses             
                      : Check the chain segment and tilt drive            
No.                  Nama Alat dan Uraian Pekerjaan    Volume Merek       
                                                                          
                      : Checking the floor mounting                       
                                                                          
                      : Check the spacing of the limit switches and the potentiomer play
                                                                          
                      : Checking installation of the linear guide         
                      : Check the gear shaft of any cracks                
                      : Clean and lubricate the tabletop, longitudinally and transversely
                      : Deburr the tabletop                               
                                                                          
                      : Tilt Drive - Checking the safety distance         
                       Spotfilm Device and Column Longitudinal Drive - Checking the
                      :                                                   
                       Safety Distances                                   
                      : Tabletop Longitudinal - Checking the Safety Distances
                      : Tabletop Transverse - Function Test               
                      : SID - Function Test                               
                      : Perform a mechanical function test of safety devices
                      : Checking the unit Control Console for Function and Damage
     Multileaf Collimator/Universal                                       
   V                  : Inspection and Maintenance                        
     Collimator                                                           
                      : Checking the collimator mounting                  
                      : Checking the rotation flange (if configured)      
                      : Checking the control elements on the collimator (if configured)
                      : Accessory rails under the collimator checked for wear
                      : Checking the light localizer lamp (if configured) 
  VI Monitor Carriage : Checking the mounting of the monitors             
                                                                          
  VII Wall Stand      : Inspection and Maintenance                        
                      : Check and clean the contact surfaces              
                      : Checking the Movement Range                       
                      : Checking the Braking Force                        
                                                                          
                      : Checking the Control Elements                     
                      : Checking of the Cassette Bucky                    
                                                                          
  VIII Fluoro Detector : Check image quality detector                     
  IX Final Work Steps : Contact voltage in volts                          
                                                                          
                      : Voltage phase 1 to the protective conductor in volts
                      : Voltage phase 2 to the protective conductor in volts
                      : Voltage phase 3 to the protective conductor in volts
                                                                          
  X  Function Test    : Perform the final function check                  
                                                                          
2 Sparepart Bekas           Tetap menjadi milik pabrikan Siemens          
3 Lokasi                          Ruang Radiologi                         
4 Waktu kerja               Senin-Jumat jam 09.00 s/d 22.00 WIB,          
5 Hari Libur                Sabtu, Minggu dan Hari Libur Nasional         
                      Sesuai dengan Katalog Suku Cadang Siemens Healthineers, jika
6 Suku Cadang Service                                                     
                                 terjadi kerusakan                        
7 Uptime Guarantee (%)            Tidak Termasuk                          
8 Onsite Support             Tidak terbatas jumlah kunjungan              
9 Response Time Commitment    Dalam 2 jam setelah panggilan               
10 System Reliablity (%)          Tidak Termasuk                          
11 Onsite Support (Upon Activation) Unlimited                             
12 Onsite Response Time (Emergency) 2 Hours                               
No.                  Nama Alat dan Uraian Pekerjaan    Volume Merek       
                                                                          
13 Onsite Response Time (Non -     2x24 jam                               
  Emergency)
Tenders also won by PT Siemens Healthineers Indonesia