| 0315225888503000 | Rp 4,279,600,000 | |
| 0827536913908000 | Rp 4,435,199,452 | |
| 0023528995903000 | Rp 4,440,000,000 | |
| 0027880632907000 | - | |
| 0023529597907000 | Rp 4,758,609,541 | |
| 0015789795907000 | - | |
| 0015124753907000 | - | |
| 0027887843908000 | - | |
| 0828685867903000 | - | |
| 0022182240907000 | - | |
CV Mulia Arta Mandiri | 0022182885907000 | - |
| 0819460924901000 | - | |
| 0030967285008000 | - | |
PT Putra Alfindo Consultama | 07*2**0****05**0 | - |
| 0027542398901000 | - | |
| 0026124107907000 | - | |
| 0966734436906000 | - | |
| 0019484898907000 | - | |
| 0965815327908000 | - | |
| 0033283425412000 | - | |
| 0838821031907000 | - | |
| 0533069308903000 | - | |
| 0019142934906000 | - | |
PT Griya Ayu | 03*6**1****01**0 | - |
| 0318095643907000 | - | |
| 0210644696907000 | - | |
| 0017773151901000 | - | |
| 0017283128901000 | - | |
CV Kembar Jaya Mandiri | 0839998184907000 | - |
| 0023537210907000 | - | |
PT Sumber Budi Luhur | 04*5**6****07**0 | - |
CV Nurjaya Karya | 0017996729904000 | - |
| 0903794386905000 | - | |
| 0017553306903000 | - | |
| 0912148012907000 | - | |
| 0956831432903000 | - | |
PT Teknik Jaya Sakti | 04*4**6****01**0 | - |
| 0927737007907000 | - | |
| 0936110808901000 | - | |
| 0021521786906000 | - | |
| 0017289489907000 | - | |
| 0733876890907000 | - | |
| 0019946813907000 | - | |
| 0012363891907000 | - | |
CV Putra Bali Timur | 0750827206907000 | - |
| 0027882836907000 | - | |
| 0749193330907000 | - | |
| 0850877895903000 | - | |
| 0018855171907000 | - | |
| 0015791635907000 | - | |
| 0015126667907000 | - | |
| 0020967378907000 | - | |
| 0016634461907000 | - |
URAIAN SINGKAT
PAKET PEKERJAAN PEMBANGUNAN TEMPAT PARKIR DI PANTAI GOA LAWAH (DAK
FISIK)
Pekerjaan PEMBANGUNAN TEMPAT PARKIR DI PANTAI GOA LAWAH (DAK
FISIK) yang berlokasi pada Pantai Goa Lawah Desa Pasinggahan, Kecamatan Dawan, Kabupaten
Klungkung, Bali Untuk memaksimalkan dan merapikan parkir pemedek/wisatawan yang
melakukan kegiatan keagamaan maupun berwisata di area pantai goa lawah, maka diperlukan
pembuatan parkir baru untuk menunjang kenyamanan pengunjung. Maka Pemerintah Kabupaten
Klungkung memandang perlu menfasilitasi kebutuhan tersebut diatas melalui kegiatan
perencanaan, fisik maupun pengawasan.
Memperhatikan hal hal tersebut di atas, maka Dinas Pariwisata Kabupaten Klungkung
menggunkan dana DPA APBD Tahun 2023 menganggarkan pembangunan parkir di area goa
lawah. Secara garis besar pekerjaan yang dilakukan adalah pekerjaan pengaspalan menggunakan
aspalt hotmix, dan dinding penahan tanah untuk menanggul lahan parkir yang akan di buat. Waktu
pelaksanaan pekerjaan adalah 160 (seratus enam puluh hari kalender). Adapun skop pekerjaan
yang dilakukan adalah
No Uraian Pekerjaan
A PEKERJAAN KESEHATAN DAN KESELAMATAN KERJA
I ALAT PELINDUNG KERJA DAN PELINGUNG DIRI
1. Topi Pelindung
2. Pelindung Pernafasan dan Mulut (Masker) @1 Kotak = 50 pcs
3. Sarung Tangan (Safety Gloves)
4. Sepatu Keselamatan ( Safety Shoes)
5. Rompi Keselamatan (Safety Vest)
II FASILITAS, SARANA, DAN PRASARANA KESEHATAN
1. Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban, dll)
III RAMBU-RAMBU
1. Rambu Petunjuk
2. Rambu Larangan
3. Rambu Peringatan
4. Rambu Kewajiban
5. Rambu Informasi
IV ALAT PEMBANTU LAINNYA
1. Lampu Rotary
2. Traffic Cone
B PEKERJAAN PERSIAPAN
1. Pek. Mobilisasi Alat
2. Pek. Pengukuran Dengan Alat Total Station dan Bowplank
3. Pek. Pembongkaran Gedung Eksisting
C PEKERJAAN DINDING PENAHAN TANAH
I PEK. GALIAN DAN TIMBUNAN
1. Pek. Galian Tanah Keras Dengan Alat Exaavator
2. Pek. Timbunan Tanah Ex. Galian
II PEK. PONDASI
1. Pek. Pas. Batu Kali 1 Pc : 5Ps
III PEK. FINISHING
1. Pek. Finishing Siar Pasangan Batu Kali Pada Dinding Penahan Tanah
2. Pek. Plesetran 1 Pc : 4 ps Bagian Atas dan Belakang DPT
D PEKERJAAN PLENTER BOX
I PEK. GALIAN DAN TIMBUNAN
1. Pek. Galian Tanah
2. Pek. Timbunan Tanah Ex. Galian
3. Pek. Tanah Subur
II PEK. PONDASI
1. Pek. Pas. Batu Kali 1 Pc : 5Ps
III PEK. DINDING PADA PLANTER BOX
1 Pek. Kanstein Duduk 15 x 30 x 50 cm K 225
IV PEK. TANAMAN
Pek Penanaman pohon Ketapang Kencana Hijau, Tinggi Minimal 6 m Dengan Lingkaran Batang
1.
Minimal 60 cm
E PEKERJAAN ASPAL
1. Pek. Lapis Pondasi Agregat Kelas B
2. Pek. Lapis Pondasi Agregat Kelas A
3. Pek. Lapis Resap Pengikat - Aspal Cair/Emulsi
4. Pek. Laston Lapis Aus (AC-BC) tebal 5 cm
5. Pek. Laston Lapis Aus (AC-WC) tebal 4 cm
F PEKERJAAN SALURAN
I PEK. GALIAN DAN TIMBUNAN
1. Pek. Galian Tanah
2. Pek. Urugan Pasir
II PEK. BETON
1. Pek. Pekerjaan Saluran
- Pek. Beton Mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
- Wiremesh M5
- Pek. Besi Ø 10 mm
- Pek. Begisting Dinding
2 Pek. Tutup Saluran
- Pek. Beton Mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
- Pek. Besi Ø 10 mm
- Pek. begisting Lantai
3 Pek. Pekerjaan Plat Penutup Pada Saluran
- Pek. Beton Mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
- Wiremesh M5
- Pek. Begisting Dinding
G PEKERJAAN RUMAH POWER HOUSE
I PEK. GALIAN DAN TIMBUNAN
1. Pek. Galian Tanah
2. Pek. Timbunan Tanah
3. Pek. Timbunan Pasir Pada Pondasi
4. Pek. Timbunan Pasir Pada Lantai
II PEK. PONDASI
1. Pek. Pas. Batu Kosong
2. Pek. Pas. Batu Kali 1 Pc : 5Ps
III PEK. BETON
1. Pek. Rabatan Lantai T = 5 cm
- Pek. Beton mutu Lantai Kerja f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,97
2. Pek. Sloof 20 x 25 cm
- Pek. Beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
- Pek. Pembesian Tulangan Ø 10 mm
- Pek. Pembesian Tulangan Ø 8 mm
- Pek. Begesting Sloof
3. Pek. Kolom 20 x 20 cm
- Pek. Beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
- Pek. Pembesian Tulangan Ø 10 mm
- Pek. Pembesian Tulangan Ø 8 mm
- Pek. Begesting Kolom
4 Pek. Balok Ring 20 x 25 cm
- Pek. Beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
- Pek. Pembesian Tulangan Ø 10 mm
- Pek. Pembesian Tulangan Ø 8 mm
- Pek. Begesting Balok Ring
5 Pek. Plat Beton Atap
- Pek. Beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
- Pek. Pembesian Tulangan Ø 8 mm
- Pek. Begesting Plat Atap
IV PEK. DINDING
1. Pek. Dinding Batako Camp 1PC : 4 PS
2. Pek. Plesteran 1 Pc : 4 Ps
3. Pek. Acian Mill
V PEK. PINTU DAN JENDELA
1 Pek. Pintu
- Pek. Kusen Kayu Bingkirai
- Pek. Pintu Kayu Bingkirai
- Pek. Pemasangan (Kunci Pintu CYLINDER CYL CON DC DL62MM SN) + (ESCUTCHEON ESCN
Z1 SN + NP) + (MORTISE LOCK MTS RL DL8585 SSS) ex. Dekson
- Pek. Pemasangan NYLON IRON HINGE ES IR 4X3X2MM 4NR NA
- Pek. Pemasangan PULL HANDLE PH D855 19X210X152 OVAL SSS
VI PEK. PENGECATAN
1. Pek. Cat Dinding Interior, Ex. Vinilex
2. Pek. Cat Dinding Exterior, Ex. Dulux Wetherbond
3. Pek. Waterproofing. Ex. No Droop
4. Pek. Polituran Ex. Lasur Eksterior
VII PEK. PENUTUP LANTAI DAN DINDING
1. Pek. Pas. Keramik 30 x 30 cm
2. Pek. Plint Keramik 10 x 30 cm
VIII PEK. ELEKTRIKAL
1 INSTALASI LISTRIK
Instalasi Penerangan dalam , NYM 2x2.5 mm²
Instalasi saklar , NYM 3x2.5 mm²
Instalasi Stop Kontak, NYM 3x2.5 mm²
2 FIXTURE, SWITCH OUTLET ,Ex. Schneider
Power Outlet Wall
Single Switch/Saklar Ganda
3 ARMATURE DAN LAMPU
Lampu LED Philip 25 Waat "Warm White"
Fiiting Lampu Tempel
H PEKERJAAN PJU
I PEKERJAAN GALIAN DAN TIMBUNAN
1. Pek. Galian Tanah
2. Pek. Timbunan Tanah
II PEKERJAAN PONDASI
A PEKERJAAN BETON
1. Pek. Footplat Uk. 40 x 40 x 30 cm
- Pek. Beton Mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
- Pek. Tulangan D 13 - 150 mm
2. Pek. Kolom Uk (25 x 25 cm)
- Pek. Beton Mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
- Pek. Tulangan D 13
- Pek. Tulangan Ø 8
- Pek. Begesting Kolom
III PEKERJAAN MEKANIKAL, ELEKTRIKAL
A PEKERJAAN ELEKTRIKAL
A.1 AMPRAH DAYA AWAL
a Biaya Amprah Daya Listrik PLN 16000 VA + SlO + Panel Listrik PLN
b Pek. Distribusi Listrik Ke Masing-Masing Lampu PJU Menggunakan Kabel NYFGBY+Accecorisnya
A.2 Lampu PJU
a Pek. Lampu PJU IP 65 "Warm White" BRP131 LED125/WW 100W 220240V DM GM ex Philips
b Pengadaan Tiang Lampu PJU Ortogonal Galvanis + Accecorisnya
c Pek. Pas. Saklar Otomatis Dengan Saklar Timer, ex Theben
Semarapura, 19 Mei 2023
Kepala Dinas Pariwisata Kabupaten Klungkung,
Ni Made Sulistiawati,SH.MH
NIP.19790610 200604 2 014