Pekerjaan Kontrak Service Alat Instalasi Radiologi Tahun 2025 Di Rs Adam Malik

Basic Information
Type: Public Tender
Tender Code: 10054456000
Date: 4 February 2025
Year: 2025
KLPD: Kementerian Kesehatan
Work Unit: Rumah Sakit Umum H Adam Malik Medan
Procurement Type: Jasa Lainnya
Method: Penunjukan Langsung
Contract Type: Lumsum
Financial Information
Value (Nilai Pagu): Rp 4,179,260,000
Estimated Value (Nilai HPS): Rp 926,281,125
Winner (Pemenang): PT Siemens Healthineers Indonesia
NPWP: 030986491027000
RUP Code: 56106698
Work Location: JL. Bunga Lau No. 17 Medan - Medan (Kota)
Participants: 1
Attachment
Uraian Pekerjaan                                                      
Pekerjaan Kontrak Service Pemeliharaan Alat Spect CT (Symbia 6/Syngo Via) Merek Siemens di Instalasi Radiologi
RSUP H. Adam Malik Tahun 2025                                         
                                                                      
 No.                      Nama Alat dan Uraian Pekerjaan    Volume    
 1 Maintenance dan Kontrak Service Unit SPECT-CT Symbia Intevo 6 dan syngo.via: 1 Unit
   Type Performance TOP                                               
   Specifications :                                                   
    ● Suku cadang Normal     : Semua suku cadang yang ada pada unitSPECT-CT SymbiaIntevo 6dan
                              syngo.via                               
                              ( Tidak Termasuk Radioactive Source, X-Ray Tube, Detector dan
                             :                                        
                              Aksesoris )                             
    ● Preventive Maintenance (PM) : 2 (dua) kali selama 11 Bulan      
    ● Corrective Maintenance (CM) :                                   
                              Tidak terbatas (pada saat alat bermasalah atau mengalami kerusakan)
    ● Tenaga kerja dan perjalanan CM : Termasuk                       
    ● Tenaga kerja dan perjalanan PM : Termasuk                       
    ● tenaga kerja jarak jauh : Termasuk                              
    ● Dukungan telepon teknis : Termasuk                              
    ● Waktu respons awal     : 2 (dua) jam                            
    ● Waktu respon di tempat (on-site) : Hari kerja berikutnya        
    ● Waktu pengiriman suku cadang : 14 (empat belas) hari kerja      
    ● Layanan jarak jauh teknisi (remote) : Remote pro-active support include
    ● Safety dan Update Software : Termasuk (jika ada instruksi dari pabrik)
    ● Jendela Pemeliharaan Perbaikan (CM : Setiap hari kerja dan jam kerja
    ● Jendela Pemeliharaan Direncanakan (PM) : Setiap hari kerja dan jam kerja
    ● Kalibrasi oleh instansi kalibrasi yang : Tidak Termasuk         
      berwenang dilengkapi dengan sertifikat, hasil uji serta         
      label kalibras                                                  
   Preventive Maintenance Rutin, meliputi :                           
                PM 1                                                  
      General Visual Check   : Visual Inspect System                  
                              - The system has no deficiencies        
      Cleaning the component : Cleaning System                        
      1st - Maintenance      : SRS Functionality Check                
                             : SW Backup                              
                             : Trunnion Brakes                        
                             : Rotate Brakes                          
                             : PHS U/D Brakes                         
                             : SLD Acme Screw Inspection 1            
                             : Control Box E-Stop for SPECT           
                             : L/R E-Stop buttons for SPECT           
                             : Control Box E-Stop for CT              
                             : Radiation Indicators                   
                             : Radiation Shutdown                     
                             : Defragmentation on C: and D: Drive     
                             : Swivel Caster Lubrication              
                             : Front PHS Check                        
                             : Rear PHS Check                         
                             : Gantry tilt switch checked             
                             : Caudal tilt detector - clutch connection (Detector 2) checked
                              Caudal tilt detector - pivot connection (Detector 2) checked
                             :                                        
                             : Detector 1 Checked                     
                              Fixed detector yoke side to Tub Connection Detector 1 have been
                             :                                        
                              tightened to reach torque spesification 
                             : Fixed and Caudal tilt yoke arm connections checked
                              Fixed yoke side arm screws have been tightened to reach torque
                             :                                        
                              spesification                           
                              Caudal tilt yoke side arm screws have been tightened to reach torque
                             :                                        
                              spesification                           
                             : Yoke to trunnion checked               
                             : Trunnion to SLD Connection checked     
                              SLD to LLD connection checked           
                             :                                        
                             : Monitors, computers, and system cleaned
                             : No safety-relevant damages on the gantry
                             : Furniture/walls are over minimum distance from gantry
                             : PPM Monitor settings checked           
                             : Motion disable on PPM when in dvd mode 
                             : PPM mechanical operation checked       
                             : No safety-relevant damages on the front PHS
                             : PHS floor plate screws are tight       
                             : Rollers under the pallet checked       
                             : Rolling force of pivot and its functionality checked
                             : ICC touchpads checked                  
                             : Light Rail touchpads checked           
                             : No safety-relevant damages on the rear PHS
                             : Patient positioning aids checked, without visible damage
                             : swivel casters inspected               
                             : L Arms checked                         
                             : ACC checked                            
                             : Cart present sensor checked            
                             : Collimator cart checked                
                             : SLD1 flapper checked                   
                             : Sensors at the back of yoke1 checked   
                             : Foot pedal docker switch checked       
                             : SPECT UPS cable checked                
                             : SPECT UPS cleaned and checked          
                             : Monitor settings checked               
                             : CT Quality check / QA Constancy        
                              Detector Testing intrinsic / extrinsic verification ( Tc99 source / Co57
                             :                                        
                              source provide by hospital )            
      Syngo.via                                                       
                             : Check if cables are squeezed or broken 
                             : Check all external cable connection    
                             : Ensure that the plug are free of dust  
                             : Safe cable routing                     
                             : Clean the monitor                      
                             : Clean the keyboard                     
                             : Check for minimum clearance            
                             : Check the functionality of the on-site air conditioner
                             : Check the system for a clean environment
                             : Backup configuration and user-specific data
                             : Delete analyze file                    
                             : Check disk capacity                    
                             : Check licenses                         
                             : Check the messages files for error messages (e.g., HW problems)
                             : Check SRS connection                   
                             : Software backup performed              
                             : Monitor image was checked (SMPTE image display)
                             : Protective conductor resistance test (< 200mOhm)
                PM 2                                                  
      General Visual Check   : Visual Inspect System                  
                              - The system has no deficiencies        
      Cleaning the component : Cleaning System                        
      2nd - Maintenance       Gantry cooling fans checked             
                             : Air filters checked                    
                             : Slip ring assembly cleaned             
                             : Power brush assembly cleaned           
                             : Power carbon brushes checked           
                             : Signal data brushes checked            
                             : Rotate limit sensors checked           
                             : Gantry rotate operation checked        
                             : Rotate ring lubricated                 
                             : Stiffening Ribs Checked                
                             : Ring to base frame connections checked 
                             : Motor connection checked               
                             : Motor mount connection checked         
                              Inspect for damager, loose parts, cracks/tears, screw connections
                             :                                        
                             : Main bearing lubricated                
                             : Tube cooler cleaned                    
                             : Checked drive belt tension checked     
                             : Gantry brake checked                   
                             : Air filter checked                     
                             : PDS fan checked                        
                             : Surge suppressors checked              
                             : Gantry Protective Conductor Resistance has been measured
                             : PHS: Protective conductor resistance has been measured
                             : LCB (Option) Protective conductor resistance has been measured
                              UPS (Symbia T/Intevo Series Systems): Protective conductor resistance
                             :                                        
                              has been measured                       
                              ICS (Symbia T/Intevo Series Systems): Protective conductor resistance
                             :                                        
                              has been measured                       
                              UPS (Symbia T/Intevo Series Systems): Protective conductor resistance
                             :                                        
                              has been measured                       
                              IRS (Symbia T/Intevo Series Systems): Protective conductor resistance
                             :                                        
                              has been measured                       
                              DRS (Symbia T/Intevo Series Systems): Protective conductor resistance
                             :                                        
                              has been measured                       
                             : Monitor: Protective conductor resistance has been measured
                              Leakage Current for Patient Tabletop to system PE has been measured
                             :                                        
                              (AC)                                    
                              Leakage Current for Patient Tabletop to system PE has been measured
                             :                                        
                              (DC)                                    
                              Leakage Current for PPM Tabletop to system PE has been measured
                             :                                        
                              (AC)                                    
                              Leakage Current for PPM Tabletop to system PE has been measured
                             :                                        
                              (DC)                                    
                              Leakage Current for ECG Leads Tabletop to system PE has been
                             :                                        
                              measured (AC)                           
                              Leakage Current for ECG Leads Tabletop to system PE has been
                             :                                        
                              measured (DC)                           
                              Leakage Current for ECG Leads to Patient Tabletop has been measured
                             :                                        
                              (AC)                                    
                              Leakage Current for ECG Leads to Patient Tabletop has been measured
                             :                                        
                              (DC)                                    
                              Perform CT NM FoV Calibration (Tc99 source and Contrast Media
                             :                                        
                              provide by hospital )                   
                             : CT Quality check / QA Constancy        
                              Detector Testing intrinsic / extrinsic verification ( Tc99 source / Co57
                             :                                        
                              source provide by hospital )            
      Syngo.via                                                       
                             : Check if cables are squeezed or broken 
                             : Check all external cable connection    
                             : Ensure that the plug are free of dust  
                             : Safe cable routing                     
                             : Clean the monitor                      
                             : Clean the keyboard                     
                             : Check for minimum clearance            
                             : Check the functionality of the on-site air conditioner
                             : Check the system for a clean environment
                             : Backup configuration and user-specific data
                             : Delete analyze file                    
                             : Check disk capacity                    
                             : Check licenses                         
                             : Check the messages files for error messages (e.g., HW problems)
                             : Check SRS connection                   
                             : Software backup performed              
                             : Monitor image was checked (SMPTE image display)
                             : Protective conductor resistance test (< 200mOhm)
 2 Sparepart Bekas                 Tetap menjadi milik pabrikan Siemens
 3 Lokasi                               Ruang Radiologi               
 4 Waktu kerja                     Senin-Jumat jam 09.00 s/d 22.00 WIB,
 5 Hari Libur                      Sabtu, Minggu dan Hari Libur Nasional
                              Sesuai dengan Katalog Suku Cadang Siemens Healthineers, jika
 6 Suku Cadang Service                                                
                                        terjadi kerusakan             
 7 Uptime Guarantee (%)                 Tidak Termasuk                
 8 Onsite Support                   Tidak terbatas jumlah kunjungan   
 9 Response Time Commitment          Dalam 2 jam setelah panggilan    
 10 System Reliablity (%)               Tidak Termasuk                
 11 Onsite Support (Upon Activation)     Unlimited                    
 12 Onsite Response Time (Emergency)      2 Hours                     
 13 Onsite Response Time (Non - Emergency) 2x24 jam                   
 Merek                                                                
Siemens
Tenders also won by PT Siemens Healthineers Indonesia