URAIAN SINGKAT PEKERJAAN
Kontrak Service Pemeliharaan Fluoroscopy Merk Siemens di Instalasi Radiologi
RSUP. H. Adam Malik Tahun Anggaran 2024
No. Nama Alat dan Uraian Pekerjaan
1 Maintenance dan Kontrak Service Unit Fluoroscopy : Type Performance TOP+
Specifications :
● Suku cadang Normal : Semua suku cadang yang ada pada unit Luminos
Fusion VE FD
: ( Termasuk X-Ray Tube )
● Preventive Maintenance (PM) : 1 (satu) kali per tahun
● Corrective Maintenance (CM) : Tidak terbatas (pada saat alat bermasalah atau
mengalami kerusakan)
● Tenaga kerja dan perjalanan CM : Termasuk
● Tenaga kerja dan perjalanan PM : Termasuk
● tenaga kerja jarak jauh : Termasuk
● Dukungan telepon teknis : Termasuk
● Waktu respons awal : 2 (dua) jam
● Waktu respon di tempat (on-site) : Hari kerja berikutnya
● Waktu pengiriman suku cadang : 4 (empat belas) hari kerja
● Layanan jarak jauh teknisi (remote) : Remote pro-active support include
● Safety dan Update Software : Termasuk (jika ada instruksi dari pabrik}
● Jendela Pemeliharaan Perbaikan (CM : Setiap hari kerja dan jam kerja
● Jendela Pemeliharaan Direncanakan (PM) : Setiap hari kerja dan jam kerja
● Kalibrasi oleh instansi kalibrasi yang : Tidak Termasuk
berwenang dilengkapi dengan sertifikat, hasil uji
serta label kalibras
Preventive Maintenance Rutin, Meliputi :
I General Visual Check : Visual Check per IEC 62353
II Cleaning the component : Inpection of internal heat dissipation and cleaning
III Polydoros :
- Inspection and Maintenance
- Cleaning
- Checking High Voltage Cables
- Radiation Indicator : Checking radiation indicators
- Tube adjusment perform tube conditioning
IV Luminos Agile :
- Inspection and Maintenance
- Lifting Base
- Systems Longitudinal Movement
- System Transverse Movement
- Image Receptor , Transverse
- Compression
- Clean the tabletop
- Tabletop Function Test
- Compression Cone
- Safety switch-off Devices
- Tabletop with aliminium profile rails
- Footrest
- Checking the operation elements
- Emergency Stop Button
- Cleaning
- Tabletop (longitudinal and transverse
movement)
- Lifting Unit
- Detector Insert
- Function Check
V Multileaf Collimator/Universal Collimator :
- Inspection and Maintenance : Cleaning
: Checking the collimator Mounting
: Checking the control elements on the collimator
Checking the accessory rails under the collimator for
:
wear
VI Monitor Trolley : : Cleaning
: Checking the mounting of the monitors
: Checking the cables, flexible, corrugated hoses
VII DCS-F : Inspection and Maintenance
Support Arm System (Radiation Shield, Injector
VIII Safety Inspection
Head)
IX Wall Stand 2 Inspection and Maintenance
X 3D V Ceiling Stand : Cleaning
Cable and flexible, corrugated hoses
- Inspection and Maintenance :
Longitudinal rails and transverse track
:
Telescope Carriage
:
Telescope
:
Support Arm
:
XI Fluoro Detector : Inspection and maintenance
XII Mobile Detector : Inspection and maintenance