1
PEKERJAAN PEMINDAHAN UNIT AHU RUANG AUDITORIUM LEIMENA
BESERTA INSTALASINYA
NO URAIAN PEKERJAAN VOL SAT
A Pekerjaan Pemindahan AHU Lt 2
Ruang Lemina Gd ADHYATMA
1 Pipa BS SCH 40 Uk 2" 6 Batang
2 Gate Valve 2" 10 K / KITZ 2 bh
3 Flange Las 2" 4 bh
4 Strainer 2" 1 bh
5 Balancing Valve 2" 1 set
6 Flexible Joint 2" 2 bh
7 Gate Valve 1/2" KITZ 2 bh
8 Pressure Gaauge 10 Bar 2 bh
9 Elbow 2" 10 bh
10 Tee 2" x 1 1/2" 4 bh
11 Reducer 2" x 1/2" 4 bh
12 Double Nepel 2" 8 bh
13 Armaflex 1" 3 rol
14 Lem Armaflex 10 klg
15 Mounting 4" 4 set
16 Pipa PVC 1 1/4" 6 btg
17 Armaflex 1 1/4 " 15 btg
18 Lem PVC 5 klg
19 knee 2" 14 bh
20 Sock las 2" 10 bh
21 Elbow 1 1/4" 20 bh
22 SDD 1 1/4 20 bh
23 Woden Blok 2" 15 set
24 UNP 80 x 80 1 btg
25 Mur Baut + Ring M16 48 bh
26 Bongkar pasang Unit AHU ,Support 1 ls
Dudukan AHU Dan Pipa AHU Lama
27 Pembuatan Support / Unit AHU 1 ls
28 Ongkos Pekerjaan Pemasangan Instalasi 1 ls
Pipa AHU Accesoris Dan Pipa Drain AHU
29 Material Bantu,Alat Bantu ( Scafolding ) 1 ls
Test Comisioning Dan Transportasi
B Pekerjaan Instalasi Ducting AHU Dan
Panel Power AHU
1 Kabel NYY 4 x 4 mm 50 mtr
2 Kabel NYY 3 x 4 mm 30 mtr
3 Ducting Utama UK 120 x 240 (BJLS 0,8 ) 1 unit
2
4 Ducting Pembagi UK 40 x 120 60 M2
-Fiu Uk 400 x 120 20 lbr
-Flengdess 100 btg
-Bayonet 100 btg
-Coverangel 150 bh
-Lem Fiu 6 klg
-TDH Allumunium 10 btg
5 Motorized Demper Honneywell 1 set
Dan Thermostad
6 Long Drat 8 mm + mur + baut 100 set
7 Support Ducting / Gantungan Ducting 1 ls
8 Armaflex 1 Cm ( Isolasi Ducting ) 25 lbr
9 Dynaset 8 mm 50 set
10 Flexible Kanvas 2 rol
11 All Tape 20 rol
12 Metalizing 25 rol
13 Sealent 25 btl
14 Allumunium Foil Double Side 2 rol
15 Ongkos Bongkar Dan Pasang Ducting AHU 1 ls
Panel AHU Dan Kabel Power
16 Material Bantu,Akomodasi,sewa Steger 1 ls
Dan Pembuangan Sampah