| Reason | |||
|---|---|---|---|
| 0022198394809000 | Rp 13,042,038,018 | - | |
| 0019065515805000 | Rp 13,068,446,248 | - | |
| 0417321809801000 | Rp 13,133,535,928 | Tidak memasukkan data kualifikasi | |
| 0018763359809000 | Rp 12,997,804,804 | Tidak memenuhi Tenaga /Personil yang disyaratkan dalam LDP | |
Mitra Syahputra Teknik | 04*0**1****09**0 | Rp 13,133,536,927 | Tidak memasukkan data kualifikasi |
| 0752205328822000 | - | - | |
| 0027006212823000 | Rp 10,657,835,136 | Tidak memasukkan data kualifikasi | |
| 0019147917823000 | Rp 13,120,406,932 | Tidak memasukkan data kualifikasi | |
| 0714085172807000 | - | - | |
| 0016647257821000 | - | - | |
| 0746946003821000 | - | - | |
| 0728310467825000 | - | - | |
| 0864158472942000 | - | - | |
| 0014632632731000 | - | - | |
| 0416689701804000 | - | - | |
| 0855675625821000 | - | - | |
| 0868996851805000 | - | - | |
CV Sinar Cahaya Utama | 0023950173822000 | - | - |
| 0033377391824000 | - | - | |
| 0020146999814000 | - | - | |
| 0017874314942000 | - | - | |
| 0032930083822000 | - | - | |
| 0032135972952000 | - | - | |
| 0661339283822000 | - | - | |
CV Jimass Karya | 0016641649621000 | - | - |
| 0012169256422000 | - | - | |
| 0030606875112000 | - | - | |
| 0821927522825000 | - | - | |
| 0714469889517000 | - | - | |
| 0803519677422000 | - | - | |
CV Lamgugob Perdana | 0809050263101000 | - | - |
| 0752659664811000 | - | - | |
CV Arsika Cipta Konsultan | 08*9**1****22**0 | - | - |
| 0841515505822000 | - | - | |
| 0022821540952000 | - | - | |
| 0811154285824000 | - | - | |
CV Andalas Lestari | 0030328561323000 | - | - |
| 0024552820833000 | - | - | |
| 0031709454822000 | - | - | |
| 0027786813423000 | - | - | |
| 0031069065806000 | - | - | |
| 0016396806804000 | - | - | |
| 0028018349824000 | - | - |
REKAPITULASI
BILL OF QUANTITY ( B O Q )
KEGIATAN : PENINGKATAN SARANA PRASARANA DI LINGKUNGAN MAHKAMAH AGUNG REPUBLIK INDONESIA
PEKERJAAN : REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
LOKASI : JALAN BARUTONA NO. 11 TAHUNA TIMUR -KEPULAUAN SANGIHE
TAHUN : 2023
SUB JUMLAH JUMLAH TOTAL
NO.
URAIAN PEKERJAAN
( Rp ) ( Rp )
I. PEKERJAAN PERSIAPAN - -
II. PEKERJAAAN STRUKTUR
1 PEKERJAAN GALIAN, URUGAN TANAH DAN PONDASI - -
2 PEKERJAAN STRUKTUR BETON & BAJA -
A. PEKERJAAN STRUKTUR BETON BAWAH -
B. PEKERJAAN STRUKTUR BETON ATAS
LANTAI I Elevasi - 1.80 s.d + 4.45 -
LANTAI II Elevasi + 4.45 s.d + 11,50 -
3. PEKERJAAN ATAP - -
III. PEKERJAAN ARSITEKTUR
1 PEKERJAAN BETON PRAKTIS & BALOK LINTLE -
A LANTAI - I -
Pekerjaan Kolom Praktis KP 12/12
Pekerjaan Ring/ Balok Lintel Beton 12/12
Pekerjaan Plat Meja Beton Wastafel
B LANTAI - II -
Pekerjaan Kolom Praktis KP 12/12
Pekerjaan Ring Balok Beton 12/12
Pekerjaan Plat Meja Beton Wastafel dan Pentry
2 PEKERJAAN DINDING DAN PLESTERAN -
A LANTAI - I -
B LANTAI - II -
3 PEKERJAAN KUSEN ALLUMUNIUM DAN RAILLING -
A LANTAI - I -
B LANTAI - II -
4 PEKERJAAN DINDING MELEKAT ( INTERIOR ) -
A. LANTAI 1 -
5 PEKERJAAN PELAPIS LANTAI -
A LANTAI - I -
B LANTAI - II -
6 PEKERJAAN PLAFOND -
A LANTAI - I -
B LANTAI - II -
7 PEKERJAAN PENGECATAN & LABURAN -
A LANTAI - I -
B LANTAI - II -
8 PEKERJAAN SANITARY -
A. LANTAI - I -
B. LANTAI - II -
IV. PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING
A. PEKERJAAN STANDAR
I PEKERJAAN PLUMBING -
1.1INSTALASI AIR BERSIH -
1.2PEKERJAAN AIR PANAS -
1.3INSTALASI AIR KOTOR, BEKAS DAN VENT -
1.4INSTALASI AIR HUJAN -
II PEKERJAAN ELEKTRIKAL -
2.1PENYAMBUNGAN KE PLN 131 KVA -
2.2PEKERJAAN PANEL DAN KABEL FEEDER -
2.3PEKERJAAN INSTALASI PENERANGAN DAN DAYA STOP KONTAK -
B. PEKERJAAN NON STANDAR
I PEKERJAAN PLUMBING -
1.1PEKERJAAN AIR BERSIH -
II PEKERJAN TATA UDARA DAN VENTILASI -
2.1PEKERJAAN TATA UDARA -
2.2PEKERJAAN VENTILASI -
III PEKERJAAN PROTEKSI KEBAKARAN -
3.1 PEKERJAAN PERLAWANAN KEBAKARAN -
SUB JUMLAH JUMLAH TOTAL
NO.
URAIAN PEKERJAAN
( Rp ) ( Rp )
IV PEKERJAAN ELEKTRIKAL ARUS KUAT -
4.1 PEKERJAAN PENGADAAN DAN PEMASANGAN ARMATUR -
4.2 PEKERJAAN INSTALASI PENANGKAL PETIR DAN GROUNDING -
4.3 PEKERJAAN RAK KABEL -
V PEKERJAAN ELEKTRONIK -
5.1 PEKERJAAN FIRE ALARM -
5.2 PEKERJAAN CCTV -
5.3 PEKERJAAN DATA -
5.4 PEKERJAAN TELEKOMUNIKASI / TELEPONE -
5.5 PEKERJAAN TATA SUARA -
C. PEKERJAAN SITE DEVELOPMENT & UTILITAS -
I PEKERJAAN PENYEDIAAN AIR BERSIH -
II PEKERJAAN PENGADAAN DAN PEMASANGAN IPAL -
III PEKERJAAN INSTALASI MEP POWER HOUSE -
V. PEKERJAAN SARANA LINGKUNGAN -
A PEKERJAAN SARANA GEDUNG/ DROF OF AREA -
B. PEKERJAAN POWER HOUSE/R. POMPA/GWT DAN R. GENZET -
JUMLAH TOTAL -
PPN (11%) -
JUMLAH TOTAL + PPN 11% -
DIBULATKAN -
Terbilang :
# …....................................................................................................................................RUPIAH #
…............., … …........ 2023
Penawar ;
PT./ CV. …..................................
PENANGGUNGJAWAB
Jabatan
RINCIAN
BILL OF QUANTITY ( B O Q )
KEGIATAN : PENINGKATAN SARANA PRASARANA DI LINGKUNGAN MAHKAMAH AGUNG REPUBLIK INDONESIA
PEKERJAAN : REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
LOKASI : JALAN BARUTONA NO. 11 TAHUNA TIMUR -KEPULAUAN SANGIHE
TAHUN : 2023
HARGA SUB
NO. URAIAN PEKERJAAN VOL. SAT SATUAN JUMLAH
Rp ( Rp )
a b c d e f = c x d
I. PEKERJAAN PERSIAPAN
1 Papan Proyek 1,00 Unit - -
2 Listrik Kerja 1,00 Ls - -
3 Air Kerja 1,00 Ls - -
4 Pek. Penyediaan Alat K3 (Safety Shoes, Body Harness, Safetybelt, Helm Project, Marka, dll) 1,00 Ls - -
JUMLAH PEKERJAAN PERSIAPAN -
II. PEKERJAAAN STRUKTUR
1 PEKERJAAN GALIAN, URUGAN TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi Batu Kali (untuk dudukan Pas. ACP) 20,27 M3 - -
2 Pek. Urugan Pasir Bawah Pondasi Batu Kali (untuk dudukan Pas. ACP) 1,27 M3 - -
3 Pek. Urugan pasir Bawah Lantai Tbl. 3 cm 20,40 M3 - -
4 Pek. Lantai Kerja Bawah Pondasi Batu Kali (untuk dudukan Pas. ACP) 1,27 M3 - -
5 Pek. Lantai Kerja Bawah Plat Lantai Tebal 3 Cm Elev -0,10. -0,15. -0,72 20,40 M3 - -
6 Pek. Pasangan Aanstamping Batu Kali 5,07 M3 - -
7 Pek. Pasangan Pondasi Batu Kali 1:5 (untuk dudukan tie beam TB1A) 7,92 M3 - -
JUMLAH PEKERJAAN URUGAN TANAH, PASIR DAN PONDASI -
2 PEKERJAAN STRUKTUR BETON & BAJA
Ref. Produk PC: sekualitas Tiga Roda,SCG,Holcim
Ref. Produk Baja Tulangan SNI : Sekualitas Krakatau Steel ,Gunung Garuda
A. PEKERJAAN STRUKTUR BETON BAWAH
1 Pek. Tie Beam Type TB1A (15x20 Cm) Elv. - 1,00 (untuk dudukan Pasangan ACP) -
- Cor Beton K-300,fcʹ = 24,90 Mpa 1,01 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 156,26 Kg - -
- Bekisting, Pas. Bata Merah, t. 1/2 Bata, 1 PC : 5 PP 13,50 M2 - -
2 Pek. Plat Lantai Tul. susut, t = 12 cm, Elv. - 0,10. - 0,15. & - 0,72 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 81,59 M3 - -
- Baja Tulangan Wiremesh M8 ( 1 Layer) 3.708,86 Kg - -
3 Pek.Pencegahan Anti Rayap 748,00 M2 - -
-
JUMLAH PEKERJAAN STRUKTUR BETON BAWAH -
B. PEKERJAAN STRUKTUR BETON ATAS
I LANTAI I Elevasi - 1.80 s.d + 4.45
PEK. BALAOK BETON ELV. + 4,45 -
1 Pek. Plat Tangga + Bordes, Type Tangga I -
- Cor Beton K-300,fcʹ = 24,90 Mpa 2,57 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 328,10 Kg - -
- Bekisting Tangga 14,96 M2 - -
2 Pek. Plat Tangga + Bordes, Type Tangga II -
- Cor Beton K-300,fcʹ = 24,90 Mpa 1,59 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 604,46 Kg - -
- Bekisting Tangga 8,59 M2 - -
3 Pek. Balok Baja WF.150. 75. 5. tbl, 7 mm , Elevasi + 4,45 40,60 Kg - -
4 Pek. Baseplate 15 x 0,75 cm, tbl, 10 mm 7,31 Kg - -
5 Pek. Perkuatan Dynabolt/HTB dia,16 16,00 Bh - -
6 Pek. Plat Lantai Type S1, t = 12,5 cm, Elevasi + 4,40 & + 4,45
- Cor Beton K-300,fcʹ = 24,90 Mpa 0,14 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa /(Wiremesh M8 /1 Layer) 6,12 Kg - -
Bekisting dengan Floordeck 1,12 M2 - -
- Bekisting Plat Lantai 0,18 M2 - -
JUMLAH PEKERJAAN STRUKTUR BETON ELEV. + 4,45 -
II LANTAI II Elevasi + 4.45 s.d + 11,50
PEKERJAAN KOLOM BETON ELV. +8,95 S/D. + 10,15, + 11,5 -
1 Pek. Kolom Type K1 (25x25 CM), Elevasi. + 8,95 s/d. + 11,50 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 0,48 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 76,88 Kg - -
- Bekisting Kolom Struktur 7,65 M2 - -
2 Pek. Kolom Type K2 (40x40 CM), Elevasi. + 8,95 s/d. + 11,50 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 0,41 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 66,38 Kg - -
- Bekisting Kolom Struktur 4,08 M2 - -
3 Pek. Kolom Type K2 (40x40 CM), Elevasi. + 8,95 s/d. + 10,15 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 3,84 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 1.729,13 Kg - -
- Bekisting Kolom Struktur 38,40 M2 - -
4 Pek. Kolom Type K3 (45x45 cm), Elevasi + 8,95 s. d. + 10.15 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 1,22 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 290,75 Kg - -
- Bekisting Kolom Struktur 10,80 M2 - -
HARGA SUB
NO. URAIAN PEKERJAAN VOL. SAT SATUAN JUMLAH
Rp ( Rp )
a b c d e f = c x d
5 Pek. Kolom Type K7 (45x65 cm), Elevasi + 8,95 s. d. + 10.15 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 0,70 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 162,97 Kg - -
- Bekisting Kolom Struktur 5,28 M2 - -
PEKERJAAN RING BALK BETON ELV. + 10,15 -
6 Pek. Ring balk Type RB.1 (25x35 cm), Elevasi + 10.15 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 6,27 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 1.088,93 Kg - -
- Bekisting Balok Struktur 68,09 M2 - -
7 Pek. Ring balk Type RB.2 (25x40 cm), Elevasi + 10.15 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 16,56 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 2.584,14 Kg - -
- Bekisting Balok Struktur 173,85 M2 - -
8 Pek. Ring balk Type RB.3 (30x60 cm), Elevasi + 10.15 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 2,08 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 246,83 Kg - -
- Bekisting Balok Struktur 17,33 M2 - -
PEKERJAAN BALOK ELV. + 11,50 -
9 Pek. Balok Beton Type B.1 (15x30 cm), Elevasi 11,50 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 0,17 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 51,11 Kg - -
- Bekisting Balok Struktur 3,21 M2 - -
10 Pek. Balok Beton Type B2 15x30, Elevasi + 11.05 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 0,21 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 65,67 Kg - -
- Bekisting Balok Struktur 5,30 M2 - -
11 Pek. Balok Beton Type BK.6 15x30 Elevasi +11,50 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 0,05 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 24,42 Kg - -
- Bekisting Balok Struktur 0,90 M2 - -
12 Pek. Plat Lantai Dak t = 12 cm, Elevasi +11,50 -
- Cor Beton K-300,fcʹ = 24,90 Mpa 1,00 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 90,97 Kg - -
- Bekisting Plat Lantai 1,04 M2 - -
13 Pek. Dudukan Rooftank Kav. 4,0 m3, Balok Beton Bertulang 20x20 cm
Cor Beton K-300,fcʹ = 24,90 Mpa 0,48 M3 - -
Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 56,53 Kg - -
Bekisting 4,80 M2 - -
JUMLAH PEKERJAAN STRUKTUR BETON ELEV. + 8,95 S/D. + 11,50 -
3. PEKERJAAN ATAP
Ref. Produk, Rangka Atap Baja Ringan: Giga Steel, SmartTruss, EKG
Ref. Produk Penutup Atap: Ondoline, Bitumen Ukuran 106 x 40 x 0.30 cm
Ref. Produk Lisplank: Calciboard
1 Pek. Rangka kuda - kuda Baja Ringan 904,20 M2 - -
2 Pek. Pemasangan Alumunium Foil 904,20 M2 - -
3 Pek. Pasang Penutup Atap Genteng Bitumen (Onduline) 904,20 M2 - -
4 Pek. Bubungan/Nok Onduline 103,88 M2 - -
5 Pek.Talang Jurai Seng bjls lebar 90 cm 23,20 M1 - -
6 Lisplang GRC Woodplank 131,21 M1 - -
JUMLAH PEKERJAAN ATAP -
RINCIAN
BILL OF QUANTITY ( B O Q )
KEGIATAN : PENINGKATAN SARANA PRASARANA DI LINGKUNGAN MAHKAMAH AGUNG REPUBLIK INDONESIA
PEKERJAAN : REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
LOKASI : JALAN BARUTONA NO. 11 TAHUNA TIMUR -KEPULAUAN SANGIHE
TAHUN : 2023
HARGA SUB
NO. URAIAN PEKERJAAN VOL. SAT SATUAN JUMLAH
Rp ( Rp )
a b c d e f = c x d
III. PEKERJAAN ARSITEKTUR
1 PEKERJAAN BETON PRAKTIS & BALOK LINTLE
A LANTAI - I
1 Pekerjaan Kolom Praktis KP 12/12 360,00 M1 - -
2 Pekerjaan Ring/ Balok Lintel Beton 12/12 81,47 M1 - -
3 Pekerjaan Plat Meja Beton Wastafel -
- Cor Beton K-175 2,75 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 52,51 Kg - -
- Bekisting 6,33 M2 - -
SUB JUMLAH PEKERJAAN BETON PRAKTIS DAN BALOK LINTLE LANTAI. I -
B LANTAI - II
1 Pekerjaan Kolom Praktis KP 12/12 680,00 M1 - -
2 Pekerjaan Ring Balok Beton 12/12 136,05 M1 - -
3 Pekerjaan Plat Meja Beton Wastafel dan Pentry -
- Cor Beton K-175 3,23 M3 - -
- Tulangan U-24 58,09 Kg - -
- Bekisting 7,43 M2 - -
SUB JUMLAH PEKERJAAN BETON PRAKTIS DAN BALOK LINTLE LANTAI. II -
JUMLAH PEKERJAAN BETON PRAKTIS DAN BALOK LINTLE -
2 PEKERJAAN DINDING DAN PLESTERAN
Ref. Produk, PC: sekualitas Tiga Roda
Ref. Produk, Bata Ringan: Hebel, Leibel, Acon, dan Power Block
Ref. Produk, Semen Instan: Mortar Utama (MU), Prime Mortar, dan Drymix
Ref. Produk, Alumunium Composite Panel: Seven
A LANTAI - I
1 Pek.Pasangang Dinding Bata Merah Camp. 1Pc : 3 Pp 52,87 M2 - -
2 Pek.Pasangang Dinding Bata Merah Camp. 1Pc : 5 Pp 731,39 M2 - -
3 Pek.Plesteran Dinding Camp. 1Pc : 3Ps 105,73 M2 - -
4 Pek.Plesteran Dinding Camp. 1Pc : 5Ps 1.335,88 M2 - -
5 Pek. Acian Dinding dengan Semen Tebal 1,5 mm 1.441,61 M2 - -
6 Pekerjaan Perapihan Sudut Opening Kusen Allumunium 377,52 M1 - -
7 Pekerjaan Banbanan/Penebalan Dinding Atas Bawah Kusen dan ACP Lb, 15 cm. Tbl, 5 cm 260,74 M1 - -
8 Pekerjaan Finishing & Profilan Kolom Entrance 4 Unit 119,20 M1 - -
9 Pekerjaan Finishing & Profilan Kolom Belakang 4 Unit 71,20 M1 - -
10 Pekerjaan Aferking Beton Plat Tangga (Finishing) 26,94 M2 - -
11 Pekerjaan Batu Andesit 30 x 300 mm susun sirih ( W9) 79,56 M2 - -
12 Pekerjaan Dinding Keramik/Homogeneous Tile (KM/WC) 30 X 60 T = 2.15 m 117,89 M2 - -
13 Pekerjaan Dinding Keramik/Homogeneous Tile Type A (KM/WC) 30 X 60 cm 9,02 M2 - -
14 Pekerjaan Plint Homogenius Tile 10 x 60 Cm 103,50 M1 - -
15 Pekerjaan Railling tangga Steinless + Handraill Solidwood (Tangga I ) 18,38 M1 - -
16 Pekerjaan Railling tangga Steinless + Handraill Solidwood (Tangga II ) 10,18 M1 - -
17 Pekerjaan Tangga Ladder 6,00 M1 - -
18 Pekerjaan Railling Steinlessteel pada Ram 53,20 M1 - -
19 Pekerjaan Perapihan Finishing & profilan Listplang beton expose 130,35 M1 - -
20 Pekerjaan Alumunium Composit Panel (ACP) 136,46 M2 - -
SUB JUMLAH PEKERJAAN DINDING DAN PLESTERAN LANTAI. I -
B LANTAI - II
1 Pek.Pasangang Dinding Bata Merah Camp. 1Pc : 3 Pp 193,66 M2 - -
2 Pek.Pasangang Dinding Bata Merah Camp. 1Pc : 5 Pp 1.652,29 M2 - -
3 Pek.Plesteran Dinding Camp. 1Pc : 3Ps 387,32 M2 - -
4 Pek.Plesteran Dinding Camp. 1Pc : 5Ps 3.123,17 M2 - -
5 Pek. Acian Dinding dengan Semen 3.510,48 M2 - -
6 Pekerjaan Perapihan Sudut Opening Kusen Allumunium 564,36 M1 - -
7 Pekerjaan Banbanan Bawah Kusen Lb, 15 cm. Tbl, 5 cm 100,23 M1 - -
8 Pekerjaan Dinding Keramik/Homogeneous Tile (KM/WC) 30 X 60 T = 2.15 m 165,57 M2 - -
9 Pekerjaan Dinding Keramik/Homogeneous Tile Type A (KM/WC) 30 X 60 cm 15,84 M2 - -
10 Pekerjaan Plint Homogenius Tile 10 x 60 Cm 125,63 M1 - -
11 Pekerjaan Railling Void Steinless + Kaca Finish Sanblas 8,00 M1 - -
12 Pekerjaan Railling Steinless Balkon 4,15 M1 - -
13 Pekerjaan Perapihan Finishing & profilan Listplang beton expose 155,60 M1 - -
14 Pekerjaan Alumunium Composit Panel (ACP) 235,33 M2 - -
SUB JUMLAH PEKERJAAN DINDING DAN PLESTERAN LANTAI. II -
JUMLAH PEKERJAAN DINDING DAN PLESTERAN -
HARGA SUB
NO. URAIAN PEKERJAAN VOL. SAT SATUAN JUMLAH
Rp ( Rp )
a b c d e f = c x d
3 PEKERJAAN KUSEN ALLUMUNIUM DAN RAILLING
Ref. Produk Kusen: Alexindo, Alcomexindo, dan Superex/INDAL
Ref. Produk Accessories: Dekson, Solid, dan SES
Ref. Produk Kaca: sekualitas ASAHI MAS, PANASAP
A LANTAI - I
1 Pek. Pasang Pintu Sliding Door Kaca Tempered + ACP Type PJ1 1,00 Unit - -
2 Pek. Pasang Pintu Kaca Tempered + ACP Type PJ2 1,00 Unit - -
3 Pek. Pasang Pintu Kaca Tempered + ACP Type PJ3 1,00 Unit - -
4 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P1 ) 2,00 Unit - -
5 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P2 ) 2,00 Unit - -
6 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P3 ) 4,00 Unit - -
7 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P4 ) 1,00 Unit - -
8 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P5 ) 1,00 Unit - -
9 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P7 ) 5,00 Unit - -
10 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P8 ) 4,00 Unit - -
11 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P9 ) 1,00 Unit - -
12 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P10 ) 1,00 Unit - -
13 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J1) 6,00 Unit - -
14 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J2) 5,00 Unit - -
15 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J3) 4,00 Unit - -
16 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J7) 3,00 Unit - -
17 Pek.Pasang Jendela Kaca Tempered + Accessories (Type J9) 2,00 Unit - -
18 Pek.Pasang Kusen Alumunium dan Kaca (Type BV1) 8,00 Unit - -
19 Pek.Pasang Kusen Alumunium dan Kaca (Type BV2) 3,00 Unit - -
20 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 1 ) 2,00 Unit - -
21 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 2 ) 1,00 Unit - -
22 Pek. Pasang Partisi Double Gypsum Rangka Metal Stud ( Type PT 3 ) 2,00 Unit - -
23 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 4 ) 1,00 Unit - -
24 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 5 ) 1,00 Unit - -
25 Pek. Pasang Partisi Double Gypsum + Kusen dan Jendela Kaca ( Type PT 6 ) 1,00 Unit - -
26 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 7 ) 1,00 Unit - -
27 Pek. Pasang Partisi Double Gypsum Rangka Metal Stud ( Type PT 8 ) 1,00 Unit - -
28 Pek. Pasang Partisi Double Gypsum Rangka Metal Stud ( Type PT 9 ) 1,00 Unit - -
29 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 10 ) 2,00 Unit - -
30 Pek. Pasang Partisi Double Gypsum Rangka Metal Stud ( Type PT 11 ) 2,00 Unit - -
31 Pek. Pasang Partisi Double Gypsum Rangka Metal Stud ( Type PT 12 ) 1,00 Unit - -
32 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 13 ) 1,00 Unit - -
SUB JUMLAH PEKERJAAN ALUMUNIUM DAN RAILLING LANTAI. I -
B LANTAI - II
1 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P3 ) 14,00 Unit - -
2 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P4 ) 3,00 Unit - -
3 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P5 ) 5,00 Unit - -
4 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P6 ) 1,00 Unit - -
5 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P7 ) 7,00 Unit - -
6 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P8 ) 4,00 Unit - -
7 Pek. Pasang Kusen Allumunium + Daun Pintu Multipleks Finish Lapis Bestwood ( Type P10 ) 1,00 Unit - -
8 Pek. Pasang Kusen Besi Canal C + Daun Pintu Plat Baja Finnis Duko ( Type P11 ) Lt. Atap 1,00 Unit - -
9 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J1) 6,00 Unit - -
10 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J2) 10,00 Unit - -
11 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J3) 2,00 Unit - -
12 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J4) 2,00 Unit - -
13 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J5) 1,00 Unit - -
14 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J6) 1,00 Unit - -
15 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J7) 1,00 Unit - -
16 Pek.Pasang Jendela Kaca Tempered + Accessories (Type J8) 2,00 Unit - -
17 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J10) 9,00 Unit - -
18 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J11) 8,00 Unit - -
19 Pek.Pasang Kusen dan Daun Jendela+ Accessories (Type J12) 2,00 Unit - -
20 Pek.Pasang Jendela Kaca Tempered + Accessories (Type J13) 1,00 Unit - -
21 Pek.Pasang Kusen Alumunium dan Kaca (Type BV2) 11,00 Unit - -
22 Pek.Pasang Kusen Alumunium dan Kaca (Type BV3) 1,00 Unit - -
23 Pek.Pasang Kusen Alumunium dan Kaca (Type BV4) - Lantai Atap 1,00 Unit - -
24 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 14 ) 1,00 Unit - -
25 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 15 ) 1,00 Unit - -
26 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 16 ) 2,00 Unit - -
27 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 17 ) 2,00 Unit - -
28 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 18 ) 2,00 Unit - -
29 Pek. Pasang Partisi Double Gypsum + Kusen dan Daun Pintu ( Type PT 19 ) 1,00 Unit - -
27 Pek. Rooster beton 20 x 40 cm 48,00 Unit - -
28 Pek. Pasang Huruf Timbul Bahan Stainless uk. 30 cm + Lampu LED Strip 6 Watt dan Accessories
PENGADILAN AGAMA TAHUNA 21,00 huruf - -
SUB JUMLAH PEKERJAAN ALUMUNIUM DAN RAILLING LANTAI. II -
JUMLAH PEKERJAAN ALUMUNIUM DAN RAILLING -
HARGA SUB
NO. URAIAN PEKERJAAN VOL. SAT SATUAN JUMLAH
Rp ( Rp )
a b c d e f = c x d
4 PEKERJAAN DINDING MELEKAT ( INTERIOR )
A. LANTAI 1
1 Ruang PTSP
- Meja Ukuran 109 x 70 x 80 cm (7 Unit) 6,28 M2 - -
- Partisi Kaca + Frame Allumunium ( Atas Meja ) 6,00 Unit - -
- Pasang Multi 12 mm Fin Bestwood+ Acrillik 4 mm 13,27 M2 - -
- Plafond Interior (Plafond Lambrisering Multi Tebal 9 mm Lapis Bestwood) 16,80 M2 - -
- Backdroop Multi 12 mm, finis Bestwood 32,55 M2 - -
Treatment dinding/Kolom 4,34 M2 - -
- Hurup Timbul " PELAYANAN TERPADU SATU PINTU " Bahan Acrylic Gold, uk.12 cm 25,00 Hurup - -
- Hurup Timbul "PENGADILAN AGAMA TAHUNA" Bahan Acrylic Gold, uk. 10 cm 21,00 Hurup - -
- Logo Pengadilan Agama Tahuna Bahan Acrylic 1,00 Unit - -
- Pasang Dinding Multi 12 mm Fin Bestwood 2,77 M2 - -
- Hurup Timbul " INFORMASI, PENDAFTARAN, KASIR, MEJA- 3, PENGADUAN, E- COURT , 53,00 Hurup - -
INZAGE " Bahan Acrylic putih, uk. 10 cm
2 Ruang Lobby/Receptionist
- Meja Ukuran 355 x 82 x 80 cm 2,91 M2 - -
- Backdroop Multi finis Bestwood 15,87 M2 - -
- Hurup Timbul " PENGADILAN AGAMA TAHUNA " Bahan Acrylic Gold, uk. 12cm 21,00 Hurup - -
- Plafond Interior (Plafond Lambrisering Multi Tebal 9 mm Lapis Bestwood) 22,50 M2 - -
- Treatment Dinding Multiplek Lapis Bestwood 14,70 M1 - -
4 Posbakum
- Meja Ukuran 220 x 70 x 80 cm 1,54 M2 - -
- Backdroop Multi finis Bestwood 14,52 M2 - -
- Hurup Timbul " POSBAKUM " Bahan Arcylic Gold uk. 12 cm 8,00 Hurup - -
- Hurup Timbul " POS BANTUAN HUKUM " Bahan Arcylic Gold uk. 10 cm 15,00 Hurup - -
- Plafond Interior (Plafond Lambrisering Multi Tebal 9 mm Lapis Bestwood) 19,65 M2 - -
- Pintu Koboy Multiplek 18 mm,Lapis Bestwood 1,30 M2 - -
5 Ruang Bermain Anak -
- Treatment Dinding Multiplek Lapis Bestwood 8,40 M1 - -
6 Ruang Pojok Gugatan Mandiri, Bank, Pos Giro -
- Treatment Dinding Multiplek Lapis Bestwood 9,38 M1 - -
- Pasang Dinding Multi 12 mm Fin Bestwood 3,22 M2 - -
- Hurup Timbul " BANK, POS GIRO , POJOK GUGATAN MANDIRI " Bahan Arcylic Gold, uk. 10 cm 30,00 Hurup - -
7 Koliddor
- Treatment Dinding Multiplek Lapis Bestwood 38,10 M1 - -
8 R. Tunggu Pendaftaran dan R. Tunggu Sidang
- Treatment Dinding Multiplek Lapis Bestwood 40,68 M1 - -
9 Ruang Sidang Utama -
- Meja Sidang Uk. 6325 x 1000 x 850 mm 7,25 M2 - -
- Kain Laken KSP 224 8,34 M2 - -
- Sekat Audience Tinggi 85 cm 6,19 M1 - -
- Pintu Koboy Multiplek 18 mm,Lapis Bestwood 1,36 M2 - -
- Treatment Dinding Multiplek Lapis Bestwood 24,20 M1 - -
- Backdrop Panel Multiplek Lapis Bestwood 46,62 M2 - -
10 Ruang Sidang Biasa -
- Meja Sidang Uk. 5,77 x 110 x 85 6,03 M2 - -
- Kain Laken KSP 224 6,93 M2 - -
- Sekat Audience Tinggi 85 cm 4,17 M1 - -
- Pintu Koboy Multiplek 18 mm,Lapis Bestwood 1,36 M2 - -
- Treatment Dinding Multiplek Lapis Bestwood 18,45 M1 - -
- Treatment Kolom Multiplek Lapis Bestwood 5,20 M2 - -
- Backdrop Panel Multiplek Lapis Bestwood 6,45 M2 - -
SUB JUMLAH PEKERJAAN DINDING MELEKAT LANTAI. I -
JUMLAH PEKERJAAN DINDING MELEKAT ( INTERIOR ) -
5 PEKERJAAN PELAPIS LANTAI
Ref. Produk Pelapis Lantai: Roman, Sierra Homogeneous Tile
A LANTAI - I
1 Urugan pasir bawah lantai t = 5 cm 34,91 M3 - -
2 Pekerjaan Lantai Homogeneous Tile Polish 60X60 Cm FL. 1 581,64 M2 - -
3 Pekerjaan Lantai HomogeneousTile Polish 30X60 Cm ( Border), FL. 2 35,90 M2 - -
4 Pekerjaan Lantai Guiding Block 30X30 Cm , FL. 12 30,30 M2 - -
5 Pekerjaan Pola Lantai Ornament Granit Tile 2,40 x 2,40 m, (R. Lobby) 1,00 Unit - -
6 Pekerjaan Lantai Keramik KM 30X30 Cm, FL. 4 37,51 M2 - -
7 Pekerjaan Homogeneous Tile Wastafel 60X60 Cm 4,20 M2 - -
8 Pekerjaan Lantai Tangga 30 X 60 cm, FL. 3 55,19 M2 - -
9 Pekerjaan Stair Nozing Teras Depan,Samping dan Belakang 83,50 M1 - -
10 Pekerjaan Stair Nozing Anak Tangga 57,50 M1 - -
11 Pekerjaan Water Proofing Coatting/Emulsion 48,76 M2 - -
SUB JUMLAH PEKERJAAN PELAPIS LANTAI LANTAI. I -
B LANTAI - II
1 Urugan pasir bawah lantai t=5 cm (Semua Ruangan) 38,03 M3 - -
2 Pekerjaan Lantai Homogeneous Tile Polish 60X60 Cm 693,66 M2 - -
3 Pekerjaan Lantai HomogeneousTile Polish 30X60 Cm ( Border) 22,61 M2 - -
4 Pekerjaan Lantai Keramik KM 30X30 Cm 44,27 M2 - -
5 Pekerjaan Homogeneous Tile Pentri 60X60 Cm Dan Wastafel 5,77 M2 - -
6 Pekerjaan Water Proofing Coatting/Emulsion 91,38 M2 - -
7 Water Proofing Membrant Sheet Dak Beton Atap dan Dak tempat Water Tower Tank 545,76 M2 - -
8 Screed penutup waterproofing 545,76 M2 - -
SUB JUMLAH PEKERJAAN PELAPIS LANTAI LANTAI. II -
JUMLAH PEKERJAAN PELAPIS LANTAI -
HARGA SUB
NO. URAIAN PEKERJAAN VOL. SAT SATUAN JUMLAH
Rp ( Rp )
a b c d e f = c x d
6 PEKERJAAN PLAFOND
Ref. Produk Plafond PVC: Sunda Plafond, Javapond
Ref. Produk Gypsum: Kalsiboard, Jayaboard, Elephant
A LANTAI - I
1 Pekerjaan Rangka Plafond ( 60 x 60 ) Hollow 40x40 mm 785,09 M2 - -
2 Pekerjaan Plafond Gypsum 9mm 534,44 M2 - -
3 Up Ceiling in 92,50 M1 - -
4 Pekerjaan Sunda Plafond / PVC (Luar) 250,66 M2 - -
5 Pekerjaan List Profil Gypsum 431,65 M1 - -
SUB JUMLAH PEKERJAAN PLAFOND LANTAI. I -
B LANTAI - II
1 Pekerjaan Rangka Plafond ( 60 x 60 ) Hollow 40x40 mm 1.066,20 M2 - -
2 Pekerjaan Plafond Gypsum 9mm 770,60 M2 - -
3 Up Ceiling in 96,40 M1 - -
4 Pekerjaan Sunda Plafond (Luar) 233,10 M2 - -
5 Pekerjaan List Profil Gypsum 926,95 M1 - -
6 Pekerjaan Plafond GRC 4 mm (Luar Bawah Atap) 62,50 M2 - -
SUB JUMLAH PEKERJAAN PLAFOND LANTAI. II -
JUMLAH PEKERJAAN PLAFOND -
7 PEKERJAAN PENGECATAN & LABURAN
Ref. Produk Cat Dinding Interior: Dulux ICI dan Jotun
Ref. Produk Cat Dinding Exterior: Dulux ICI dan Jotun (Weathershield)
Ref. Produk Cat Plafond: Dulux ICI dan Jotun
A LANTAI - I
1 Pek. Pengecatan Dinding Exterior 226,09 M2 - -
2 Pek. Pengecatan Dinding Interior 1.802,37 M2 - -
3 Pek. Pengecatan Plafond 719,44 M2 - -
SUB JUMLAH PEKERJAAN PENGECATAN DAN LABURAN LANTAI. I -
B LANTAI - II
1 Pek. Pengecatan Dinding Exterior 307,54 M2 - -
2 Pek. Pengecatan Dinding Interior 3.313,15 M2 - -
3 Pek. Pengecatan Plafond 963,40 M2 - -
4 Pek. Pengecatan Lisplank GRC 45,90 M2 - -
SUB JUMLAH PEKERJAAN PENGECATAN DAN LABURAN LANTAI. II -
JUMLAH PEKERJAAN PENGECATAN DAN LABURAN -
8 PEKERJAAN SANITARY
A. LANTAI - I
1 Pemasangan Kloset Duduk (Type CW632 J / SW 6372 JP) 3 ,00 Unit - -
2 Pemasangan Kloset Duduk (Type C704 L /SW 784 JF) 1 ,00 Unit - -
3 Pemasangan Kloset Jongkok Type CE 7 4 ,00 Unit - -
4 Pemasangan Jet Washer 3 ,00 Unit - -
5 Pemasangan Washtafel Type L521 VIA 5 ,00 Unit - -
6 Pemasangan Washtafel LW 248 JT1 /TX125L 1 ,00 Unit - -
7 Pemasangan Kran dinding 9 ,00 Unit - -
8 Pemasangan Urinoir Type Muslim + flush Valve 1 ,00 Unit - -
9 Pemasangan Floor Drain 9 ,00 Unit - -
10 Cermin Kecil 7 ,00 Unit - -
11 Paper Holder (Chrome) 4 ,00 Unit - -
12 Pegangan Pipa Stainlees Φ 2" 1 ,00 Unit - -
SUB JUMLAH PEKERJAAN SANITARY LANTAI. I -
B. LANTAI - II
1 Pemasangan Kloset Duduk (Type CW632 J / SW 6372 JP) 5 ,00 Unit - -
2 Pemasangan Kloset Duduk (Type CW 826 J /SW826JP) 2 ,00 Unit - -
3 Pemasangan Kloset Jongkok Type CE 7 2 ,00 Unit - -
3 Pemasangan Jet Washer 7 ,00 Unit - -
4 Pemasangan Washtafel Type L521 VIA 2 ,00 Unit - -
5 Pemasangan Washtafel LW 240 CJ / 240 HFJ 2 ,00 Unit - -
6 Pemasangan Washtafel LW649 CJ 2 ,00 Unit - -
7 Pemasangan Kran dinding 15,00 Unit - -
8 Pemasangan Kitchen Sink Type Stainless Steel 1 ,00 Unit - -
9 Pemasangan kran Kitchen Sink 1 ,00 Unit - -
10 Pemasangan Urinoir Type Muslim + flush Valve 2 ,00 Unit - -
11 Pemasangan Partisi Urinal 1 ,00 Unit - -
12 Pemasangan Floor Drain 14,00 Unit - -
13 Pemasangan Shower 5 ,00 Unit - -
14 Cermin Kecil 6 ,00 Unit - -
15 Paper Holder (Chrome) 6 ,00 Unit - -
16 Pasang Kaca Tempered 10 mm 4 ,32 M2 - -
SUB JUMLAH PEKERJAAN SANITARY LANTAI. II -
JUMLAH PEKERJAAN SANITARY -
HARGA SUB
NO. URAIAN PEKERJAAN VOL. SAT SATUAN JUMLAH
Rp ( Rp )
a b c d e f = c x d
V. PEKERJAAN SARANA LINGKUNGAN
A PEKERJAAN SARANA GEDUNG/ DROF OF AREA
1 Pekerjaan Beton Ram Drof OF Area dan Samping Belakang Gedung
a. Pekerjaan Pasir Urug Tebal : 5 cm 2,16 M³ - -
b. Pekerjaan Lantai Kerja Lantai Kerja Tebal : 5 cm 2,16 M³ - -
c. Cor Beton 1 : 2 : 3 t= 15 cm, K-250 6,48 M³ - -
d. Pembesian Wiremesh M8 235,66 Kg - -
2 Pekerjaan Beton Drof OF Area
a. Pekerjaan Pasir Urug Tebal : 5 cm 4,13 M³ - -
b. Pekerjaan Lantai Kerja Lantai Kerja Tebal : 5 cm 4,13 M³ - -
c. Cor Beton 1 : 2 : 3 t= 15 cm, K-250 12,40 M³ - -
d. Pembesian Wiremesh M8 451,06 Kg - -
3 Pasangan Lantai Pearl Stone (Batu sikat) 31,24 M² - -
4 Pasang Lantai Batu Andesit 20 x 40 cm 51,45 M² - -
5 Pekerjaan Bloombak /Planter Box -
a. Pek. Galian Tanah 5,04 M³ - -
b. Pek Pasang Rolag Bata 1 :3 20,16 M² - -
c. Pek. Pasangan Bata Merah 1 : 3 91,97 M² - -
d. Pek.Plesteran Dinding Bata Campuran 1 : 3 45,98 M² - -
e. Pekerjaan Banbanan 133,13 M¹ - -
f. Pasang Batu Andesit 20 x 40 cm 135,91 M² - -
g. Pengecatan Dinding Exterior 46,59 M² - -
h. Tiang Bendera dan Pondasi 1,00 Unit - -
JUMLAH PEKERJAAN SARANA GEDUNG/DROF OF AREA -
B. PEKERJAAN POWER HOUSE/R. POMPA/GWT DAN R. GENZET
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran site dan pasang Bouwplank 15,00 M¹ - -
SUB JUMLAH PEKERJAAN PERSIAPAN -
II PEKERJAAN GALIAN, URUGAN TANAH PONDASI
1 Pek. Galian Tanah Pondasi Plat Beton 1T ≥ 1 m 0,80 M3 - -
2 Pek. Galian Tanah Pondasi Plat Beton 1P ≤ 1 m 1,13 M3 - -
3 Pekerjaan Galian Tanah Dalam 2.3 meter 27,32 M3 - -
4 Pek. Urugan Pasir Bawah Pile Cap 1P 0,11 M3 - -
5 Pek. Urugan Pasir Bawah Pile Cap 1T 0,10 M3 - -
6 Pek. Urugan Pasir Bawah Plat Lantai GWT 0,40 M3 - -
7 Pek. Urugan pasir Bawah Tie Beam TB1 0,27 M3 - -
8 Pek. Lantai Kerja Bawah Pile Cap 1P 0,11 M3 - -
9 Pek. Lantai Kerja Bawah Pile Cap 1T 0,10 M3 - -
10 Pek. Lantai Kerja Bawah Plat Lantai GWT 0,40 M3 - -
11 Pek. Lantai Kerja Bawah Tie Beam TB1 0,27 M3 - -
12 Pek. Buangan Tanah Eks Galian 27,32 M3 - -
SUB JUMLAH PEKERJAAN GALIAN, URUGAN TANAH PONDASI -
III. PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR GWT
1 Pek Pondasi Pile Cap 1P 75x75x40 cm
- Cor Beton K-300 0,90 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 157,82 Kg - -
- Bekisting, Pas. Bata Merah, t. 1/2 Bata, 1 PC : 5 PP 4,80 M2 - -
2 Pek. Sloof Type TB1 20x35 Cm -
- Cor Beton K-300 0,46 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 75,75 Kg - -
- Bekisting, Pas. Bata Merah, t. 1/2 Bata, 1 PC : 5 PP 4,62 M2 - -
3 Beton Lantai t = 20 cm.Beton K-300 -
- Cor Beton K-300 1 ,22 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 148,04 Kg - -
4 Beton Dinding Sisi Keliling t=20 cm.Beton K-300 -
- Cor Beton K-300 4 ,10 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 1.012,79 Kg - -
- Bekisting 41,04 M2 - -
5 Plat Lantai t= 15 cm .Beton K-300 Elev - 0.65 -
- Cor Beton K-300 1,22 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 154,13 Kg - -
- Bekisting 8,16 M2 - -
PEKERJAAN STRUKTUR R.GENSET DAN RUANG POMPA -
1 Pek Pondasi Plat Setempat T1 100x100x30 cm -
- Cor Beton K-300 1,50 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 189,62 Kg - -
- Bekisting, Pas. Bata Merah, t. 1/2 Bata, 1 PC : 5 PP 6,00 M2 - -
2 Pek. Sloof Type TB1 20x35 Cm -
- Cor Beton K-300 1,41 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 224,09 Kg - -
- Bekisting, Pas. Bata Merah, t. 1/2 Bata, 1 PC : 5 PP 14,09 M2 - -
3 Balok B1 20/40.Beton K-300 -
- Cor Beton K-300 0,32 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 39,89 Kg - -
- Bekisting Balok 4,00 M2 - -
4 Beton Lantai t = 10 cm.Beton K-300 Ele 0,00 -
- Cor Beton K-300 3,04 M3 - -
- Tul Wiremest M 8 161,36 Kg - -
5 Pek. Kolom Type K1 20/40,20/20 -
- Cor Beton K-300 1,99 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 270,97 Kg - -
- Bekisting Kolom Struktur 26,56 M2 - -
HARGA SUB
NO. URAIAN PEKERJAAN VOL. SAT SATUAN JUMLAH
Rp ( Rp )
a b c d e f = c x d
6 Pek. Kolom Type K2 20/40 -
- Cor Beton K-300 0,33 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 43,60 Kg - -
- Bekisting Kolom Struktur 4,98 M2 - -
7 Pek. Kolom Type K3 20/20 -
- Cor Beton K-300 0,33 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 57,26 Kg - -
- Bekisting Kolom Struktur 6,64 M2 - -
8 Balok B1 20/40.Beton K-300 -
- Cor Beton K-300 1,29 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 204,29 Kg - -
- Bekisting Balok 16,08 M2 - -
9 Balok B1' 20/40.Beton K-300 -
- Cor Beton K-300 0,38 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 400 MPa 69,88 Kg - -
- Bekisting Balok 4,73 M2 - -
10 Balok B2 20/30.Beton K-300 -
- Cor Beton K-300 0,31 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 64,40 Kg - -
- Bekisting Balok 4,16 M2 - -
11 Balok B2' 20/30.Beton K-300 -
- Cor Beton K-300 0,16 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 400 MPa 38,17 Kg - -
- Bekisting Balok 2,16 M2 - -
12 Balok B3 15/30.Beton K-300 -
- Cor Beton K-300 0,17 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 31,77 Kg - -
- Bekisting Balok 2,89 M2 - -
13 Balok B3' 15/30.Beton K-300 -
- Cor Beton K-300 0,06 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 14,36 Kg - -
- Bekisting Balok 1,01 M2 - -
14 Balok B4 15/60.Beton K-300 -
- Cor Beton K-300 3,06 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 331,90 Kg - -
- Bekisting Balok 36,97 M2 - -
15 Pek. Plat Lantai Dak t = 12 cm, Elevasi +2,90 -
- Cor Beton K-300 5,05 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 1109,70 Kg - -
- Bekisting 42,05 M2 - -
16 Pek. Dudukan Genset (3,75 x 1,4 x 2 x 0,2) -
- Cor Beton K-300 1,05 M3 - -
- Baja Tulangan Deform/Ulir, BJTD, fy 420 MPa 184,00 Kg - -
- Bekisting 2,06 M2 - -
17 Pekerjaan Kolom Praktis KP 12/12 9,30 M1 - -
-
SUB JUMLAH PEKERJAAN STRUKTUR -
IV. PEKERJAAN DINDING DAN PLESTERAN
1 Pek.Pasangang Dinding Bata Camp. 1 : 5 41,29 M2 - -
2 Pek.Plesteran Dinding Bata Campuran 1 : 5 82,57 M2 - -
3 Pekerjaan Acian Dinding 82,57 M2 - -
4 Pekerjaan Perapihan Sudut Opening Kusen Allumunium 31,74 M1 - -
5 Pekerjaan Banbanan Bawah Kusen 19,46 M1 - -
6 Pekerjaan Plesteran/Kamprotan kasar 15,58 M2 - -
SUB JUMLAH PEKERJAAN DINDING DAN PLESTERAN -
V. PEKERJAAN KUSEN BESI CANAL, PINTU PLAT BESI
1 Pek. Pasang Kusen Canal 100,50.20.2,3 + Plat Besi ( Type PB) 1,00 Unit - -
2 Pek. Pasang Kusen Canal 100,50.20.2,3 + Plat Besi ( Type P1) 1,00 Unit - -
3 Pek. Pasang Kusen Canal Bouvenlight ( Type BV1 ) 6,00 Unit - -
SUB JUMLAH PEKERJAAN KUSEN BESI CANAL DAN PINTU PLAT BESI -
VI. PEKERJAAN LANTAI
1 Pekerjaan Lantai Floor Hardeneer ( R. Mesin) dan Teras & Ramp 44,92 M2 - -
2 Pekerjaan Lantai/Dinding Keramik 30X30 Cm (GWT) 25,44 M2 - -
SUB JUMLAH PEKERJAAN LANTAI -
VII. PEKERJAAN PLAFOND
1 Pekerjaan Plafond Exspos 42,05 M2 - -
SUB JUMLAH PEKERJAAN PLAFOND EXPOST -
VIII. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Exterior 41,29 M2 - -
2 Pek. Pengecatan Dinding Interior 41,29 M2 - -
3 Pek. Pengecatan Plafond 42,05 M2 - -
4 WaterStop (Sambungan beton Dinding ke Lantai) 10,70 M1 - -
5 Waterproofing Dak Atap (Membrane/Sheet) 53,27 M2 - -
6 Watterproof Dinding & Lantai Dalam (kedap air) 25,44 M2 - -
7 Screed Lantai/Dak Atap ad.1 : 3 : 5 (Penutup Waterproofing ) 53,27 M2 - -
8 Tangga Manhole Pipa GIP 1,5" 1,00 Unit - -
SUB JUMLAH PEKERJAAN PENGECATAN -
JUMLAH PEKERJAAN POWER HOUSE, R. POMPA/GWT DAN R. GENZET -
RINCIAN HARGA PERKIRAAN SENDIRI ( H P S )
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
TAHUN ANGGARAN 2023
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
A. PEKERJAAN STANDAR
I PEKERJAAN PLUMBING
1.1 INSTALASI AIR BERSIH
a. LANTAI SATU (ELL +0,00)
1 Pemipaan Lantai Dasar :
* Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" m' 7 4,00 - -
* Pipa PPr PN10 Dia. 25 mm Setara Dia. 3/4" m' 4 3,00 - -
* Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" m' 1 1,00 - -
* Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" m' 1 2,00 - -
2 Gate Valve
* Gate Valve 5K Dia. 25 mm Setara Dia. 3/4" bh 3,00 - -
* Gate Valve 5K Dia. 32 mm Setara Dia. 1" bh 2,00 - -
* Gate Valve 5K Dia. 50 mm Setara Dia. 1.1/2" bh 2,00 - -
3 Fitting & Material Bantu 35% Dari Harga Pipa (SNI) lot 1,00 - -
b. LANTAI DUA (ELL +4,50)
1 Pemipaan:
* Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" m' 4 5,00 - -
* Pipa PPr PN10 Dia. 25 mm Setara Dia. 3/4" m' 7 8,00 - -
* Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" m' 3 6,00 - -
* Pipa PPr PN10 Dia. 40 mm Setara Dia. 1.1/4" m' 3 0,00 - -
* Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" m' 5 8,00 - -
2 Gate Valve
* Gate Valve 5K Dia. 25 mm Setara Dia. 3/4" bh 1,00 - -
* Gate Valve 5K Dia. 32 mm Setara Dia. 1" bh 3,00 - -
* Gate Valve 5K Dia. 50 mm Setara Dia. 1.1/2" bh 1,00 - -
3 Fitting & Material Bantu 35% Dari Harga Pipa (SNI) lot 1,00 - -
JUMLAH 1.1INSTALASI AIR BERSIH -
1.2 PEKERJAAN AIR PANAS
a. Electric Water Heater, kapasitas 50 liter. set 2,00 - -
b. INSTALASI m'
1 Pemipaan :
* Pipa PPr PN20 Dia. 20 mm Setara Dia. 1/2" m' 8,00 - -
2 Gate Valve
* Gate Valve 5K Dia. 20 mm Setara Dia. 1/2" bh 4,00 - -
3 Fitting & Material Bantu 10% Dari Harga Pipa (SNI) lot 1,00 - -
JUMLAH 1,2PEKERJAAN AIR PANAS -
1.3 INSTALASI AIR KOTOR, BEKAS DAN VENT
a. LANTAI SATU (ELL +0,00)
1 Pemipaan:
* Pipa PVC AW Dia. 32 mm Setara Dia. 1.1/4" m' 2 4,00 - -
* Pipa PVC AW Dia. 50 mm SetaraDia. 2" m' 2 0,00 - -
* Pipa PVC AW Dia. 65 mm Setara Dia. 2.1/2" m' 6,00 - -
* Pipa PVC AW Dia. 80 mm Setara Dia. 3" m' 2 5,00 - -
Pek. Standar Gedung Utama - page 1 of 2
* Pipa PVC AW Dia. 100 mm Setara Dia. 4" m' 3 9,00 - -
2 Floor Clean Out
* Floor Clean Out Dia. 3" bh 3,00 - -
* Floor Clean Out Dia. 4" bh 4,00 - -
* Floor Drain bh 1 2,00 - -
3 Fitting & Material Bantu 35% Dari Harga Pipa (SNI) lot 1,00 - -
b. LANTAI DUA (ELL +4,50)
1 Pemipaan:
* Pipa PVC AW Dia. 32 mm Setara Dia. 1.1/4" m' 2 8,00 - -
* Pipa PVC AW Dia. 50 mm SetaraDia. 2" m' 100,00 - -
* Pipa PVC AW Dia. 80 mm Setara Dia. 3" m' 1 3,00 - -
* Pipa PVC AW Dia. 100 mm Setara Dia. 4" m' 8 5,00 - -
2 Floor Clean Out
* Floor Clean Out Dia. 3" bh 2,00 - -
* Floor Clean Out Dia. 4" bh 3,00 - -
* Floor Drain bh 1 7,00 - -
3 Fitting & Material Bantu 35% Dari Harga Pipa (SNI) lot 1,00 - -
JUMLAH 1.3INSTALASI AIR KOTOR, BEKAS DAN VENT -
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1.4 INSTALASI AIR HUJAN
1 Pemipaan:
* Pipa PVC AW Dia. 100 mm Setara Dia. 4" m' 280,00 - -
2 Roof Drain
* Roof Drain Dia. 4" bh 2 0,00 - -
3 Fitting & Material Bantu 35% Dari Harga Pipa (SNI) lot 1,00 - -
JUMLAH 1.4INSTALASI AIR HUJAN -
II PEKERJAAN ELEKTRIKAL
2.1 PENYAMBUNGAN KE PLN 131 KVA
a. Penyambungan Daya ke PLN dan Perijinan VA 131.000 - -
1.1 PENYAM BUNGAN DAYA KE PLN -
2.2 PEKERJAAN PANEL DAN KABEL FEEDER
a. LANTAI SATU (ELL +0,00)
1 Panel
* MDP - PA (Posisi di Power House) unit 1,00 - -
* SDP - 1 unit 1,00 - -
* LP - 1 unit 1,00 - -
* PP - 1 unit 1,00 - -
* PP - AC.1 unit 1,00 - -
* PP - AB unit 1,00 - -
* PP - PL unit 1,00 - -
* PP - IPAL unit 1,00 - -
2 Kabel Feeder
* Dari KWH Ke :
MDP , Kabel NYY 4X 95mm2 m' 1 0,00 - -
* Dari MPD Ke :
SDP - 1, Kabel NYFGBY 4 x 70mm2 m' 5 0,00 - -
PP - AB, Kabel NYY 4 x 4mm2 m' 6,00 - -
PP - PL, Kabel NYY 3 x 4mm2 m' 1 0,00 - -
* Kabel Dari SDP - 1 ke :
LP - 1, Kabel NYY 4 x 4mm2 m' 4,00 - -
PP - 1, Kabel NYY 4 x 16mm2 m' 4,00 - -
PP - AC.1, Kabel NYY 4 x 16mm2 m' 4,00 - -
b. LANTAI DUA (ELL +4,50)
1 Panel
* SDP - 2 unit 1,00 - -
* LP - 2 unit 1,00 - -
* PP - 2 unit 1,00 - -
* PP - AC.2 unit 1,00 - -
* PP - Elektronik unit 1,00 - -
* PP - BP unit 1,00 - -
2 Kabel Feeder
* Dari SDP - 1 Ke :
SDP - 2, Kabel NYY 4 x 35mm2 m' 8,00 - -
* Dari SDP - 2 Ke :
LP - 2, Kabel NYY 4 x 6mm2 m' 4,00 - -
LP - Elektronik, Kabel NYY 4 x 6mm2 m' 4,00 - -
PP - 2, Kabel NYY 4 x 10mm2 m' 4,00 - -
PP - Boster, Kabel NYY 3 x 4mm2 m' 4 0,00 - -
PP - AC.2, Kabel NYY 4 x 16mm2 m' 4,00 - -
JUMLAH 2.2PEKERJAAN PANEL DAN KABEL FEEDER -
Pek. Standar Gedung Utama - page 2 of 2
2.3 PEKERJAAN INSTALASI PENERANGAN DAN DAYA STOP KONTAK
a. LANTAI SATU (ELL +0,00)
* Instalasi Penerangan ttk 118,00 - -
* Instalasi Stop Kontak ttk 5 8,00 - -
b. LANTAI DUA (ELL +4,50)
* Instalasi Penerangan ttk 124,00 - -
* Instalasi Stop Kontak ttk 5 5,00 - -
JUMLAH 2.3PEKERJAAN INSTALASI PENERANGAN DAN DAYA STOP KONTAK -
RINCIAN HARGA PERKIRAAN SENDIRI ( H P S )
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
TAHUN ANGGARAN 2023
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
B. PEKERJAAN NON STANDAR
I PEKERJAAN PLUMBING
1.1 PEKERJAAN AIR BERSIH
a. LANTAI DAK /ATAP Elv. + 9.00
1 Tanki Air Atas / Roof Tank
- Bahan Fibrerenforced Plastic / FRP Modular, kapasitas : 4 M3 unit 1,00 - -
- Floating valve Ø 1 1/2" bh 3,00 - -
- Water level cintrol ( WLC ) unit 1,00 - -
- Gate valve
Diameter Ø 2" bh 3,00 - -
Diameter Ø 1 1/2" bh 3,00 - -
- Check valve Ø 2" bh 3,00 - -
2 Pompa Tekan / Boster Pump
- Packaged Booster Pump, (termsk Panel Kontrol) unit 2,00 - -
kapasitas : 150 lt/ mnt
Head : 20 meter
- Flexible joint Ø 2" bh 3,00 - -
- Strainer Ø 2" bh 3,00 - -
- Gate valve Ø 2" bh - -
3,00
- Check valve Ø 2" bh 3,00 - -
3 Water Hammer bh 1,00 - -
4 Pemipaan Poliprophilyn PPr. PN10
- Diameter Ø 1 1/2" pipa distribusi m¹ 46,00 - -
- Pipa pengisi Roof Tank Ø 1 1/2" m¹ 38,00 - -
- Fitting - fitting Ls 1,00 - -
JUMLAH 1.1PEKERJAAN AIR BERSIH -
II PEKERJAN TATA UDARA DAN VENTILASI
2.1 PEKERJAAN TATA UDARA
a. LANTAI SATU (ELL +0,00)
1. Unit Air conditioning Single Split Sytem
Lengkap dudukan dan supporting matrial
Indoor Unit - IU & Outdoor Unit - OU
* IU/OU.1.16, Kapasitas 24200 BTU/h, 4-Way Celling Cassete unit 1,00 - -
* IU/OU.1.17, Kapasitas 24200 BTU/h, 4-Way Celling Cassete unit 1,00 - -
4 Pemipaan Refrigerant
* Pipa Refrigerant+Insulasi m' 301,00 - -
* Pipa Drain+Insulasi m' 171,00 - -
* Fiiting & Material Bantu 15% Dari Harga Pipa (SNI) lot 1,00 - -
5 Kabel indoor unit ac ke panel ac lt.1
Kabel NYM 3 x 2,5mm2 m' 250,00 - -
b. LANTAI DUA (ELL +4,50)
1 Unit Air conditioning Single Split Sytem
Lengkap dudukan dan supporting matrial
Indoor Unit - IU & Outdoor Unit - OU
* FCU/OU.2.1, Kapasitas 17100 BTU/h, unit 1,00 - -
4 Pemipaan Refrigerant
* Pipa Refrigerant+Insulasi m' 205,00 - -
* Pipa Drain+Insulasi m' 177,00 - -
* Fiiting & Material Bantu 15% Dari Harga Pipa (SNI) lot 1,00 - -
5 Kabel indoor unit ac ke panel ac lt.2
Kabel NYM 3 x 2,5mm2 m' 145,00 - -
6 Ducting Polyurethane
* Plenum unit 1,00 - -
* Volume Damper bh 1,00 - -
Supply
* Uk. 10x6" m' 6,00 - -
* SAD 12x12" bh 4,00 - -
* Flexible Joint m' 4,00 - -
Return & Fresh Air
* Uk. 8x6" m' 10,00 - -
* RAG 8x6" bh 2,00 - -
* FAG 8x6" bh 1,00 - -
* Flexible Joint m' 4,00 - -
JUMLAH 2.1PEKERJAAN TATA UDARA -
2.2 PEKERJAAN VENTILASI
a. LANTAI SATU (ELL +0,00)
2 Grille
* Exhaust Air Grille 8 x 8 inch bh 3,00 - -
3 * Pipa PVC AW Dia. 6" m' 10,00 - -
* Pipa PVC AW Dia. 4" m' 7,00 - -
b. LANTAI DUA (ELL +4,50)
2 Grille
* Exhaust Air Grille 8 x 8 inch bh 6,00 - -
3 * Pipa PVC AW Dia. 6" m' 7,00 - -
* Pipa PVC AW Dia. 4" m' 28,00 - -
JUMLAH 2.2PEKERJAAN VENTILASI -
JUMLAH PEKERJAAN TATA UDARA DAN VENTILASI -
Pek. Non Standar Gedung Utama - page 1 of 4
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
III PEKERJAAN PROTEKSI KEBAKARAN
3.1 PEKERJAAN PERLAWANAN KEBAKARAN
a. LANTAI SATU (ELL +0,00)
1 Thermatic Suppression / Hallon 3 kg
Diruang Arsip Perkara unit 1,00 - -
2 Area Korridoor, Fire extinguser 6 kg unit 4,00 - -
b. LANTAI DUA (ELL +4,50)
1 Area Korridoor, Fire extinguser 6 kg unit 4,00 - -
JUMLAH PEKERJAAN PROTEKSI KEBAKARAN -
IV PEKERJAAN ELEKTRIKAL ARUS KUAT
4.1 PEKERJAAN PENGADAAN DAN PEMASANGAN ARMATUR
a. LANTAI SATU (ELL +0,00)
* Lampu TL LED 2 x28 W, Cover Lovre dipasang rata Plafon set 37,00 - -
* Lampu TL LED 1 x28 W, Emergency set 4,00 - -
* Lampu TL LED 1 x12 W, pasang pada cove wastafel set 5,00 - -
* Lampu Down Light LED 5" 13 W set 52,00 - -
* Lampu Down Light Par LED 38 40watt set 9,00 - -
* Lampu TL 1 X 10 W (Exit) set 1,00 - -
* Lampu Down Light LED 7 W set 10,00 - -
* LAMPU LED STRIP 5W/M m1 126,00 - -
* Stop Kontak
200 Watt 16 Ampre bh 52,00 - -
200 watt 16 Ampre type Floor bh 6,00 - -
* Saklar Ganda bh 18,00 - -
* Saklar Tunggal bh 22,00 - -
* Saklar Tukar set 2,00 - -
b. LANTAI DUA (ELL +4,50)
* Lampu TL LED 2 x 28 W, Cover Lovre dipasang rata Plafon set 49,00 - -
* Lampu TL LED 1 x 28 W, Emergency set 2,00 - -
* Lampu TL LED 1 x12 W, pasang pada cove wastafel set 6,00 - -
* Lampu Down Light LED 5" 13 W set 51,00 - -
* Lampu Down Light LED 7 W set 16,00 - -
* LAMPU LED STRIP 5W/M m1 126,00 - -
* Stop Kontak
200 Watt 16 Ampre bh 55,00 - -
* Saklar Ganda bh 2,00 - -
* Saklar Tunggal bh 33,00 - -
* Saklar Tukar set 16,00 - -
JUMLAH 4.1PEKERJAAN PENGADAAN DAN PEMASANGAN ARMATUR -
4.2 PEKERJAAN INSTALASI PENANGKAL PETIR DAN GROUNDING
1 Penangkal Petir
- Penangkal Petir Elektro Static Radius 30 Meter ttk 1,00 - -
Bok Kontrol unit 1,00 - -
Kabel Pengahantar, NYY 70MM2 m' 75,00 - -
Material Bantu Dan Aksesories Ls 1,00 - -
- Pengeboran Untuk Pentanahan ttk 2,00 - -
- Grounding Rood 15 mm bh 2,00 - -
- Bak Kontrol 40x40x40 cm+EGB bh 2,00 - -
- EGB 300x100x10 mm+Box bh 2,00 - -
JUMLAH 4.1PEKERJAAN PENGADAAN DAN PEMASANGAN ARMATUR -
4.3 PEKERJAAN RAK KABEL
a. LANTAI SATU (ELL +0,00)
1 Kabel Tray 400x100 mm2 m' 65,00 - -
2 Kabel Tray 200x100 mm2 m' 65,00 - -
b. LANTAI DUA (ELL +4,50)
1 Kabel Tray 400x100 mm2 m' 65,00 - -
2 Kabel Tray 200x100 mm2 m' 65,00 - -
c. SHAFT
1 Kabel ladder 400x100 mm2 m' 4,00 - -
2 Kabel Ladder 200x100 mm2 m' 4,00 - -
JUMLAH 4.3PEKERJAAN RAK KABEL -
JUMLAH PEKERJAAN ELEKTRIKAL ARUS KUAT -
V PEKERJAAN ELEKTRONIK
5.1 PEKERJAAN FIRE ALARM
a. LANTAI SATU (ELL +0,00)
Peralatan Utama
1 Main Control Panel Fire Alarm Semi Addressable Set 1,00 - -
256 Address c/w peralatan
Line Surge Arrester
Battery 4 Jam Nicad Type (Rechargeable)
2 Power Supply unit 1,00 - -
3 Interconection Panel/ w Module, Acessories unit 1,00 - -
4 Pengkabelan di ruang kontrol Ls 1,00 - -
5 Programing ,Testing dan Commisioning Ls 1,00 - -
6 Announciator addreasable LCD unit 1,00 - -
7 STP AWG #18 + NYA 2 x 1,5 mm di dalam PVC Hi Conduit dia 20 mm titik 1,00 - -
Dari MCFA ke Annunciator
8 STP AWG #18 , NYA 2X 1,5 mm² di dalam PVC Conduit dia 20 mm dari :
MCFA ke TB-FA.Lt1 titik 1,00 - -
TBFA-Lt.1 ke TBFA Lt.2 titik 1,00 - -
TBFA-Lt.2 ke MCFA titik 1,00 - -
9 NYA 4 mm2 untuk GROUNDING dari :
MCFA ke TBFA Lt.2 titik 1,00 - -
TBFA Lt.1 ke titik 1,00 - -
10 Di dalam PVC Conduit dia 20 mm dari :
Firemans telepon ke TBFA Lt.2 titik 1,00 - -
TBFA Lt.1 ke titik 1,00 - -
Pek. Non Standar Gedung Utama - page 2 of 4
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
Instalasi dan Pemasanagan Ditektor
1 Terminal Box/ W. Module Zone, Acessories
TBFA-1 Set 1,00 - -
2 Fixs Detector bh 1,00 - -
3 Smoke Detector bh 19,00 - -
4 Indicator Lamp bh 2,00 - -
5 Manual Brek Glass + Fire Fighting Jackphone bh 2,00 - -
6 Alarm Bell bh 2,00 - -
7 End Of Line bh 2,00 - -
8 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk Fix Detector titik 1,00 - -
9 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk Smoke Detector titik 19,00 - -
10 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk Indikator Lamp titik 2,00 - -
11 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk Manual Break Glass titik 2,00 - -
12 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk untuk Alarm Bell titik 2,00 - -
b. LANTAI DUA (ELL +4,50)
1 Terminal Box/ W. Module Zone, Acessories
TBFA-2 Set 1,00 - -
2 Fixs Detector bh 2,00 - -
3 Smoke Detector bh 17,00 - -
4 Indicator Lamp bh 2,00 - -
5 Manual Brek Glass + Fire Fighting Jackphone bh 2,00 - -
6 Alarm Bell bh 2,00 - -
7 End Of Line bh 2,00 - -
8 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk Fix Detector titik 2,00 - -
9 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk Smoke Detector titik 17,00 - -
10 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk Indikator Lamp titik 2,00 - -
11 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk Manual Break Glass titik 2,00 - -
12 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm untuk untuk Alarm Bell titik 2,00 - -
JUMLAH 5.1PEKERJAAN FIRE ALARM -
5.2 PEKERJAAN CCTV
a. LANTAI SATU (ELL +0,00) *termasuk area luar
-
Instalasi dan Accsessories -
2 Instalasi Kamera CCTV Fixed titik 12,00 - -
Kabel UTP Cat 6/ w. connector dalam High Impact conduit dia.20mm
3 PATCH Panel Cat 6 16 Port set 1,00 - -
b. LANTAI DUA (ELL +4,50)
2 Instalasi Kamera CCTV Fixed ttk 8,00 - -
Kabel UTP Cat 6/ w. connector dalam High Impact conduit dia.20mm
JUMLAH 5.2PEKERJAAN CCTV -
5.3 PEKERJAAN DATA
5.3.1 PEKERJAAN DATA / LAN
a. LANTAI SATU (ELL +0,00)
PERALATAN UTAMA DATA
1 Pemasangan dan Instalasi Perangkat Utama include Accesoriesnya (pictail connector dan conduit) ls 2,00 - -
2 Main Patch Panel (Kap. 24 Ports) bh 2,00 - -
3 Main Switch Managable (Kap. 24 Ports) bh 2,00 - -
Integrated wireless controller capability with:
◦24 Port RJ45 10/100/1000 Mbps, Layer 3 Stackable 24 10/100/1000 Ethernet ports, with
350WAC power supply 1 RU, IP Base feature set
◦ Stackable 24 10/100/1000 Ethernet ports, with 350WAC power supply 1 RU, IP Base feature set;
models with Energy-Efficient Ethernet (EEE)
Instalasi dan Accssories
1 Sub Patch Panel Lt. 1 Cat.6 ( Kap. 48 Port) bh 1,00 - -
2 Sub Switch Lantai 1 (Kap. 32 Ports) bh 1,00 - -
3 Pemasangan dan Instalasi Perangkat Utama include Accesoriesnya (pictail connector dan conduit) ls 1,00 - -
4 Instalasi Sub Patch Panel Lt. 1 ke Main Patch Panel titik 2,00 - -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
5 Instalasi Sub Switch Lt. 1 ke Main Switch titik 2,00 - -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
6 Closed Rack Wall Mounted 12U set 1,00 - -
7 Switch Hub Cad 6, 24 Port bh 2,00 - -
8 Instalasi Switch Hub lokasi ruangan ke Sub Switch Lantai 1 titik 2,00 - -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
9 Instalasi Kabel Data dari Outlet ke Switch Hub lokasi ruangan titik 23,00 - -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
10 Outlet Data Komputer Dinding/w inbowdus bh 23,00 - -
b. LANTAI DUA (ELL +4,50)
1 Sub Patch Panel Lt. 2 Cat.6 ( Kap. 48 Port) bh 1,00 - -
2 Sub Switch Lt. 2 (Kap. 32 Ports) bh 1,00 - -
3 Pemasangan dan Instalasi Perangkat Utama include Accesoriesnya (pictail connector dan conduit) ls 1,00 - -
4 Instalasi Sub Patch Panel Lt. 2 ke Main Patch Panel titik 2,00 - -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
5 Instalasi Sub Switch Lt. 2 ke Main Switch titik 2,00 - -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
6 Closed Rack Wall Mounted 12U set 1,00 - -
7 Switch Hub Cad 6, 24 Port bh 2,00 - -
8 Instalasi Switch Hub lokasi ruangan ke Sub Switch Lantai 2 titik 2,00 - -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
9 Instalasi Kabel Data dari Outlet ke Switch Hub lokasi ruangan titik 20,00 - -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
10 Outlet Data Komputer Dinding/w inbowdus bh 20,00 - -
JUMLAH 5.3PEKERJAAN DATA -
Pek. Non Standar Gedung Utama - page 3 of 4
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
5.4 PEKERJAAN TELEKOMUNIKASI / TELEPONE
a. LANTAI SATU (ELL +0,00)
PERALATAN UTAMA DATA
IP PABX kap. 10 co line 45 Extention
lengkap dengan :
1 UPS Ð 1Phasa 2000VA/1000W unit 1,00 - -
2 Box MDF c/w frame & LSA 100 Ext. set 1,00 - -
3 Instalas Kabel ITC 100 x2x0.6mm² dari PABX ke MDF Lot 1,00 - -
4 Pemasangan dan Instalasi Perangkat Utama di ruang kontrol ls 1,00 - -
Instalasi dan Accssories
1 Telepon Terminal Box Lantai 1 (TTB Lt1)/w LSA set 1,00 - -
2 Instalasi Kabel ITC 20x2x0.6 mm² (dari MDF ke TTB Lt 1) titik 1,00 - -
3 Instalasi Telephone Kabel ITC 2x2x0.6mm² dalam High Impact conduit dia. 20 mm titik 16,00 - -
4 Hand set Telephone single line bh 16,00 - -
5 Outlet Telephone Dinding/w inbow bh 16,00 - -
b. LANTAI DUA (ELL +4,50)
1 Telepon Terminal Box Lantai 2 (TTB Lt2)/w LSA set 1,00 - -
2 Instalasi Kabel ITC 20x2x0.6 mm² (dari MDF ke TIB Lt 2) titik 1,00 - -
3 Instalasi Telephone Kabel ITC 2x2x0.6mm² dalam High Impact conduit dia. 20 mm titik 21,00 - -
4 Hand set Telephone single line bh 21,00 - -
5 Outlet Telephone Dinding/w inbow bh 21,00 - -
JUMLAH 5.4PEKERJAAN TELEKOMUNIKASI / TELEPONE -
5.5 PEKERJAAN TATA SUARA
a. LANTAI SATU
PERALATAN UTAMA
1 MDF SS (Main Distribution Frame Sound System) unit 1,00 - -
2 Remote Mic with chime (Carr Call) bh 1,00 - -
3 Instalasi Kabel NYMHY 2 x 1.5 mm² + Pipa Hi Conduit dia 20 mm dari MDF-SS diruang reception ttk 1,00 - -
4 Remote Microphone (PA) bh 1,00 - -
5 Instalasi Kabel NYMHY 2 x 1.5 mm² + Pipa Hi Conduit dia 20 mm dari MDF-SS diruang Control ttk 1,00 - -
6 FM Tuner, USB, MMC, DVD Player bh 1,00 - -
7 EQUELIZER bh 1,00 - -
8 Power Amplifier 120 W bh 2,00 - -
9 Speaker Selector 10 channel bh 1,00 - -
10 Mixer 12 Channel bh 2,00 - -
11 Cabinet Rack c/w Accessories, Wiring , Grounding, Power, Pemasangan perangkat utama set 1,00 - -
12 Testing & Commisioning ls 1,00 - -
13 Instalasi Kabel Fedder dari MDF to TBS.1, NYMHY kabel 3 x 2,5 mm2 dengan pipa conduit ttk 1,00 - -
14 Instalasi Kabel Fedder dari MDF to TBS.2, NYMHY kabel 3 x 2,5 mm2 dengan pipa conduit ttk 1,00 - -
Instalasi dan Accsessories
1 Ceiling Speaker 6W bh 2,00 - -
2 Instalasi Ceilling Speaker ttk 2,00 - -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
3 Box Speaker 15W bh 4,00 - -
4 Instalasi Box Speaker ttk 4,00 - -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
5 Horn Speaker 15W bh 6,00 - -
6 Instalasi Horn Speaker ttk 6,00 - -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
7 Ceiling Speaker 3W bh 11,00 - -
8 Instalasi Ceilling Speaker ttk 11,00 - -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
9 Volume Control unit 2,00 - -
10 Instalasi Volume Control ttk 2,00 - -
Kabel NYMHY 3x1.5 mm² dalam High Impact conduit dia. 20 mm
11 Terminal Box Lantai 1 (STB L1)/w acessories unit 1,00 - -
12 Kabel NYMHY 3x1,5 mm² (MDF SS - STB L1) ttk 1,00 - -
Terminal Box
Peralatan Conferece 2 Ruang Sidang & 1 Ruang Rapat
1 240 WATT MIXER AMPLIFIER Unit 1,00 - -
2 DYNAMIC HANDHELD MICROPHONE Unit 1,00 - -
3 Conference Control Unit Unit 1,00 - -
4 Chairmant Mic Unit Unit 1,00 - -
5 Delegate Mic Unit Unit 9,00 - -
6 Box Speaker 15W bh 6,00 - -
7 Instalasi Box Speaker
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm ttk 6,00 - -
8 Column Speaker min. 30 Watts Unit 3,00 - -
9 Instalasi Kabel Telemergency dari TB-TS.1 ke Unit Ruang sidang, Kabel 2x1, 5mm2 dengan pipa Condutittk 3,00 - -
10 Instalasi Kabel Telemergency Column Speaker dengan Kabel 2 x 1, 5mm2 di dalam pipa Conduit ttk 3,00 - -
b. LANTAI DUA (ELL +4,50)
1 Ceiling Speaker 6W bh 3,00 - -
2 Instalasi Ceilling Speaker ttk 3,00 - -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
3 Ceiling Speaker 3W bh 13,00 - -
4 Instalasi Ceilling Speaker ttk 13,00 - -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
5 Volume Control unit 2,00 - -
6 Instalasi Volume Control ttk 2,00 - -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
7 Terminal Box Lantai 2 (STB L2)/w acessories unit 1,00 - -
8 Kabel NYMHY 2x1,5 mm² (MDF SS - STB L1) ttk 1,00 - -
Terminal Box
JUMLAH 5,5PEKERJAAN TATA SUARA -
Pek. Non Standar Gedung Utama - page 4 of 4
RINCIAN HARGA PERKIRAAN SENDIRI ( H P S )
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
TAHUN ANGGARAN 2023
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
C. PEKERJAAN SITE DEVELOPMENT & UTILITAS
I PEKERJAAN PENYEDIAAN AIR BERSIH
b. Di ruang Pompa, Pekerjaan Pengadaan dan Pemasangan Pompa Transfer
Pompa Air Bersih, jenis Centrfugal End Suction
- PAB.1 & PAB.2 set 1,00 - -
kapasitas : 200 liter/menit
Head : 50 M
putaran : 1450 Rpm
jenis : Centrifugal End Susction
Operasi : 1 unit operasi, 1 unit stanby
- Flexible Joint diameter 65 mm bh 2,00 - -
- Flexible Joint diameter 50 mm bh 2,00 - -
- Gate valve diameter 65 mm bh - -
2,00
- Gate valve diameter 50 mm bh - -
6,00
- Check valve diameter 65 mm bh - -
2,00
- Check valve diameter 50 mm bh - -
2,00
- Strainer diameter 65 mm bh - -
1,00
- Strainer diameter 50 mm bh - -
1,00
- Header diameter 100 mm bh - -
2,00
c. Sumur Dangkal Kedalaman 80 meter (Terpasang) Set - -
1,00
Lengkap Dengan:
Pengeboran
Screeen Dia. 4'' panjang 4 meter
Casing Pipa PVC Dia. 4" (36 meter)
d. Pemipaan Area Ruang pompa :
* Pipa PPr PN10 Dia.64 mm Setara Dia. 2" m' 3,00 - -
* Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" m' 15,00 - -
* Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" m' 15,00 - -
* Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" m' 5,00 - -
e Gate Valve
* Gate Valve 5K Dia. 50 mm Setara Dia. 1.1/2" bh 4,00 - -
* Gate Valve 5K Dia. 40 mm Setara Dia. 1.1/4" bh 1,00 - -
f. Pekerjaan Taman
* keran taman 3/4" bh 7,00 - -
g. Pemipaan Area Site
* Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" m' 134,00 - -
* Pipa PPr PN100 Dia. 25 mm Setara Dia. 3/4" m' 185,00 - -
h Fiiting & Material Bantu 10% Dari Harga Pipa lot 1,00 - -
JUMLAH IPEKERJAAN PENYEDIAAN AIR BERSIH -
II PEKERJAAN PENGADAAN DAN PEMASANGAN IPAL
1 BIOFILTRATION. Sistem pengolahan Anaerob+aerob Kap. 4m3/hari (Package) set 1,00 - -
untuk gedung Utama
Panel Kontrol
Kabel kontrol
Galian Urugan Tanah dan Buangan
Beton Bertulang
2 BIOFILTRATION. Sistem pengolahan Anaerob+aerob Kap. 0,8m3/hari (Package) set 1,00 - -
untuk di area gedung
Panel Kontrol
Kabel kontrol
Galian Urugan Tanah dan Buangan
Beton Bertulang
3 Bak Kontrol 600x600x600 mm unit 1,00 - -
JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN IPAL -
III PEKERJAAN INSTALASI MEP POWER HOUSE
Pekerjaan MEP Power House
* EFW.2 & 3 Wall type, Kapasitas 500 cfm unit 2,00 - -
* Roof Drain Dia.3" bh 5,00 - -
* Pipa PVC Kelas AW Dia 3" m' 20,00 - -
Pekerjaan elektrical ruang genset dan R.Pompa
* Lampu Down Light13 W set 1,00 - -
* Lampu TL LED 1 x28 W set 3,00 - -
* Stop Kontak
200 Watt 16 Ampre bh 1,00 - -
* Saklar Ganda bh 2,00 - -
* Instalasi Penerangan ttk 4,00 - -
* Instalasi Stop Kontak ttk 1,00 - -
JUMLAH IIIPEKERJAAN INSTALASI MEP POWER HOUSE -
Pekerjaan Site Development - page 1 of 1
REKAP DAFTAR INDEK HARGA SATUAN PEKERJAAN
HARGA SATUAN
NO. JENIS PEKERJAAN PEKERJAAN
(RP)
I PEKERJAAN PERSIAPAN, BONGKARAN, GALIAN, dan URUGAN
1 1 M1 PENGUKURAN dan PEMASANGAN BOUWPLANK (Analisa Permen PU No 28,2016 ) -
2 1 M2 PEMBUATAN KANTOR SEMENTARA LANTAI PLESTERAN (Analisa Permen PU No 28,2016 ) -
3 1 M2 (K3) MEMBERSIHKAN LAPANGAN dan PERATAAN (Analisa Permen PU No 28,2016 ) -
4 PEMBUATAN 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGGA 2 M (Analisa Permen PU no 28,2016) -
5 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 M1 (Analisa Permen PU No 28,2016 ) -
6 1 M3 GALIAN TANAH BIASA KEDALAMAN 2 M1 (Analisa Permen PU No 28,2016 ) -
7 1 M3 GALIAN TANAH BIASA KEDALAMAN 3 M1 (Analisa Permen PU No 28,2016 ) -
8 1 M2 STRIPPING TANAH SETINGGI 1 M1 (Analisa Permen PU No 28,2016 ) -
9 1 M3 BUANGAN TANAH SEJAUH 30 METER (Analisa Permen PU No 28,2016 ) -
10 1 M3 PENGURUGAN KEMBALI GALIAN TANAH (Analisa Permen PU No 28,2016 ) -
11 1 M3 URUGAN PASIR (Analisa Permen PU No 28,2016 ) -
12 1 M3 URUGAN TANAH (Analisa Permen PU No 28,2016 ) -
II PEKERJAAN KAYU
1 PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL KAYU KELAS 1 (Analisa Permen PU No 28,2016 ) -
2 PEMASANGAN 1 M2 DAUN PINTU MULTIPLEK 18 MM LAPIS BESTWOOD (Analisa Permen PU No 28,2016 ) -
III PEKERJAAN STRUKTUR
1 1 M3 LANTAI KERJA, BETON MUTU K-100, fc' = 7,4 Mpa, SLUMP (3-6) cm, w/c = 0.87 (Analisa Permen PU No 28,2016 ) -
2 1 M3 BETON MUTU K-175, fc' = 14,5 Mpa, SLUMP (120±20) mm, w/c = 0.66 (Analisa Permen PU No 28,2016 ) -
3 1 M3 BETON MUTU K-225, fc' = 19,3 Mpa, SLUMP (120±20) mm, w/c = 0.58 (Analisa Permen PU No 28,2016 ) -
4 1 M3 BETON MUTU K-250, fc' = 21,7 Mpa, SLUMP (120±20) mm, w/c = 0.56 (Analisa Permen PU No 28,2016 ) -
5 1 M3 BETON MUTU K-300, fc' = 24,9 Mpa, SLUMP (120±20) mm, w/c = 0.52 (Analisa Permen PU No 28,2016 ) -
6 1 M3 MENGGUNAKAN PERALATAN POMPA BETON (Analisa Permen PU No 28,2016 ) -
7 1 M3 MENGGUNAKAN VIBRATOR (Analisa Permen PU No 28,2016 ) -
8 1 M3 BETON READY MIX K-300, f'c = 26,4 MPa, SLUMP (12±2) CM, w/c = 0.52 (Analisa Permen PU No 28,2016 ) -
9 1 KG BAJA TULANGAN POLOS, BJTP, U24, fy 240 MPa (Analisa Permen PU No 28,2016 ) -
10 1 KG BAJA TULANGAN DEFORM/ULIR, BJTD, fy 420 MPa (Analisa Permen PU No 28,2016 ) -
11 PEMASANGAN 1 M PVC WATTERSTOP LEBAR 150 MM (Analisa Permen PU No 28,2016 ) -
12 1 KG PASANG WIRE MESH (Analisa Permen PU No 28,2016 ) -
13 1 M2 BEKISTING PONDASI/SLOOP PAS. BATA MERAH, T. 1/2 BATA, 1 PC : 5 PP (Analisa Permen PU No 28,2016 ) -
14 1 M2 (K3) PASANG BEKISTING PONDASI 2X PAKAI (Analisa Permen PU No 28,2016 ) -
15 1 M2 (K3) PASANG BEKISTING KAYU KLS III, 2 KALI PAKAI SLOOP (Analisa Permen PU No 28,2016 ) -
16 1 M2 (K3) PASANG BEKISTING KOLOM PRAKTIS 4x PAKAI dengan PAPAN (Analisa Permen PU No 28,2016 ) -
17 1 M2 (K3) PASANG BEKISTING KOLOM STRUKTUR 2x PAKAI (Analisa Permen PU No 28,2016 ) -
18 1 M2 (K3) PASANG BEKISTING BALOK 2X PAKAI (Analisa Permen PU No 28,2016 ) -
19 1 M2 (K3) PASANG BEKISTING BALOK LINTEL 4X PAKAI (Analisa Permen PU No 28,2016 ) -
20 1 M2 (K3) PASANG BEKISTING dengan PAPAN 3X20, 3X PAKAI (Analisa Permen PU No 28,2016 ) -
21 1 M2 (K3) PASANG BEKISTING PLAT LANTAI DENGAN PLYWOOD 2X PAKAI (Analisa Permen PU No 28,2016 ) -
22 1 M2 PASANG BEKISTING PLAT LANTAI DENGAN FLOORDECK, JAP < = 0,8 m (Analisa Permen PU No 28,2016 ) -
23 1 M2 (K3) PASANG BEKISTING PLAT BETON 4X PAKAI (Analisa Permen PU No 28,2016 ) -
24 1 M2 PASANG BEKISTING UNTUK TANGGA 2X PAKAI (Analisa Permen PU No 28,2016 ) -
25 1 M2 (K3) PASANG BEKISTING UNTUK PLAT DINDING 2X PAKAI (Analisa Permen PU No 28,2016 ) -
26 1 M2 PASANG STOOWEK/PERANCAH SCAFOLDING (Sewa) -
27 1 M2 (K3) PASANG BEKISTING KOLOM STRUKTUR 2x PAKAI+ SCAFOLDING (Analisa Permen PU No 28,2016 ) -
28 1 M2 (K3) PASANG BEKISTING BALOK 2X PAKAI + SCAFOLDING(Analisa Permen PU No 28,2016 ) -
29 1 M2 (K3) PASANG BEKISTING PLAT LANTAI DENGAN PLYWOOD 2 X PAKAI + SCAFOLDING (Analisa Permen PU No 28,2016 ) -
30 1 M2 PASANG BEKISTING PLAT LANTAI DENGAN FLOORDECK, JAP < = 0,8 m + SCAFOLDING(Analisa Permen PU No 28,2016 ) -
31 1 M2 PASANG BEKISTING UNTUK TANGGA 2 X PAKAI + SCAFOLDING(Analisa Permen PU No 28,2016 ) -
32 MEMBUAT 1M¹ KOLOM PRAKTIS BETON BERTULANG (12 + 12) CM -
33 MEMBUAT 1M¹ BALOK LINTEL BETON BERTULANG (12 + 12) CM -
34 1 M1 PANJANG CERUCUK BAMBU Φ 8 CM - 10 CM (Analisa Permen PU No 28,2016 ) -
35 1 M3 (K3) LAPISAN BATU KOSONG/AANSTAMPING (Analisa Permen PU No 28, 2016 ) -
36 1 M3 PONDSI BATU BELAH, CAMPURAN 1PC : 3PP (Analisa Permen PU No 28, 2016 ) -
37 1 M3 PONDSI BATU BELAH, CAMPURAN 1PC : 4PP (Analisa Permen PU No 28, 2016 ) -
38 1 M3 PONDSI BATU BELAH, CAMPURAN 1PC : 5PP (Analisa Permen PU No 28, 2016 ) -
39 1 KG KONSTRUKSI BAJA PROFIL, IWF/INP/DIR/DIN/CHANEL, (Analisa Permen PU No 28, 2016 ) -
40 1 KG PASANG PLAT SIMPUL -
41 1 BH PASANG ANGKUR BAUT DIA 16 MM, PANJANG 25 CM -
42 1 BH PASANG BAUD MUR HTB DIA 16 MM PANJANG 5 CM -
IV PEKERJAAN DINDING
1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 3 PP (Analisa Permen PU No 28,2016 ) -
2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 PP (Analisa Permen PU No 28,2016 ) -
3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 PP (Analisa Permen PU No 28,2016 ) -
4 1 M2 PELESTERAN DINDING 1 PC. : 3 PS; TEBAL 15 MM (Analisa Permen PU No 28,2016 ) -
5 1 M2 PELESTERAN DINDING 1 PC. : 5 PS; TEBAL 15 MM (Analisa Permen PU No 28,2016 ) -
6 1 M1 LIST PROFIL/SKONING LEBAR 10 cm, 1PC:3PP (Analisa Permen PU No 28,2016 ) -
7 1 M2 PASANGAN BATA RINGAN UKURAN 600X200X100, SPASI TEBAL 3 MM (Analisa Permen PU No 28,2016 ) -
8 1 M2 PELESTERAN DINDING DENGAN SEMEN INSTAN, TEBAL 10 MM (Analisa Permen PU No 28,2016 ) -
9 1 M2 ACIAN DINDING DENGAN SEMEN INSTAN, TEBAL 1,5 MM (Analisa Permen PU No 28,2016 ) -
10 1 M2 ACIAN PC (Analisa Permen PU No 28,2016 ) -
11 1 M1 PLESTERAN SKONING 1 SP : 3PP LEBAR 10 CM (Analisa Permen PU No 28,2016 ) -
12 1 M2 PLESTERAN CIPRAT 1 SP ; 2 PS (Analisa Permen PU No 28,2016 ) -
13 1 M2 FINISHING PLAFOND EXPOSE (Analisa Permen PU No 28,2016 ) -
14 1 M2 PARTISI DOUBLE GYPSUM T = 9 MM + RANGKA METAL STUD -
15 1 M2 DINDING PEMISAH MULTI 12 MM LAPIS BESTWODD (Analisa Permen PU No 28,2016 ) -
16 1 M2 DINDING PEMISAH MULTI 12 MM LAPIS BESTWODD + GYPSUM FINIS CET ITERIOR (Analisa Permen PU No 28,2016 ) -
17 1 M2 DINDING PEMISAH MULTI 12 MM RANGKAP LAPIS BESTWODD (Analisa Permen PU No 28,2016 ) -
HARGA SATUAN
NO. JENIS PEKERJAAN PEKERJAAN
(RP)
V PEKERJAAN PINTU DAN JENDELA
1 1 M1 PASANG KUSEN ALUMUNIUM UKURAN 4″ LENGKAP ASSESORIES (Analisa Permen PU No 28.2016) -
2 1 M2 PASANG PINTU KACA RANGKA ALUMUNIUM (Analisa Permen PU No 28.2016) -
3 1 M2 PASANG DAUN JENDELA ALUMUNIUM (Analisa Permen PU No 28.2016) -
4 1 M2 PASANG KACA RYBEN TEBAL 5 MM (Analisa Permen PU No 28.2016) -
5 1 M2 PASANG KACA ONE WAY TEBAL 5 MM (Analisa Permen PU No 28.2016) -
6 1 M2 PASANG KACA POLOS TEBAL 6 MM (Analisa Permen PU No 28.2016) -
7 1 M2 PASANG KACA POLOS TEBAL 8 MM (Analisa Permen PU No 28.2016) -
8 1 M2 PASANG KACA POLOS TEBAL 10 MM (Analisa Permen PU No 28.2016) -
9 1 M2 PASANG KACA POLOS TEBAL 12 MM (Analisa Permen PU No 28.2016) -
10 1 M2 PASANG KACA TEMPERED SAFETY CLASS CLEAR TEBAL 12 MM (Analisa Permen PU No 28.2016) -
11 1 M2 PASANG KACA TEMPERED TEBAL 10 MM (Analisa Permen PU No 28.2016) -
12 1 M2 PASANG KACA SILVER GREEN TEBAL 8 MM (Analisa Permen PU No 28.2016) -
13 1 Pasang Engsel Pintu (Analisa Permen PU No 28.2016) -
14 1 PSG PEMASANGAN HANDLE (Analisa Permen PU No 28.2016) -
15 1 PSG PEMASANGAN FULL HANDLE (Analisa Permen PU No 28.2016) -
16 1 BUAH PEMASANGAN FLOOR HANGER SETARA DECKSON (Analisa Permen PU No 28.2016) -
17 1 UNIT PASANG PINTU SLIDING DOOR KACA TEMPERED +ACP TYPE PJ1 -
18 1 UNIT PASANG PINTU KACA TEMPERED +ACP TYPE PJ2 -
19 1 UNIT PASANG PINTU KACA TEMPERED TYPE PJ3 -
20 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P1 -
21 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P2 -
22 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P3 -
23 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P4 -
24 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P5 -
25 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P6 -
26 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P7 -
27 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P8 -
28 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P9 -
29 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P10 -
30 1 UNIT PASANG KUSEN CANAL C +PINTU PLAT BAJA FINN. CAT DUCO TYPE P11 -
31 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J1 -
32 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J2 -
33 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J3 -
34 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J4 -
35 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J5 -
36 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J6 -
37 1 UNIT PASANG KUSEN DAN DAUN JENDELA +ACCESSORIES TYPE J7 -
38 1 UNIT PASANG JENDELA KACA TEMPERED + ACCESSORIES TYPE J8 -
39 1 UNIT PASANG JENDELA KACA TEMPERED + ACCESSORIES TYPE J9 -
40 1 UNIT PASANG KUSEN DAN DAUN JENDELA +ACCESSORIES TYPE J10 -
41 1 UNIT PASANG KUSEN DAN DAUN JENDELA +ACCESSORIES TYPE J11 -
42 1 UNIT PASANG KUSEN DAN DAUN JENDELA +ACCESSORIES TYPE J12 -
43 1 UNIT PASANG JENDELA KACA TEMPERED + ACCESSORIES TYPE J13 -
44 1 UNIT PASANG KUSEN ALUMUNIUM + KACA TYPE BV1 -
45 1 UNIT PASANG KUSEN ALUMUNIUM + KACA TYPE BV2 -
46 1 UNIT PASANG KUSEN ALUMUNIUM + KACA TYPE BV3 -
47 1 UNIT PASANG KUSEN ALUMUNIUM + KACA TYPE BV4 -
48 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 1 -
49 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 2 -
50 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 3 -
51 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 4 -
52 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 5 -
53 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN JENDELA KACA TYPE PT6 -
54 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT7 -
55 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 8 -
56 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 9 -
57 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT10 -
58 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 11 -
59 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 12 -
60 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT13 -
61 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT14 -
62 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 15 -
63 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 16 -
64 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 17 -
65 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 18 -
66 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 19 -
67 1 UNIT PASANG KUSEN CANAL C +PINTU TYPE PB (Ruang Genset) -
68 1 UNIT PASANG KUSEN CANAL C+PINTU TYPE P1 (Ruang Genset) -
69 1 UNIT PASANG KUSEN CANAL C TYPE BV1 (GENSET) -
70 1 UNIT PASANG KUSEN CANAL C TYPE BV2 (GENSET) -
71 MEMASANG 1 M1 TREATMENT FINISH BESTWODD -
72 1 M2 PASANG PELAPIS DINDING DENGAN MULTI, t = 12 mm LAPIS BESTWOOD+ACRYLIC t = 4 mm -
73 MEMASANG 1 M2 BACKDROP FINISH BESTWODD -
74 MEMASANG 1 M2 MEJA STANDAR FINISH BESTWODD -
75 MEMASANG 1 M2 MEJA STANDAR FINISH BESTWODD -
76 MEMASANG 1 M2 STAGE FINIS VINIL -
77 MEMASANG 1 M1 SEKAT AUDIENCE (TINGGI 85 CM) -
78 MEMASANG 1 M2 PLAFOND INTERIOR FINISH BESTWOOD -
HARGA SATUAN
NO. JENIS PEKERJAAN PEKERJAAN
(RP)
79 MEMASANG 1 BUAH HURUP ACRYLIC GOLD UK. 12 CM -
80 MEMASANG 1 BUAH HURUP ACRYLIC GOLD UK. 10 CM -
81 MEMASANG 1 BUAH HURUP ACRYLIC PUTIH UK. 12 CM -
82 MEMASANG 1 BUAH HURUP ACRYLIC PUTIH UK. 10 CM -
83 MEMASANG 1 BUAH HURUP STAINLESS UK. 30 CM + LAMPU LED 6 WATT DAN ACCESSORIES -
85 MEMASANG 1 BUAH HURUP STAINLESS UK. 12 CM -
86 MEMASANG 1 BUAH HURUP STAINLESS UK. 10 CM -
87 MEMASANG 1 BUAH HURUP STAINLESS UK. 4 CM -
VI PEKERJAAN PLAFOND
1 1 M2 RANGKA PLAFOND, BESI HOLLOW 1X40X40X0,4 mm, MODUL 60X60, (Analisa Permen PU No 28,2016 ) -
2 1 M1 UP CEALLING PLAFOND GYPSUMBOARD, BESI HOLLOW 1X40X40X0,4 mm -
3 1 M2 PENUTUP PLAFOND, GYPSUMBOARD, 120x240x9 mm (Analisa Permen PU No 28,2016 ) -
4 1 M2 PENUTUP PLAFOND, GRC, 120X240X4 mm, (Analisa Permen PU No 28,2016 ) -
5 1 M2 PENUTUP PLAFOND PVC (Analisa Permen PU No 28,2016 ) -
6 1 M2 PENUTUP PLAFOND LAMBRISERING MULTI TEBAL 9 MM FINIS BESTWODD -
7 1 M1 LIST PLAFOND PROFIL KAYU (Analisa Permen PU No 28,2016 ) -
8 1 M1 LIST PLAFOND PROFIL GYPSUM (Analisa Permen PU No 28,2016 ) -
VII PEKERJAAN ATAP
1 MEMASANG 1 M2 ATAP RANGKA BAJA RINGAN -
2 MEMASANG 1 M2 ATAP GENTENG BITUMEN UK. 106 X 40 X 0,30 CM (Analisa Permen PU No 28,2016 ) -
3 MEMASANG 1 M1 NOK BITUMEN MONOLAYER 3 MM (Analisa Permen PU No 28,2016 ) -
4 MEMASANG 1 M2 ALUMINIUM FOIL (Analisa Permen PU No 28,2016 ) -
5 MEMASANG 1 M1 PASANG LISPLANK UK TEBAL = 8 CM LEBAR 30 CM (Analisa Permen PU No 28,2016 ) -
6 MEMASANG 1 M1 TALANG DATAR/JURAI SENG BJLS 30 LEBAR 90 CM (Analisa Permen PU No 28,2016 ) -
VIII PEKERJAAN PELAPIS LANTAI DAN DINDING
1 PEMASANGAN 1 M2 PELAPIS LANTAI, KERAMIK 20x20 (Analisa Permen PU No 28 2016 ) -
2 PEMASANGAN 1 M2 PELAPIS LANTAI, KERAMIK 30x30 (Analisa Permen PU No 28 2016 ) -
3 PEMASANGAN 1 M2 PELAPIS LANTAI, GUIDING BLOCK 30x30 (Analisa Permen PU No 28 2016 ) -
4 1 M2 PELAPIS LANTAI, HOMOGENIUS TILE 60x60 POLISHED (Analisa Permen PU No 28,2016 ) -
5 1 M2 PELAPIS DINDING, HOMOGENIUS TILE 30x60 POLISHED (Analisa Permen PU No 28,2016 ) -
6 1 M1 PLINT HOMOGENIUS TILE UKURAN 10 CM X 60 CM (Analisa Permen PU No 28,2016 ) -
7 1 M1 PLINT SRAIR NOZING 10 CM X 60 CM (Analisa Permen PU No 28,2016 ) -
8 1 M2 FLOOR HARDENER (Analisa Permen PU No 28,2016 ) -
9 1 M2 PASANGAN BATU ANDESIT 20 x 40 CM (Analisa Permen PU No 28,2016 ) -
10 1 M2 PASANGAN BATU ANDESIT SUSUN SIRIH 3 x 30 CM (Analisa Permen PU No 28,2016 ) -
11 1 M2 PASANGAN BATU SIKAT (Analisa Permen PU No 28,2016 ) -
12 1 M2 PASANGAN LAPISAN ALUMUNIUM COMPOSIT PANEL+RANGKA HOLLOW GALVANIS 40X40 -
13 1 M2 PASANGAN LAPISAN ALUMUNIUM COMPOSIT PANEL+RANGKA HOLLOW GALVANIS 40X40 (Atas/Atap) -
14 1 M2 PASANG RANGKA DINDING PARTISI, HOLLOW 40X40X2, MODUL 60X120, (Analisa Permen PU No 28,2016) -
15 1 M2 PASANG PELAPIS DINDING DENGAN TEAKWOOD, t = 4 mm LAPIS HPL -
16 1 M2 PASANG PELAPIS DINDING PARTISI GRC T = 8 CM + RANGKA METAL STUD -
17 1 M2 PASANG PELAPIS DINDING DENGAN TEAKWOOD, t = 4 mm LAPIS HPL+ACRYLIC t = 4 mm -
18 1 M2 PASANG PELAPIS DINDING DENGAN WALPAPER (Analisa Permen PU No 28,2016 ) -
19 1 M2 PASANG PELAPIS LANTAI DENGAN MULTIPLEK, t = 18 mm LAPIS BESTWOOD -
IX PEKERJAAN SANITARY
1 PEMASANGAN CLOSET TYPE CW 632J/SW6372JP DUDUK/MONOBLOCK (Analisa Permen PU No 28,2016) -
2 PEMASANGAN CLOSET TYPE C704L/SW 784 JF DUDUK/MONOBLOCK (Analisa Permen PU No 28,2016) -
3 PEMASANGAN CLOSETTYPE CW826-SW826JP DUDUK/MONOBLOCK (Analisa Permen PU No 28,2016) -
4 PEMASANGAN CLOSET JONGKOK(Analisa Permen PU No 28,2016) -
5 PEMASANGAN WASTAFEL TYPE 521 VIA (Analisa Permen PU No 28,2016) -
6 PEMASANGAN WASTAFEL TYPE LW 240 CJ (Analisa Permen PU No 28,2016) -
7 PEMASANGAN WASTAFEL TYPE 649 CJ (Analisa Permen PU No 28,2016) -
8 PEMASANGAN WASTAFEL LW 248 JT (Analisa Permen PU No 28,2016) -
9 PEMASANGAN LAVATORY FAUCET -
10 PEMASANGAN KITCHEN SINK TYPE STAINLES STEEL (Analisa Permen PU No 28,2016) -
11 PEMASANGAN JET WASHER (Analisa Permen PU No 28,2016) -
12 PEMASANGAN HAND SHOWER/SHOWER SPAY (Analisa Permen PU No 28,2016) -
13 PEMASANGAN SHOWER MIXER (Analisa Permen PU No 28,2016) -
14 PEMASANGAN FIXED SHOWER HEAD (Analisa Permen PU No 28,2016) -
15 PEMASANGAN FLOOR DRAIN (Analisa Permen PU No 28,2016) -
16 PEMASANGAN ROOF DRAIN (Analisa Permen PU No 28,2016) -
17 PEMASANGAN STOP KERAN -
18 PEMASANGAN KRAN KICHEN SINK -
19 PEMASANGAN PAPER HOLDER -
20 PEMASANGAN ROBE HOOK -
21 PEMASANGAN URINOIR (Analisa Permen PU No 28,2016) -
22 PEMASANGAN PARTISI URINOIR (Analisa Permen PU No 28,2016) -
X PEKERJAAN FINISING
1 1 M2 PENGECATAN DINDING INTERIOR (2x Cat Penutup) (Analisa Permen PU No 28,2016 ) -
2 1 M2 PENGECATAN DINDING EXTERIOR (2x Cat Penutup) (Analisa Permen PU No 28,2016 ) -
3 1 M2 PENGECATAN PLAFOND, 2X LAPIS CAT PENUTUP (Analisa Permen PU No 28,2016 ) -
4 1 M2 PENGECATAN BESI/KAYU (2 Lapis Cat Penutup) (Analisa Permen PU No 28,2016 ) -
5 1 M2 PENGECATAN WATERPROOFING EMULSEN (2 Lapis Cat Penutup) (Analisa Permen PU No 28,2016 ) -
6 1 M2 WATER PROOFING MEMBRANCE(Analisa Permen PU No 28,2016 ) -
7 1 M2 PLITURAN DENGAN PLITUR MELAMIK (Analisa Permen PU No 28,2016 ) -
8 1 M2 PLITURAN DENGAN DUCO(Analisa Permen PU No 28,2016 ) -
HARGA SATUAN
NO. JENIS PEKERJAAN PEKERJAAN
(RP)
XI PEKERJAAN LAIN-LAIN
1 1 CM PENGELASAN DENGAN LISTRIK -
2 MEMASANG 1 UNIT KUSEN, DAUN PINTU PLAT BAJA RUANG POMPA (209 X 200) CM, PD.1 -
3 MEMASANG 1 UNIT KUSEN, DAUN PINTU PLAT BAJA RUANG POMPA (89 X 200) CM ( P.1 ) -
4 MEMBUAT 1 Unit BV1 RUANG POMPA -
5 1 UNIT PASANG PAGAR BESI ULIR D 32 PANJANG 3.7 M -
6 1 M1 HOLLOW BAJA 75X75X3,2 MM -
7 1 M1 PASANG RAILLING BALKON DENGAN KACA 8 mm -
8 1 M1 PASANG RAILLING TANGGA DENGAN PIPA STAINLESS + HANDRAILL SOLIDWOOD -
9 1 M1 PASANG RAILLING RAMP DENGAN PIPA STAINLESS -
10 1 M1 PASANG RAILLING BALKON KACA TEMPERED 10 MM DENGAN PIPA STAINLESS -
11 1 M1 PASANG HAND RAILLING STAINLESS STEEL Ø 2" -
12 1 M1 PASANG HAND RAILLING STAINLESS STEEL 40/60 MM -
13 1 M RANGKA TANGGA LADDER BESI , MODUL 1000X550 -
14 LS PENYEDIAAN K3 -
15 1 M2 PASANG PENCEGAHAN BAHAYA ANTI RAYAP/TERMITE CONTROL -
HARGA SATUAN TERPASANG PEKERJAAN ELEKTRIKAL
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
NO. URAIAN PEKERJAAN HARGA SATUAN
ELEKTRIKAL
1 1 Unit MDP - PA Rp -
2 1 Unit SDP-1 Rp -
3 1 Unit SDP-2 Rp -
4 1 Unit PP-PL Rp -
5 1 Unit PP-AB Rp -
6 1 Unit LP-1 Rp -
7 1 Unit PP-PD Rp -
8 1 Unit PP-AC.1 Rp -
9 1 Unit LP-2 Rp -
10 1 Unit PP-2 Rp -
11 1 Unit PP-AC.2 Rp -
12 1 Unit PP-ELEKTRON IK Rp -
13 1 Unit PP-BP Rp -
14 1 Unit PP-IPAL Rp -
15 1 Titik Pemasangan instalasi penerangan Rp -
16 1 Titik Pemasangan instalasi daya stop kontak 1 Phasa Rp -
17 m' Pipa konduit penerangan Rp -
18 m' Pipa konduit stop kontak Rp -
19 1 Titik Pemasangan instalasi Fire Alarm Rp -
20 1 Titik Pemasangan instalasi Telephone/Data Rp -
21 1 Titik Pemasangan instalasi IPTV Rp -
22 1 Titik Pemasangan instalasi Speaker Rp -
23 1 Set Lampu Lampu TL LED 2 x28 W, Cover Lovre dipasang rata Plafon Rp -
24 1 Set Lampu Lampu TL LED 2 x28 W Rp -
25 1 Set Lampu Lampu TL LED 2 x 28 W Emergency Rp -
26 1 Set Lampu Lampu TL LED 1 x28 W, (V-Shape) Rp -
27 1 Set Lampu Lampu LED Stip Rp -
28 1 Set Lampu Lampu TL LED 1 x12 W, pasang pada cove wastafel Rp -
29 1 Set Lampu Lampu Down Light13 W Rp -
30 1 Set Lampu Lampu Down Light Par 38 40watt Rp -
31 1 Set Lampu Lampu Down Light LED 7 W Rp -
32 1 Set Lampu T8.TL 2x18W RM Louver Rp -
33 1 Set Lampu T8.TL 2x18W RM Prismatic + Battery Rp -
34 1 Set Lampu Spot Light 100 Watt Rp -
35 1 Set Lampu Exit Lamp 10 Watt Rp -
36 1 Set Saklar single Rp -
37 1 Set Saklar double Rp -
38 1 Set Saklar tukar Rp -
39 1 Set Stop kontak 1 Phasa Rp -
40 1 Set Stop kontak 1 Phasa type floor Rp -
41 1 Meter Kabel tray 200 mm Rp -
42 1 Meter Kabel tray 300 mm Rp -
43 1 Meter Kabel tray 400 mm Rp -
44 1 Meter Kabel tray 600 mm Rp -
45 1 Meter Kabel Ladder 200 mm Rp -
46 1 Meter Kabel Ladder 600 mm Rp -
47 1 Meter Pemasangan kabel NYM 2x1.5 mm Rp -
48 1 Meter Pemasangan kabel NYM 3x2,5 mm² Rp -
49 1 Meter Pemasangan kabel NYY 3x2,5 mm² Rp -
50 1 Meter Pemasangan kabel NYY 3x4 mm² Rp -
51 1 Meter Pemasangan kabel NYY 3x6 mm² Rp -
52 1 Meter Pemasangan kabel NYY 4x2,5 mm² Rp -
53 1 Meter Pemasangan kabel NYY 4x4 mm² Rp -
54 1 Meter Pemasangan kabel NYY 4x6 mm² Rp -
55 1 Meter Pemasangan kabel NYY 4x10 mm² Rp -
56 1 Meter Pemasangan kabel NYY 4x16 mm² Rp -
57 1 Meter Pemasangan kabel NYY 4x35 mm² Rp -
58 1 Meter Pemasangan kabel NYY 4x50 mm² Rp -
59 1 Meter Pemasangan kabel NYY 4x70 mm² Rp -
Harga Satuan Terpasang Pek. Elektrikal - page 1 of 4
NO. URAIAN PEKERJAAN HARGA SATUAN
60 1 Meter Pemasangan kabel NYFGby 4x95 mm Rp -
61 1 Meter Pemasangan kabel NYY 4x120 mm² Rp -
62 1 Meter Pemasangan kabel NYY 4x150 mm² Rp -
63 1 Meter Pemasangan kabel NYY 4x185 mm² Rp -
64 1 Meter Pemasangan kabel NYY 4x240 mm² Rp -
65 1 Meter Pemasangan kabel NYFGby 4x70 mm Rp -
66 1 Meter Pemasangan kabel NYFGby 4x120 mm Rp -
67 1 Meter Pemasangan kabel NYFGby 4x185 mm Rp -
68 1 Meter Pemasangan kabel NYFGby 4x240 mm² Rp -
69 1 Meter Pemasangan kabel N2XSY 1x70 mm Rp -
70 1 Meter Pemasangan kabel N2XSY 1x120 mm Rp -
71 1 Meter Pemasangan kabel NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm Rp -
72 1 Meter Pemasangan kabel NYA/BC 6 mm Rp -
73 1 Meter Pemasangan kabel NYA/BC 150 mm Rp -
ELEKTRONIK
Pekerjaan Fire Alarm
1 1 Unit MDF/ CTB Rp -
2 1 Unit Terminal Box Fire Rp -
3 1 Unit Smoke Detector Rp -
4 1 Unit Rate of Rise Detector Rp -
5 1 Unit Heat Detector Rp -
6 1 Unit Break Glass Rp -
7 1 Unit Alarm Bell Rp -
8 1 Unit Indicator Lamp Rp -
9 1 Meter Pemasangan Twisted Shelded 18,2 PAIR 2 x 1,5 mm2 Rp -
10 1 Meter Pemasangan FRC 2x1.5 mm2 Rp -
11 1 Unit EOL Rp -
CCTV
1 1 Set NVR Kap. 12 Channel lengkap dengan : Rp -
- hardisk 2 TB
- Monitor Color LED 32 inch
- Switcher Monitor
- Surge Arester
2 1 Set STORAGE recorder 10TB Include PC Monitoring Rp -
3 1 Set PoE Switch 18-Port RJ45 Rp -
4 1 Set Pengkabelan di ruang kontrol Rp -
5 1 Set Closed Rack Rp -
6 1 Set Pemograman, Testing & Commisioning Rp -
7 1 PATCH Panel Cat 6 16 Port Rp -
Instalasi dan Accsessories
1 1 Set Dome Camera Color Poe Fixed IR 2 MB Rp -
1 1 Set Outdor Camera Rp -
2 1 Set Instalasi Kamera CCTV Fixed Rp -
1 Set Kabel UTP Cat 6/ w. connector dalam High Impact conduit dia.20mm
PEKERJAAN DATA DAN TELEKOMUNIKASI
1 1 Set Komputer Server Lengkap Dengan Rp -
CPU : Power suplai, prosesor2x Intel® Bronze, PERC H330+ Integrated RAID Controller Full Height
Support Raid 0,1,10,5,50, Redundan Power Supply; iDRAC9 Exppress
Monitor : wide LCD 20 Inch, HDMI
windows server original
Accesories Komputer : mouse, keyboard
2 1 Set LASER Printer Rp -
3 1 Set UPS 4000 VA Rp -
4 1 Set Pemasangan dan Instalasi Perangkat Utama include Accesoriesnya (pictail connector dan conduit) Rp -
5 1 Set Main Patch Panel (Kap. 24 Ports) Rp -
6 1 Set Main Switch Managable (Kap. 24 Ports) Rp -
Integrated wireless controller capability with:
◦24 Port RJ45 10/100/1000 Mbps, Layer 3 Stackable 24 10/100/1000 Ethernet ports, with 350WAC power
supply 1 RU, IP Base feature set
◦ Stackable 24 10/100/1000 Ethernet ports, with 350WAC power supply 1 RU, IP Base feature set; models
with Energy-Efficient Ethernet (EEE)
7 1 Set 19" STANDING CLOSE RACK SERVER 18U Rp -
8 Testing & Commisioning Rp -
Harga Satuan Terpasang Pek. Elektrikal - page 2 of 4
NO. URAIAN PEKERJAAN HARGA SATUAN
Instalasi dan Accssories
1 1 Set Sub Patch Panel Lt. 1 Cat.6 ( Kap. 48 Port) Rp -
2 1 Set Sub Switch Lantai 1 (Kap. 32 Ports) Rp -
3 1 Set Pemasangan dan Instalasi Perangkat Utama include Accesoriesnya (pictail connector dan conduit) Rp -
4 1 Set Instalasi Sub Patch Panel Lt. 1 ke Main Patch Panel Rp -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
5 1 Set Instalasi Sub Switch Lt. 1 ke Main Switch Rp -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
6 1 Set Closed Rack Wall Mounted 12U Rp -
7 1 Set Switch Hub Cad 6, 24 Port Rp -
8 1 Set Instalasi Switch Hub lokasi ruangan ke Sub Switch Lantai 1 Rp -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
9 1 Set Instalasi Kabel Data dari Outlet ke Switch Hub lokasi ruangan Rp -
Kabel Belden UTP Cat 6 dalam High Impact conduit dia.20mm
10 1 Set Outlet Data Komputer Dinding/w inbowdus Rp -
PEKERJAAN TELEKOMUNIKASI / TELEPONE
IP PABX kap. 10 co line 64 Extention
lengkap dengan :
1 1 Set Main Unit PABX, Power suplay, Operator Console Rp -
Extension card, analog card dan handset operator
- Rectifier dan Baterai back Up 1 jam
- Surge Arrester
2 1 Set Pemograman, Testing & Commisioning Rp -
3 1 Set UPS Ð 1Phasa 2000VA/1000W Rp -
4 1 Set Box MDF c/w frame & LSA 100 Ext. Rp -
5 1 Set Instalas Kabel ITC 100 x2x0.6mm² dari PABX ke MDF Rp -
6 1 Set Pemasangan dan Instalasi Perangkat Utama di ruang kontrol Rp -
Instalasi dan Accssories
1 1 Set Telepon Terminal Box Lantai 1 (TTB Lt1)/w LSA Rp -
2 1 Set Instalasi Kabel ITC 20x2x0.6 mm² (dari MDF ke TTB Lt 1) Rp -
3 1 Set Instalasi Telephone Kabel ITC 2x2x0.6mm² dalam High Impact conduit dia. 20 mm Rp -
4 1 Set Hand set Telephone single line Rp -
5 1 Set Outlet Telephone Dinding/w inbow Rp -
PEKERJAAN TATA SUARA
1 1 Unit MDF SS (Main Distribution Frame Sound System) Rp -
2 1 Unit Remote Mic with chime (Carr Call) Rp -
3 1 Set Instalasi Kabel NYMHY 2 x 1.5 mm² + Pipa Hi Conduit dia 20 mm dari MDF-SS diruang reception Rp -
4 1 Unit Remote Microphone (PA) Rp -
5 1 Set Instalasi Kabel NYMHY 2 x 1.5 mm² + Pipa Hi Conduit dia 20 mm dari MDF-SS diruang Control Rp -
6 1 Set FM Tuner, USB, MMC, DVD Player Rp -
7 1 Set EQUELIZER Rp -
8 1 Unit Power Amplifier 120 W Rp -
9 1 Unit Speaker Selector 10 channel Rp -
10 1 Unit Mixer 12 Channel Rp -
11 1 Unit Cabinet Rack c/w Accessories, Wiring , Grounding, Power, Pemasangan perangkat utama Rp -
12 1 Set Testing & Commisioning Rp -
13 1 Set Instalasi Kabel Fedder dari MDF-TS to TB-TS.1, NYMHY kabel 3 x 2,5 mm2 dengan pipa conduit Rp -
14 1 Set Instalasi Kabel Fedder dari MDF-TS to TB-TS.2, NYMHY kabel 3 x 2,5 mm2 dengan pipa conduit Rp -
Harga Satuan Terpasang Pek. Elektrikal - page 3 of 4
NO. URAIAN PEKERJAAN HARGA SATUAN
Instalasi dan Accsessories
1 1 Unit Ceiling Speaker 6W Rp -
2 1 Unit Instalasi Ceilling Speaker Rp -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
3 1 Unit Box Speaker 15W Rp -
4 1 Unit Instalasi Box Speaker Rp -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
5 1 Unit Horn Speaker 15W Rp -
6 1 Unit Instalasi Horn Speaker Rp -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
7 1 Unit Ceiling Speaker 3W Rp -
8 1 Unit Instalasi Ceilling Speaker Rp -
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
9 1 Unit Volume Control Rp -
10 1 Unit Instalasi Volume Control Rp -
Kabel NYMHY 3x1.5 mm² dalam High Impact conduit dia. 20 mm
11 1 Unit Terminal Box Lantai 1 (STB L1)/w acessories Rp -
12 1 Unit Kabel NYMHY 2x1,5 mm² (MDF SS - STB L1) Rp -
Terminal Box
TATA SUARA RUANG SIDANG
1 1 Set 240 WATT MIXER AMPLIFIER Rp -
2 1 Set DYNAMIC HANDHELD MICROPHONE Rp -
3 1 Set Conference Control Unit Rp -
4 1 Set Chairmant Mic Unit Rp -
5 1 Set Delegate Mic Unit Rp -
6 1 Set Column Speaker min. 30 Watts Rp -
7 1 Titik Instalasi Kabel Telemergency Kabel 2x1, 5mm2 dengan pipa Conduit Rp -
Harga Satuan Terpasang Pek. Elektrikal - page 4 of 4
HARGA SATUAN TERPASANG PEKERJAAN MEKANIKAL PLUMBING
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
HARGA SATUAN
NO. URAIAN PEKERJAAN
TERPASANG
PEKERJAAN AIR BERSIH
Peralatan Utama
1 1 Set Harga Terpasang Pompa Air Bersih Rp -
2 1 Set Harga Terpasang Booster Pump Kap. (Package)/Otomatis Rp -
3 1 Set Harga Terpasang ELECTRIC Water Heater, kapasitas 50 liter. Rp -
4 1 Set Harga Terpasang Tanki Air FRP 8 m3 (Ground Water Tank) Rp -
5 1 Set Harga Terpasang Tanki Air FRP 4 m3 (Roof Water Tank) Rp -
6 1 Set Harga Terpasang Electric Water Heater Kap. Rp -
7 1 Set Harga Terpasang Water Level Control (WLC) Rp -
8 1 Buah Harga Terpasang Header Dia. 100 mm Rp -
9 1 Buah Harga Terpasang Keran Taman Rp -
9 1 Set Harga Terpasang Pekerjaan Sumur Dangkal Rp -
Pipa PPRPN 10
1 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" Rp -
2 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 25 mm Setara Dia. 3/4" Rp -
3 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" Rp -
4 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 40 mm Setara Dia. 1.1/4" Rp -
5 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" Rp -
6 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 64 mm Setara Dia. 2" Rp -
Pipa PPRPN 20
1 1 Meter Harga Terpasang Pipa PPr PN20 Dia. 20 mm Setara Dia. 1/2" Rp -
Gate Valve 5K
1 1 Buah Harga Terpasang Gate Valve 5K Dia. 20 mm Setara Dia. 1/2" Rp -
2 1 Buah Harga Terpasang Gate Valve 5K Dia. 25 mm Setara Dia. 3/4" Rp -
3 1 Buah Harga Terpasang Gate Valve 5K Dia. 32 mm Setara Dia. 1" Rp -
4 1 Buah Harga Terpasang Gate Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Rp -
5 1 Buah Harga Terpasang Gate Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Rp -
6 1 Buah Harga Terpasang Gate Valve 5K Dia. 65 mm Setara Dia. 2" Rp -
7 1 Buah Harga Terpasang Strainer 10K Dia. 2" Rp -
STAINER 10K
1 1 Buah Harga Terpasang Strainer Dia. 65 Rp -
1 1 Buah Harga Terpasang Strainer Dia. 50 Rp -
Fleksible Joint
1 1 Buah Harga Terpasang Fleksible Joint dia. 50 Rp -
2 1 Buah Harga Terpasang Fleksible Joint dia. 65 Rp -
Check Valve
1 1 Buah Harga Terpasang Check Valve Dia. 20 mm Setara Dia. 1/2" Rp -
2 1 Buah Harga Terpasang Check Valve Dia. 25 mm Setara Dia. 3/4" Rp -
3 1 Buah Harga Terpasang Check Valve Dia. 32 mm Setara Dia. 1" Rp -
4 1 Buah Harga Terpasang Check Valve Dia. 40 mm Setara Dia. 1.1/4" Rp -
5 1 Buah Harga Terpasang Check Valve Dia. 50 mm Setara Dia. 1.1/2" Rp -
6 1 Buah Harga Terpasang Check Valve Dia. 63 mm Setara Dia. 2" Rp -
7 1 Buah Harga Terpasang Check Valve Dia. 65 mm Setara Dia. 2.1/2" Rp -
8 1 Buah Harga Terpasang Check Valve Dia. 90 mm Setara Dia. 3" Rp -
9 1 Buah Harga Terpasang Check Valve Dia. 110 mm Setara Dia. 4" Rp -
Floating Valve
1 1 Buah Harga Terpasang Floating Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Rp -
2 1 Buah Harga Terpasang Floating Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Rp -
3 1 Buah Harga Terpasang Floating Valve 5K Dia. 63 mm Setara Dia. 2" Rp -
PEKERJAAN AIR PANAS
1 1 Set Harga Terpasang ELECTRIC Water Heater, kapasitas 50 liter. Rp -
PEKERJAAN AIR KOTOR DAN BEKAS
1 1 Set Harga Terpasang STP Kap. 4 m3 Rp -
2 1 Set Harga Terpasang Sumpit Pump Package 1 (Lengkap) Rp -
3 1 Set Harga Terpasang Grease trap Rp -
4 1 Set Harga Terpasang Floor Clean Out Dia. 3" Rp -
5 1 Set Harga Terpasang Floor Clean Out Dia. 4" Rp -
6 1 Set Harga Terpasang Roof Drain Dia. 3" Rp -
7 1 Set Harga Terpasang Roof Drain Dia. 4" Rp -
8 1 Set Harga Terpasang Floor Drain Rp -
7 1 Set Harga Terpasang Water Hammer Rp -
Pipa PVC AW
1 1 Set Harga Terpasang Pipa PVC AW Dia. 1/2" Rp -
2 1 Set Harga Terpasang Pipa PVC AW Dia. 3/4" Rp -
3 1 Set Harga Terpasang Pipa PVC AW Dia. 1" Rp -
4 1 Set Harga Terpasang Pipa PVC AW Dia. 1.1/4" Rp -
5 1 Set Harga Terpasang Pipa PVC AW Dia. 1.1/2" Rp -
6 1 Set Harga Terpasang Pipa PVC AW Dia. 2" Rp -
7 1 Set Harga Terpasang Pipa PVC AW Dia. 2.1/2" Rp -
8 1 Set Harga Terpasang Pipa PVC AW Dia. 3" Rp -
9 1 Set Harga Terpasang Pipa PVC AW Dia. 4" Rp -
10 1 Buah Harga Terpasang Pipa PVC AW Dia. 6" Rp -
Harga Satuan Terpasang Pek. Mekanikal Plumbing - page 1 of 2
HARGA SATUAN
NO. URAIAN PEKERJAAN
TERPASANG
PEKERJAAN HYDRANT DAN SPRINKLER
1 1 Set Harga Terpasang Diesel Fire Pump, Lengkap Panel Kontrol Standart NFPA20 Rp -
2 1 Set Harga Terpasang Electric Fire Pump, Lengkap Panel kontrol standart NFPA20 Rp -
3 1 Set Harga Terpasang Jockey Fire Pump, Lengkap Panel Kontrol standart NFPA20 Rp -
4 1 Set Harga Terpasang Presure Tank 1000 liter lengkap dengan aksesories Rp -
5 1 Set Harga Terpasang Siamese Dia. 100 mm Rp -
6 1 Set Harga Terpasang Pilar Hydrant 20K Dia. 100 mm Rp -
7 1 Set Harga Terpasang Outdoor Hydrant Box Rp -
8 1 Set Harga Terpasang Indoor Hydrant Box Rp -
9 1 Set Harga Terpasang Sprinkler Head Rp -
10 1 Set Harga Terpasang Thermatic Suppression / Hallon 3 kg Rp -
11 1 Set Harga Terpasang Orifice Dia.150 mm Rp -
12 1 Set Harga Terpasang Sight Glass Dia. 150 mm Rp -
13 1 Set Harga Terpasang Presure Gauge Rp -
14 1 Set Harga Terpasang Fire Extinguiser 3kg Rp -
15 1 Set Harga Terpasang Branch Control Valve Rp -
Gate Valve 20K
1 1 Set Harga Terpasang Gate Valve 20K Dia. 1.1/4" Rp -
2 1 Set Harga Terpasang Gate Valve 20K Dia. 1.1/2" Rp -
3 1 Set Harga Terpasang Gate Valve 20K Dia. 2" Rp -
4 1 Set Harga Terpasang Gate Valve 20K Dia. 2.1/2" Rp -
5 1 Set Harga Terpasang Gate Valve 20K Dia. 3" Rp -
6 1 Set Harga Terpasang Gate Valve 20K Dia. 4" Rp -
7 1 Set Harga Terpasang Gate Valve 20K Dia. 6" Rp -
8 1 Set Harga Terpasang Gate Valve 20K Dia. 8" Rp -
PEKERJAAN TATA UDARA
1 1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 10200 Btu/h Rp -
2 1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 17070 Btu/h Rp -
3 1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 24000 Btu/h Rp -
4 1 Set Harga Terpasang Wall Mounted Type Kap. 5000 Btu/h (Lengkap Dengan Bracket)
5 1 Set Harga Terpasang Wall Mounted Type Kap. 7000 Btu/h (Lengkap Dengan Bracket) Rp -
6 1 Set Harga Terpasang Wall Mounted Type Kap. 9000 Btu/h (Lengkap Dengan Bracket) Rp -
7 1 Set Harga Terpasang Wall Mounted Type Kap. 18000 Btu/h (Lengkap Dengan Bracket) Rp -
8 1 Set Harga Terpasang Ceilling Cassete Type Kap. 17100 Btu/h (Lengkap Dengan Bracket) Rp -
9 1 Set Harga Terpasang Ceilling Cassete Type Kap. 24200 Btu/h (Lengkap Dengan Bracket) Rp -
9 1 Set Harga Terpasang FAN Coil Unit Kap. 17.100 Btu/h (Lengkap Dengan Bracket) Rp -
10 1 Set Harga Terpasang Ceilling Cassete Type Kap.34100 Btu/h (Lengkap Dengan Bracket) Rp -
11 1 Set Harga Terpasang Pipa Refrigerant+Insulasi Rp -
12 1 Set Harga Terpasang Pipa Drain+Insulasi Rp -
13 1 Set Harga Terpasang Rafnet Joint Rp -
14 1 Set Harga Terpasang Rafnet Reducer Rp -
15 1 Set Harga Terpasang Plenum Rp -
16 1 Set Harga Terpasang Volume Damper Rp -
17 1 Set Harga Terpasang Ducting Polyurethane Rp -
18 1 Set Harga Terpasang Flexible Joint Rp -
19 1 Set Harga Terpasang Supply Air Diffuser (SAD) Rp -
20 1 Set Harga Terpasang Return Air Grill (RAG) Rp -
21 1 Set Harga Terpasang Fresh Air Grill (FAG) Rp -
22 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 100 cfm Rp -
23 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 200 cfm Rp -
24 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 300 cfm Rp -
25 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 700 cfm Rp -
26 1 Set Harga Terpasang Exhaust Fan Wall Type Kap. 300 cfm Rp -
27 1 Set Harga Terpasang Exhaust Fan Wall Type Kap. 500 cfm Rp -
28 1 Set Harga Terpasang Wall Fan Dia. Propeller 16 Inch Rp -
Harga Satuan Terpasang Pek. Mekanikal Plumbing - page 2 of 2
ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
I PEKERJAAN PERSIAPAN, BONGKARAN, GALIAN, dan URUGAN
1 1 M1 PENGUKURAN dan PEMASANGAN BOUWPLANK (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,100 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,005 - -
B Bahan:
Kayu Balok Terentang m 3 0,012 - -
Paku ukuran 4cm-12cm kg 0,020 - -
Kayu Papan Terentang m 3 0,007 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, Maksimum 15% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 1 M2 PEMBUATAN KANTOR SEMENTARA LANTAI PLESTERAN (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 2,000 - -
Tukang Kayu oh 2,000 - -
Tukang Batu oh 2,000 - -
Kepala Tukang oh 0,300 - -
Mandor oh 0,050 - -
B Bahan:
Dolken Kayu Diameter 8-10/400 cm btg 1,250 - -
Kayu m3 0,180 - -
Paku Biasa kg 0,080 - -
Besi Strip kg 1,100 - -
Portland Cement (1 zak = 50 kg) kg 35,000 - -
Pasir Pasang m3 0,150 - -
Pasir Beton m3 0,100 - -
Koral Beton m3 0,150 - -
Bata Merah bh 30,000 - -
Seng Plat lbr 0,250 - -
Jendela Naco bh 0,200 - -
Kaca Polos m2 0,080 - -
Kunci Tanam bh 0,150 - -
Plywood 4 mm m2 0,060 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, Maksimum 15% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 1 M2 (K3) MEMBERSIHKAN LAPANGAN dan PERATAAN (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,100 - -
Mandor oh 0,050 - -
B Bahan:
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4 PEMBUATAN 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGGA 2 M (Analisa Permen PU no 28,2016)
A Tenaga:
Pekerja oh 0,200 - -
Tukang oh 0,400 - -
Kepala Tukang oh 0,020 - -
Mandor oh 0,020 - -
B Bahan:
Kayu Dolken Dia 8 - 10 cm batang 1,250 - -
Semen (PC) Kg 2,500 - -
Seng Gelombang Lembar 1,200 - -
Pasir Beton m3 0,005 - -
Koral Beton m3 0,009 - -
Kayu Klas II & III m3 0,072 - -
Paku 2-5″ Kg 0,060 - -
Meni Besi Kg 0,450 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 M1 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,750 - -
Mandor oh 0,025 - -
B Bahan:
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
6 1 M3 GALIAN TANAH BIASA KEDALAMAN 2 M1 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,900 - -
Mandor oh 0,045 - -
B Bahan:
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7 1 M3 GALIAN TANAH BIASA KEDALAMAN 3 M1 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,050 - -
Mandor oh 0,067 - -
B Bahan:
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8 1 M2 STRIPPING TANAH SETINGGI 1 M1 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,050 - -
Mandor oh 0,005 - -
B Bahan:
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9 1 M3 BUANGAN TANAH SEJAUH 30 METER (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,33 - -
Mandor oh 0,01 - -
B Bahan:
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10 1 M3 PENGURUGAN KEMBALI GALIAN TANAH (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,500 - -
Mandor oh 0,050 - -
B Bahan:
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11 1 M3 URUGAN PASIR (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,300 - -
Mandor oh 0,010 - -
B Bahan:
Pasir Urug m 3 1,200 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12 1 M3 URUGAN TANAH (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,250 - -
Mandor oh 0,025 - -
B Bahan:
Tanah Urug m 3 1,200 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
II PEKERJAAN KAYU
1 PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL KAYU KELAS 1 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 3,000 - -
Kepala Tukang oh 0,300 - -
Mandor oh 0,050 - -
B Bahan:
Papan Kayu Kelas I m 3 0,040 - -
Lem kg 0,500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 PEMASANGAN 1 M2 DAUN PINTU MULTIPLEK 18 MM LAPIS BESTWOOD (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 3,000 - -
Kepala Tukang oh 0,300 - -
Mandor oh 0,050 - -
B Bahan:
Papan Kayu Kelas II m 3 0,025 - -
Paku 1 - 2.5″ kg 0,030 - -
Lem kg 0,800 - -
Multiplek 18 mm lbr 0,688 - -
Bestwood lbr 0,500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
III PEKERJAAN STRUKTUR
Ref. Produk, PC: sekualitas Tiga Roda
Ref. Produk, Baja Tulangan: Garuda Steel, Gunung Garuda, Krakatau Steel (KS)
Ref. Produk, Baja Profil: Garuda Steel/Gunung Garuda, Krakatau Steel (KS), Cigading Habeam Center
1 1 M3 LANTAI KERJA, BETON MUTU K-100, fc' = 7,4 Mpa, SLUMP (3-6) cm, w/c = 0.87 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,200 - -
Tukang oh 0,200 - -
Kepala Tukang oh 0,020 - -
Mandor oh 0,060 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 2 30,000 - -
Pasir Beton m 3 0,638 - -
Split 2-3 m 3 0,761 - -
Air m 3 0,200 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 1 M3 BETON MUTU K-175, fc' = 14,5 Mpa, SLUMP (120±20) mm, w/c = 0.66 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,650 - -
Tukang oh 0,275 - -
Kepala Tukang oh 0,028 - -
Mandor oh 0,083 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 3 26,000 - -
Pasir Beton m 3 0,543 - -
Split 2-3 m 3 0,762 - -
Air m 3 0,215 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 1 M3 BETON MUTU K-225, fc' = 19,3 Mpa, SLUMP (120±20) mm, w/c = 0.58 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,650 - -
Tukang oh 0,275 - -
Kepala Tukang oh 0,028 - -
Mandor oh 0,083 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 3 71,000 - -
Pasir Beton m 3 0,499 - -
Split 2-3 m 3 0,776 - -
Air m 3 0,215 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
4 1 M3 BETON MUTU K-250, fc' = 21,7 Mpa, SLUMP (120±20) mm, w/c = 0.56 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,650 - -
Tukang oh 0,275 - -
Kepala Tukang oh 0,028 - -
Mandor oh 0,083 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 3 84,000 - -
Pasir Beton m 3 0,494 - -
Split 2-3 m 3 0,770 - -
Air m 3 0,215 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5 1 M3 BETON MUTU K-300, fc' = 24,9 Mpa, SLUMP (120±20) mm, w/c = 0.52 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,650 - -
Tukang oh 0,275 - -
Kepala Tukang oh 0,028 - -
Mandor oh 0,083 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 413,00 - -
Pasir Beton m 3 0,5238 - -
Split 2-3 m 3 0,7854 - -
Air m 3 0,215 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6 1 M3 MENGGUNAKAN PERALATAN POMPA BETON (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,200 - -
Mandor oh 0,020 - -
B Bahan:
C Peralatan:
Sewa Pompa Beton/m3 m 3 1,000 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 0% x D 0,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7 1 M3 MENGGUNAKAN VIBRATOR (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,250 - -
Mandor oh 0,250 - -
B Bahan:
C Peralatan:
Vibrator sewa-hari 0,100 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 0% x D 0,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8 1 M3 BETON READY MIX K-300, f'c = 26,4 MPa, SLUMP (12±2) CM, w/c = 0.52 (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 0,250 - -
Kepala Tukang oh 0,025 - -
Mandor oh 0,100 - -
B Bahan:
Ready Mix K-300 m 3 1,020 - -
C Peralatan:
Pompa Beton/m3 m 3 1,000 - -
Vibrator m 3 1,000 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9 1 KG BAJA TULANGAN POLOS, BJTP, U24, fy 240 MPa (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,007 - -
Tukang oh 0,007 - -
Kepala Tukang oh 0,0007 - -
Mandor oh 0,0004 - -
B Bahan:
Baja Tulangan Polos, BJTP, U24, fy240 Mpa kg 1,050 - -
Kawat beton kg 0,015 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
10 1 KG BAJA TULANGAN DEFORM/ULIR, BJTD, fy 420 MPa (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,007 - -
Tukang oh 0,007 - -
Kepala Tukang oh 0,0007 - -
Mandor oh 0,0004 - -
B Bahan:
Baja Tulangan Deform/Ulir, BJTD, fy420 Mpa kg 1,050 - -
Kawat beton kg 0,015 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11 PEMASANGAN 1 M PVC WATTERSTOP LEBAR 150 MM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,060 - -
Tukang Batu/Pipa oh 0,030 - -
Kepala Tukang oh 0,0030 - -
Mandor oh 0,0030 - -
B Bahan:
Watterstop Lbr 150 mm m' 1,050 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12 1 KG PASANG WIRE MESH (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,0025 - -
Tukang oh 0,0025 - -
Kepala Tukang oh 0,0025 - -
Mandor oh 0,0001 - -
B Bahan :
Wiremesh M10, 2,1 x 5,4 meter, Mutu Baja U50 kg 1,0200 - -
Kawat beton kg 0,0050 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
13 1 M2 BEKISTING PONDASI/SLOOP PAS. BATA MERAH, T. 1/2 BATA, 1 PC : 5 PP (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,015 - -
B Bahan:
Bata Merah Bakar Kelas 1 bh 70,000 - -
Portland Cement (1 zak = 50 kg) kg 9,680 - -
Pasir Pasang m 3 0,045 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
14 1 M2 (K3) PASANG BEKISTING PONDASI 2X PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,520 - -
Tukang oh 0,260 - -
Kepala Tukang oh 0,026 - -
Mandor oh 0,026 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,020 - -
Paku ukuran 4cm-12cm kg 0,300 - -
Minyak Bekisting liter 0,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
15 1 M2 (K3) PASANG BEKISTING KAYU KLS III, 2 KALI PAKAI SLOOP (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,520 - -
Tukang oh 0,260 - -
Kepala Tukang oh 0,026 - -
Mandor oh 0,026 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,009 - -
Paku ukuran 4cm-12cm kg 0,300 - -
Minyak Bekisting liter 0,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
16 1 M2 (K3) PASANG BEKISTING KOLOM PRAKTIS 4x PAKAI dengan PAPAN (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Papan Terentang m 3 0,009 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Kayu Balok Terentang m 3 0,003 - -
Dolken dia 8 s/d 10 cm btg 0,426 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
17 1 M2 (K3) PASANG BEKISTING KOLOM STRUKTUR 2x PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,022 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,008 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
Dolken dia 8 s/d 10 cm btg 1,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
18 1 M2 (K3) PASANG BEKISTING BALOK 2X PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,022 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,010 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
Dolken dia 8 s/d 10 cm btg 1,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
19 1 M2 (K3) PASANG BEKISTING BALOK LINTEL 4X PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,009 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,003 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,090 - -
Dolken dia 8 s/d 10 cm btg 0,426 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
20 1 M2 (K3) PASANG BEKISTING dengan PAPAN 3X20, 3X PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,220 - -
Tukang oh 0,660 - -
Kepala Tukang oh 0,066 - -
Mandor oh 0,022 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,016 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,006 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
21 1 M2 (K3) PASANG BEKISTING PLAT LANTAI DENGAN PLYWOOD 2X PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,022 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,008 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
Dolken dia 8 s/d 10 cm btg 3,300 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
22 1 M2 PASANG BEKISTING PLAT LANTAI DENGAN FLOORDECK, JAP < = 0,8 m (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,080 - -
Tukang oh 0,040 - -
Kepala Tukang oh 0,0040 - -
Mandor oh 0,0080 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,0014 - -
Paku ukuran 4cm-12cm kg 0,2300 - -
Balok Kayu Kelas Kuat II m 3 0,0089 - -
Floordeck/Metal Sheet, t = 0,85 mm lebar 1,00 m m 2 1,0800 - -
Dolken dia 8 s/d 10 cm btg 3,300 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
23 1 M2 (K3) PASANG BEKISTING PLAT BETON 4X PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,009 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,003 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,090 - -
Dolken dia 8 s/d 10 cm btg 1,278 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
24 1 M2 PASANG BEKISTING UNTUK TANGGA 2X PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,017 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,008 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
Dolken dia 8 s/d 10 cm btg 1,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
25 1 M2 (K3) PASANG BEKISTING UNTUK PLAT DINDING 2X PAKAI (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,017 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,011 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
Dolken dia 8 s/d 10 cm btg 1,650 - -
Spacer bh 4,000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
PERANCAH MENGGUNAKAN SCAFOLDING
26 1 M2 PASANG STOOWEK/PERANCAH SCAFOLDING (Sewa)
A Tenaga:
Pekerja oh 0,200 - -
Tukang oh 0,020 - -
Kepala Tukang oh 0,050 - -
Mandor oh 0,002 - -
B Bahan:
Min frame pcs 1,4250 - -
Cros brace pcs 1,4250 - -
Join pin pcs 1,4250 - -
U Head pcs 1,4250 - -
Jack base pcs 1,4250 - -
Swivel clamp pcs 1,4250 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D
F Jumlah (D+E) -
G Dibulatkan (F) -
27 1 M2 (K3) PASANG BEKISTING KOLOM STRUKTUR 2x PAKAI+ SCAFOLDING (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,022 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Minyak Bekisting ltr 0,200 - -
Balok Kayu Kelas Kuat II m 3 0,008 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
C Peralatan:
Perancah Scafolding m2 0,500 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
28 1 M2 (K3) PASANG BEKISTING BALOK 2X PAKAI + SCAFOLDING(Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,022 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Minyak Bekisting ltr 0,200 - -
Balok Kayu Kelas Kuat II m 3 0,010 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
C Peralatan:
Perancah Scafolding m2 1,000 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
29 1 M2 (K3) PASANG BEKISTING PLAT LANTAI DENGAN PLYWOOD 2 X PAKAI + SCAFOLDING (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,022 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Minyak Bekisting ltr 0,200 - -
Balok Kayu Kelas Kuat II m 3 0,008 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
C Peralatan:
Perancah Scafolding m2 1,250 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
30 1 M2 PASANG BEKISTING PLAT LANTAI DENGAN FLOORDECK, JAP < = 0,8 m + SCAFOLDING(Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,080 - -
Tukang oh 0,040 - -
Kepala Tukang oh 0,0040 - -
Mandor oh 0,0080 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,0014 - -
Paku ukuran 4cm-12cm kg 0,2300 - -
Balok Kayu Kelas Kuat II m 3 0,0089 - -
Floordeck/Metal Sheet, t = 0,85 mm lebar 1,00 m m 2 1,0800 - -
C Peralatan:
Perancah Scafolding m2 1,000 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
31 1 M2 PASANG BEKISTING UNTUK TANGGA 2 X PAKAI + SCAFOLDING(Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,660 - -
Tukang oh 0,330 - -
Kepala Tukang oh 0,033 - -
Mandor oh 0,033 - -
B Bahan:
Kayu Kelas Kuat III m 3 0,017 - -
Paku ukuran 4cm-12cm kg 0,400 - -
Balok Kayu Kelas Kuat II m 3 0,008 - -
Multipleks 9 mm, uk. 1,20 x 2,40 lbr 0,201 - -
C Peralatan:
Perancah Scafolding m2 0,500 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
32 MEMBUAT 1M¹ KOLOM PRAKTIS BETON BERTULANG (12 + 12) CM
A Tenaga:
Pekerja OH 0,1800 - -
Tukang batu OH 0,0200 - -
Tukang kayu OH 0,0200 - -
Tukang besi OH 0,0200 - -
Kepala tukang OH 0,0060 - -
Mandor OH 0,0090 - -
B Bahan:
Kayu kelas lll m3 0,0020 - -
Paku 5 cm-12cm kg 0,0100 - -
Besi beton polos Kg 3,0000 - -
Kawat beton Kg 0,0450 - -
Portland Cement Kg 4,0000 - -
Pasir Beton m3 0,0060 - -
Kerikil m3 0,0080 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
33 MEMBUAT 1M¹ BALOK LINTEL BETON BERTULANG (12 + 12) CM
A Tenaga:
Pekerja OH 0,2970 - -
Tukang batu OH 0,0330 - -
Tukang kayu OH 0,0330 - -
Tukang besi OH 0,0330 - -
Kepala tukang OH 0,0100 - -
Mandor OH 0,0150 - -
B Bahan:
Kayu kelas lll m3 0,0030 - -
Paku 5 cm-12cm kg 0,0200 - -
Besi beton polos Kg 3,6000 - -
Kawat beton Kg 0,0500 - -
Portland Cement Kg 5,5000 - -
Pasir Beton m3 0,0090 - -
Kerikil m3 0,0150 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
34 1 M1 PANJANG CERUCUK BAMBU Φ 8 CM - 10 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,120 - -
Mandor oh 0,012 - -
B Bahan:
Bambu Φ 8 Cm-10 Cm m 1 1,050 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
35 1 M3 (K3) LAPISAN BATU KOSONG/AANSTAMPING (Analisa Permen PU No 28, 2016 )
A Tenaga:
Pekerja oh 0,780 - -
Tukang oh 0,390 - -
Kepala Tukang oh 0,039 - -
Mandor oh 0,039 - -
B Bahan:
Batu Belah m 3 1,200 - -
Pasir Urug m 3 0,432 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
36 1 M3 PONDSI BATU BELAH, CAMPURAN 1PC : 3PP (Analisa Permen PU No 28, 2016 )
A Tenaga:
Pekerja oh 1,500 - -
Tukang oh 0,750 - -
Kepala Tukang oh 0,075 - -
Mandor oh 0,075 - -
B Bahan:
Batu Belah m 3 1,200 - -
Portland Cement (1 zak = 50 kg) kg 2 02,000 - -
Pasir Pasang m 3 0,485 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
37 1 M3 PONDSI BATU BELAH, CAMPURAN 1PC : 4PP (Analisa Permen PU No 28, 2016 )
A Tenaga:
Pekerja oh 1,500 - -
Tukang oh 0,750 - -
Kepala Tukang oh 0,075 - -
Mandor oh 0,075 - -
B Bahan:
Batu Belah m 3 1,200 - -
Portland Cement (1 zak = 50 kg) kg 1 63,000 - -
Pasir Pasang m 3 0,520 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
38 1 M3 PONDSI BATU BELAH, CAMPURAN 1PC : 5PP (Analisa Permen PU No 28, 2016 )
A Tenaga:
Pekerja oh 1,500 - -
Tukang oh 0,750 - -
Kepala Tukang oh 0,075 - -
Mandor oh 0,075 - -
B Bahan:
Batu Belah m 3 1,200 - -
Portland Cement (1 zak = 50 kg) kg 1 36,000 - -
Pasir Pasang m 3 0,544 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
39 1 KG KONSTRUKSI BAJA PROFIL, IWF/INP/DIR/DIN/CHANEL, (Analisa Permen PU No 28, 2016 )
A Tenaga:
Pekerja oh 0,060 - -
Tukang oh 0,060 - -
Kepala Tukang oh 0,006 - -
Mandor oh 0,003 - -
B Bahan:
Baja Profil, IWF/INP/DIR/DIN/CHANEL kg 1,150 - -
C Peralatan:
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
40 1 KG PASANG PLAT SIMPUL
A Tenaga:
Biaya Pemotongan Lainnya, 15% dari Jumlah Bahan % 15% - -
B Bahan:
Plat Baja T = 10 mm kg 1,150 - -
C Peralatan:
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
41 1 BH PASANG ANGKUR BAUT DIA 16 MM, PANJANG 25 CM
A Tenaga:
Upah dan Alat Bantu % 5% - -
B Bahan:
Baut Angkur dia 16 mm, Panjang 25 cm Bh 1,000 - -
C Peralatan:
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
42 1 BH PASANG BAUD MUR HTB DIA 16 MM PANJANG 5 CM
A Tenaga:
Upah dan Alat Bantu % 5% - -
B Bahan:
Baut Mur HTB dia 16 mm, Panjang 5 cm Bh 1,000 - -
C Peralatan:
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
IV PEKERJAAN DINDING
Ref. Produk, Bata Ringan: Hebel, Leibel, Acon, dan Power Block
Ref. Produk, Semen Instan: Mortar Utama (MU), Prime Mortar, dan Drymix
1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 3 PP (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,600 - -
Tukang oh 0,200 - -
Kepala Tukang oh 0,020 - -
Mandor oh 0,030 - -
B Bahan: -
Bata Merah Bakar Kelas 1 bh 1 40,000 - -
Portland Cement (1 zak = 50 kg) kg 32,950 - -
Pasir Pasang m 3 0,091 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 PP (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,015 - -
B Bahan:
Bata Merah Bakar Kelas 1 bh 70,000 - -
Portland Cement (1 zak = 50 kg) kg 14,370 - -
Pasir Pasang m 3 0,040 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 PP (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,015 - -
B Bahan:
Bata Merah Bakar Kelas 1 bh 70,000 - -
Portland Cement (1 zak = 50 kg) kg 9,680 - -
Pasir Pasang m 3 0,045 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4 1 M2 PELESTERAN DINDING 1 PC. : 3 PS; TEBAL 15 MM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,150 - -
Kepala Tukang oh 0,015 - -
Mandor oh 0,015 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 7,776 - -
Pasir Pasang m 3 0,023 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
5 1 M2 PELESTERAN DINDING 1 PC. : 5 PS; TEBAL 15 MM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,150 - -
Kepala Tukang oh 0,015 - -
Mandor oh 0,015 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 5,184 - -
Pasir Pasang m 3 0,026 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6 1 M1 LIST PROFIL/SKONING LEBAR 10 cm, 1PC:3PP (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,080 - -
Tukang oh 0,400 - -
Kepala Tukang oh 0,040 - -
Mandor oh 0,004 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 0,500 - -
Pasir Pasang m 3 0,013 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7 1 M 2 PASANGAN BATA RINGAN UKURAN 600X200X100, SPASI TEBAL 3 MM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,015 - -
B Bahan:
Bata Ringan 600x200x100 m 3 0,105 - -
Semen Instan Perekat Pasangan Bata, @40kg zak 0,066 - -
C Peralatan:
Peralatan (Persentase dari jumlah bahan) % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8 1 M 2 PELESTERAN DINDING DENGAN SEMEN INSTAN, TEBAL 10 MM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,200 - -
Tukang oh 0,150 - -
Kepala Tukang oh 0,015 - -
Mandor oh 0,010 - -
B Bahan:
Semen Instan Pelester, @40kg zak 0,479 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9 1 M 2 ACIAN DINDING DENGAN SEMEN INSTAN, TEBAL 1,5 MM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,200 - -
Tukang oh 0,150 - -
Kepala Tukang oh 0,015 - -
Mandor oh 0,010 - -
B Bahan:
Semen Instan Acian, @40kg zak 0,058 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10 1 M2 ACIAN PC (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,200 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,010 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 3,250 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
11 1 M1 PLESTERAN SKONING 1 SP : 3PP LEBAR 10 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,080 - -
Tukang oh 0,400 - -
Kepala Tukang oh 0,040 - -
Mandor oh 0,004 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 0,500 - -
Pasir pasang m3 0,013 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12 1 M2 PLESTERAN CIPRAT 1 SP ; 2 PS (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,015 - -
B Bahan:
Portland Cement (1 zak = 50 kg) kg 0,500 - -
Pasir pasang m3 0,013 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
13 1 M2 FINISHING PLAFOND EXPOSE (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,165 - -
Tukang oh 0,130 - -
Kepala Tukang oh 0,018 - -
Mandor oh 0,010 - -
B Bahan:
Portland Cement (1 zak = 50 kg) zak 0,150 - -
Kalbon perekat acian kg 0,068 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
14 1 M2 PARTISI DOUBLE GYPSUM T = 9 MM + RANGKA METAL STUD
A Tenaga:
Pekerja oh 0,250 - -
Tukang oh 0,250 - -
Kepala Tukang oh 0,025 - -
Mandor oh 0,013 - -
B Bahan:
Rangka Partisi Metal Stud M 3,5000 - -
Gypsum t = 9 mm Lbr 0,6940 - -
Plaster Board Ls 1,0000 - -
Finishing Cet Tembuk (+Upah) m2 2,0000 - -
C Peralatan:
Assesories dan Alat Bantu % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
15 1 M2 DINDING PEMISAH MULTI 12 MM LAPIS BESTWODD (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,200 - -
Tukang oh 0,600 - -
Kepala Tukang oh 0,060 - -
Mandor oh 0,010 - -
B Bahan:
Balok Kayu 6 x 12 cm M3 0,028 - -
Paku 5 dan 10 cm Kg 1,500 - -
Multiplex 12 mm Lbr 0,860 - -
Bestwodd Lbr 0,860 - -
Lem Kg 0,580 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
16 1 M2 DINDING PEMISAH MULTI 12 MM LAPIS BESTWODD + GYPSUM FINIS CET ITERIOR (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,200 - -
Tukang oh 0,600 - -
Kepala Tukang oh 0,060 - -
Mandor oh 0,010 - -
B Bahan:
Balok Kayu 6 x 12 cm M3 0,028 - -
Paku 5 dan 10 cm Kg 1,500 - -
Multiplex 12 mm Lbr 0,430 - -
Bestwodd Lbr 0,430 - -
Gypsum t = 9 mm Lbr 0,430 - -
Plaster Board Ls 1,0000 - -
Finishing Cet Tembuk (+Upah) m2 1,0000 - -
Lem Kg 0,580 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
17 1 M2 DINDING PEMISAH MULTI 12 MM RANGKAP LAPIS BESTWODD (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,200 - -
Tukang oh 0,600 - -
Kepala Tukang oh 0,060 - -
Mandor oh 0,010 - -
B Bahan:
Balok Kayu 6 x 12 cm M3 0,028 - -
Paku 5 dan 10 cm Kg 1,500 - -
Multiplex 12 mm Lbr 0,347 - -
Beswood Lbr 0,347 - -
Lem Kg 0,290 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
V PEKERJAAN PINTU DAN JENDELA
Ref. Produk, Kusen: Alcomexindo, Alexindo, dan Superex/INDAL
Ref. Produk, Accessories: Deckson, Solid, dan SES
Ref. Produk, Kaca: sekualitas ASAHI MAS, PANASAP
1 1 M 1 PASANG KUSEN ALUMUNIUM UKURAN 4″ LENGKAP ASSESORIES (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0430 - -
Tukang oh 0,0430 - -
Kepala Tukang oh 0,0043 - -
Mandor oh 0,0021 - -
B Bahan:
Profil alluminium M 1,1000 - -
Skrup fixer Bh 2,0000 - -
Sealant Tube 0,0600 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 1 M 2 PASANG PINTU KACA RANGKA ALUMUNIUM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0850 - -
Tukang oh 0,0850 - -
Kepala Tukang oh 0,0090 - -
Mandor oh 0,0050 - -
B Bahan:
Pintu Alumunium M 4,4000 - -
Profil Kaca Bh 4,5000 - -
Sealant Tube 0,2700 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 1 M 2 PASANG DAUN JENDELA ALUMUNIUM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0850 - -
Tukang oh 0,0850 - -
Kepala Tukang oh 0,0090 - -
Mandor oh 0,0050 - -
B Bahan:
Jendela Alumunium M 4,4000 - -
Profil Kaca Bh 4,5000 - -
Sealant Tube 0,2700 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
4 1 M 2 PASANG KACA RYBEN TEBAL 5 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0150 - -
Tukang oh 0,1500 - -
Kepala Tukang oh 0,0150 - -
Mandor oh 0,0008 - -
B Bahan:
Kaca RybenTebal 5 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5 1 M 2 PASANG KACA ONE WAY TEBAL 5 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0150 - -
Tukang oh 0,1500 - -
Kepala Tukang oh 0,0150 - -
Mandor oh 0,0008 - -
B Bahan:
Kaca One WayTebal 5 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6 1 M 2 PASANG KACA POLOS TEBAL 6 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0150 - -
Tukang oh 0,1500 - -
Kepala Tukang oh 0,0150 - -
Mandor oh 0,0008 - -
B Bahan:
Kaca Clear Tebal 6 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7 1 M 2 PASANG KACA POLOS TEBAL 8 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0150 - -
Tukang oh 0,1500 - -
Kepala Tukang oh 0,0150 - -
Mandor oh 0,0008 - -
B Bahan:
Kaca Clear Tebal 8 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8 1 M 2 PASANG KACA POLOS TEBAL 10 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0250 - -
Tukang oh 0,2500 - -
Kepala Tukang oh 0,0250 - -
Mandor oh 0,0013 - -
B Bahan:
Kaca Bening Tebal 10 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9 1 M 2 PASANG KACA POLOS TEBAL 12 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0250 - -
Tukang oh 0,2500 - -
Kepala Tukang oh 0,0250 - -
Mandor oh 0,0013 - -
B Bahan:
Kaca Polos Tebal 12 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
10 1 M 2 PASANG KACA TEMPERED SAFETY CLASS CLEAR TEBAL 12 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0250 - -
Tukang oh 0,2500 - -
Kepala Tukang oh 0,0250 - -
Mandor oh 0,0013 - -
B Bahan:
Kaca Tempered Tebal 12 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11 1 M 2 PASANG KACA TEMPERED TEBAL 10 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0250 - -
Tukang oh 0,2500 - -
Kepala Tukang oh 0,0250 - -
Mandor oh 0,0013 - -
B Bahan:
Kaca Tempered Tebal 10 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12 1 M 2 PASANG KACA SILVER GREEN TEBAL 8 MM (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0170 - -
Tukang oh 0,1700 - -
Kepala Tukang oh 0,0170 - -
Mandor oh 0,0090 - -
B Bahan:
Kaca Silver Green Tebal 8 mm M 1,1000 - -
Sealant Tube 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
13 1 Pasang Engsel Pintu (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0150 - -
Tukang oh 0,1500 - -
Kepala Tukang oh 0,0150 - -
Mandor oh 0,0008 - -
B Bahan:
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,0000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
14 1 PSG PEMASANGAN HANDLE (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0050 - -
Tukang oh 0,5000 - -
Kepala Tukang oh 0,0500 - -
Mandor oh 0,0030 - -
B Bahan:
Hendle PH D268 2x4x80x60 SSS+WOOD psg 1,0000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
15 1 PSG PEMASANGAN FULL HANDLE (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0050 - -
Tukang oh 0,5000 - -
Kepala Tukang oh 0,0500 - -
Mandor oh 0,0030 - -
B Bahan:
Pull Handle, PH 802 32x800 SSS+PSS psg 1,0000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
16 1 BUAH PEMASANGAN FLOOR HANGER SETARA DECKSON (Analisa Permen PU No 28.2016)
A Tenaga:
Pekerja oh 0,0050 - -
Tukang oh 0,5000 - -
Kepala Tukang oh 0,0500 - -
Mandor oh 0,0030 - -
B Bahan:
Patch Fitting US 10 PSS Bh 1,0000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
17 1 UNIT PASANG PINTU SLIDING DOOR KACA TEMPERED +ACP TYPE PJ1
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kaca Tempered Safety Class- Clear 12 MM m² 4,9500 - -
Kaca Tempered Safety Class- Clear 10 MM m² 1 0,7488 - -
U-Alumunium m¹ 22,600 - -
Sticker Motif Etnik Tahuna ( Sanblas) m² 4,3500 - -
Logo Mahkamah Agung Republik Indonesia Unit 1,0000 - -
Mesin Otomatis Sliding Door (Type ES200 Dorma) Unit 1,0000 - -
Penutup Mesin Di Atas Ambang Pintu + Accessories Unit 1,0000 - -
Finish Alumunium Composite Panel (ACP) m² 1 1,5200 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
18 1 UNIT PASANG PINTU KACA TEMPERED +ACP TYPE PJ2
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kaca Tempered Safety Class- Cleer 12 MM m² 3,7400 - -
Kaca Tempered Safety Class- Clear 10 MM m² 6,1296 - -
U-Alumunium m¹ 17,749 - -
Sticker Motif ( Sanblas) m² 4,5880 - -
Logo Mahkamah Agung Republik Indonesia Unit 1,0000 - -
Floor Hinges, Fh 84 IDR set 2,0000 - -
Patch Fitting PT 10 PSS bh 2,0000 - -
Patch Fitting PT 20 PSS bh 2,0000 - -
Patch Fitting PT 30 PSS bh 2,0000 - -
Patch Fitting US 10 PSS bh 2,0000 - -
Pull Handle, PH 802 32x800 SSS+PSS psg 2,0000 - -
Finish Alumunium Composite Panel (ACP) m² 1 1,0400 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
-
19 1 UNIT PASANG PINTU KACA TEMPERED TYPE PJ3
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kaca Tempered Safety Class- Cleer 12 MM m² 3,7400 - -
Kaca Tempered Safety Class- Clear 10 MM m² 4,0752 - -
U-Alumunium m¹ 17,749 - -
Sticker Motif ( Sanblas) m² 4,5880 - -
Logo Mahkamah Agung Republik Indonesia Unit 1,0000 - -
Floor Hinges, Fh 84 IDR set 2,0000 - -
Patch Fitting PT 10 PSS bh 2,0000 - -
Patch Fitting PT 20 PSS bh 2,0000 - -
Patch Fitting PT 30 PSS bh 2,0000 - -
Patch Fitting US 10 PSS bh 2,0000 - -
Pull Handle, PH 802 32x800 SSS+PSS psg 2,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
20 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P1
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,8400 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 3,4182 - -
Acitrap ( Multi Lapis Beswood) m² 3,4200 - -
Aluminium Strip 10 mm m¹ 1 8,4000 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 3,0000 - -
Hendle PH D268 2x4x80x60 SSS+WOOD psg 2,0000 - -
Martice lock MTS IL DL 8585 SSS set 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN set 1,0000 - -
Escutcheon ESCN DOI SSS psg 1,0000 - -
Flush Bolt Sek. FB 808 6″+12″SN set 1,0000 - -
Dust Proof Strike ESDN DOI SSS set 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
21 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P2
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,6000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 2,5424 - -
Kaca Clear 6 mm m² 0,0864 - -
Aluminium Strip 10 mm m¹ 5,0180 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 3,0000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS set 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN set 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Escutcheon ESCN DOI SSS psg 1,0000 - -
Flush Bolt Sek. FB 808 6″+12″SN set 1,0000 - -
Dust Proof Strike ESDN DOI SSS set 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
22 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P3
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,6000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 2,5424 - -
Kaca Clear 6 mm m² 0,0864 - -
Aluminium Strip 10 mm m¹ 2,4600 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 3,0000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS set 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN set 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Escutcheon ESCN DOI SSS psg 1,0000 - -
Flush Bolt Sek. FB 808 6″+12″SN set 1,0000 - -
Dust Proof Strike ESDN DOI SSS set 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
23 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P4
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,2000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,6944 - -
Kaca Clear 6 mm m² 0,0864 - -
Aluminium Strip 10 mm m¹ 3,7100 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
24 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P5
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,2000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,7808 - -
Aluminium Strip 10 mm m¹ 2,5200 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
25 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P6
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 8,0000 - -
Kaca Clear 6 mm m² 0,7812 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,7808 - -
Aluminium Strip 10 mm m¹ 2,5200 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
26 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P7
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,1000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,5688 - -
Hendle LS T6200 BK SSS psg 1,0000 - -
Aluminium Strip 10 mm m¹ 2,2200 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LS T6200 BT SSS set 1,0000 - -
Pytogram Plat stainless Steel + Logo bh 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
27 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P8
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,0000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,3568 - -
Aluminium Strip 10 mm m¹ 1,9200 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LS T6200 BT SSS set 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
28 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P9
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,3000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 2,1500 - -
Box Sliding Rell, Multiplek 18 mm lapis Bestwood m² 0,2380 - -
Aluminium Strip 10 mm m¹ 3,0000 - -
Sliding Door SR 8901 D4 set 1,0000 - -
Handle PP 012 SSS psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
29 1 UNIT PASANG KUSEN ALUMUNIUM+ DAUN PINTU MULTIPLEK FINN. LAPIS BESTWOOD TYPE P10
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 3,8000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 0,6600 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,0000 - -
Handle PP 012 SSS psg 2,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
30 1 UNIT PASANG KUSEN CANAL C +PINTU PLAT BAJA FINN. CAT DUCO TYPE P11
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Besi canal C 100,50,20, 3,2 Kg 2 6,4000 - -
Hollow 40 x 40 cm m' 8,5000 - -
Plat Baja Kg 4 6,7000 - -
Besi Angkur dia 19 Kg 3,1565 - -
Handle pintu besi/Tarikan pintu Psg 1,0000 - -
Engsel Pintu Besi Bh 3,0000 - -
Kunci Pintu Bh 1,0000 - -
Pengelasan Cm 9 4,8000 - -
Finishing Cat Duko (Upah+Bahan) M² 3,9020 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
31 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J1
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 2 0,0000 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 1,6146 - -
Kaca Rayben 5 mm m² 6,5688 - -
Friction Stay DELUXE FS HD T250-20″ psg 2,0000 - -
Casemet Handle CH 420 NA bh 2,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
32 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J2
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 1 4,8000 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 1,4976 - -
Kaca Rayben 5 mm m² 3,8926 - -
Friction Stay DELUXE FS HD T250-20″ psg 2,0000 - -
Casemet Handle CH 420 NA bh 2,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
33 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J3
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 1 0,2000 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 1,2636 - -
Kaca Rayben 5 mm m² 2,0338 - -
Friction Stay DELUXE FS HD T250-20″ psg 2,0000 - -
Casemet Handle CH 420 NA bh 2,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
34 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J4
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 2 8,8250 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 3,2058 - -
Kaca Rayben 5 mm m² 8,5464 - -
Friction Stay DELUXE FS HD T250-20″ psg 4,0000 - -
Casemet Handle CH 420 NA bh 4,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
35 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J5
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 2 4,0000 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 3,0888 - -
Kaca Rayben 5 mm m² 6,5693 - -
Friction Stay DELUXE FS HD T250-20″ psg 4,0000 - -
Casemet Handle CH 420 NA bh 4,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
36 1 UNIT PASANG KUSEN DAN DAUN JENDELA + ACCESSORIES TYPE J6
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 3 4,5200 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 3,5568 - -
Kaca Rayben 5 mm m² 1 1,2844 - -
Friction Stay DELUXE FS HD T250-20″ psg 4,0000 - -
Casemet Handle CH 420 NA bh 4,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
37 1 UNIT PASANG KUSEN DAN DAUN JENDELA +ACCESSORIES TYPE J7
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 6,8000 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 0,8424 - -
Kaca Rayben 5 mm m² 1,3900 - -
Friction Stay DELUXE FS HD T250-20″ psg 1,0000 - -
Casemet Handle CH 420 NA bh 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
38 1 UNIT PASANG JENDELA KACA TEMPERED + ACCESSORIES TYPE J8
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kaca Tempered Safety Class- Clear 10 MM m² 3,1209 - -
U-Alumunium m¹ 8,000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
39 1 UNIT PASANG JENDELA KACA TEMPERED + ACCESSORIES TYPE J9
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kaca Tempered Safety Class- Clear 10 MM m² 1,3104 - -
U-Alumunium m¹ 5,300 - -
Sticker Motif Etnik Tahuna ( Sanblas) m² 1,2300 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
40 1 UNIT PASANG KUSEN DAN DAUN JENDELA +ACCESSORIES TYPE J10
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 6,1500 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 1,2636 - -
Kaca Clear 6 mm m² 0,9680 - -
Friction Stay DELUXE FS HD T250-20″ psg 2,0000 - -
Casemet Handle CH 420 NA bh 2,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
41 1 UNIT PASANG KUSEN DAN DAUN JENDELA +ACCESSORIES TYPE J11
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 9,0000 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 1,3104 - -
Kaca Clear 6 mm m² 2,0046 - -
Friction Stay DELUXE FS HD T250-20″ psg 2,0000 - -
Casemet Handle CH 420 NA bh 2,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
42 1 UNIT PASANG KUSEN DAN DAUN JENDELA +ACCESSORIES TYPE J12
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Alumunium Warna 4" m¹ 4,1000 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 0,8424 - -
Kaca Clear 6 mm m² 0,7018 - -
Friction Stay DELUXE FS HD T250-20″ psg 1,0000 - -
Casemet Handle CH 420 NA bh 1,0000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
43 1 UNIT PASANG JENDELA KACA TEMPERED + ACCESSORIES TYPE J13
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kaca Tempered Safety Class- Clear 10 MM m² 3,7500 - -
U-Alumunium m¹ 8,500 - -
Sticker Motif Etnik Tahuna ( Sanblas) m² 2,2500 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
44 1 UNIT PASANG KUSEN ALUMUNIUM + KACA TYPE BV1
A Tenaga:
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,7000 - -
Kaca Clear 6 mm m² 1,3206 - -
C Peralatan:
% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
45 1 UNIT PASANG KUSEN ALUMUNIUM + KACA TYPE BV2
A Tenaga:
B Bahan:
Kusen Alumunium Warna 4" m¹ 3,3800 - -
Kaca Ryben 25 % Tebal : 5 mm m² 0,6272 - -
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
46 1 UNIT PASANG KUSEN ALUMUNIUM + KACA TYPE BV3
A Tenaga:
B Bahan:
Kusen Alumunium Warna 4" m¹ 5,9700 - -
Kaca Ryben 25 % Tebal : 5 mm m² 1,3206 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% -
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
47 1 UNIT PASANG KUSEN ALUMUNIUM + KACA TYPE BV4
A Tenaga:
B Bahan:
Kusen Alumunium Warna 4" m¹ 2,2000 - -
Kaca Clear Tebal 6 mm M 0,2496 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% -
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
48 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 1
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud 76 m² 2,230 - -
Kusen Alumunium Warna 4" m¹ 1 3,1700 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,9350 - -
Aluminium Strip 10 mm m¹ 2,7600 - -
Kaca One Way Selver 5 mm m² 2,4892 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS set 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN set 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Finishing Cet Interior m² 4,4600 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
49 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 2
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud 76 m² 2,150 - -
Kusen Alumunium Warna 4" m¹ 1 3,1700 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,9350 - -
Aluminium Strip 10 mm m¹ 2,7600 - -
Kaca One Way Selver 5 mm m² 2,3892 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS set 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN set 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Finishing Cet Interior m² 4,3000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
50 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 3
A Tenaga:
-
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud 76 m² 10,675 - -
Finishing Cet Interior m² 2 1,3500 - -
C Peralatan:
- -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
51 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 4
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud 76 m² 8,470 - -
Kusen Alumunium Warna 4" m¹ 5,2000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,7430 - -
Aluminium Strip 10 mm m¹ 2,7600 - -
Box Penutup Sliding Rel, Multiplek 18 mm lapis Bestwood m² 0,4560 - -
Sliding Door SL 8901 D4 set 1,0000 - -
Handle PP 012 SSS set 1,0000 - -
Mortice lock MTS SLD DL 84100 SSS set 1,0000 - -
Cylider CYLDC DL 60mm SN set 1,0000 - -
Finishing Cet Interior m² 1 6,9400 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
52 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 5
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud 76 m² 3,790 - -
Kusen Alumunium Warna 4" m¹ 1 5,2250 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,9780 - -
Aluminium Strip 10 mm m¹ 2,7600 - -
Kaca One Wat Selver 5 mm m² 3,0703 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS set 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN set 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Finishing Cet Interior m² 7,5800 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
53 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN JENDELA KACA TYPE PT6
A Tenaga:
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud 76 m² 3,280 - -
Kusen Alumunium Warna 4" m¹ 1 1,8500 - -
Kaca One Way Silver 5 mm m² 3,9400 - -
Finishing Cet Interior m² 6,5600 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
54 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT7
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud 76 m² 1,050 - -
Kusen Alumunium Warna 4" m¹ 7,4000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,8564 - -
Kaca One Wat Selver 5 mm m² 0,5292 - -
Aluminium Strip 10 mm m¹ 2,7600 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Martice lock MTS IL DL 8585 SSS set 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN set 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Finishing Cet Interior m² 2,1000 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
55 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 8
A Tenaga:
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 6,475 - -
Finishing Cet Interior m² 1 2,9500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
56 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 9
A Tenaga:
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 5,600 - -
Finishing Cet Interior m² 1 1,2000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
57 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT10
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 1,840 - -
Kusen Alumunium Warna 4" m¹ 1 3,3000 - -
Daun Pintu Kaca Rangka Aluminium m² 1,7220 - -
Kaca One Way Silver 5 mm m² 2,5086 - -
Aluminium Strip 10 mm m¹ 2,7600 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Finishing Cet Interior m² 3,6800 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
58 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 11
A Tenaga:
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 7,000 - -
Finishing Cet Interior m² 1 4,0000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
59 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 12
A Tenaga:
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 6,388 - -
Finishing Cet Interior m² 1 2,7750 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
60 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT13
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 9,3900 - -
Kusen Alumunium Warna 4" m¹ 9,3000 - -
Daun Jendela Aluminium (Tanpa Kaca) m² 0,8424 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 1,8564 - -
Kaca One Wat Selver 5 mm m² 0,7840 - -
Aluminium Strip 10 mm m¹ 3,7500 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Friction Stay DELUXE FS HD T250-20″ psg 1,0000 - -
Casemet Handle CH 420 NA bh 1,0000 - -
Finishing Cet Interior m² 1 8,7800 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
61 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT14
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 9,9800 - -
Kusen Alumunium Warna 4" m¹ 5,6000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 2,6412 - -
Kaca Clear 6 mm m² 0,0864 - -
Aluminium Strip 10 mm m¹ 2,4900 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Escutcheon ESCN DOI SSS set 1,0000 - -
Flush Bolt Sek. FB 88 6″+12″SN set 1,0000 - -
Dust Proof Strike ESDN DOI SSS set 1,0000 - -
Finishing Cet Interior m² 1 9,9600 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
62 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 15
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 7,0250 - -
Kusen Alumunium Warna 4" m¹ 1 6,3000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 2,3352 - -
Kaca One Way Silver 5 mm m² 3,5504 - -
Aluminium Strip 10 mm m¹ 2,5200 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Finishing Cet Interior m² 1 4,0500 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
63 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 16
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 5,6425 - -
Kusen Alumunium Warna 4" m¹ 1 0,4000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 2,3352 - -
Kaca One Way Silver 5 mm m² 2,3128 - -
Aluminium Strip 10 mm m¹ 2,5200 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Finishing Cet Interior m² 1 1,2850 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
64 1 UNIT PASANG PARTISI DOUBLE GYPSUM + KUSEN DAN DAUN PINTU TYPE PT 17
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 5,7300 - -
Kusen Alumunium Warna 4" m¹ 1 0,4000 - -
Daun Pintu Rangka,Multiplek 18 mm Lapis Bestwood m² 2,3352 - -
Kaca One Way Silver 5 mm m² 2,3128 - -
Aluminium Strip 10 mm m¹ 2,5200 - -
Engsel EES DL 5X3 X3 MM 4 BB SSS psg 1,5000 - -
Hendle LHSR 0058 SSS ( SOLID) psg 1,0000 - -
Cylinder Sek. CYL DC DL 60 MM SN bh 1,0000 - -
Martice lock MTS IL DL 8585 SSS bh 1,0000 - -
Door Closer DCL 529 NHO NA set 1,0000 - -
Finishing Cet Interior m² 1 1,4600 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
65 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 18
A Tenaga:
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 10,150 - -
Finishing Cet Interior m² 2 0,3000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
66 1 UNIT PASANG PARTISI DOUBLE GYPSUM RANGKA METAL STUD TYPE PT 19
A Tenaga:
B Bahan:
Pasang Partisi Double Gypsum Rangka Metal Stoud m² 8,575 - -
Finishing Cet Interior m² 1 7,1500 - -
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
67 1 UNIT PASANG KUSEN CANAL C +PINTU TYPE PB (Ruang Genset)
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Besi canal C 100,50,20, 3,2 Kg 2 6,0267 - -
Rangka Pintu canal C 100,50,20, 3,2 Kg 1 7,2360 - -
Plat Baja Kg 2 1,7728 - -
Besi Angkur dia 19 Kg 7,1021 - -
Handle pintu/Tarikan pintu Psg 2,0000 - -
Engsel Pintu Besi Bh 2,0000 - -
Kunci Pintu Besi Bh 1,0000 - -
Pengelasan Cm 226,8000 - -
Finishing Cat Duko (Upah+Bahan) M² 8,2800 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
68 1 UNIT PASANG KUSEN CANAL C+PINTU TYPE P1 (Ruang Genset)
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Besi canal C 100,50,20, 3,2 Kg 2 2,5700 - -
Rangka Pintu canal C 100,50,20, 3,2 Kg 8,6180 - -
Plat Baja Kg 1 0,2816 - -
Besi Angkur dia 19 Kg 3,1565 - -
Handle pintu/Tarikan pintu Psg 1,0000 - -
Engsel Pintu Bh 1,0000 - -
Kunci Pintu Bh 1,0000 - -
Pengelasan Cm 119,7000 - -
Finishing Cat Duko (Upah+Bahan) M² 4,3700 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
69 1 UNIT PASANG KUSEN CANAL C TYPE BV1 (GENSET)
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Besi canal C 100,50,20, 3,2 m¹ 1 4,2333 - -
Besi Hollow 20 x 40 m¹ 9,9000 - -
Pengelasan Cm 216,0000 - -
Finishing Cat Duko (Upah+Bahan) M² 1,6200 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
70 1 UNIT PASANG KUSEN CANAL C TYPE BV2 (GENSET)
A Tenaga:
Upah Pasang 10 % dari (B) % 10% - -
B Bahan:
Kusen Besi canal C 100,50,20, 3,2 m¹ 8,9467 - -
Besi Hollow 20 x 40 m¹ 4,9500 - -
Pengelasan Cm 216,0000 - -
Finishing Cat Duko (Upah+Bahan) M² 0,9780 - -
C Peralatan:
Alat Bantu 2,5 % dari (B) % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
71 MEMASANG 1 M1 TREATMENT FINISH BESTWODD
A Tenaga:
Jasa Pasang % 30% - -
B Bahan:
Multiplek 12 mm lbr 0,3819 - -
Bestwood lbr 0,3472 - -
Profil jati Jabar btg 0,2500 - -
Lem Putih bks 0,2500 - -
Lem Kuning kg 0,5000 - -
Cat Ducco m2 0,7000 - -
Paku/skrup ls 1,0000 - -
Amplas halus/duco lbr 1,0000 - -
C Peralatan:
Accessories+Material Pendukung, 5% dari bahan % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
72 1 M 2 PASANG PELAPIS DINDING DENGAN MULTI, t = 12 mm LAPIS BESTWOOD+ACRYLIC t = 4 mm
A Tenaga:
Jasa Pasang 30 % dari bahan % 30% - -
B Bahan:
Multiplek, 12 mm, 1,20x2,40 lbr 0,3472 - -
Acrylic Warna Susu 1,22x2,44, tebal 4 mm m 2 0,158 - -
Sekrup Gypsum/GRC kg 0,110 - -
Bestwood m 2 0,3472 - -
Profil jati Jabar btg 0,2500 - -
Lem Kayu kg 0,350 - -
Lem Kuning kg 0,4500 - -
Cat Ducco m2 0,5000 - -
Amplas halus/duco lbr 4,0000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
73 MEMASANG 1 M2 BACKDROP FINISH BESTWODD
A Tenaga:
Jasa Pasang % 30% - -
B Bahan:
Multiplek 12 mm lbr 0,6900 - -
Bestwodd lbr 0,3472 - -
Kayu Kaso 5/7 Kelas II m3 0,0150 - -
Kawat stainless btg 1,0000 - -
Lis Jati Jabar Btg 0,7500 - -
Plat stainless btg 0,5000 - -
Lem Putih bks 0,2500 - -
Lem Kuning kg 0,4500 - -
Cat Ducco m2 0,5000 - -
Paku/skrup ls 1,0000 - -
Amplas lbr 4,0000 - -
C Peralatan:
Accessories+Material Pendukung, 5% dari bahan % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
74 MEMASANG 1 M2 MEJA STANDAR FINISH BESTWODD
A Tenaga:
Jasa Pasang % 30% - -
B Bahan:
Multiplek 12 mm lbr 2,7400 - -
Multiplek 6 mm lbr 0,6500 - -
Bestwodd lbr 2,7400 - -
Lis Jati Jabar btg 1,5000 - -
Lem Putih bks 0,5000 - -
Lem kuning kg 0,5000 - -
Rel Laci ps 1,0000 - -
Engsel Pintu ps 1,0000 - -
Tarikan bh 2,0000 - -
Paku/skrup ls 1,0000 - -
Amplas lbr 4,0000 - -
C Peralatan:
Accessories+Material Pendukung, 5% dari bahan % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
75 MEMASANG 1 M2 MEJA STANDAR FINISH BESTWODD
A Tenaga:
Jasa Pasang % 35% - -
B Bahan:
Multiplek 12 mm lbr 2,7400 - -
Multiplek 6 mm lbr 0,6500 - -
Bestwodd lbr 2,7400 - -
Lis Jati Jabar btg 3,0000 - -
Lem Putih bks 0,5000 - -
Lem kuning kg 0,5000 - -
Rel Laci ps 1,0000 - -
Engsel Pintu ps 1,0000 - -
Tarikan bh 2,0000 - -
Paku/skrup ls 1,0000 - -
Amplas lbr 4,0000 - -
C Peralatan:
Accessories+Material Pendukung, 5% dari bahan % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
76 MEMASANG 1 M2 MEJA CREDENZA FINISH BESTWODD
A Tenaga:
Jasa Pasang % 35% - -
B Bahan:
Multiplek 12 mm lbr 2,7400 - -
Multiplek 6 mm lbr 0,6500 - -
Bestwodd lbr 2,7400 - -
Lis Jati Jabar btg 3,0000 - -
Lem Putih bks 0,5000 - -
Lem kuning kg 0,5000 - -
Paku/skrup ls 1,0000 - -
Amplas lbr 4,0000 - -
C Peralatan:
Accessories+Material Pendukung, 5% dari bahan % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
76 MEMASANG 1 M2 STAGE FINIS VINIL
A Tenaga:
Jasa Pasang % 35% - -
B Bahan:
Multiplek 18 mm lbr 0,7986 - -
Lem Putih bks 0,5000 - -
Lem kuning kg 0,5000 - -
Paku/skrup ls 1,0000 - -
Amplas lbr 4,0000 - -
Vinil m2 1,0000 - -
C Peralatan:
Accessories+Material Pendukung, 5% dari bahan % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
77 MEMASANG 1 M1 SEKAT AUDIENCE (TINGGI 85 CM)
A Tenaga:
Jasa Pasang % 35% - -
B Bahan:
Multiplek 12 mm lbr 0,3400 - -
Bestwodd lbr 0,6800 - -
Rangka 4 / 6 Borneo Super m3 0,0350 - -
Cat Ducco m2 0,3000 - -
Lem Putih bks 0,2500 - -
Lem kuning kg 0,5000 - -
Profil jati Jabar btg 1,0000 - -
Paku/skrup ls 1,0000 - -
Amplas lbr 4,0000 - -
C Peralatan:
Accessories+Material Pendukung, 5% dari bahan % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
78 MEMASANG 1 M2 PLAFOND INTERIOR FINISH BESTWOOD
A Tenaga:
Jasa Pasang % 35% - -
B Bahan:
Multiplek 12 mm lbr 0,4100 - -
Bestood lbr 0,7200 - -
Borneo super 5/7 m3 0,0074 - -
Borneo super 4/6 m3 0,0050 - -
Kawat stainless btg 0,5000 - -
Lis Jati Jabar btg 1,0000 - -
Lem Putih bks 0,5000 - -
Lem kuning kg 0,5000 - -
Paku/skrup ls 1,0000 - -
Amplas lbr 3,0000 - -
C Peralatan:
Accessories+Material Pendukung, 5% dari bahan % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
79 MEMASANG 1 BUAH HURUP ACRYLIC GOLD UK. 12 CM
A Tenaga:
Jasa Pasang % 20% - -
B Bahan:
Hurup Timbul Arcylic Warna Gold cm 1 2,0000 - -
C Peralatan:
Accessories+Material Pendukung, 10% dari bahan % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
80 MEMASANG 1 BUAH HURUP ACRYLIC GOLD UK. 10 CM
A Tenaga:
Jasa Pasang % 20% - -
B Bahan:
Hurup Timbul Arcylic Warna Gold cm 1 0,0000 - -
C Peralatan:
Accessories+Material Pendukung, 10% dari bahan % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
81 MEMASANG 1 BUAH HURUP ACRYLIC PUTIH UK. 12 CM
A Tenaga:
Jasa Pasang % 20% - -
B Bahan:
Hurup Timbul Arcylic Putih cm 1 2,0000 - -
C Peralatan:
Accessories+Material Pendukung, 10% dari bahan % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
82 MEMASANG 1 BUAH HURUP ACRYLIC PUTIH UK. 10 CM
A Tenaga:
Jasa Pasang % 20% - -
B Bahan:
Hurup Timbul Arcylic Putih cm 1 0,0000 - -
C Peralatan:
Accessories+Material Pendukung, 10% dari bahan % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
83 MEMASANG 1 BUAH HURUP STAINLESS UK. 30 CM + LAMPU LED 6 WATT DAN ACCESSORIES
A Tenaga:
Jasa Pasang % 20% - -
B Bahan:
Hurup Timbul Stainlless cm 3 0,0000 - -
Lampu LED Strip 6 watt m 0,5000 - -
C Peralatan:
Accessories+Material Pendukung, 10% dari bahan % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
85 MEMASANG 1 BUAH HURUP STAINLESS UK. 12 CM
A Tenaga:
Jasa Pasang % 20% - -
B Bahan:
Hurup Timbul Stainlless cm 1 2,0000 - -
C Peralatan:
Accessories+Material Pendukung, 10% dari bahan % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
86 MEMASANG 1 BUAH HURUP STAINLESS UK. 10 CM
A Tenaga:
Jasa Pasang % 20% - -
B Bahan:
Hurup Timbul Stainlless cm 1 0,0000 - -
C Peralatan:
Accessories+Material Pendukung, 10% dari bahan % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
87 MEMASANG 1 BUAH HURUP STAINLESS UK. 4 CM
A Tenaga:
Jasa Pasang % 20% - -
B Bahan:
Hurup Timbul Stainlless cm 4,0000 - -
C Peralatan:
Accessories+Material Pendukung, 10% dari bahan % 10% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
VI PEKERJAAN PLAFOND
Ref. Produk, Gypsumboard: Knauf, Jayaboard, dan Elephant
Ref. Produk, GRC: Kalsiboard, Jayaboard, Elephant
Ref. Produk, PVC: Sekualitas Shunda Plafond
Ref. Produk, Compound: Aplus, Knauf, Jayaboard
1 1 M2 RANGKA PLAFOND, BESI HOLLOW 1X40X40X0,4 mm, MODUL 60X60, (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,350 - -
Tukang oh 0,350 - -
Kepala Tukang oh 0,035 - -
Mandor oh 0,018 - -
B Bahan:
Hollow Galvanis untuk Plafond 40x40mm, t = 0,4 mm m 1 4,000 - -
Accessories (Perkuatan, Penggantung, Las, dll), 100% dari Rangka % 100% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 1 M1 UP CEALLING PLAFOND GYPSUMBOARD, BESI HOLLOW 1X40X40X0,4 mm
A Tenaga:
Pekerja oh 0,350 - -
Tukang oh 0,350 - -
Kepala Tukang oh 0,035 - -
Mandor oh 0,018 - -
B Bahan:
Gypsumboard 120 x 240 t = 9 mm lbr 0,073 - -
Sekrup Gypsum/GRC kg 0,022 - -
Hollow Galvanis untuk Plafond 40x40mm, t = 0,4 mm m 1 2,400 - -
Accessories (Perkuatan, Penggantung, Las, dll), 100% dari Rangka % 100% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 1 M2 PENUTUP PLAFOND, GYPSUMBOARD, 120x240x9 mm (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,100 - -
Tukang oh 0,050 - -
Kepala Tukang oh 0,005 - -
Mandor oh 0,005 - -
B Bahan:
Gypsumboard 120 x 240 t = 9 mm lbr 0,364 - -
Sekrup Gypsum/GRC kg 0,110 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4 1 M2 PENUTUP PLAFOND, GRC, 120X240X4 mm, (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,100 - -
Tukang oh 0,050 - -
Kepala Tukang oh 0,005 - -
Mandor oh 0,005 - -
B Bahan:
GRC 1200x2400, t= 4 mm lbr 0,364 - -
Sekrup Gypsum/GRC kg 0,110 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5 1 M 2 PENUTUP PLAFOND PVC (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,100 - -
Tukang oh 0,050 - -
Kepala Tukang oh 0,005 - -
Mandor oh 0,005 - -
B Bahan:
Plafond PVC, t = 8 mm m 2 1,100 - -
Sekrup kg 0,110 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
6 1 M2 PENUTUP PLAFOND LAMBRISERING MULTI TEBAL 9 MM FINIS BESTWODD
A Tenaga:
Pekerja oh 0,800 - -
Tukang oh 0,800 - -
Kepala Tukang oh 0,080 - -
Mandor oh 0,040 - -
B Bahan:
Multiplek 9 mm m2 0,400 - -
Bestwodd lbr 0,4000 - -
Paku Triplek kg 0,050 - -
Lem Putih bks 0,0500 - -
Lem kuning kg 0,2000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7 1 M1 LIST PLAFOND PROFIL KAYU (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,050 - -
Tukang oh 0,050 - -
Kepala Tukang oh 0,005 - -
Mandor oh 0,003 - -
B Bahan:
List Profil Kayu m1 1,050 - -
Paku kg 0,010 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8 1 M 1 LIST PLAFOND PROFIL GYPSUM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,060 - -
Tukang oh 0,060 - -
Kepala Tukang oh 0,006 - -
Mandor oh 0,003 - -
B Bahan:
List Profil Gypsum m 1 1,050 - -
Tepung gypsum kg 0,150 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
VII PEKERJAAN ATAP
Ref. Produk, Rangka Atap Baja Ringan: Gyga Steel, SmartTruss, EKG
1 MEMASANG 1 M2 ATAP RANGKA BAJA RINGAN
A Tenaga:
Upah Pasang 5 % dari (B) % 5% - -
B Bahan:
Rangka Atap Baja Ringan m² 1,000 - -
Accesories / Peralatan 2.5 % % 2,5% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 MEMASANG 1 M2 ATAP GENTENG BITUMEN UK. 106 X 40 X 0,30 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0 ,2000 - -
Tukang oh 0 ,1000 - -
Kepala Tukang oh 0 ,0100 - -
Mandor oh 0 ,0010 - -
B Bahan:
Genteng Bitumen Monolayer 3 mm sek Onduline Uk 106 x 40 x 0.3 cm lbr 3 ,7420 - -
Paku/Srup bh 1 6,1500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 MEMASANG 1 M1 NOK BITUMEN MONOLAYER 3 MM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0 ,0840 - -
Tukang oh 0 ,1250 - -
Kepala Tukang oh 0 ,0130 - -
Mandor oh 0 ,0040 - -
B Bahan:
Nok/ Ridge Onduline Lbr 1 ,4380 - -
Paku/Srup bh 1 0,0000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
4 MEMASANG 1 M2 ALUMINIUM FOIL (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0 ,1500 - -
Tukang oh 0 ,0500 - -
Kepala Tukang oh 0 ,0050 - -
Mandor oh 0 ,0080 - -
B Bahan:
Aluminium Foil m 2 1 ,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5 MEMASANG 1 M1 PASANG LISPLANK UK TEBAL = 8 CM LEBAR 30 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,110 - -
Tukang oh 0,220 - -
Kepala Tukang oh 0,022 - -
Mandor oh 0,005 - -
B Bahan:
Lisplank GRC Woodplank T = 8 cm Lebar = 30 cm m 1 1,000 - -
Assesories 5 % % 5% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6 MEMASANG 1 M1 TALANG DATAR/JURAI SENG BJLS 30 LEBAR 90 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,110 - -
Tukang oh 0,220 - -
Kepala Tukang oh 0,022 - -
Mandor oh 0,005 - -
B Bahan:
Seng Plat BJLS 30 Lebar 90 cm m1 1,200 - -
Paku Skrup 1 - 2.5 cm kg 0,015 - -
Papan Kayu Kelas II m3 0,019 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
VIII PEKERJAAN PELAPIS LANTAI DAN DINDING
Ref. Produk, Pelapis Lantai dan Dinding Keramik: Roman
Ref. Produk, Pelapis Lantai dan Dinding Granite Tile: Homogeniusn Tile, Niro, dan Granito
Ref. Produk, Semen Instan: Mortar Utama (MU), Prime Mortar, dan Drymix
Ref. Produk, Alumunium Composite Panel: Alucomp, Maco, Seven
1 PEMASANGAN 1 M2 PELAPIS LANTAI, KERAMIK 20x20 (Analisa Permen PU No 28 2016 )
A Tenaga:
Pekerja oh 0,260 - -
Tukang oh 0,125 - -
Kepala Tukang oh 0,013 - -
Mandor oh 0,013 - -
B Bahan:
Keramik 20 x 20 cm bh 2 6,5000 - -
Portland Cement (1 zak = 50 kg) kg 10,400 - -
Pasir Pasang m 3 0,045 - -
Semen Warna kg 1,500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 PEMASANGAN 1 M2 PELAPIS LANTAI, KERAMIK 30x30 (Analisa Permen PU No 28 2016 )
A Tenaga:
Pekerja oh 0 ,260 - -
Tukang oh 0 ,130 - -
Kepala Tukang oh 0 ,013 - -
Mandor oh 0 ,013 - -
B Bahan:
Keramik 30 x 30 cm bh 1 1,870 - -
Portland Cement (1 zak = 50 kg) kg 1 0,000 - -
Pasir Pasang m 3 0 ,045 - -
Semen Warna kg 1 ,500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
3 PEMASANGAN 1 M2 PELAPIS LANTAI, GUIDING BLOCK 30x30 (Analisa Permen PU No 28 2016 )
A Tenaga:
Pekerja oh 0 ,260 - -
Tukang oh 0 ,130 - -
Kepala Tukang oh 0 ,013 - -
Mandor oh 0 ,013 - -
B Bahan:
Guiding Block 30 x 30 cm bh 1 1,870 - -
Portland Cement (1 zak = 50 kg) kg 1 0,000 - -
Pasir Pasang m 3 0 ,045 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4 1 M2 PELAPIS LANTAI, HOMOGENIUS TILE 60x60 POLISHED (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,240 - -
Tukang oh 0,120 - -
Kepala Tukang oh 0,012 - -
Mandor oh 0,012 - -
B Bahan:
Homogenius Tile bh 3,1000 - -
Portland Cement (1 zak = 50 kg) kg 9,800 - -
Pasir Pasang m 3 0,045 - -
Semen Warna kg 1,300 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5 1 M2 PELAPIS DINDING, HOMOGENIUS TILE 30x60 POLISHED (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,620 - -
Tukang oh 0,350 - -
Kepala Tukang oh 0,035 - -
Mandor oh 0,030 - -
B Bahan:
Homogenius Tile 30X60 Polished bh 6,000 - -
Portland Cement (1 zak = 50 kg) kg 9,300 - -
Pasir Pasang m 3 0,018 - -
Semen Warna kg 1,940 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6 1 M1 PLINT HOMOGENIUS TILE UKURAN 10 CM X 60 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0 ,090 - -
Tukang oh 0 ,090 - -
Kepala Tukang oh 0 ,035 - -
Mandor oh 0 ,005 - -
B Bahan:
Plint Granit Tile 10 x 60 cm bh 1,667 - -
Portland Cement (1 zak = 50 kg) kg 1,114 - -
Pasir Pasang m 3 0,003 - -
Semen Warna kg 0,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7 1 M1 PLINT SRAIR NOZING 10 CM X 60 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0 ,090 - -
Tukang oh 0 ,090 - -
Kepala Tukang oh 0 ,009 - -
Mandor oh 0 ,005 - -
B Bahan:
Step Nozing Granit Tile 10 x 60 cm bh 1,700 - -
Portland Cement (1 zak = 50 kg) kg 1,114 - -
Pasir Pasang m 3 0,003 - -
Semen Warna kg 0,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
8 1 M2 FLOOR HARDENER (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,120 - -
Tukang oh 0,120 - -
Kepala Tukang oh 0,012 - -
Mandor oh 0,006 - -
B Bahan:
Semen Instan Floor hardener @ 25 kg kg 5,000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9 1 M2 PASANGAN BATU ANDESIT 20 x 40 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,700 - -
Tukang oh 0,350 - -
Kepala Tukang oh 0,035 - -
Mandor oh 0,035 - -
B Bahan:
Batu Andesit 20x40 m 2 1,100 - -
Portland Cement (1 zak = 50 kg) kg 11,750 - -
Pasir Pasang m 3 0,035 - -
Coating m 2 1,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10 1 M2 PASANGAN BATU ANDESIT SUSUN SIRIH 3 x 30 CM (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,700 - -
Tukang oh 0,350 - -
Kepala Tukang oh 0,035 - -
Mandor oh 0,035 - -
B Bahan:
Batu Andesit 20x40 m 2 1,100 - -
Portland Cement (1 zak = 50 kg) kg 11,750 - -
Pasir Pasang m 3 0,035 - -
Coating m 2 1,100 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11 1 M2 PASANGAN BATU SIKAT (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0 ,250 - -
Tukang oh 0 ,500 - -
Kepala Tukang oh 0 ,050 - -
Mandor oh 0 ,025 - -
B Bahan:
Batu Sikat kg 20,000 - -
Portland Cement (1 zak = 50 kg) kg 15,000 - -
Pasir Pasang m 3 0,080 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12 1 M 2 PASANGAN LAPISAN ALUMUNIUM COMPOSIT PANEL+RANGKA HOLLOW GALVANIS 40X40
A Tenaga:
Pekerja oh 0,150 - -
Tukang oh 0,500 - -
Kepala Tukang oh 0,050 - -
Mandor oh 0,008 - -
B Bahan:
Hollow Galvanis 40x40mm, t = 2 mm m 1 5,750 - -
Perlengkapan 35% dari Rangka % 35% - -
Ram Shet 12 cm s/d 20 cm bh 1,000 - -
Paku Ripet bh 8,000 - -
Paku Sekrup 3" bh 6,000 - -
Sealant m 1 4,200 - -
Alumunium Composite Panel m 2 1,050 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
13 1 M2 PASANGAN LAPISAN ALUMUNIUM COMPOSIT PANEL+RANGKA HOLLOW GALVANIS 40X40 (Atas/Atap)
A Tenaga:
Pekerja oh 0,150 - -
Tukang oh 0,500 - -
Kepala Tukang oh 0,050 - -
Mandor oh 0,008 - -
B Bahan:
Hollow Galvanis 40x40mm, t = 2 mm m1 5,750 - -
Besi BSP Dia 1.5 ( Dibending) m1 2,500 - -
Perlengkapan 35% dari Rangka % 35% -
Ram Shet 12 cm s/d 20 cm bh 1,000 - -
Paku Ripet bh 8,000 - -
Paku Sekrup 3" bh 6,000 - -
Sealant m1 4,200 - -
Alumunium Composite Panel m2 1,050 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
14 1 M2 PASANG RANGKA DINDING PARTISI, HOLLOW 40X40X2, MODUL 60X120, (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 0,250 - -
Tukang oh 0,250 - -
Kepala Tukang oh 0,025 - -
Mandor oh 0,013 - -
B Bahan:
Hollow Galvanis 40x40mm, t = 2 mm m 1 3,500 - -
GRC Tebal 8 mm m2 0,683 - -
Accessories (Perkuatan, Las, dll), 100% dari Rangka % 100% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
15 1 M 2 PASANG PELAPIS DINDING DENGAN TEAKWOOD, t = 4 mm LAPIS HPL
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,010 - -
B Bahan:
Teakwood, 4 mm, 1,20x2,40 lbr 0,364 - -
Sekrup Gypsum/GRC kg 0,110 - -
HPL, 1,20x2,40 m 2 1 ,05 - -
Lem Kayu kg 0,350 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
16 1 M 2 PASANG PELAPIS DINDING PARTISI GRC T = 8 CM + RANGKA METAL STUD
A Tenaga:
Pekerja oh 0,250 - -
Tukang oh 0,250 - -
Kepala Tukang oh 0,025 - -
Mandor oh 0,013 - -
B Bahan:
Rangka Metal Stud M2 1,0000 - -
GRC / Calsiboard t = 8 mm Lbr 0,6940 - -
Plaster Board Ls 1,0000 - -
Accessories (Perkuatan, Las, dll), 100% dari Rangka % 5% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
17 1 M 2 PASANG PELAPIS DINDING DENGAN TEAKWOOD, t = 4 mm LAPIS HPL+ACRYLIC t = 4 mm
A Tenaga:
Pekerja oh 0,300 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,010 - -
B Bahan:
Teakwood, 4 mm, 1,20x2,40 lbr 0,364 - -
Acrylic Warna Susu 1,22x2,44, tebal 4 mm m 2 0,158 - -
Sekrup Gypsum/GRC kg 0,110 - -
HPL, 1,20x2,40 m 2 1 ,05 - -
Lem Kayu kg 0,350 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
18 1 M 2 PASANG PELAPIS DINDING DENGAN WALPAPER (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,350 - -
Tukang oh 0,175 - -
Kepala Tukang oh 0,017 - -
Mandor oh 0,002 - -
B Bahan:
Wallpaper Bergambar m 2 2 ,20 - -
Lem Kayu kg 0,250 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
19 1 M 2 PASANG PELAPIS LANTAI DENGAN MULTIPLEK, t = 18 mm LAPIS BESTWOOD
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 3,000 - -
Kepala Tukang oh 0,300 - -
Mandor oh 0,050 - -
B Bahan:
Multiplek, 18 mm, 1,20x2,40 lbr 1,084 - -
Paku 1 - 2.5″ kg 0,030 - -
Lem Kayu kg 0,800 - -
Bestwood lbr 0,110 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
IX PEKERJAAN SANITARY
1 PEMASANGAN CLOSET TYPE CW 632J/SW6372JP DUDUK/MONOBLOCK (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 3,300 - -
Tukang oh 1,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,160 - -
B Bahan:
Closet Dududk Type CW 632J/SW 6372 JP Unit 1 ,00 - -
Perlengkapan % 6% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 PEMASANGAN CLOSET TYPE C704L/SW 784 JF DUDUK/MONOBLOCK (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 3,300 - -
Tukang oh 1,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,160 - -
B Bahan:
Closet Dududk Type C704L/SW 784 JF Unit 1 ,00 - -
Perlengkapan % 6% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 PEMASANGAN CLOSETTYPE CW826-SW826JP DUDUK/MONOBLOCK (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 3,300 - -
Tukang oh 1,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,160 - -
B Bahan:
Closet Dududk Type CW826J-SW826JP Unit 1 ,00 - -
Perlengkapan % 6% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4 PEMASANGAN CLOSET JONGKOK(Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 1,500 - -
Kepala Tukang oh 0,150 - -
Mandor oh 0,160 - -
B Bahan:
Closet Jongkok TYPE CE 9 Unit 1 ,00 - -
Portland Cement (1 zak = 50 kg) kg 6,000 - -
Pasir Pasang m 3 0,010 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
5 PEMASANGAN WASTAFEL TYPE 521 VIA (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 1,000 - -
Kepala Tukang oh 0,100 - -
Mandor oh 0,050 - -
B Bahan:
Washtafel L 521 VIA Unit 1 ,00 - -
Portland Cement (1 zak = 50 kg) kg 6,000 - -
Pasir Pasang m 3 0,010 - -
Perlengkapan % 30% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6 PEMASANGAN WASTAFEL TYPE LW 240 CJ (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 1,000 - -
Kepala Tukang oh 0,100 - -
Mandor oh 0,050 - -
B Bahan:
Washtafel LW 240CJ Ex Toto Unit 1 ,00 - -
Portland Cement (1 zak = 50 kg) kg 6,000 - -
Pasir Pasang m 3 0,010 - -
Perlengkapan % 30% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7 PEMASANGAN WASTAFEL TYPE 649 CJ (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 1,000 - -
Kepala Tukang oh 0,100 - -
Mandor oh 0,050 - -
B Bahan:
Washtafel LW 649 CJ Ex Toto Unit 1 ,00 - -
Portland Cement (1 zak = 50 kg) kg 6,000 - -
Pasir Pasang m 3 0,010 - -
Perlengkapan % 30% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8 PEMASANGAN WASTAFEL LW 248 JT (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 1,000 - -
Kepala Tukang oh 0,100 - -
Mandor oh 0,050 - -
B Bahan:
Washtafel LW 248 JT Ex Toto Unit 1 ,00 - -
Portland Cement (1 zak = 50 kg) kg 6,000 - -
Pasir Pasang m 3 0,010 - -
Perlengkapan % 30% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9 PEMASANGAN LAVATORY FAUCET
A Tenaga:
Upah Pasang 15% dari (B) % 10% - -
B Bahan:
Lavatory Faucet Type TX 108 LJ Unit 1,000 - -
Solatip bh 0,025 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10 PEMASANGAN KITCHEN SINK TYPE STAINLES STEEL (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 0,030 - -
Tukang oh 0,300 - -
Kepala Tukang oh 0,030 - -
Mandor oh 0,015 - -
B Bahan:
Bak Sink 1 lubang Stainless Steel dalam bak 21 cm Unit 1 ,00 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
11 PEMASANGAN JET WASHER (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 0,010 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,005 - -
B Bahan:
Jet Washer Unit 1 ,00 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12 PEMASANGAN HAND SHOWER/SHOWER SPAY (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 0,010 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,005 - -
B Bahan:
Hand Shower/Shower Spay Type THX 20 NBW Unit 1 ,00 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
13 PEMASANGAN SHOWER MIXER (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 0,010 - -
Tukang oh 0,400 - -
Kepala Tukang oh 0,040 - -
Mandor oh 0,005 - -
B Bahan:
Shower Mixer TX 433 SJN Unit 1 ,00 - -
Solatip bh 0,025 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
14 PEMASANGAN FIXED SHOWER HEAD (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 0,010 - -
Tukang oh 0,400 - -
Kepala Tukang oh 0,040 - -
Mandor oh 0,005 - -
B Bahan:
Fixed Shower Head Type TX 465 SEN Unit 1 ,00 - -
Solatip bh 0,025 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
15 PEMASANGAN FLOOR DRAIN (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 0,010 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,005 - -
B Bahan:
Floor Drain TX 1 EBV1 Unit 1 ,00 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
16 PEMASANGAN ROOF DRAIN (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 0,010 - -
Tukang oh 0,100 - -
Kepala Tukang oh 0,010 - -
Mandor oh 0,005 - -
B Bahan:
Floor Drain Unit 1 ,00 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
17 PEMASANGAN STOP KERAN
A Tenaga:
Upah Pasang 10% dari (B) % 10% - -
B Bahan:
Stop Kran T 23 B13 Unit 1,000 - -
Solatip bh 0,025 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
18 PEMASANGAN KRAN KICHEN SINK
A Tenaga:
Upah Pasang 10% dari (B) % 10% - -
B Bahan:
Kran Kitchen Sink TOTO Type TX605 KES Unit 1,000 - -
Solatip bh 0,025 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
19 PEMASANGAN PAPER HOLDER
A Tenaga:
Upah Pasang 10% dari (B) % 10% - -
B Bahan:
Paper Holder Type TX 720 ACRb Unit 1,000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
20 PEMASANGAN ROBE HOOK
A Tenaga:
Upah Pasang 10% dari (B) % 10% - -
B Bahan:
Robe Hook Type Unit 1,000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
21 PEMASANGAN URINOIR (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 1,000 - -
Kepala Tukang oh 0,100 - -
Mandor oh 0,050 - -
B Bahan:
Urinal TYPE 370 M Unit 1 ,00 - -
Portland Cement (1 zak = 50 kg) kg 6,000 - -
Pasir Pasang m 3 0,010 - -
Perlengkapan % 30% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
22 PEMASANGAN PARTISI URINOIR (Analisa Permen PU No 28,2016)
A Tenaga:
Pekerja oh 1,000 - -
Tukang oh 1,000 - -
Kepala Tukang oh 0,100 - -
Mandor oh 0,050 - -
B Bahan:
Urinal Divider TYPE A 100 Unit 1 ,00 - -
Perlengkapan % 6% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
X PEKERJAAN FINISING
Ref. Produk, Cat Dinding Interior: Dulux ICI, Mowilex, dan Jotun
Ref. Cat Dinding Exterior: Dulux ICI, Mowilex, dan Jotun
Ref. Produk, Cat Plafond: Dulux ICI, Mowilex, dan Jotun
Ref. Produk, Cat Kayu/Besi: Seiv, ICI, Avian
Ref. Produk, Water Proofing: Master Guard, SIKA, dan FOSROC
1 1 M2 PENGECATAN DINDING INTERIOR (2x Cat Penutup) (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,020 - -
Tukang oh 0 ,063 - -
Kepala Tukang oh 0 ,0063 - -
Mandor oh 0,0030 - -
B Bahan:
Plamir kg 0,100 - -
Ampelas lbr 0,150 - -
Cat Dasar kg 0,100 - -
Cat Dinding Interior kg 0,260 - -
C Peralatan:
Roll cat bh 0,010 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2 1 M2 PENGECATAN DINDING EXTERIOR (2x Cat Penutup) (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,020 - -
Tukang oh 0 ,063 - -
Kepala Tukang oh 0 ,006 - -
Mandor oh 0,003 - -
B Bahan:
Plamir kg 0,100 - -
Ampelas lbr 0,150 - -
Cat Dasar kg 0,100 - -
Cat Dinding Exterior kg 0,260 - -
C Peralatan:
Roll Cat bh 0,010 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 1 M 2 PENGECATAN PLAFOND, 2X LAPIS CAT PENUTUP (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja oh 0,030 - -
Tukang oh 0 ,075 - -
Kepala Tukang oh 0 ,008 - -
Mandor oh 0,003 - -
B Bahan:
Plamir kg 0,120 - -
Ampelas lbr 0,150 - -
Cat Dasar kg 0,100 - -
Cat Dinding Interior kg 0,280 - -
C Peralatan:
Roll Cat bh 0,010 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4 1 M2 PENGECATAN BESI/KAYU (2 Lapis Cat Penutup) (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja Oh 0,070 - -
Tukang Oh 0 ,009 - -
Kepala Tukang Oh 0 ,006 - -
Mandor Oh 0,003 - -
B Bahan:
Cat Menie kg 0,200 - -
Plamir kg 0,150 - -
Cat Dasar kg 0,170 - -
Cat kayu/besi kg 0,260 - -
Terpentin/Pengencer kg 0,030 - -
Ampelas lbr 0,200 - -
C Peralatan:
Kwas bh 0,010 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
5 1 M2 PENGECATAN WATERPROOFING EMULSEN (2 Lapis Cat Penutup) (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja Oh 0,020 - -
Tukang Oh 0 ,200 - -
Kepala Tukang Oh 0 ,020 - -
Mandor Oh 0,010 - -
B Bahan:
Waterproofing Emulsen kg 0,500 - -
Ampelas kg 0,500 - -
C Peralatan:
Kwas 3" bh 0,050 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6 1 M 2 WATER PROOFING MEMBRANCE(Analisa Permen PU No 28,2016 )
A Tenaga:
Upah Pasang 15% dari (B) % 15% - -
B Bahan:
Water Proofing Membrance m 2 1,100 - -
C Peralatan:
Alat Bantu 1% dari (B) % 1% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% -
F Jumlah (D+E) -
G Dibulatkan (F) -
7 1 M2 PLITURAN DENGAN PLITUR MELAMIK (Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja Oh 0,200 - -
Tukang Oh 1 ,200 - -
Kepala Tukang Oh 0 ,120 - -
Mandor Oh 0,010 - -
B Bahan:
Wood Filler kg 0,150 - -
Wood Stain kg 0,150 - -
Melamin Sending Siller MSS 123 kg 0,150 - -
ML 131 Clear Danagloss kg 0,240 - -
Tiner kg 0,200 - -
Ampelas lbr 0,600 - -
C Peralatan:
Kwas bh 0,500 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8 1 M2 PLITURAN DENGAN DUCO(Analisa Permen PU No 28,2016 )
A Tenaga:
Pekerja Oh 0 ,3000 - -
Tukang Oh 0 ,7500 - -
Kepala Tukang Oh 0 ,0750 - -
Mandor Oh 0 ,0500 - -
B Bahan:
Cat Nipe kg 0 ,5000 - -
Thiner ltr 0 ,8500 - -
Surpricer kg 0 ,3500 - -
Dempul plastic kg 0 ,6000 - -
Amplas duco lbr 3 ,0000 - -
Scrap / kape bh 0 ,2500 - -
C Peralatan:
Kwas bh 0 ,5000 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
XI PEKERJAAN LAIN-LAIN
1 1 CM PENGELASAN DENGAN LISTRIK
A Tenaga:
Pekerja oh 0,0040 - -
Tukang oh 0,0020 - -
Kepala Tukang oh 0,0002 - -
Mandor oh 0,0002 - -
B Bahan:
Kawat las listrik kg 0,0400 - -
Solar Liter 0,0300 - -
Minyak pelumas Liter 0,0040 - -
C Peralatan:
Sewa alat Jam 0,017 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
2 MEMASANG 1 UNIT KUSEN, DAUN PINTU PLAT BAJA RUANG POMPA (209 X 200) CM, PD.1
A Tenaga:
Jasa Pasang % 10% - -
B Bahan:
Kusen Besi canal C 100,50,20, 3,2 Kg 2 4,7660 - -
Rangka Pintu canal C 60,30,10, 1,2 Kg 1 9,5920 - -
Plat besi 2 mm 2 Lapis Kg 129,7222 - -
Besi Angkur dia 19 Kg 1 9,6240 - -
Handle pintu/Tarikan pintu Psg 2,0000 - -
Engsel Pintu Bh 6,0000 - -
Kunci Pintu Bh 1,0000 - -
Pengelasan Cm 636,0000 - -
Finishing Cat (Upah+Bahan) M² 9,4800 - -
C Peralatan:
Alat Bantu % 3% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3 MEMASANG 1 UNIT KUSEN, DAUN PINTU PLAT BAJA RUANG POMPA (89 X 200) CM ( P.1 )
A Tenaga:
Jasa Pasang % 10% - -
B Bahan:
Kusen Besi canal C 100,50,20, 3,2 Kg 1 9,9267 - -
Rangka Pintu canal C 60,30,10, 1,2 Kg 7,0618 - -
Plat besi 2 mm 2 Lapis Kg 5 0,2755 - -
Besi Angkur dia 19 Kg 9,8120 - -
Handle pintu/Tarikan pintu Psg 1,0000 - -
Engsel Pintu Bh 3,0000 - -
Kunci Pintu Bh 1,0000 - -
Pengelasan Cm 318,0000 - -
Finishing Cat (Upah+Bahan) M² 5,1200 - -
C Peralatan:
Alat Bantu % 3% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4 MEMBUAT 1 Unit BV1 RUANG POMPA
A Tenaga:
Jasa Pasang % 10% - -
B Bahan:
Kusen Besi canal C 100,50,20, 3,2 Kg 4 1,4800 - -
Besi Hollow 20/40 m1 1 8,7500 - -
Besi Angkur dia 19 Kg 9,8120 - -
Pengelasan Cm 175,0000 - -
Finishing Cat (Upah+Bahan) M² 2,2000 - -
C Peralatan:
Alat Bantu % 3% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5 1 UNIT PASANG PAGAR BESI ULIR D 32 PANJANG 3.7 M
A Tenaga:
Jasa Pasang % 10% - -
B Bahan:
DinaBolt dia.12 mm bh 1 6,0000 - -
Pipa Besi Ulir D 19 kg 6 5,6735 - -
Plat Besi 5 mm kg 2 4,3750 - -
Pengelasan cv 360,0000 - -
Finishing Cat m2 1,7369 - -
C Peralatan:
Alat Bantu % 3% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6 1 M1 HOLLOW BAJA 75X75X3,2 MM
A Tenaga:
Pekerja oh 0,027 - -
Tukang oh 0,045 - -
Kepala Tukang oh 0,005 - -
Mandor oh 0,001 - -
B Bahan:
Hollow Baja 75x75mm, t = 3,2 mm m 1 1,050 - -
Perlengkapan 5% dari Bahan % 5% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
7 1 M 1 PASANG RAILLING BALKON DENGAN KACA 8 mm
A Tenaga:
B Bahan:
Pipa Stainless Steel Ø2", t = 3,90 mm m 1 1,050 - -
Pipa Stainless Steel Ø1" t = 3,65 mm m 1 0,504 - -
Plat Baja, t = 10 mm kg 25,484 - -
Pengecatan Baja m 2 0,630 - -
Kaca Polos 8 mm m 2 0,998 - -
Sealant m 1 1,050 - -
Accessories+Material Pendukung, 5% dari bahan % 5% - -
C Peralatan: -
Alat Bantu 2,5% dari bahan % 2,5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8 1 M 1 PASANG RAILLING TANGGA DENGAN PIPA STAINLESS + HANDRAILL SOLIDWOOD
A Tenaga:
Upah Pasang Pabrikasi Railling Tangga % 30% - -
B Bahan:
Plat Dudukan Tiang Railling dan Handraill Solid Wood kg 1 2,1354 - -
DinaBolt dia.12 mm bh 4,0000 - -
Pipa Tiang Stainlesstell 2.5" btg 0,1833 - -
Pipa Tiang Stainlesstell 2.0" btg 0,0333 - -
Pipa Stainlesstell 1.5" btg 0,8750 - -
Railling Pipa Atas Kayu Solid Wood 5/10 btg 0,2750 - -
Cet Duko m2 0,7700 - -
Accessories+Material Pendukung, 5% dari bahan % 5% - -
C Peralatan: -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9 1 M 1 PASANG RAILLING RAMP DENGAN PIPA STAINLESS
A Tenaga:
Upah Pasang Pabrikasi Railling Tangga % 30% - -
B Bahan:
Plat Dudukan Tiang Railling kg 8,0903 - -
DinaBolt dia.12 mm bh 4,0000 - -
Pipa Tiang Stainlesstell 2.5" btg 0,1833 - -
Pipa Stainlesstell 1.5" btg 0,8750 - -
Railling Pipa Atas Stainlesstell dia. 2.5" btg 0,1833 - -
Accessories+Material Pendukung, 5% dari bahan % 5% - -
C Peralatan: -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10 1 M 1 PASANG RAILLING BALKON KACA TEMPERED 10 MM DENGAN PIPA STAINLESS
A Tenaga:
Upah Pasang Pabrikasi Railling Tangga % 30% - -
B Bahan:
Plat Dudukan Tiang Railling kg 0,5000 - -
DinaBolt dia.12 mm bh 4,0000 - -
Pipa Hand Stainlesstell Dia 2,5" btg 0,1667 - -
Pipa Tiang Kotak Stainlesstell 4/4 cm btg 0,4667 - -
Still Plat Staenles btg 0,4833 - -
Pen Stainlees Dia 20 mm bh 4,0000 - -
Kaca Bening 10 mm m2 0,4560 - -
Sanblas m2 0,4560 - -
Accessories+Material Pendukung, 5% dari bahan % 10% - -
C Peralatan: -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11 1 M1 PASANG HAND RAILLING STAINLESS STEEL Ø 2"
A Tenaga:
Pekerja oh 0,108 - -
Tukang oh 0,180 - -
Kepala Tukang oh 0,018 - -
Mandor oh 0,005 - -
B Bahan:
Pipa Stainless Steel Ø2", t = 3,90 mm m 1 1,200 - -
Perlengkapan 35% dari Bahan % 35% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
12 1 M1 PASANG HAND RAILLING STAINLESS STEEL 40/60 MM
A Tenaga:
Pekerja oh 0,108 - -
Tukang oh 0,180 - -
Kepala Tukang oh 0,018 - -
Mandor oh 0,005 - -
B Bahan:
Pipa Stainless Steel 40/60, t = 3,90 mm m 1 1,200 - -
Perlengkapan 35% dari Bahan % 35% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
13 1 M RANGKA TANGGA LADDER BESI , MODUL 1000X550
A Tenaga:
Pekerja oh 0,350 - -
Tukang oh 0,350 - -
Kepala Tukang oh 0,035 - -
Mandor oh 0,018 - -
B Bahan:
Besi Pipa BSP 2" Thk 1,2 mm btg 0,333 - -
Besi Pipa BSP 1, 1/2" Thk 3 mm btg 0,333 - -
Plat Besi dudukan kg 1,625 - -
DinaBolt dia.12 mm bh 16,000 - -
Accessories (Perkuatan, Penggantung, Las, dll), 20% dari Rangka % 25% - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
14 LS PENYEDIAAN K3
A Tenaga:
B Bahan:
Helm project Pekerja Bh 50,00 - -
Helm project Direksi Bh 10,00 - -
Bodyharness Bh 30,00 - -
Safetyshoes Pekerja Bh 50,00 - -
Safetyshoes Direksi Sek. Kings Bh 10,00 - -
Safetybelt Bh 30,00 - -
Jaring Pengaman Set 1,00 - -
Marka (Tambang, Besi pembatas, Sign) Set 1,00 - -
C Peralatan:
D Jumlah (A+B+C) - -
E Over Head & Profit, 10% x D
F Jumlah (D+E) -
G Dibulatkan (F) -
15 1 M2 PASANG PENCEGAHAN BAHAYA ANTI RAYAP/TERMITE CONTROL
A Tenaga:
Jasa Pasang % 10% - -
B Bahan:
Bahan Anti Rayap sekualitas Fumida ltr 1,050 - -
C Peralatan:
Alat Bantu/Perlengkapan pendukung Lainnya % 5% - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 10,00% x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6=(4 x 5)
1 1 Unit MDP - PA Rp -
Bahan:
- Box panel 80x120cm unit 1 ,000 Rp - Rp -
- MCCB 200A 3P/36Ka buah 2 ,000 Rp - Rp -
- MCCB 160A 3P/35Ka buah 1 ,000 Rp - Rp -
- MCB 10A 3P/10Ka buah 5 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 2 ,000 Rp - Rp -
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di
- lot 1 ,000 Rp - Rp -
gambar, Pilot Lamp, Kabel Control, dan aksesoris lain sesuai
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
1 1 Unit SDP-1 Rp -
Bahan:
- Box panel 80x120cm unit 1 ,000 Rp - Rp -
- MCCB 200A 3P/36Ka buah 2 ,000 Rp - Rp -
- MCCB 100A 3P/25Ka buah 1 ,000 Rp - Rp -
- MCB 35A 3P/16Ka buah 1 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 1 ,000 Rp - Rp -
- MCB 25A 3P/10Ka buah 3 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
2 1 Unit SDP-2 Rp -
Bahan:
- Box panel 80x120cm unit 1 ,000 Rp - Rp -
- MCCB 200A 3P/36Ka buah 1 ,000 Rp - Rp -
- MCB 10A 3P/10Ka buah 2 ,000 Rp - Rp -
- MCB 20A 3P/10Ka buah 1 ,000 Rp - Rp -
- MCCB 50A 3P/18Ka buah 1 ,000 Rp - Rp -
- MCB 25A 3P/10Ka buah 4 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
3 1 Unit PP-PL Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 16A 1P/10Ka buah 1 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 8 ,000 Rp - Rp -
- MCB 2A 1P/6Ka buah 6 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
4 1 Unit PP-AB Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 10A 3P/10Ka buah 1 ,000 Rp - Rp -
- MCB 10A 1P/6Ka buah 6 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 1 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
5 1 Unit LP-1 Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCCB 16A 3P/10Ka buah 1 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 15,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
6 1 Unit PP-PD Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 25A 3P/10Ka buah 1 ,000 Rp - Rp -
- MCB 16A 1P/10Ka buah 4 ,000 Rp - Rp -
- MCB 10A 1P/6Ka buah 3 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 6 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
7 1 Unit PP-AC.1 Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 35A 3P/16Ka buah 1 ,000 Rp - Rp -
- MCB 10A 1P/6Ka buah 9 ,000 Rp - Rp -
- MCB 16A 1P/10Ka buah 3 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 7 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
8 1 Unit LP-2 Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 10A 3P/10Ka buah 1 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 12,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
9 1 Unit PP-2 Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 20A 3P/10Ka buah 1 ,000 Rp - Rp -
- MCB 16A 1P/10Ka buah 12,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
10 1 Unit PP-AC.2 Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 50A 3P/16Ka buah 1 ,000 Rp - Rp -
- MCB 16A 1P/10Ka buah 8 ,000 Rp - Rp -
- MCB 10A 1P/6Ka buah 7 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 10,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Analisa Harga Satuan Pek. Elektrikal - page 2 of 20
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
11 1 Unit PP-ELEKTRONIK Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 25A 3P/10Ka buah 1 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 8 ,000 Rp - Rp -
- MCB 20A 3P/10Ka buah 1 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
12 1 Unit PP-BP Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 16A 1P/10Ka buah 1 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 4 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
13 1 Unit PP-IPAL Rp -
Bahan:
- Box panel 40x60 cm unit 1 ,000 Rp - Rp -
- MCB 6A 1P/6Ka buah 6 ,000 Rp - Rp -
- Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Pilloott Lamp , K a b e l 1 C,o0n0t0rol, Rdpa n a k s e s o r i s l a i-n sesuRapi g a m b a r ) -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Upah Wiring dan Pemasangan lot 1 ,000 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
14 1 Titik Pemasangan instalasi penerangan Rp -
Bahan:
1 NYM 3x2,5 mm² meter 12,000 Rp - Rp -
2 Pipa Conduit 20 mm² meter 13,000 Rp - Rp -
3 Klem pipa conduit 20 mm² buah 6 ,500 Rp - Rp -
4 Kabel ties buah 6 ,500 Rp - Rp -
5 T dus buah 1 ,000 Rp - Rp -
6 Isolasi roll 0 ,333 Rp - Rp -
7 Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,333 Rp - Rp -
b. Tukang oh 0 ,333 Rp - Rp -
c. Kepala Tukang oh 0 ,167 Rp - Rp -
d. Mandor oh 0 ,033 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
15 1 Titik Pemasangan instalasi daya stop kontak 1 Phasa Rp -
Bahan:
a. NYM 3x2,5 mm² meter 14,000 Rp - Rp -
b. Pipa Conduit 20 mm² meter 13,000 Rp - Rp -
c. Klem pipa conduit 20 mm² buah 6 ,500 Rp - Rp -
d. Kabel ties buah 6 ,500 Rp - Rp -
e. T dus buah 1 ,000 Rp - Rp -
f. Isolasi roll 0 ,333 Rp - Rp -
g. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,333 Rp - Rp -
b. Tukang oh 0 ,333 Rp - Rp -
c. Kepala Tukang oh 0 ,167 Rp - Rp -
d. Mandor oh 0 ,033 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 3 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
16 m' Pipa konduit penerangan Rp -
Bahan:
1 Pipa Conduit 20 mm² meter 1 ,000 Rp - Rp -
2 Klem pipa conduit 20 mm² buah 1 ,000 Rp - Rp -
3 Kabel ties buah 1 ,000 Rp - Rp -
4 T dus buah - Rp - Rp -
5 Isolasi roll 0 ,067 Rp - Rp -
6 Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,067 Rp - Rp -
b. Tukang oh 0 ,067 Rp - Rp -
c. Kepala Tukang oh 0 ,033 Rp - Rp -
d. Mandor oh 0 ,007 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
17 m' Pipa konduit stop kontak Rp -
Bahan:
a. Pipa Conduit 20 mm² meter 1 ,000 Rp - Rp -
b. Klem pipa conduit 20 mm² buah 1 ,000 Rp - Rp -
c. Kabel ties buah 1 ,000 Rp - Rp -
d. T dus buah - Rp - Rp -
e. Isolasi roll 0 ,067 Rp - Rp -
f. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,067 Rp - Rp -
b. Tukang oh 0 ,067 Rp - Rp -
c. Kepala Tukang oh 0 ,033 Rp - Rp -
d. Mandor oh 0 ,007 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
18 1 Titik Pemasangan instalasi Fire Alarm Rp -
Bahan:
a. NYA 1x1.5 mm² meter 28,000 Rp - Rp -
b. Pipa Conduit 25 mm² meter 13,500 Rp - Rp -
c. Klem pipa conduit 25 mm² buah 6 ,750 Rp - Rp -
d. Kabel ties buah 6 ,750 Rp - Rp -
e. T dus buah 1 ,000 Rp - Rp -
f. Isolasi roll 0 ,333 Rp - Rp -
g. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,417 Rp - Rp -
b. Tukang oh 0 ,417 Rp - Rp -
c. Kepala Tukang oh 0 ,209 Rp - Rp -
d. Mandor oh 0 ,042 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
19 1 Titik Pemasangan instalasi Telephone/Data Rp -
Bahan:
a. Kabel Coaxial RG8 ( 0,6 mm2 ) meter 14,000 Rp - Rp -
b. Pipa Conduit 25 mm² meter 13,000 Rp - Rp -
c. Klem pipa conduit 25 mm² buah 6 ,500 Rp - Rp -
d. Kabel ties buah 6 ,500 Rp - Rp -
e. T dus buah 1 ,000 Rp - Rp -
f. Isolasi roll 0 ,333 Rp - Rp -
g. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,417 Rp - Rp -
b. Tukang oh 0 ,417 Rp - Rp -
c. Kepala Tukang oh 0 ,209 Rp - Rp -
d. Mandor oh 0 ,042 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 4 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
20 1 Titik Pemasangan instalasi IPTV Rp -
Bahan:
a. Kabel Serat Optik meter 14,000 Rp - Rp -
b. Pipa Conduit 25 mm² meter 13,000 Rp - Rp -
c. Klem pipa conduit 25 mm² buah 6 ,500 Rp - Rp -
d. Kabel ties buah 6 ,500 Rp - Rp -
e. T dus buah 1 ,000 Rp - Rp -
f. Isolasi roll 0 ,333 Rp - Rp -
g. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,417 Rp - Rp -
b. Tukang oh 0 ,417 Rp - Rp -
c. Kepala Tukang oh 0 ,209 Rp - Rp -
d. Mandor oh 0 ,042 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
21 1 Titik Pemasangan instalasi Speaker Rp -
Bahan:
a. Kabel NYMHY 3x1,5 mm2 meter 14,000 Rp - Rp -
b. Pipa Conduit 25 mm² meter 13,000 Rp - Rp -
c. Klem pipa conduit 25 mm² buah 6 ,500 Rp - Rp -
d. Kabel ties buah 6 ,500 Rp - Rp -
e. T dus buah 1 ,000 Rp - Rp -
f. Isolasi roll 0 ,333 Rp - Rp -
g. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,417 Rp - Rp -
b. Tukang oh 0 ,417 Rp - Rp -
c. Kepala Tukang oh 0 ,209 Rp - Rp -
d. Mandor oh 0 ,042 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
22 1 Set Lampu Lampu LED Stip Rp -
Bahan:
a. Lampu LED Stip buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
23 1 Set Lampu Lampu TL LED 2 x28 W, Cover Lovre dipasang rata Plafon Rp -
Bahan:
a. Lampu TL LED 2 x28 W, Cover Lovre dipasang rata Plafon buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
24 1 Set Lampu Lampu TL LED 2 x28 W Rp -
Bahan:
a. Lampu TL LED 2 x28 W buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 5 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
25 1 Set Lampu Lampu TL LED 2 x 28 W Emergency Rp -
Bahan:
a. Lampu TL LED 2 x 28 W Emergency buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
26 1 Set Lampu Lampu TL LED 1 x28 W, (V-Shape) Rp -
Bahan:
a. Lampu TL LED 1 x28 W, (V-Shape) buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
27 1 Set Lampu Lampu TL LED 1 x12 W, pasang pada cove wastafel Rp -
Bahan:
a. Lampu TL LED 1 x12 W, pasang pada cove wastafel buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
28 1 Set Lampu Lampu Down Light13 W Rp -
Bahan:
a. Lampu Down Light13 W buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
29 1 Set Lampu Lampu Down Light Par 38 40watt Rp -
Bahan:
a. Lampu Down Light Par 38 40watt buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 6 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
30 1 Set Lampu Lampu Down Light LED 7 W Rp -
Bahan:
a. Lampu Down Light LED 7 W buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
31 1 Set Lampu T8.TL 2x18W RM Louver Rp -
Bahan:
a. T8.TL 2x18W RM Louver buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
32 1 Set Lampu T8.TL 2x18W RM Prismatic + Battery Rp -
Bahan:
a. T8.TL 2x18W RM Prismatic + Battery buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
33 1 Set Lampu Spot Light 100 Watt Rp -
Bahan:
a. Spot Light 100 Watt buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,103 Rp - Rp -
b. Tukang oh 0 ,103 Rp - Rp -
c. Kepala Tukang oh 0 ,052 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
34 1 Set Lampu Exit Lamp 10 Watt Rp -
Bahan:
a. Exit Lamp 10 Watt buah 1 ,000 Rp - Rp -
b. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,083 Rp - Rp -
b. Tukang oh 0 ,083 Rp - Rp -
c. Kepala Tukang oh 0 ,042 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 7 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
35 1 Set Saklar single Rp -
Bahan:
a. Saklar single buah 1 ,000 Rp - Rp -
b. Inbown dus buah 1 ,000 Rp - Rp -
c. Fisher s6 buah 2 ,000 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,042 Rp - Rp -
b. Tukang oh 0 ,042 Rp - Rp -
c. Kepala Tukang oh 0 ,021 Rp - Rp -
d. Mandor oh 0 ,008 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
36 1 Set Saklar double Rp -
Bahan:
a. Saklar double buah 1 ,000 Rp - Rp -
b. Inbown dus buah 1 ,000 Rp - Rp -
c. Fisher s6 buah 2 ,000 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,042 Rp - Rp -
b. Tukang oh 0 ,042 Rp - Rp -
c. Kepala Tukang oh 0 ,021 Rp - Rp -
d. Mandor oh 0 ,008 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
37 1 Set Saklar tukar Rp -
Bahan:
a. Saklar tukar buah 1 ,000 Rp - Rp -
b. Inbown dus buah 1 ,000 Rp - Rp -
c. Fisher s6 buah 2 ,000 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,042 Rp - Rp -
b. Tukang oh 0 ,042 Rp - Rp -
c. Kepala Tukang oh 0 ,021 Rp - Rp -
d. Mandor oh 0 ,008 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
38 1 Set Stop kontak 1 Phasa Rp -
Bahan:
a. Stop kontak 1 Phasa buah 1 ,000 Rp - Rp -
b. Inbown dus buah 1 ,000 Rp - Rp -
c. Fisher s6 buah 1 ,000 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,042 Rp - Rp -
b. Tukang oh 0 ,042 Rp - Rp -
c. Kepala Tukang oh 0 ,021 Rp - Rp -
d. Mandor oh 0 ,008 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
39 1 Set Stop kontak 1 Phasa type floor Rp -
Bahan:
a. Stop kontak 1 Phasa type floor buah 1 ,000 Rp - Rp -
b. Inbown dus buah 1 ,000 Rp - Rp -
c. Fisher s6 buah 1 ,000 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,083 Rp - Rp -
b. Tukang oh 0 ,083 Rp - Rp -
c. Kepala Tukang oh 0 ,042 Rp - Rp -
d. Mandor oh 0 ,008 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 8 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
40 1 Meter Kabel tray 200 mm Rp -
Bahan:
a. Kabel tray 200 mm buah 1 ,000 Rp - Rp -
b. Dina Bolt 8 mm buah 0 ,500 Rp - Rp -
c. Siku 4 buah 0 ,125 Rp - Rp -
d. As Drat 8mm buah 0 ,500 Rp - Rp -
e. Mur Baut 8 buah 1 ,000 Rp - Rp -
f. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,083 Rp - Rp -
b. Tukang oh 0 ,083 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
41 1 Meter Kabel tray 300 mm Rp -
Bahan:
a. Kabel tray 300 mm buah 1 ,000 Rp - Rp -
b. Dina Bolt 8 mm buah 0 ,500 Rp - Rp -
c. Siku 4 buah 0 ,125 Rp - Rp -
d. As Drat 8mm buah 0 ,500 Rp - Rp -
e. Mur Baut 8 buah 1 ,000 Rp - Rp -
f. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,083 Rp - Rp -
b. Tukang oh 0 ,083 Rp - Rp -
c. Kepala Tukang oh 0 ,042 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
42 1 Meter Kabel tray 400 mm Rp -
Bahan:
a. Kabel tray 400 mm buah 1 ,000 Rp - Rp -
b. Dina Bolt 8 mm buah 0 ,500 Rp - Rp -
c. Siku 4 buah 0 ,125 Rp - Rp -
d. As Drat 8mm buah 0 ,500 Rp - Rp -
e. Mur Baut 8 buah 1 ,000 Rp - Rp -
f. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,083 Rp - Rp -
b. Tukang oh 0 ,083 Rp - Rp -
c. Kepala Tukang oh 0 ,042 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
43 1 Meter Kabel tray 600 mm Rp -
Bahan:
a. Kabel tray 600 mm buah 1 ,000 Rp - Rp -
b. Dina Bolt 8 mm buah 0 ,500 Rp - Rp -
c. Siku 4 buah 0 ,125 Rp - Rp -
d. As Drat 8mm buah 0 ,500 Rp - Rp -
e. Mur Baut 8 buah 1 ,000 Rp - Rp -
f. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,083 Rp - Rp -
b. Tukang oh 0 ,083 Rp - Rp -
c. Kepala Tukang oh 0 ,042 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 9 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
44 1 Meter Kabel Ladder 200 mm Rp -
Bahan:
a. Kabel Ladder 200 mm buah 1 ,000 Rp - Rp -
b. Dina Bolt 8 mm buah 0 ,500 Rp - Rp -
c. Siku 4 buah 0 ,125 Rp - Rp -
d. As Drat 8mm buah 0 ,500 Rp - Rp -
e. Mur Baut 8 buah 1 ,000 Rp - Rp -
f. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,083 Rp - Rp -
b. Tukang oh 0 ,083 Rp - Rp -
c. Kepala Tukang oh 0 ,042 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
45 1 Meter Kabel Ladder 600 mm Rp -
Bahan:
a. Kabel Ladder 600 mm buah 1 ,000 Rp - Rp -
b. Dina Bolt 8 mm buah 0 ,500 Rp - Rp -
c. Siku 4 buah 0 ,125 Rp - Rp -
d. As Drat 8mm buah 0 ,500 Rp - Rp -
e. Mur Baut 8 buah 1 ,000 Rp - Rp -
f. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,083 Rp - Rp -
b. Tukang oh 0 ,083 Rp - Rp -
c. Kepala Tukang oh 0 ,042 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
46 1 Meter Pemasangan kabel NYM 2x1.5 mm Rp -
Bahan:
a. NYM 2x1.5 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,050 Rp - Rp -
b. Tukang oh 0 ,050 Rp - Rp -
c. Kepala Tukang oh 0 ,025 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
47 1 Meter Pemasangan kabel NYM 3x2,5 mm² Rp -
Bahan:
a. NYM 3x2,5 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,025 Rp - Rp -
b. Tukang oh 0 ,013 Rp - Rp -
c. Kepala Tukang oh 0 ,006 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
48 1 Meter Pemasangan kabel NYY 3x2,5 mm² Rp -
Bahan:
a. NYY 3x2,5 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,050 Rp - Rp -
b. Tukang oh 0 ,050 Rp - Rp -
c. Kepala Tukang oh 0 ,025 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Analisa Harga Satuan Pek. Elektrikal - page 10 of 20
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
49 1 Meter Pemasangan kabel NYY 3x4 mm² Rp -
Bahan:
a. NYY 3x4 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,053 Rp - Rp -
b. Tukang oh 0 ,053 Rp - Rp -
c. Kepala Tukang oh 0 ,026 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
50 1 Meter Pemasangan kabel NYY 3x6 mm² Rp -
Bahan:
a. NYY 3x6 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,050 Rp - Rp -
b. Tukang oh 0 ,050 Rp - Rp -
c. Kepala Tukang oh 0 ,025 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
51 1 Meter Pemasangan kabel NYY 4x2,5 mm² Rp -
Bahan:
a. NYY 4x2,5 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,050 Rp - Rp -
b. Tukang oh 0 ,050 Rp - Rp -
c. Kepala Tukang oh 0 ,025 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
52 1 Meter Pemasangan kabel NYY 4x4 mm² Rp -
Bahan:
a. NYY 4x4 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,050 Rp - Rp -
b. Tukang oh 0 ,050 Rp - Rp -
c. Kepala Tukang oh 0 ,025 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
53 1 Meter Pemasangan kabel NYY 4x6 mm² Rp -
Bahan:
a. NYY 4x6 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,050 Rp - Rp -
b. Tukang oh 0 ,050 Rp - Rp -
c. Kepala Tukang oh 0 ,025 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 11 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
54 1 Meter Pemasangan kabel NYY 4x10 mm² Rp -
Bahan:
a. NYY 4x10 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,061 Rp - Rp -
b. Tukang oh 0 ,061 Rp - Rp -
c. Kepala Tukang oh 0 ,031 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
55 1 Meter Pemasangan kabel NYY 4x16 mm² Rp -
Bahan:
a. NYY 4x16 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,064 Rp - Rp -
b. Tukang oh 0 ,064 Rp - Rp -
c. Kepala Tukang oh 0 ,032 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
56 1 Meter Pemasangan kabel NYY 4x35 mm² Rp -
Bahan:
a. NYY 4x35 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,069 Rp - Rp -
b. Tukang oh 0 ,069 Rp - Rp -
c. Kepala Tukang oh 0 ,035 Rp - Rp -
d. Mandor oh 0 ,003 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
57 1 Meter Pemasangan kabel NYY 4x50 mm² Rp -
Bahan:
a. NYY 4x50 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,081 Rp - Rp -
b. Tukang oh 0 ,081 Rp - Rp -
c. Kepala Tukang oh 0 ,040 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
58 1 Meter Pemasangan kabel NYY 4x70 mm² Rp -
Bahan:
a. NYY 4x70 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,081 Rp - Rp -
b. Tukang oh 0 ,081 Rp - Rp -
c. Kepala Tukang oh 0 ,040 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 12 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
59 1 Meter Pemasangan kabel NYFGby 4x95 mm Rp -
Bahan:
a. NYFGby 4x95 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,081 Rp - Rp -
b. Tukang oh 0 ,081 Rp - Rp -
c. Kepala Tukang oh 0 ,040 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
60 1 Meter Pemasangan kabel NYY 4x120 mm² Rp -
Bahan:
a. NYY 4x120 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,081 Rp - Rp -
b. Tukang oh 0 ,081 Rp - Rp -
c. Kepala Tukang oh 0 ,040 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
61 1 Meter Pemasangan kabel NYY 4x150 mm² Rp -
Bahan:
a. NYY 4x150 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,081 Rp - Rp -
b. Tukang oh 0 ,081 Rp - Rp -
c. Kepala Tukang oh 0 ,040 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
62 1 Meter Pemasangan kabel NYY 4x185 mm² Rp -
Bahan:
a. NYY 4x185 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,081 Rp - Rp -
b. Tukang oh 0 ,081 Rp - Rp -
c. Kepala Tukang oh 0 ,040 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
63 1 Meter Pemasangan kabel NYY 4x240 mm² Rp -
Bahan:
a. NYY 4x240 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,081 Rp - Rp -
b. Tukang oh 0 ,081 Rp - Rp -
c. Kepala Tukang oh 0 ,040 Rp - Rp -
d. Mandor oh 0 ,004 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 13 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
64 1 Meter Pemasangan kabel NYFGby 4x70 mm Rp -
Bahan:
a. NYFGby 4x70 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
65 1 Meter Pemasangan kabel NYFGby 4x120 mm Rp -
Bahan:
a. NYFGby 4x120 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
66 1 Meter Pemasangan kabel NYFGby 4x185 mm Rp -
Bahan:
a. NYFGby 4x185 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
67 1 Meter Pemasangan kabel NYFGby 4x240 mm² Rp -
Bahan:
a. NYFGby 4x240 mm² meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
68 1 Meter Pemasangan kabel N2XSY 1x70 mm Rp -
Bahan:
a. N2XSY 1x70 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 14 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
69 1 Meter Pemasangan kabel N2XSY 1x120 mm Rp -
Bahan:
a. N2XSY 1x120 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
70 1 Meter Pemasangan kabel NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm Rp -
Bahan:
a. NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
71 1 Meter Pemasangan kabel NYA/BC 6 mm Rp -
Bahan:
a. NYA/BC 6 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
72 1 Meter Pemasangan kabel NYA/BC 150 mm Rp -
Bahan:
a. NYA/BC 150 mm meter 1 ,050 Rp - Rp -
b. Kabel ties buah 1 ,050 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,044 Rp - Rp -
b. Tukang oh 0 ,044 Rp - Rp -
c. Kepala Tukang oh 0 ,022 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
ELEKTRONIK
1 1 Unit MDF/ CTB Rp -
Bahan:
a. MDF/ CTB Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,667 Rp - Rp -
b. Tukang oh 0 ,667 Rp - Rp -
c. Kepala Tukang oh 0 ,333 Rp - Rp -
d. Mandor oh 0 ,033 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 15 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
2 1 Unit Terminal Box Fire Rp -
Bahan:
a. Terminal Box Fire Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,667 Rp - Rp -
b. Tukang oh 0 ,667 Rp - Rp -
c. Kepala Tukang oh 0 ,333 Rp - Rp -
d. Mandor oh 0 ,033 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
3 1 Unit Smoke Detector Rp -
Bahan:
a. Smoke Detector Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
4 1 Unit Rate of Rise Detector Rp -
Bahan:
a. Rate of Rise Detector Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
5 1 Unit Heat Detector Rp -
Bahan:
a. Heat Detector Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
6 1 Unit Break Glass Rp -
Bahan:
a. Break Glass Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 16 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
7 1 Unit Alarm Bell Rp -
Bahan:
a. Alarm Bell Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
8 1 Unit Indicator Lamp Rp -
Bahan:
a. Indicator Lamp Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
9 1 Meter Pemasangan Twisted Shelded 18,2 PAIR 2 x 1,5 mm2 Rp -
Bahan:
a. Twisted Shelded 18,2 PAIR 2 x 1,5 mm2 Unit 1 ,000 Rp - Rp -
b. Kabel ties buah 1 ,000 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,042 Rp - Rp -
b. Tukang oh 0 ,042 Rp - Rp -
c. Kepala Tukang oh 0 ,021 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
10 1 Meter Pemasangan FRC 2x1.5 mm2 Rp -
Bahan:
a. FRC 2x1.5 mm2 Unit 1 ,000 Rp - Rp -
b. Kabel ties buah 1 ,000 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,042 Rp - Rp -
b. Tukang oh 0 ,042 Rp - Rp -
c. Kepala Tukang oh 0 ,021 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
11 1 Unit EOL Rp -
Bahan:
a. EOL Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,042 Rp - Rp -
b. Tukang oh 0 ,042 Rp - Rp -
c. Kepala Tukang oh 0 ,021 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 17 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
12 1 Unit Outlet Telephone Rp -
Bahan:
a. Outlet Telephone Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,042 Rp - Rp -
b. Tukang oh 0 ,042 Rp - Rp -
c. Kepala Tukang oh 0 ,021 Rp - Rp -
d. Mandor oh 0 ,002 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
13 1 Unit Terminal Box 20 Pairs Rp -
Bahan:
a. Terminal Box 20 Pairs Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,667 Rp - Rp -
b. Tukang oh 0 ,667 Rp - Rp -
c. Kepala Tukang oh 0 ,333 Rp - Rp -
d. Mandor oh 0 ,033 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
14 1 Meter Pemasangan Kabel ITC 2x0,6 mm2 Rp -
Bahan:
a. Kabel ITC 2x0,6 mm2 Unit 1 ,000 Rp - Rp -
b. Kabel ties buah 1 ,000 Rp - Rp -
c. Isolasi roll 0 ,050 Rp - Rp -
d. Sewa alat 5% dari harga bahan lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
15 1 Unit 240 W/300W Power Amplifier Rp -
Bahan:
a. 240 W/300W Power Amplifier Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
16 1 Unit Speaker Selector ( SS-021B ) Rp -
Bahan:
a. Speaker Selector ( SS-021B ) Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 18 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
17 1 Unit Ceiling Speaker ( ZS-646R ) Rp -
Bahan:
a. Ceiling Speaker ( ZS-646R ) Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
18 1 Unit Coulumn speaker 20 watt Rp -
Bahan:
a. Coulumn speaker 20 watt Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
19 1 Unit Fire Dome Speaker Rp -
Bahan:
a. Fire Dome Speaker Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
20 1 Unit Volume Control Rp -
Bahan:
a. Volume Control Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
21 1 Unit Fixed Dome Camera Rp -
Bahan:
a. Fixed Dome Camera Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 19 of 20
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
22 1 Unit Monitor Rp -
Bahan:
a. Monitor Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
23 1 Unit Outlet Data Rp -
Bahan:
a. Outlet Data Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
24 1 Meter PemasanganKabel UTP- Cat 6 Rp -
Bahan:
a. Kabel UTP- Cat 6 Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
25 1 Unit Kabel NYMHY 3( 3 x2,5 mm2 ) Rp -
Bahan:
a. Kabel NYMHY 3( 3 x2,5 mm2 ) Unit 1 ,000 Rp - Rp -
b. Alat Bantu lot 1 ,000 Rp - Rp -
Jumlah harga bahan Rp -
Tenaga Kerja:
a. Pekerja oh 0 ,097 Rp - Rp -
b. Tukang oh 0 ,097 Rp - Rp -
c. Kepala Tukang oh 0 ,049 Rp - Rp -
d. Mandor oh 0 ,005 Rp - Rp -
Jumlah harga upah tenaga kerja Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
Jumlah Harga Persatuan Pekerjaan (Jumlah Harga Bahan+Jumlah Harga Upah Tenaga Kerja) Rp -
Analisa Harga Satuan Pek. Elektrikal - page 20 of 20
ANALISA HARGA SATUAN PEKERJAAN MEKANIKAL PLUMBING
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
PEKERJAAN AIR BERSIH
Peralatan Utama
1 1 Set Harga Terpasang Pompa Air Bersih Rp -
Bahan:
1 Pompa Air Bersih set 1,000 Rp - Rp -
Kap. 300 LPM / Head 60Meter (2 Unit, Pompa Kerja gantian)
Gate Valve Dimensi Sesuai Gambar
Check Valve Dimensi Sesuai Gambar
Strainer Dimensi Sesuai Gambar
Presure Gauge Dimensi Sesuai Gambar
Flexible Joint Dimensi Sesuai Gambar
Flow Swicth
Presure Swict
Water Level Kontrol
Panel Kontrol
Kabel Kontrol
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 2,500 Rp - Rp -
2 Tukang Oh 4,000 Rp - Rp -
3 Kepala Tukang Oh 2,500 Rp - Rp -
4 Mandor Oh 0,800 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pompa Air Bersih Rp -
2 1 Set Harga Terpasang Booster Pump Kap. (Package)/Otomatis Rp -
Bahan:
1 Booster Pump Kap. (Package)/Otomatis set 1,000 Rp - Rp -
Pompa Kap. ...Liter/Menit (3 Unit Pompa 1 stan by 2 operation)
Gate Valve Dimensi Sesuai Gambar
Check Valve Dimensi Sesuai Gambar
Strainer Dimensi Sesuai Gambar
Presure Gauge Dimensi Sesuai Gambar
Flexible Joint Dimensi Sesuai Gambar
Flow Swicth
Pressure Swicth
Water Level Kontrol
Panel Kontrol
Kabel Kontrol
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 2,500 Rp - Rp -
2 Tukang Oh 4,000 Rp - Rp -
3 Kepala Tukang Oh 2,500 Rp - Rp -
4 Mandor Oh 0,800 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Booster Pump Kap. (Package)/Otomatis Rp -
3 1 Set Harga Terpasang ELECTRIC Water Heater, kapasitas 50 liter. Rp -
Bahan:
1 ELECTRIC Water Heater, kapasitas 50 liter. set 1,000 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 2,500 Rp - Rp -
2 Tukang Oh 4,000 Rp - Rp -
3 Kepala Tukang Oh 2,500 Rp - Rp -
4 Mandor Oh 0,800 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang ELECTRIC Water Heater, kapasitas 50 liter. Rp -
4 1 Set Harga Terpasang Tanki Air FRP 8 m3 (Ground Water Tank) Rp -
Bahan:
1 Tanki Air FRP 1 m3 (Ground Water Tank) set 8,000 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1,000 Rp - Rp -
3 Kepala Tukang Oh 0,250 Rp - Rp -
4 Mandor Oh 0,160 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Tanki Air FRP 8 m3 (Ground Water Tank) Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 1 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
5 1 Set Harga Terpasang Tanki Air FRP 4 m3 (Roof Water Tank) Rp -
Bahan:
1 Tanki Air FRP 1 m3 (Roof Water Tank) set 4,000 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1,000 Rp - Rp -
3 Kepala Tukang Oh 0,250 Rp - Rp -
4 Mandor Oh 0,160 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Tanki Air FRP 4 m3 (Roof Water Tank) Rp -
6 1 Set Harga Terpasang Electric Water Heater Kap. Rp -
Bahan:
1 Electric Water Heater Kap. set 1,000 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1,000 Rp - Rp -
3 Kepala Tukang Oh 0,250 Rp - Rp -
4 Mandor Oh 0,160 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Electric Water Heater Kap. Rp -
Pipa PPRPN 10
1 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" Rp -
Bahan:
1 Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" meter 1,050 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,020 Rp - Rp -
2 Tukang Oh 0,031 Rp - Rp -
3 Kepala Tukang Oh 0,008 Rp - Rp -
4 Mandor Oh 0,005 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Meter Harga Terpasang Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" Rp -
2 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 25 mm Setara Dia. 3/4" Rp -
Bahan:
1 Pipa PPr PN10 Dia. 25 mm Setara Dia. 3/4" meter 1,050 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,029 Rp - Rp -
2 Tukang Oh 0,047 Rp - Rp -
3 Kepala Tukang Oh 0,012 Rp - Rp -
4 Mandor Oh 0,008 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Meter Harga Terpasang Pipa PPr PN10 Dia. 25 mm Setara Dia. 3/4" Rp -
3 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" Rp -
Bahan:
1 Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" meter 1,050 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,039 Rp - Rp -
2 Tukang Oh 0,063 Rp - Rp -
3 Kepala Tukang Oh 0,016 Rp - Rp -
4 Mandor Oh 0,010 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Meter Harga Terpasang Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" Rp -
4 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 40 mm Setara Dia. 1.1/4" Rp -
Bahan:
1 Pipa PPr PN10 Dia. 40 mm Setara Dia. 1.1/4" meter 1,050 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,049 Rp - Rp -
2 Tukang Oh 0,078 Rp - Rp -
3 Kepala Tukang Oh 0,020 Rp - Rp -
4 Mandor Oh 0,013 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Meter Harga Terpasang Pipa PPr PN10 Dia. 40 mm Setara Dia. 1.1/4" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 2 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
5 1 Meter Harga Terpasang Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" Rp -
Bahan:
1 Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" meter 1,050 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,059 Rp - Rp -
2 Tukang Oh 0,094 Rp - Rp -
3 Kepala Tukang Oh 0,023 Rp - Rp -
4 Mandor Oh 0,015 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Meter Harga Terpasang Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" Rp -
Pipa PPRPN 20
1 1 Meter Harga Terpasang Pipa PPr PN20 Dia. 20 mm Setara Dia. 1/2" Rp -
Bahan:
1 Pipa PPr PN20 Dia. 20 mm Setara Dia. 1/2" meter 1,100 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,020 Rp - Rp -
2 Tukang Oh 0,031 Rp - Rp -
3 Kepala Tukang Oh 0,008 Rp - Rp -
4 Mandor Oh 0,005 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Meter Harga Terpasang Pipa PPr PN20 Dia. 20 mm Setara Dia. 1/2" Rp -
Gate Valve 5K
1 1 Buah Harga Terpasang Gate Valve 5K Dia. 20 mm Setara Dia. 1/2" Rp -
Bahan:
1 Gate Valve 5K Dia. 20 mm Setara Dia. 1/2" Buah 1,000 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,016 Rp - Rp -
2 Tukang Oh 0,025 Rp - Rp -
3 Kepala Tukang Oh 0,006 Rp - Rp -
4 Mandor Oh 0,004 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Gate Valve 5K Dia. 20 mm Setara Dia. 1/2" Rp -
2 1 Buah Harga Terpasang Gate Valve 5K Dia. 25 mm Setara Dia. 3/4" Rp -
Bahan:
1 Gate Valve 5K Dia. 25 mm Setara Dia. 3/4" Buah 1,000 Rp - Rp -
2 Sewa Alat 5% 0,050 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,023 Rp - Rp -
2 Tukang Oh 0,038 Rp - Rp -
3 Kepala Tukang Oh 0,009 Rp - Rp -
4 Mandor Oh 0,006 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Gate Valve 5K Dia. 25 mm Setara Dia. 3/4" Rp -
3 1 Buah Harga Terpasang Gate Valve 5K Dia. 32 mm Setara Dia. 1" Rp -
Bahan:
1 Gate Valve 5K Dia. 32 mm Setara Dia. 1" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,03125 Rp - Rp -
2 Tukang Oh 0,05 Rp - Rp -
3 Kepala Tukang Oh 0,0125 Rp - Rp -
4 Mandor Oh 0,008 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Gate Valve 5K Dia. 32 mm Setara Dia. 1" Rp -
4 1 Buah Harga Terpasang Gate Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Rp -
Bahan:
1 Gate Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0390625 Rp - Rp -
2 Tukang Oh 0,0625 Rp - Rp -
3 Kepala Tukang Oh 0,015625 Rp - Rp -
4 Mandor Oh 0,01 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Gate Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 3 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
5 1 Buah Harga Terpasang Gate Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Rp -
Bahan:
1 Gate Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,046875 Rp - Rp -
2 Tukang Oh 0,075 Rp - Rp -
3 Kepala Tukang Oh 0,01875 Rp - Rp -
4 Mandor Oh 0,012 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Gate Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Rp -
6 1 Buah Harga Terpasang Gate Valve 5K Dia. 65 mm Setara Dia. 2" Rp -
Bahan:
1 Gate Valve 5K Dia. 65 mm Setara Dia. 2" Buah 1,00 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0625 Rp - Rp -
2 Tukang Oh 0,1 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,016 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Gate Valve 5K Dia. 65 mm Setara Dia. 2" Rp -
7 1 Buah Harga Terpasang Strainer 10K Dia. 2" Rp -
Bahan:
1 Strainer 10K Dia. 2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,078125 Rp - Rp -
2 Tukang Oh 0,125 Rp - Rp -
3 Kepala Tukang Oh 0,03125 Rp - Rp -
4 Mandor Oh 0,02 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Strainer 10K Dia. 2" Rp -
8 1 Buah Harga Terpasang Pipa PVC AW Dia. 6" Rp -
Bahan:
1 Pipa PVC AW Dia. 6" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,09375 Rp - Rp -
2 Tukang Oh 0,15 Rp - Rp -
3 Kepala Tukang Oh 0,0375 Rp - Rp -
4 Mandor Oh 0,024 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa PVC AW Dia. 6" Rp -
Floating Valve
1 1 Buah Harga Terpasang Floating Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Rp -
Bahan:
1 Floating Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0390625 Rp - Rp -
2 Tukang Oh 0,0625 Rp - Rp -
3 Kepala Tukang Oh 0,015625 Rp - Rp -
4 Mandor Oh 0,01 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Floating Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Rp -
2 1 Buah Harga Terpasang Floating Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Rp -
Bahan:
1 Floating Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,046875 Rp - Rp -
2 Tukang Oh 0,075 Rp - Rp -
3 Kepala Tukang Oh 0,01875 Rp - Rp -
4 Mandor Oh 0,012 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Floating Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 4 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
3 1 Buah Harga Terpasang Floating Valve 5K Dia. 63 mm Setara Dia. 2" Rp -
Bahan:
1 Floating Valve 5K Dia. 63 mm Setara Dia. 2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0625 Rp - Rp -
2 Tukang Oh 0,1 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,016 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Floating Valve 5K Dia. 63 mm Setara Dia. 2" Rp -
4 1 Buah Harga Terpasang Floating Valve 5K Dia. 75 mm Setara Dia. 2.1/2" Rp -
Bahan:
1 Floating Valve 5K Dia. 75 mm Setara Dia. 2.1/2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,078125 Rp - Rp -
2 Tukang Oh 0,125 Rp - Rp -
3 Kepala Tukang Oh 0,03125 Rp - Rp -
4 Mandor Oh 0,02 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Floating Valve 5K Dia. 75 mm Setara Dia. 2.1/2" Rp -
5 1 Buah Harga Terpasang Floating Valve 5K Dia. 90 mm Setara Dia. 3" Rp -
Bahan:
1 Floating Valve 5K Dia. 90 mm Setara Dia. 3" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,09375 Rp - Rp -
2 Tukang Oh 0,15 Rp - Rp -
3 Kepala Tukang Oh 0,0375 Rp - Rp -
4 Mandor Oh 0,024 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Floating Valve 5K Dia. 90 mm Setara Dia. 3" Rp -
6 1 Buah Harga Terpasang Floating Valve 5K Dia. 120 mm Setara Dia. 4" Rp -
Bahan:
1 Floating Valve 5K Dia. 120 mm Setara Dia. 4" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,125 Rp - Rp -
2 Tukang Oh 0,2 Rp - Rp -
3 Kepala Tukang Oh 0,05 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Floating Valve 5K Dia. 120 mm Setara Dia. 4" Rp -
Check Valve
1 1 Buah Harga Terpasang Check Valve Dia. 20 mm Setara Dia. 1/2" Rp -
Bahan:
1 Check Valve Dia. 20 mm Setara Dia. 1/2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,015625 Rp - Rp -
2 Tukang Oh 0,025 Rp - Rp -
3 Kepala Tukang Oh 0,00625 Rp - Rp -
4 Mandor Oh 0,004 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 20 mm Setara Dia. 1/2" Rp -
2 1 Buah Harga Terpasang Check Valve Dia. 25 mm Setara Dia. 3/4" Rp -
Bahan:
1 Check Valve Dia. 25 mm Setara Dia. 3/4" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0234375 Rp - Rp -
2 Tukang Oh 0,0375 Rp - Rp -
3 Kepala Tukang Oh 0,009375 Rp - Rp -
4 Mandor Oh 0,006 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 25 mm Setara Dia. 3/4" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 5 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
3 1 Buah Harga Terpasang Check Valve Dia. 32 mm Setara Dia. 1" Rp -
Bahan:
1 Check Valve Dia. 32 mm Setara Dia. 1" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,03125 Rp - Rp -
2 Tukang Oh 0,05 Rp - Rp -
3 Kepala Tukang Oh 0,0125 Rp - Rp -
4 Mandor Oh 0,008 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 32 mm Setara Dia. 1" Rp -
4 1 Buah Harga Terpasang Check Valve Dia. 40 mm Setara Dia. 1.1/4" Rp -
Bahan:
1 Check Valve Dia. 40 mm Setara Dia. 1.1/4" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0390625 Rp - Rp -
2 Tukang Oh 0,0625 Rp - Rp -
3 Kepala Tukang Oh 0,015625 Rp - Rp -
4 Mandor Oh 0,01 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 40 mm Setara Dia. 1.1/4" Rp -
5 1 Buah Harga Terpasang Check Valve Dia. 50 mm Setara Dia. 1.1/2" Rp -
Bahan:
1 Check Valve Dia. 50 mm Setara Dia. 1.1/2" Buah 1,00 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,046875 Rp - Rp -
2 Tukang Oh 0,075 Rp - Rp -
3 Kepala Tukang Oh 0,01875 Rp - Rp -
4 Mandor Oh 0,012 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 50 mm Setara Dia. 1.1/2" Rp -
6 1 Buah Harga Terpasang Check Valve Dia. 63 mm Setara Dia. 2" Rp -
Bahan:
1 Check Valve Dia. 63 mm Setara Dia. 2" Buah 1,00 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0625 Rp - Rp -
2 Tukang Oh 0,1 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,016 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 63 mm Setara Dia. 2" Rp -
7 1 Buah Harga Terpasang Check Valve Dia. 65 mm Setara Dia. 2.1/2" Rp -
Bahan:
1 Check Valve Dia. 65 mm Setara Dia. 2.1/2" Buah 1,00 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,078125 Rp - Rp -
2 Tukang Oh 0,125 Rp - Rp -
3 Kepala Tukang Oh 0,03125 Rp - Rp -
4 Mandor Oh 0,02 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 65 mm Setara Dia. 2.1/2" Rp -
8 1 Buah Harga Terpasang Check Valve Dia. 90 mm Setara Dia. 3" Rp -
Bahan:
1 Check Valve Dia. 90 mm Setara Dia. 3" Buah 1,00 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,09375 Rp - Rp -
2 Tukang Oh 0,15 Rp - Rp -
3 Kepala Tukang Oh 0,0375 Rp - Rp -
4 Mandor Oh 0,024 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 90 mm Setara Dia. 3" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 6 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
9 1 Buah Harga Terpasang Check Valve Dia. 110 mm Setara Dia. 4" Rp -
Bahan:
1 Check Valve Dia. 110 mm Setara Dia. 4" Buah 1,00 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,125 Rp - Rp -
2 Tukang Oh 0,2 Rp - Rp -
3 Kepala Tukang Oh 0,05 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Check Valve Dia. 110 mm Setara Dia. 4" Rp -
Pipa Galvanis
1 1 Buah Harga Terpasang Pipa Galvanis Dia. 1/2" Rp -
Bahan:
1 Pipa Galvanis Dia. 1/2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,015625 Rp - Rp -
2 Tukang Oh 0,025 Rp - Rp -
3 Kepala Tukang Oh 0,00625 Rp - Rp -
4 Mandor Oh 0,004 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 1/2" Rp -
2 1 Buah Harga Terpasang Pipa Galvanis Dia. 3/4" Rp -
Bahan:
1 Pipa Galvanis Dia. 3/4" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0234375 Rp - Rp -
2 Tukang Oh 0,0375 Rp - Rp -
3 Kepala Tukang Oh 0,009375 Rp - Rp -
4 Mandor Oh 0,006 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 3/4" Rp -
3 1 Buah Harga Terpasang Pipa Galvanis Dia. 1" Rp -
Bahan:
1 Pipa Galvanis Dia. 1" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,03125 Rp - Rp -
2 Tukang Oh 0,05 Rp - Rp -
3 Kepala Tukang Oh 0,0125 Rp - Rp -
4 Mandor Oh 0,008 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 1" Rp -
4 1 Buah Harga Terpasang Pipa Galvanis Dia. 1.1/4" Rp -
Bahan:
1 Pipa Galvanis Dia. 1.1/4" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0390625 Rp - Rp -
2 Tukang Oh 0,0625 Rp - Rp -
3 Kepala Tukang Oh 0,015625 Rp - Rp -
4 Mandor Oh 0,01 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 1.1/4" Rp -
5 1 Buah Harga Terpasang Pipa Galvanis Dia. 1.1/2" Rp -
Bahan:
1 Pipa Galvanis Dia. 1.1/2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,046875 Rp - Rp -
2 Tukang Oh 0,075 Rp - Rp -
3 Kepala Tukang Oh 0,01875 Rp - Rp -
4 Mandor Oh 0,012 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 1.1/2" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 7 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
6 1 Buah Harga Terpasang Pipa Galvanis Dia. 2" Rp -
Bahan:
1 Pipa Galvanis Dia. 2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0625 Rp - Rp -
2 Tukang Oh 0,1 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,016 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 2" Rp -
7 1 Buah Harga Terpasang Pipa Galvanis Dia. 2.1/2" Rp -
Bahan:
1 Pipa Galvanis Dia. 2.1/2" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,078125 Rp - Rp -
2 Tukang Oh 0,125 Rp - Rp -
3 Kepala Tukang Oh 0,03125 Rp - Rp -
4 Mandor Oh 0,02 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 2.1/2" Rp -
8 1 Buah Harga Terpasang Pipa Galvanis Dia. 3" Rp -
Bahan:
1 Pipa Galvanis Dia. 3" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,09375 Rp - Rp -
2 Tukang Oh 0,15 Rp - Rp -
3 Kepala Tukang Oh 0,04 Rp - Rp -
4 Mandor Oh 0,024 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 3" Rp -
9 1 Buah Harga Terpasang Pipa Galvanis Dia. 4" Rp -
Bahan:
1 Pipa Galvanis Dia. 4" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,125 Rp - Rp -
2 Tukang Oh 0,2 Rp - Rp -
3 Kepala Tukang Oh 0,05 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 4" Rp -
10 1 Buah Harga Terpasang Pipa Galvanis Dia. 6" Rp -
Bahan:
1 Pipa Galvanis Dia. 6" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,1875 Rp - Rp -
2 Tukang Oh 0,3 Rp - Rp -
3 Kepala Tukang Oh 0,075 Rp - Rp -
4 Mandor Oh 0,048 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 6" Rp -
11 1 Buah Harga Terpasang Pipa Galvanis Dia. 8" Rp -
Bahan:
1 Pipa Galvanis Dia. 8" Buah 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,25 Rp - Rp -
2 Tukang Oh 0,4 Rp - Rp -
3 Kepala Tukang Oh 0,1 Rp - Rp -
4 Mandor Oh 0,064 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Buah Harga Terpasang Pipa Galvanis Dia. 8" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 8 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
PEKERJAAN AIR KOTOR DAN BEKAS
Peralatan Utama
1 1 Set Harga Terpasang STP Kap. 4 m3 Rp -
Bahan:
1 STP Kap. 4 m3 set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang STP Kap. 4 m3 Rp -
2 1 Set Harga Terpasang Sumpit Pump Package 1 (Lengkap) Rp -
Bahan:
1 Sumpit Pump Package 1 (Lengkap) set 1,00 Rp - Rp -
Pompa : 2 unit
Type Submercible Pump
Kap. 150 lpm
Head 10 m
Power : 1,5 Kw
Panel Kontrol
Kabel Kontrol
Material Bantu & Aksesories
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 2,5 Rp - Rp -
2 Tukang Oh 4 Rp - Rp -
3 Kepala Tukang Oh 2,5 Rp - Rp -
4 Mandor Oh 0,8 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Sumpit Pump Package 1 (Lengkap) Rp -
3 1 Set Harga Terpasang Grease trap Rp -
Bahan:
1 Grease trap set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Grease trap Rp -
4 1 Set Harga Terpasang Floor Clean Out Dia. 3" Rp -
Bahan:
1 Floor Clean Out Dia. 3" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,09375 Rp - Rp -
2 Tukang Oh 0,15 Rp - Rp -
3 Kepala Tukang Oh 0,0375 Rp - Rp -
4 Mandor Oh 0,024 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Floor Clean Out Dia. 3" Rp -
5 1 Set Harga Terpasang Floor Clean Out Dia. 4" Rp -
Bahan:
1 Floor Clean Out Dia. 4" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,125 Rp - Rp -
2 Tukang Oh 0,2 Rp - Rp -
3 Kepala Tukang Oh 0,05 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Floor Clean Out Dia. 4" Rp -
6 1 Set Harga Terpasang Roof Drain Dia. 3" Rp -
Bahan:
1 Roof Drain Dia. 3" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,09375 Rp - Rp -
2 Tukang Oh 0,15 Rp - Rp -
3 Kepala Tukang Oh 0,0375 Rp - Rp -
4 Mandor Oh 0,024 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Roof Drain Dia. 3" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 9 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
7 1 Set Harga Terpasang Roof Drain Dia. 4" Rp -
Bahan:
1 Roof Drain Dia. 4" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,125 Rp - Rp -
2 Tukang Oh 0,2 Rp - Rp -
3 Kepala Tukang Oh 0,05 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Roof Drain Dia. 4" Rp -
8 1 Set Harga Terpasang Floor Drain Rp -
Bahan:
1 Floor Drain set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,3125 Rp - Rp -
2 Tukang Oh 0,5 Rp - Rp -
3 Kepala Tukang Oh 0,125 Rp - Rp -
4 Mandor Oh 0,08 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Floor Drain Rp -
Pipa PVC AW
1 1 Set Harga Terpasang Pipa PVC AW Dia. 1/2" Rp -
Bahan:
1 Pipa PVC AW Dia. 1/2" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,015625 Rp - Rp -
2 Tukang Oh 0,025 Rp - Rp -
3 Kepala Tukang Oh 0,00625 Rp - Rp -
4 Mandor Oh 0,004 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 1/2" Rp -
2 1 Set Harga Terpasang Pipa PVC AW Dia. 3/4" Rp -
Bahan:
1 Pipa PVC AW Dia. 3/4" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0234375 Rp - Rp -
2 Tukang Oh 0,0375 Rp - Rp -
3 Kepala Tukang Oh 0,009375 Rp - Rp -
4 Mandor Oh 0,006 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 3/4" Rp -
3 1 Set Harga Terpasang Pipa PVC AW Dia. 1" Rp -
Bahan:
1 Pipa PVC AW Dia. 1" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,03125 Rp - Rp -
2 Tukang Oh 0,05 Rp - Rp -
3 Kepala Tukang Oh 0,0125 Rp - Rp -
4 Mandor Oh 0,008 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 1" Rp -
4 1 Set Harga Terpasang Pipa PVC AW Dia. 1.1/4" Rp -
Bahan:
1 Pipa PVC AW Dia. 1.1/4" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0390625 Rp - Rp -
2 Tukang Oh 0,0625 Rp - Rp -
3 Kepala Tukang Oh 0,015625 Rp - Rp -
4 Mandor Oh 0,01 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 1.1/4" Rp -
5 1 Set Harga Terpasang Pipa PVC AW Dia. 1.1/2" Rp -
Bahan:
1 Pipa PVC AW Dia. 1.1/2" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,046875 Rp - Rp -
2 Tukang Oh 0,075 Rp - Rp -
3 Kepala Tukang Oh 0,01875 Rp - Rp -
4 Mandor Oh 0,012 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 1.1/2" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 10 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
6 1 Set Harga Terpasang Pipa PVC AW Dia. 2" Rp -
Bahan:
1 Pipa PVC AW Dia. 2" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0625 Rp - Rp -
2 Tukang Oh 0,1 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,016 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 2" Rp -
7 1 Set Harga Terpasang Pipa PVC AW Dia. 2.1/2" Rp -
Bahan:
1 Pipa PVC AW Dia. 2.1/2" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,078125 Rp - Rp -
2 Tukang Oh 0,125 Rp - Rp -
3 Kepala Tukang Oh 0,03125 Rp - Rp -
4 Mandor Oh 0,02 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 2.1/2" Rp -
8 1 Set Harga Terpasang Pipa PVC AW Dia. 3" Rp -
Bahan:
1 Pipa PVC AW Dia. 3" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,09375 Rp - Rp -
2 Tukang Oh 0,15 Rp - Rp -
3 Kepala Tukang Oh 0,0375 Rp - Rp -
4 Mandor Oh 0,024 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 3" Rp -
9 1 Set Harga Terpasang Pipa PVC AW Dia. 4" Rp -
Bahan:
1 Pipa PVC AW Dia. 4" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,125 Rp - Rp -
2 Tukang Oh 0,2 Rp - Rp -
3 Kepala Tukang Oh 0,05 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa PVC AW Dia. 4" Rp -
PEKERJAAN HYDRANT DAN SPRINKLER
Peralatan Utama
1 1 Set Harga Terpasang Diesel Fire Pump, Lengkap Panel Kontrol Standart NFPA20 Rp -
Bahan:
1 Diesel Fire Pump, Lengkap Panel Kontrol Standart NFPA20 set 1,00 Rp - Rp -
Type Horizontal Split Case
Kap. 750 GPM /220 meter
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 2,5 Rp - Rp -
2 Tukang Oh 4 Rp - Rp -
3 Kepala Tukang Oh 2,5 Rp - Rp -
4 Mandor Oh 0,8 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Diesel Fire Pump, Lengkap Panel Kontrol Standart NFPA20 Rp -
2 1 Set Harga Terpasang Electric Fire Pump, Lengkap Panel kontrol standart NFPA20 Rp -
Bahan:
1 Electric Fire Pump, Lengkap Panel kontrol standart NFPA20 set 1,00 Rp - Rp -
Type Horizontal Split Case
Kap. 750 GPM 200kW/220 meter
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 2,5 Rp - Rp -
2 Tukang Oh 4 Rp - Rp -
3 Kepala Tukang Oh 2,5 Rp - Rp -
4 Mandor Oh 0,8 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Electric Fire Pump, Lengkap Panel kontrol standart NFPA20 Rp -
3 1 Set Harga Terpasang Jockey Fire Pump, Lengkap Panel Kontrol standart NFPA20 Rp -
Bahan:
1 Jockey Fire Pump, Lengkap Panel Kontrol standart NFPA20 set 1,00 Rp - Rp -
Type : Vertical Segment
Kap. 25 GPM/6 kW/240m
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 2,5 Rp - Rp -
2 Tukang Oh 4 Rp - Rp -
3 Kepala Tukang Oh 2,5 Rp - Rp -
4 Mandor Oh 0,8 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Jockey Fire Pump, Lengkap Panel Kontrol standart NFPA20 Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 11 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
4 1 Set Harga Terpasang Presure Tank 1000 liter lengkap dengan aksesories Rp -
Bahan:
1 Presure Tank 1000 liter lengkap dengan aksesories set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Presure Tank 1000 liter lengkap dengan aksesories Rp -
5 1 Set Harga Terpasang Siamese Dia. 100 mm Rp -
Bahan:
1 Siamese Dia. 100 mm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Siamese Dia. 100 mm Rp -
6 1 Set Harga Terpasang Pilar Hydrant 20K Dia. 100 mm Rp -
Bahan:
1 Pilar Hydrant 20K Dia. 100 mm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pilar Hydrant 20K Dia. 100 mm Rp -
7 1 Set Harga Terpasang Outdoor Hydrant Box Rp -
Bahan:
1 Outdoor Hydrant Box set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Outdoor Hydrant Box Rp -
8 1 Set Harga Terpasang Indoor Hydrant Box Rp -
Bahan:
1 Indoor Hydrant Box set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Indoor Hydrant Box Rp -
9 1 Set Harga Terpasang Sprinkler Head Rp -
Bahan:
1 Sprinkler Head set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Sprinkler Head Rp -
10 1 Set Harga Terpasang Thermatic Suppression / Hallon 3 kg Rp -
Bahan:
1 Thermatic Suppression / Hallon 3 kg set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Thermatic Suppression / Hallon 3 kg Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 12 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
11 1 Set Harga Terpasang Orifice Dia.150 mm Rp -
Bahan:
1 Orifice Dia.150 mm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Orifice Dia.150 mm Rp -
12 1 Set Harga Terpasang Sight Glass Dia. 150 mm Rp -
Bahan:
1 Sight Glass Dia. 150 mm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Sight Glass Dia. 150 mm Rp -
13 1 Set Harga Terpasang Presure Gauge Rp -
Bahan:
1 Presure Gauge set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Presure Gauge Rp -
14 1 Set Harga Terpasang Fire Extinguiser 3kg Rp -
Bahan:
1 Fire Extinguiser 3kg set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0625 Rp - Rp -
2 Tukang Oh 0,1 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,016 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Fire Extinguiser 3kg Rp -
15 1 Set Harga Terpasang Branch Control Valve Rp -
Bahan:
1 Branch Control Valve set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,625 Rp - Rp -
2 Tukang Oh 1 Rp - Rp -
3 Kepala Tukang Oh 0,25 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Branch Control Valve Rp -
Gate Valve 20K
1 1 Set Harga Terpasang Gate Valve 20K Dia. 1.1/4" Rp -
Bahan:
1 Gate Valve 20K Dia. 1.1/4" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0625 Rp - Rp -
2 Tukang Oh 0,1 Rp - Rp -
3 Kepala Tukang Oh 0,0625 Rp - Rp -
4 Mandor Oh 0,02 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Gate Valve 20K Dia. 1.1/4" Rp -
2 1 Set Harga Terpasang Gate Valve 20K Dia. 1.1/2" Rp -
Bahan:
1 Gate Valve 20K Dia. 1.1/2" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,075 Rp - Rp -
2 Tukang Oh 0,12 Rp - Rp -
3 Kepala Tukang Oh 0,075 Rp - Rp -
4 Mandor Oh 0,024 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Gate Valve 20K Dia. 1.1/2" Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 13 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
3 1 Set Harga Terpasang Gate Valve 20K Dia. 2" Rp -
Bahan:
1 Gate Valve 20K Dia. 2" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,1 Rp - Rp -
2 Tukang Oh 0,16 Rp - Rp -
3 Kepala Tukang Oh 0,1 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Gate Valve 20K Dia. 2" Rp -
4 1 Set Harga Terpasang Gate Valve 20K Dia. 2.1/2" Rp -
Bahan:
1 Gate Valve 20K Dia. 2.1/2" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,125 Rp - Rp -
2 Tukang Oh 0,2 Rp - Rp -
3 Kepala Tukang Oh 0,125 Rp - Rp -
4 Mandor Oh 0,04 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Gate Valve 20K Dia. 2.1/2" Rp -
5 1 Set Harga Terpasang Gate Valve 20K Dia. 3" Rp -
Bahan:
1 Gate Valve 20K Dia. 3" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,15 Rp - Rp -
2 Tukang Oh 0,24 Rp - Rp -
3 Kepala Tukang Oh 0,15 Rp - Rp -
4 Mandor Oh 0,048 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Gate Valve 20K Dia. 3" Rp -
6 1 Set Harga Terpasang Gate Valve 20K Dia. 4" Rp -
Bahan:
1 Gate Valve 20K Dia. 4" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,2 Rp - Rp -
2 Tukang Oh 0,32 Rp - Rp -
3 Kepala Tukang Oh 0,2 Rp - Rp -
4 Mandor Oh 0,064 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Gate Valve 20K Dia. 4" Rp -
7 1 Set Harga Terpasang Gate Valve 20K Dia. 6" Rp -
Bahan:
1 Gate Valve 20K Dia. 6" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,3 Rp - Rp -
2 Tukang Oh 0,48 Rp - Rp -
3 Kepala Tukang Oh 0,3 Rp - Rp -
4 Mandor Oh 0,096 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Gate Valve 20K Dia. 6" Rp -
8 1 Set Harga Terpasang Gate Valve 20K Dia. 8" Rp -
Bahan:
1 Gate Valve 20K Dia. 8" set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,4 Rp - Rp -
2 Tukang Oh 0,64 Rp - Rp -
3 Kepala Tukang Oh 0,4 Rp - Rp -
4 Mandor Oh 0,128 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Gate Valve 20K Dia. 8" Rp -
PEKERJAAN TATA UDARA
1 1 Set Harga Terpasang Wall Mounted Type Kap. 5000 Btu/h (Lengkap Dengan Bracket) Rp -
Bahan:
1 Wall Mounted Type Kap. 5000 Btu/h (Lengkap Dengan Bracket) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Wall Mounted Type Kap. 5000 Btu/h (Lengkap Dengan Bracket) Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 14 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
PEKERJAAN TATA UDARA
1 1 Set Harga Terpasang Wall Mounted Type Kap. 7000 Btu/h (Lengkap Dengan Bracket) Rp -
Bahan:
1 Wall Mounted Type Kap. 7000 Btu/h (Lengkap Dengan Bracket) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Wall Mounted Type Kap. 7000 Btu/h (Lengkap Dengan Bracket) Rp -
2 1 Set Harga Terpasang Wall Mounted Type Kap. 18000 Btu/h (Lengkap Dengan Bracket) Rp -
Bahan:
1 Wall Mounted Type Kap. 18000 Btu/h (Lengkap Dengan Bracket) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Wall Mounted Type Kap. 18000 Btu/h (Lengkap Dengan Bracket) Rp -
3 1 Set Harga Terpasang FAN Coil Unit Kap. 17.100 Btu/h (Lengkap Dengan Bracket) Rp -
Bahan:
1 FAN Coil Unit Kap. 17.100 Btu/h (Lengkap Dengan Bracket) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang FAN Coil Unit Kap. 17.100 Btu/h (Lengkap Dengan Bracket) Rp -
4 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 200 cfm Rp -
Bahan:
1 Exhaust Fan Ceiling Mounted Type Kap. 200 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 200 cfm Rp -
4 1 Set Harga Terpasang Ceilling Cassete Type Kap.34100 Btu/h (Lengkap Dengan Bracket) Rp -
Bahan:
1 Ceilling Cassete Type Kap.34100 Btu/h (Lengkap Dengan Bracket) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Ceilling Cassete Type Kap.34100 Btu/h (Lengkap Dengan Bracket) Rp -
5 1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 10200 Btu/h Rp -
Bahan:
1 Outdoor Unit Variable Refrigenrant Kap. 10200 Btu/h set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 1 Rp - Rp -
2 Tukang Oh 1,6 Rp - Rp -
3 Kepala Tukang Oh 1 Rp - Rp -
4 Mandor Oh 0,32 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 10200 Btu/h Rp -
6 1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 17070 Btu/h Rp -
Bahan:
1 Outdoor Unit Variable Refrigenrant Kap. 17070 Btu/h set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 1 Rp - Rp -
2 Tukang Oh 1,6 Rp - Rp -
3 Kepala Tukang Oh 1 Rp - Rp -
4 Mandor Oh 0,32 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 17070 Btu/h Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 15 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
7 1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 24000 Btu/h Rp -
Bahan:
1 Outdoor Unit Variable Refrigenrant Kap. 24000 Btu/h set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 1 Rp - Rp -
2 Tukang Oh 1,6 Rp - Rp -
3 Kepala Tukang Oh 1 Rp - Rp -
4 Mandor Oh 0,32 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Outdoor Unit Variable Refrigenrant Kap. 24000 Btu/h Rp -
8 1 Set Harga Terpasang Wall Mounted Type Kap. 9000 Btu/h (Lengkap Dengan Bracket) Rp -
Bahan:
1 Wall Mounted Type Kap. 9000 Btu/h (Lengkap Dengan Bracket) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Wall Mounted Type Kap. 9000 Btu/h (Lengkap Dengan Bracket) Rp -
9 1 Set Harga Terpasang Ceilling Cassete Type Kap. 17100 Btu/h (Lengkap Dengan Bracket) Rp -
Bahan:
1 Ceilling Cassete Type Kap. 17100 Btu/h (Lengkap Dengan Bracket) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Ceilling Cassete Type Kap. 17100 Btu/h (Lengkap Dengan Bracket) Rp -
10 1 Set Harga Terpasang Ceilling Cassete Type Kap. 24200 Btu/h (Lengkap Dengan Bracket) Rp -
Bahan:
1 Ceilling Cassete Type Kap. 24200 Btu/h (Lengkap Dengan Bracket) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,7875 Rp - Rp -
2 Tukang Oh 1,26 Rp - Rp -
3 Kepala Tukang Oh 0,7875 Rp - Rp -
4 Mandor Oh 0,252 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Ceilling Cassete Type Kap. 24200 Btu/h (Lengkap Dengan Bracket) Rp -
10 1 Set Harga Terpasang Pipa Refrigerant+Insulasi Rp -
Bahan:
1 Pipa Refrigerant+Insulasi set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0875 Rp - Rp -
2 Tukang Oh 0,14 Rp - Rp -
3 Kepala Tukang Oh 0,0875 Rp - Rp -
4 Mandor Oh 0,028 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa Refrigerant+Insulasi Rp -
11 1 Set Harga Terpasang Pipa Drain+Insulasi Rp -
Bahan:
1 Pipa Drain+Insulasi set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0875 Rp - Rp -
2 Tukang Oh 0,14 Rp - Rp -
3 Kepala Tukang Oh 0,0875 Rp - Rp -
4 Mandor Oh 0,028 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Pipa Drain+Insulasi Rp -
12 1 Set Harga Terpasang Rafnet Joint Rp -
Bahan:
1 Rafnet Joint set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0875 Rp - Rp -
2 Tukang Oh 0,14 Rp - Rp -
3 Kepala Tukang Oh 0,0875 Rp - Rp -
4 Mandor Oh 0,028 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Rafnet Joint Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 16 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
13 1 Set Harga Terpasang Rafnet Reducer Rp -
Bahan:
1 Rafnet Reducer set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0875 Rp - Rp -
2 Tukang Oh 0,14 Rp - Rp -
3 Kepala Tukang Oh 0,0875 Rp - Rp -
4 Mandor Oh 0,028 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Rafnet Reducer Rp -
14 1 Set Harga Terpasang Plenum Rp -
Bahan:
1 Plenum set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,1 Rp - Rp -
2 Tukang Oh 0,16 Rp - Rp -
3 Kepala Tukang Oh 0,1 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Plenum Rp -
15 1 Set Harga Terpasang Volume Damper Rp -
Bahan:
1 Volume Damper set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0875 Rp - Rp -
2 Tukang Oh 0,14 Rp - Rp -
3 Kepala Tukang Oh 0,0875 Rp - Rp -
4 Mandor Oh 0,028 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Volume Damper Rp -
16 1 Set Harga Terpasang Ducting Polyurethane Rp -
Bahan:
1 Ducting Polyurethane set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,1 Rp - Rp -
2 Tukang Oh 0,16 Rp - Rp -
3 Kepala Tukang Oh 0,1 Rp - Rp -
4 Mandor Oh 0,032 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Ducting Polyurethane Rp -
17 1 Set Harga Terpasang Flexible Joint Rp -
Bahan:
1 Flexible Joint set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,0875 Rp - Rp -
2 Tukang Oh 0,14 Rp - Rp -
3 Kepala Tukang Oh 0,0875 Rp - Rp -
4 Mandor Oh 0,028 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Flexible Joint Rp -
18 1 Set Harga Terpasang Supply Air Diffuser (SAD) Rp -
Bahan:
1 Supply Air Diffuser (SAD) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,025 Rp - Rp -
2 Tukang Oh 0,04 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,008 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Supply Air Diffuser (SAD) Rp -
19 1 Set Harga Terpasang Return Air Grill (RAG) Rp -
Bahan:
1 Return Air Grill (RAG) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,025 Rp - Rp -
2 Tukang Oh 0,04 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,008 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Return Air Grill (RAG) Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 17 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
20 1 Set Harga Terpasang Fresh Air Grill (FAG) Rp -
Bahan:
1 Fresh Air Grill (FAG) set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,025 Rp - Rp -
2 Tukang Oh 0,04 Rp - Rp -
3 Kepala Tukang Oh 0,025 Rp - Rp -
4 Mandor Oh 0,008 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Fresh Air Grill (FAG) Rp -
21 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 100 cfm Rp -
Bahan:
1 Exhaust Fan Ceiling Mounted Type Kap. 100 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,5 Rp - Rp -
2 Tukang Oh 0,8 Rp - Rp -
3 Kepala Tukang Oh 0,5 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 100 cfm Rp -
22 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 200 cfm Rp -
Bahan:
1 Exhaust Fan Ceiling Mounted Type Kap. 200 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,30 Rp - Rp -
2 Tukang Oh 0,48 Rp - Rp -
3 Kepala Tukang Oh 0,30 Rp - Rp -
4 Mandor Oh 0,10 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 200 cfm Rp -
23 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 300 cfm Rp -
Bahan:
1 Exhaust Fan Ceiling Mounted Type Kap. 300 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,30 Rp - Rp -
2 Tukang Oh 0,48 Rp - Rp -
3 Kepala Tukang Oh 0,30 Rp - Rp -
4 Mandor Oh 0,10 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 300 cfm Rp -
24 1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 700 cfm Rp -
Bahan:
1 Exhaust Fan Ceiling Mounted Type Kap. 700 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,30 Rp - Rp -
2 Tukang Oh 0,48 Rp - Rp -
3 Kepala Tukang Oh 0,30 Rp - Rp -
4 Mandor Oh 0,10 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Fan Ceiling Mounted Type Kap. 700 cfm Rp -
24 1 Set Harga Terpasang Exhaust Fan Wall Type Kap. 100 cfm Rp -
Bahan:
1 Exhaust Fan Wall Type Kap. 100 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,30 Rp - Rp -
2 Tukang Oh 0,48 Rp - Rp -
3 Kepala Tukang Oh 0,30 Rp - Rp -
4 Mandor Oh 0,10 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Fan Wall Type Kap. 100 cfm Rp -
25 1 Set Harga Terpasang Exhaust Fan Wall Type Kap. 300 cfm Rp -
Bahan:
1 Exhaust Fan Wall Type Kap. 300 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,30 Rp - Rp -
2 Tukang Oh 0,48 Rp - Rp -
3 Kepala Tukang Oh 0,30 Rp - Rp -
4 Mandor Oh 0,10 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Fan Wall Type Kap. 300 cfm Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 18 of 19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
26 1 Set Harga Terpasang Exhaust Fan Wall Type Kap. 500 cfm Rp -
Bahan:
1 Exhaust Fan Wall Type Kap. 500 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,30 Rp - Rp -
2 Tukang Oh 0,48 Rp - Rp -
3 Kepala Tukang Oh 0,30 Rp - Rp -
4 Mandor Oh 0,10 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Fan Wall Type Kap. 500 cfm Rp -
27 1 Set Harga Terpasang Exhaust Axial Fan Type Kap. 350 cfm Rp -
Bahan:
1 Exhaust Axial Fan Type Kap. 350 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,30 Rp - Rp -
2 Tukang Oh 0,48 Rp - Rp -
3 Kepala Tukang Oh 0,30 Rp - Rp -
4 Mandor Oh 0,10 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Axial Fan Type Kap. 350 cfm Rp -
28 1 Set Harga Terpasang Exhaust Axial Fan Type Kap. 700 cfm Rp -
Bahan:
1 Exhaust Axial Fan Type Kap. 700 cfm set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,5 Rp - Rp -
2 Tukang Oh 0,8 Rp - Rp -
3 Kepala Tukang Oh 0,5 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Exhaust Axial Fan Type Kap. 700 cfm Rp -
29 1 Set Harga Terpasang Wall Fan Dia. Propeller 16 Inch Rp -
Bahan:
1 Wall Fan Dia. Propeller 16 Inch set 1,00 Rp - Rp -
2 Sewa Alat 5% 0,05 Rp - Rp -
Jumlah Harga Bahan: Rp -
Tenaga Kerja:
1 Pekerja Oh 0,5 Rp - Rp -
2 Tukang Oh 0,8 Rp - Rp -
3 Kepala Tukang Oh 0,5 Rp - Rp -
4 Mandor Oh 0,16 Rp - Rp -
Jumlah Harga Tenaga Kerja: Rp -
Jumlah Harga Bahan+Jumlah Harga Tenaga Kerja Rp -
Keuntungan 10% Rp -
1 Set Harga Terpasang Wall Fan Dia. Propeller 16 Inch Rp -
Analisa Harga Satuan Pek. Mekanikal Plumbing - page 19 of 19
DAFTAR HARGA SATUAN BAHAN
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
1 Tanah Biasa /Tanah Urug m3 -
2 Sirtu m3 -
3 Pasir Pasang m3 -
4 Pasir Urug m3 -
5 Pasir Beton 1 m3 -
6 Split Mesin 2/3 m3 -
7 Base Couse A m3 -
8 Base Couse B m3 -
9 Batu Belah Pondasi m3 -
10 Bata Merah Bakar Kelas I bh -
11 Kerikil m3 -
12 Hebel M3 -
13 Batako 11x15x30 cm bh -
14 Semen Indonesia PC 50 Kg Sek. Tonasa zak -
15 Semen PC / Kg Sek. kg -
16 Semen Putih 20 Kg zak -
17 Thin Bed Mortar PM 100 40 kg -
18 Plester premium ( MU 100 ) 40 Kg 40 kg -
19 Acian ( MU 250 ) 40 Kg 40 kg -
20 Semen Instan Floor hardener @ 25 kg 25 kg -
21 Semen Warna kg -
22 Paving Blok Natural 8 cm K - 350 bh -
23 Paving Blok Natural 8 cm K - 200 bh -
24 Paving Blok Natural 6 cm K - 200 bh -
25 Grass Blok Warna 8 cm m2 -
26 Kanstin Paving Blok bh -
27 Batu Alam bh -
28 Beton K – 300 (ready mix) m3 -
BIAYA SEWA ALAT BERAT
1 Sewa Pompa Beton m3 -
2 Vibrator Hari -
3 Jack Hammer hari -
4 Min frame Pcs -
5 Cros brace pcs -
6 Join pin pcs -
7 U Head pcs -
8 Jack base pcs -
9 Swivel clamp pcs -
B. BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA
1 Plamur Tembok kg -
2 Dempul Plastik kg -
3 Cat Dasar Tembok kg -
4 Cat Dasar/Meni kayu/Besi kg -
5 Cat Tembok Exterior Dulux ICI / Jotun " kg -
6 Cat Tembok Exterior / Weathershield " Dulux ICI / Jotun " kg -
7 Cat Tembok Interior " Dulux ICI / Jotun " kg -
8 Cat Nippon Paint kg -
9 Surpricer kg -
10 Water Profing Emulsion kg -
11 Water Profing Membrance Sheet m2 -
12 Roll Cat Tembok bh -
13 Kape Tembok bh -
14 Kape Kayu bh -
15 Soligneum 1 blek 5 lt -
16 Kwas 3" bh -
17 Scrap / kape bh -
18 Dempul Halus / Imfra ( Wood Filler ) kg -
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
19 Terpentin lt -
20 Tiner A lt -
21 Tiner B lt -
22 Ampelas lbr -
23 Ampelas halus/duco lbr -
24 Dempul Kayu/Plamir kg -
25 Meni Kayu / Besi kg -
26 Sincromat kg -
27 Cat Kayu kg -
28 Cat Besi kg -
29 Cat Duco kg -
30 Politur jadi " Pinogard" kg -
31 Sanding saller kg -
32 Wood Stain lt -
33 Top Coat Clear Doff lt -
34 Melamin lack Clear Gloss lt -
35 Melamin Lack Clear Doff lt -
36 Dempul Kayu Cap Kucing kg -
37 Lem FOX kg -
38 Lem Kuning kg -
39 Minyak Bekisting Ltr -
40 Solar Non Subsidi Ltr -
41 Minyak Pelumas Ltr -
42 Air m3 -
43 strorox -100 kg -
44 Watterstop PVC Maspion WSF 150 Lbr 15 cm m -
45 Bahan anti Rayap sek, Fumida Ltr -
C. BAHAN KAYU BERIKUT BAHAN JADINYA
1 Kayu kelas III ( Kayu Terentang ) m3 -
2 Kayu Balok kelas II m3 -
3 Kayu Papan kelas II m3 -
4 Kayu Balok kelas I (Kamper Samarinda)/Besi m3 -
5 Kayu Papan kelas I (Kamper Samarinda)/Lingua m3 -
6 Kayu kelas Perancah m3 -
7 Lis Jati Jabar btg -
8 Kayu Solid 5/10 btg -
9 Dolken 5 s/d 7 bt -
10 Dolken 7 s/d 10 bt -
11 Bambu Φ 6 cm -8 cm bt -
D. BAHAN PLAFOND
1 Eternit 4 mm 100x100 cm m2 -
2 Gypsum Tile ( Accoustic ) 60 x 120 cm Ex. Knauf, t = 9 mm lbr -
3 Hardflek / GRC 120 x 240 t = 4 mm lbr -
4 GRC / Calsiboard 120 x 240 t = 8 mm lbr -
5 Gypsum Board 120 x 240 t = 9 mm ex.DN lbr -
6 Plafond PVC (Javapond) Lebar 20 Panjang 400 Tebal 0.8 cm m2 -
7 List profil Gypsum C-7 m1 -
8 Plaster Board m1 -
9 List Profil U Alumunium m1 -
10 List Kayu Profil Kamper m1 -
11 Sekrop Gypsum/GRC kg -
12 Semen Compound Adhesive, @20 Kg kg -
13 Joint Tape @ 75 m roll -
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
E. BAHAN KAYU LAPIS
1 Triplek 3 mm 120 x 240 lbr -
2 Triplek 4 mm 120 x 240 lbr -
3 Multiplek 6 mm 120 x 240 lbr -
4 Multiplek 9 mm 120 x 240 lbr -
5 Multiplek 12 mm 120 x 240 lbr -
6 Multiplek 18 mm 120 x 240 lbr -
7 Teak Wood 4 mm 90 x 220 lbr -
8 HPL lbr -
9 Beswood lbr -
10 Acrylic Warna Susu 1,22x2,44, tebal 4 mm lbr -
11 Wallpaper Bergambar m2 -
12 Engineering Door Panel Kayu Oven, Honey Comb Double HPL, Wood Unit -
13 Folding Door m2 -
14 GRC Panel Karawangan m2 -
F. BAHAN LANTAI DAN PELAPIS DINDING
1 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip bh -
2 Keramik 30 x 30 (KM) KW I DN Corak / Warna / Anti Slip bh -
3 Guiding Block 30 x 30 bh -
4 Dinding 30 x 60 Homogenius Tile Bh -
5 Dinding 60 x 60 Homogenius Tile Bh -
6 Homogenius Tile Ukuran 60 x 60 cm Polished Bh -
7 Homogenius Tile Ukuran 60 x 60 (Border) Bh -
8 Vinyl M2 -
9 Plint 10 x 60 cm Bh -
10 Step Nozing 10 x 60 cm Bh -
11 Batu Andesit Susun Sirih 3 x 30 m2 -
12 Batu Andesit 30 x 60 m2 -
13 Batu Andesit 20 x 40 m2 -
14 Koral Sikat ( Batu Sikat) kg -
15 Keramik 40 x 40 KW I DN m2 -
16 Bata Krawang Bh -
17 Wall paper @ 10mx1,1m Roll -
18 Wall paper ( kls menengah ) m2 -
19 Keramik 20 x 20 KW I DN Corak m2 -
20 Keramik 20 x 25 Dinding KW I DN Corak m2 -
G. BAHAN LOGAM DAN BAHAN JADINYA
1 Besi Tulangan Beton U-24 Polos kg -
2 Besi Tulangan Beton U-42 Ulir kg -
3 Wiremesh M8, 2,1 x 5,4 meter, Mutu Baja U50 kg -
4 Kwat Baja Dilas kg -
5 Besi C Lip Chanel kg -
6 Besi Profil DN SII kg -
7 IWF Ex. DN SII kg -
8 Besi Plat Baja Tipis 2 mm s/d 5 mm kg -
9 Hollow Baja 75x75mm, t = 3,2 mm @ 6 mtr Btg -
10 Besi Hollow Galvanis 25x50 mm tebal = 1.1 mm @ 6mtr Btg -
11 Besi Hollow Galvanis 40x80 mm tebal = 2 mm @ 6mtr Btg -
12 Besi Hollow Galvanis 40x60 mm tebal = 1.1 mm @ 6mtr Btg -
13 Besi Hollow Galvanis 40x40mm tebal = 2.0 mm @ 6mtr Btg -
14 Besi Hollow Galvanis 40x40mm tebal = 0,4 mm @ 6mtr Btg -
15 Besi Hollow Galvanis 20x40mm tebal = 0,4 mm @ 6mtr Btg -
16 Plat Floor Deck T=0.75 mm Type A-890 (Cahaya deck) m2 -
17 Besi Beton Weirmes M-10 Uk. 2,1x5,4 "Cahaya deck" m2 -
18 Ram Kawat Harmonika M2 -
19 Kawat Beton kg -
20 Kawat Las Listrik kg -
21 Kawat Stainles btg -
22 Plat Stainles btg -
23 Metal Stud btg -
24 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) m1 -
25 Kusen Alumunium Warna 1.3 mm t=1.3 mm ( 4" ) m1 -
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
26 Daun Jendela Alumunium Warna ( Tanpa Kaca ) m1 -
27 Daun Pintu Alumunium Natural ( Tanpa Kaca ) m2 -
28 Daun Pintu Alumunium Warna ( Tanpa Kaca ) m2 -
29 Jalusi Alumunium Warna m2 -
30 Prifil Kaca m -
31 Floordeck/Metal Sheet t = 0.85 mm Lebar 1 m m2 -
32 U Alumunium 1 cm m1 -
33 Alumunium Strip 10 mm m1 -
34 Rangka Metal Stud m2 -
35 Seng Gelombang BJLS 28 ( 80 x 180 cm ) lbr -
36 List Karet Assesoris Kusen/Pintu Alumunium m1 -
37 Sealant @ 200mm m1 -
38 Sealant @ 200mm Tube -
39 Mesin Otomatis Sliding Door (Type ES200 Dorma) Unit -
40 Body Kunci + Celender bh -
41 Full Handle Stainless Steell Sek. Dekson bh -
42 Lever Handle Sek. Dekson bh -
43 Floor Hinges, Setara Deckson FH 84 bh -
44 Kunci 2 Slaag Silinder Utama Standard bh -
45 Kunci KM Bulat ALPHA biasa bh -
46 Kunci Pintu besi bh -
47 Engsel Pintu Besi bh -
48 Engsel Casement Iron Friction Stay 8" Psg -
49 Handle Alumunium ( Tarikan Pintu Alumunium ) psg -
50 Handle Pintu Geser bh -
51 Engsel EES DL 5X3 X3 MM 4 BB SSS Psg -
52 Hendle PH D268 2x4x80x60 SSS+WOOD Psg -
53 Hendle LHSR 0058 SSS ( SOLID) Psg -
54 Hendle LS T6200 BT SSS Psg -
55 Hendle PP 012 SSS Psg -
56 Pull Handle, PH 802 32x800 SSS+PSS Psg -
57 Martice lock MTS IL DL 8585 SSS Psg -
58 Cylinder Sek. CYL DC DL 60 MM SN Set -
59 Escutcheon ESCN DOI SSS Set -
60 Flush Bolt Sek. FB 88 6″+12″SN Set -
61 Dust Proof Strike ESDN DOI SSS Set -
62 Door Closer DCL 529 NHO NA Set -
63 Door Closer DCL 300 HO Set -
64 Sign Plate SPOO 2A SSS (PUSH) Set -
65 Tubular Lever Set LS T6300 BK SSS (For Toilet) Set -
66 Door Lorrer Set -
67 Bottem Real Set -
68 Lockset Set -
69 Floor Hinges, Fh 84 IDR Psg -
70 Sliding Rail SR 8901 04 (MAX 100 KG) set -
71 Patch Fitting US 10 PSS Bh -
72 Patch Fitting PT 10 PSS Bh -
73 Patch Fitting PT 20 PSS Bh -
74 Patch Fitting PT 30 PSS Bh -
75 Friction Stay DELUXE FS HD T250-20″ Bh -
76 Friction Stay DELUXE FS HD T250-16″ Bh -
77 Casemet Handle CH 420 NA Bh -
78 Engsel Pintu Coboy Stenlis Stell 3" ps -
79 Engsel Pintu Aluminium ps -
80 Handle Pintu/Tarikan pintu ps -
81 Engsel Pintu Tanam (Floor Hinges) sek.Dorma ps -
82 Engsel Pintu Besi (Engsel bubut) bh -
83 Casement Handle Psg -
84 Sloot Pintu Tanam/Espanolet bh -
85 Kunci Pintu Utama Bh -
86 Rel Laci psg -
87 Engsel Pintu psg -
88 Tarikan bh -
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
H. BAHAN KACA
1 Kaca Polos 3 mm ( ASAHI ) m2 -
2 Kaca Polos 5 mm ( ASAHI ) m2 -
3 Kaca Polos 6 mm ( ASAHI ) m2 -
4 Kaca Reybend 5 mm 25 %( ASAHI ) m2 -
5 Kaca One Way 5 mm (ASAHI) m2 -
6 Kaca Polos 8 mm ( ASAHI ) m2 -
7 Kaca Polos 10 mm ( ASAHI ) m2 -
8 Kaca Polos 12 mm ( ASAHI ) m2 -
9 Kaca Cermin Tebal 6 mm m2 -
10 Kaca Silvel Green 8 mm ( ASAHI ) m2 -
11 Jendela Naco bh -
12 Glass Block DN 20 x 20 ( Kedawung ) bh -
13 Kaca Float Tempered 12mm m2 -
14 Kaca Float Tempered 10mm m2 -
15 Cutting Sticker / Sunblast m2 -
16 Pytogram Plat stainless Steel + Logo bh -
17 Logo Mahkamag Agung Republik Indoesia Bahan Kuningan Unit -
18 Almunium Composite Panel Sekualitas Seven PVDF m2 -
19 Hurup Timbul Bahan Arcylic Gold cm -
20 Hurup Timbul Bahan Arcylic Putih cm -
21 Hurup Timbul Bahan Stainlless cm -
22 Logo Pengadilan Agama Tahuna Bahan Arcylic Unit -
I. BAHAN PAKU DAN MUR BAUT
1 Paku 1 cm s/d 3 cm kg -
2 Paku 4 cm s/d 7 cm kg -
3 Paku 8 cm s/d 12 cm kg -
4 Skrup Pisher bh -
5 Skrup Fiper bh -
6 Paku Skrup. 12 s/d 20 cm. bh -
7 Duk Angker bh -
8 Angker Mur Baut dia. D 16 -19 / Panjang 60 cm bh -
9 Angker Mur Baut dia. D 16 - D 19 bh -
10 Mur Baut HTB dia. 16 mm s/d 19 mm (5cm) bh -
11 Mur Baut Biasa dia. 10 mm s/d 16 mm (5cm ) bh -
12 Ramset 12 cm sd. 20 cm bh -
13 Dinabolt bh -
14 Paku Sekrup (Atap Bitumen) bh -
15 Ring Plat t=3mm dia.1" bh -
16 Pisher dia. 12 s/d 20 cm. bh -
17 Paku Skrup 1 1/4 dus -
18 Paku Skrup 1 1/2 dus -
19 Paku Skrup 5/8 dus -
20 Paku Skrup 1/4 dus -
21 Paku Skrup 1/6 dus -
22 Paku Skrup fixer bh -
23 Asesories Stainlesstell bh -
J. BAHAN PERPIPAAN
1 Pipa Stainlesstell A Ø 1,5" ( Pjg. 6 m', tbl. 1,5 mm ) bt -
2 Pipa Stainlesstell A Ø 2" ( Pjg. 6 m1 , tbl. 1,5 mm) bt -
3 Pipa Stainlesstell A Ø 2.5" (Pjg. 6 m1, lbr. 1,5 mm ) bt -
4 Pipa Stainlesstell Kotak 4/6 cm ( 6 m1 ) bt -
5 Pipa Stainlesstell Kotak 4/4 cm ( 6 m1 ) bt -
6 Stil Plate Stainlesstell bt -
7 Pipa GIP Ø 1.5" ( 6 m1 ) bt -
8 Pipa GIP Ø 2" ( 6 m1 ) bt -
9 Pipa GIP Ø 6" ( 6 m1 ) bt -
HARGA SAT
NO. JENIS BAHAN BANGUNAN SAT.
Rp.
K. BAHAN PENUTUP ATAP
Ref. Produk, Rangka Atap Baja Ringan: Giga Steel, SmartTruss, EKG
Ref. Produk Penutup Atap: Ondoline , Monolayer Ukuran 106 x 40 x 0.3 Cm
1 Rangka Atap Baja Ringan m2 -
Baja Ringan TS 150-C75-075
Baja Ringan CR.75-065
Baja Ringan BR.32-055
2 Alumunium Foil m2 -
3 Listplank GRC / Woodplank t = 8mm, L=30cm m1 -
4 Genteng Metal Uk. 106 x 86 (Sakura Roof ) m2 -
5 Genteng Bitumen Monolayer 3 mm sek Onduline Uk 106 x 40 x 0.3 cm lbr -
6 Genteng Bitumen Monolayer 3 mm sek Onduline Uk 200 x 95 x 0.3 cm lbr -
7 Bubung Bitumen Monolayer m1 -
L. BAHAN SANITARY
Ref Produk : Sekualitas TOTO, American Standar, HCG
1 Closet Dududk Type CW 632 J/SW 6372 JP -
2 Closet Dududk Type C704L/SW 784 JF -
3 Closet Dududk Type CW826J-SW826JP -
4 Closet Jongkok TYPE CE 7 -
5 Washtafel L 521VIA Ex Toto -
6 Washtafel LW 240CJ Ex Toto -
7 Washtafel LW 649 CJ Ex Toto -
8 Washtafel LW 248 JT Ex Toto -
9 Urinal TYPE U57 M/370 M -
10 Urinal Divider TYPE A 100 -
11 Lavatory Faucet Type TX 108 LJ -
12 Shower Mixer TX 433 SJN -
13 Fixed Shower Head Type TX 465 SEN -
14 Bak Sink 1 lubang Stainless Steel dalam bak 21 cm -
15 Kitchen Faucet TX 606 Kes -
16 Kran dinding -
17 Kran Kitchen Sink TOTO Type TX605 KES -
18 Towel Ring Tpe TX 3 AI -
19 Towel Horder Type TX 726 AES -
20 Paper Holder Type TX 720 ACRb -
21 Grab Ban Type TX 3 AI -
22 Hand Shower/Shower Spay Type THX 20 NBW -
23 Jet Shower Spray -
24 Robe Hook Type -
25 Floor Drain -
26 Roof Drain 4 " -
27 Bak Fiberglass -
M. BIAYA PENYEDIAAN ALAT K3
1 Helm project Pekerja Bh -
2 Helm project Direksi Bh -
3 Bodyharness Bh -
4 Safetyshoes Pekerja Bh -
5 Safetyshoes Direksi Sek. Kings Bh -
6 Safetybelt Bh -
7 Jaring Pengaman Set -
8 Marka (Tambang, Besi pembatas, Sign) Set -
HARGA UPAH DAN BAHAN PEKERJAAN ELEKTRIKAL
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
NO UPAH & BAHAN HARGA SATUAN
1 2 3
I. UPAH TENAGA KERJA
1 Pekerja Rp - Oh
2 Tukang Rp - Oh
3 Kepala Tukang Rp - Oh
4 Mandor Rp - Oh
II. BAHAN/MATERIAL
A. Kabel Feeder
1 NYA 1x1.5 mm² Rp - /meter
2 NYA 1x2.5 mm Rp - /meter
3 NYA 1x185 mm Rp - /meter
4 NYA 1x240 mm Rp - /meter
5 NYA 1x300 mm Rp - /meter
6 NYA 1x400mm Rp - /meter
6 NYA 2 x 1.5 mm2 + Pipa Hi Conduit dia 20 mm Rp - /meter
7 NYM 2x1.5 mm Rp - /meter
8 NYM 2x2.5 mm Rp - /meter
9 NYM 2x4 mm Rp - /meter
10 NYM 2x6 mm Rp - /meter
11 NYM 2x10 mm Rp - /meter
12 NYM 3x1.5 mm Rp - /meter
13 NYM 3x2,5 mm² Rp - /meter
14 NYM 3x4 mm² Rp - /meter
15 NYM 3x6 mm Rp - /meter
16 NYM 3x10 mm Rp - /meter
17 NYM 4x1.5 mm Rp - /meter
18 NYM 4x2.5 mm Rp - /meter
19 NYM 4x4 mm Rp - /meter
20 NYM 4x6 mm Rp - /meter
21 NYM 4x10 mm Rp - /meter
21 NYY 1x70 mm² Rp - /meter
22 NYY 3x2,5 mm² Rp - /meter
23 NYY 3x4 mm² Rp - /meter
24 NYY 3x6 mm² Rp - /meter
25 NYY 4x1,5 mm² Rp - /meter
26 NYY 4x2,5 mm² Rp - /meter
27 NYY 4x4 mm² Rp - /meter
28 NYY 4x6 mm² Rp - /meter
29 NYY 4x10 mm² Rp - /meter
30 NYY 4x16 mm² Rp - /meter
31 NYY 4x25 mm² Rp - /meter
32 NYY 4x35 mm² Rp - /meter
33 NYY 4x50 mm² Rp - /meter
34 NYY 4x70 mm² Rp - /meter
35 NYY 4x95 mm² Rp - /meter
36 NYY 4x120 mm² Rp - /meter
37 NYY 4x150 mm² Rp - /meter
38 NYY 4x185 mm² Rp - /meter
39 NYY 4x240 mm² Rp - /meter
40 NYY 4x300 mm² Rp - /meter
41 NYFGby 4x70 mm Rp - /meter
42 NYFGby 4x95 mm Rp - /meter
42 NYFGby 4x120 mm Rp - /meter
43 NYFGby 4x150 mm Rp - /meter
44 NYFGby 4x185 mm Rp - /meter
45 NYFGby 4x240 mm² Rp - /meter
46 NYFGby 4x300 mm Rp - /meter
47 NYA/BC 4 mm Rp - /meter
48 NYA/BC 6 mm Rp - /meter
49 NYA/BC 10 mm Rp - /meter
Upah dan Bahan Pek. Elektrikal - page 1 of 5
NO UPAH & BAHAN HARGA SATUAN
50 NYA/BC 16 mm Rp - /meter
51 NYA/BC 25 mm Rp - /meter
52 NYA/BC 35 mm Rp - /meter
53 NYA/BC 50 mm Rp - /meter
54 NYA/BC 70 mm Rp - /meter
55 NYA/BC 95 mm Rp - /meter
56 NYA/BC 120 mm Rp - /meter
57 NYA/BC 150 mm Rp - /meter
58 N2XSY 1x70 mm Rp - /meter
59 N2XSY 1x120 mm Rp - /meter
B. Armatur penerangan dan lampu
1 Lampu TL LED 2 x28 W, Cover Lovre dipasang rata Plafon Rp - /set
2 Lampu TL LED 2 x28 W Rp - /set
3 Lampu TL LED 2 x 28 W Emergency Rp - /set
4 Lampu TL LED 1 x28 W, (V-Shape) Rp - /set
5 Lampu TL LED 1 x12 W, pasang pada cove wastafel Rp - /set
6 Lampu Down Light13 W Rp - /set
7 Lampu Down Light Par 38 40watt Rp - /set
8 Lampu LED Stip Rp - /set
8 Lampu Down Light LED 7 W Rp - /set
9 T8.TL 2x18W RM Louver Rp - /set
10 T8.TL 2x18W RM Prismatic + Battery Rp - /set
11 Spot Light 100 Watt Rp - /set
12 Exit Lamp 10 Watt Rp - /buah
13 Saklar single Rp - /buah
14 Saklar double Rp - /buah
15 Saklar tukar Rp - /buah
C. Outlet penerangan dan daya
1 Stop kontak 1 Phasa Rp - /buah
2 Stop kontak 1 Phasa type floor Rp - /buah
3 Rp -
Stop kontak 3 Phasa buah
D. Kabel tray
1 Kabel tray 200 mm Rp - /meter
2 Kabel tray 300 mm Rp - /meter
3 Kabel tray 400 mm Rp - /meter
4 Kabel tray 600 mm Rp - /meter
5 Tee Tray 200 mm Rp - /meter
6 Tee Tray 300 mm Rp - /meter
7 Tee Tray 400 mm Rp - /meter
8 Tee Tray 600 mm Rp - /meter
9 Kabel Ladder 200 mm Rp - /meter
10 Kabel Ladder 600 mm Rp - /meter
F. Pekerjaan Fire Alarm
1 Main Control Panel Fire Alarm Addressable Rp - set
256 Address c/w peralatan
Line Surge Arrester
Battery 4 Jam Nicad Type (Rechargeable)
2 Power Supply Rp - unit
3 Interconection Panel/ w Module, Acessories Rp - unit
4 Pengkabelan di ruang kontrol Rp - Ls
5 Programing ,Testing dan Commisioning Rp - Ls
6 Firemans telepon dan Handset (Provisional) Rp - Set
7 Announciator addreasable LCD Rp - unit
8 STP AWG #18 + NYA 2 x 1,5 mm di dalam PVC Hi Conduit dia 20 mm Rp - titik
Dari MCFA ke Annunciator
9 FRC 3 x 1,5 mm2 di dalam PVC Conduit dia 20 mm
MCP-FA ke Pressurized Fan Rp - titik
MCP-FA ke LVMDP Rp - titik
MCP-FA ke Genset Monitoring Rp - titik
KMCP-FA ke Hydrant Pump Rp - titik
10 STP AWG #18 , NYA 2X 1,5 mm² di dalam PVC Conduit dia 20 mm dari :
MCFA ke TB-FA.Lt1 Rp - titik
TBFA-Lt.1 ke TBFA Lt.2 Rp - titik
TBFA-Lt.2 ke MCFA Rp - titik
11 NYA 4 mm2 untuk GROUNDING dari :
MCFA ke TBFA Lt.2 Rp - titik
TBFA Lt.1 ke Rp - titik
Upah dan Bahan Pek. Elektrikal - page 2 of 5
NO UPAH & BAHAN HARGA SATUAN
12 di dalam PVC Conduit dia 20 mm dari :
Firemans telepon ke TBFA Lt.2 Rp - titik
TBFA Lt.1 ke Rp - titik
13 Terminal Box/ W. Module Zone, Acessories Rp - set
14 MCFA sEMI Addressable 24 zone Rp - /unit
15 MDF/ CTB Rp - /unit
16 Terminal Box Fire Rp - /buah
17 Smoke Detector Rp - /buah
18 Rate of Rise Detector Rp - /buah
19 Heat Detector Rp - /buah
20 Break Glass Rp - /buah
21 Alarm Bell Rp - /buah
22 Indicator Lamp Rp - /buah
23 Twisted Shelded 18,2 PAIR 2 x 1,5 mm2 Rp - /buah
24 EOL Rp - /buah
25 FRC 2x1.5 mm2 Rp - /buah
H. Pekerjaan Telepon
1 Outlet Telephone Rp - /buah
2 Terminal Box 20 Pairs Rp - /buah
3 Kabel ITC 2x0,6 mm2 Rp - /meter
4 Kabel Coaxial RG8 ( 0,6 mm2 ) Rp - /meter
I. SOUND SISTEM
1 240 W/300W Power Amplifier Rp - /unit
2 DYNAMIC HANDHELD MICROPHONE Rp - /unit
3 Conference Control Unit Rp - /unit
4 Chairmant Mic Unit Rp - /unit
5 Delegate Mic Unit Rp - /unit
6 Column Speaker min. 30 Watts Rp - /unit
Instalasi Kabel Telemergency dari TB-TS.1 ke Unit Ruang sidang, Kabel 2x1, 5mm2
7 Rp - ttk
dengan pipa Conduit
8 Instalasi Column Speaker dengan Kabel 2 x 1, 5mm2 di dalam pipa Conduit Rp - ttk
9 Autorserve Cassete Rp - /unit
10 CD Playaer Rp - /unit
11 Equalizer Card ( VX-200 ) Rp - /unit
12 Mixer Frame w/ Module (V-1000B ) Rp - /unit
13 Pagging Microphone PM 660D/1 ( w/ RU-2001 ) Rp -
14 Radio Tunner AM/FM ( V-1034B ) Rp - /unit
15 Speaker Selector ( SS-021B ) Rp - /buah
16 Ceiling Speaker ( ZS-646R ) Rp - /buah
17 Coulumn speaker 20 watt Rp - /buah
18 Fire Dome Speaker Rp - /buah
19 Horn Speaker Rp - /buah
20 Attenuator Rp - /buah
21 Kabel NYMHY 2x1,5 mm2 Rp - /meter
22 Kabel NYMHY 3x1,5 mm2 Rp - /meter
23 Kabel NYMHY 3( 3 x2,5 mm2 ) Rp - /meter
24 Terminal Box / TB Rp - /buah
25 MDF / CTB Rp - /unit
26 Cabinet Rack Rp - /unit
27 Volume Control Rp - /buah
J. CCTV
1 NVR Samsung SRN-1670D Rp - /unit
2 VIEWSONIC Multi-touch Monitor LED 24" Rp - /unit
3 Switch D-LINK DGS-1210-20 16 port Rp - /unit
4 Switch Hub Managed TPLink 8 Port TL SG3210 Rp - /unit
5 D-LINK Switch Unmanaged [DGS-1005A] 5 port Rp - /unit
6 PC Computer + Printer Rp - /unit
7 Fixed Dome Camera Rp - /buah
8 Camera With Rotation Rp - /buah
9 Terminal Box CCTV Rp - /unit
Upah dan Bahan Pek. Elektrikal - page 3 of 5
NO UPAH & BAHAN HARGA SATUAN
K. DATA
1 HP ProLiant DL320eG8-421 Rp - /unit
2 Switch Data 12 port Rp - /unit
3 Switch Data 16 port Rp - /unit
4 Switch Data 24 port Rp - /unit
5 Switch Data 32 port Rp - /unit
6 Switch Data 48 port Rp - /unit
7 Monitor Rp - /unit
8 Printer Rp - /unit
9 Outlet Data Rp - /buah
10 Kabel UTP- Cat 6 Rp - /meter
11 Optical Network Unit (ONU) Rp - /buah
12 Wi-fi Router Akses Point Rp - /buah
L. Material dan alat bantu
1 Inbown dus Rp - /buah
2 Fisher s6 Rp - /buah
3 Ballast electronik 28 Watt Rp - /buah
4 Pipa Conduit 20 mm² Rp - /meter
5 Pipa Conduit 25 mm² Rp - /meter
6 Klem pipa conduit 20 mm² Rp - /buah
7 Klem pipa conduit 25 mm² Rp - /buah
8 T dus Rp - /buah
9 Rp -
Soket Conduit buah
10 Rp -
Flexible conduit 20mm meter
11 Isolasi Rp - /roll
12 Kabel ties Rp - /buah
13 Kawat bendrat Rp - /buah
14 Dina Bolt 8 mm Rp - /buah
15 Siku 4 Rp - /buah
16 As Drat 8mm Rp - /buah
17 Mur Baut 8 Rp - /buah
M. IPTV
1 Kabel Serat Optik Rp - /meter
2 Booster Rp - /buah
3 Spliter 2 Way Rp - /buah
4 Passive Optical Splitter 1/8 Rp - /buah
5 Passive Optical Splitter 1/16 Rp - /buah
6 Outlet IPTV Rp - /buah
N. Nurse Call
1 Ceilling Sub Stations Rp - /buah
2 Corridor Call Light up to 3 Subs Rp - /buah
3 Call Reset Button Rp - /buah
4 Hand-Held Call Button Rp - /buah
5 Bathroom Pull Card (BPC) Rp - /buah
6 Call Master PTT Rp - /set
7 Power Supply Adaptor 24 V PS-2420S Rp -
set
O. Panel
1 Box Panel Rp - /unit
2 Box panel 40x60 cm Rp - /unit
3 Box panel 80x120cm Rp - /unit
4 Box MCB Plastik Rp - /unit
5 MCB 2A 1P/6Ka Rp - /buah
6 MCB 6A 1P/6Ka Rp - /buah
7 MCB 10A 1P/6Ka Rp - /buah
8 MCB 16A 1P/10Ka Rp - /buah
9 MCCB 50A 3P/18Ka Rp - /buah
10 MCCB 80A 3P/18Ka Rp - /buah
11 MCB 20A 3P/10Ka Rp - /buah
12 MCB 25A 3P/10Ka Rp - /buah
13 MCB 35A 3P/16Ka Rp - /buah
14 MCB 50A 3P/16Ka Rp - /buah
15 MCB 10A 3P/10Ka Rp - /buah
16 MCCB 16A 3P/10Ka Rp - /buah
17 MCCB 35A 3P/10Ka Rp - /buah
Upah dan Bahan Pek. Elektrikal - page 4 of 5
NO UPAH & BAHAN HARGA SATUAN
18 MCB 20A 3P/10Ka Rp - /buah
19 MCCB 100A 3P/25Ka Rp - /buah
20 MCCB 160A 3P/35Ka Rp - /buah
21 MCCB 200A 3P/36Ka Rp - /buah
22 MCCB 320A 3P/50Ka Rp - /buah
23 Busbar 12x2x40 Rp - /btg
24 Busbar 15x3x40 Rp - /btg
25 Busbar 25x3x40 Rp - /btg
26 Busbar 30x5x40 Rp - /btg
27 Busbar 40x5x40 Rp - /btg
28 Busbar 50x5x40 Rp - /btg
29 Busbar 80x5x40 Rp - /btg
30 Busbar 100x10x40 Rp - /btg
31 Busbar 200x10 mm Rp - /btg
32 Busbar Sisir Rp - /buah
P. Generating Set
Unit Utama
1 Unit Genset, Kapasitas : 150 KVA Rp - /unit
2 Panel Control AMF, Rp - /unit
3 Pemindahan genset ke Pondasi Rp - /unit
Sistem Bahan Bakar
4 Storage Tank, Kapasitas : 1000 Liter (Tangki Harian) Rp - /unit
5 Electric Transfer Pump 60 lpm / Gear Pump Rp - /unit
6 Hand Pump 8 lpm Rp - /unit
Sistem Elektrikal
1 Kabel dari Genset ke P.Genset, NYY 4x1Cx 240mm2) Rp - /meter
2 Kabel ke Elektrik Transfer Pump, NYY 4 x 2,5 mm2 Rp - /meter
3 Kabel kontrol Genset dari Panel Genset ke LVMDP NYY 4 x 6mm2 Rp - /meter
4 Sound Atenuator Genset (Intake & Exhuse) Rp - /ls
5 Grille & Louvre Atenuator Ruang Genset Rp - /buah
6 Testing & commisioning Rp - /ls
7 Peralatan dan Matrial Bantu Rp - /ls
Grounding Elektrikal
1 Pengeboran Untuk Pentanahan 12 meter Rp - /titik
2 Grounding Rod 16 mm x 12 meter Rp - /meter
3 Bak Kontrol 40x40x40 cm+EGB maksimum 2 ohm Rp - /buah
4 EGB 300x100x10 mm Rp - /buah
5 Tiang Penangkal Petir Radius 30 m Lengkap Rp - /titik
6 Grounding Cooper Plat 400x400x10 mm Rp - /titik
7 Penangkal Petir Elektro Static Radius 30 Meter Rp -
Upah dan Bahan Pek. Elektrikal - page 5 of 5
HARGA UPAH DAN BAHAN PEKERJAAN MEKANIKAL PLUMBING
PEKERJAAN REHABILITASI DAN PERLUASAN GEDUNG KANTOR PENGADILAN AGAMA TAHUNA
NO. BAHAN DAN MATERIAL HARGA SATUAN SATUAN
a. b. c. d.
A. Tenaga Kerja
1 Pekerja Rp - Oh
2 Tukang Rp - Oh
3 Kepala Tukang Rp - Oh
4 Mandor Rp - Oh
B. BAHAN/MATERIAL
PEKERJAAN AIR BERSIH
PERALATAN UTAMA
1 Pompa Air Bersih Rp - /set
Kap. 300 LPM / Head 60Meter (2 Unit, Pompa Kerja gantian)
Gate Valve Dimensi Sesuai Gambar
Check Valve Dimensi Sesuai Gambar
Strainer Dimensi Sesuai Gambar
Presure Gauge Dimensi Sesuai Gambar
Flexible Joint Dimensi Sesuai Gambar
Flow Swicth
Presure Swict
Water Level Kontrol
Panel Kontrol
Kabel Kontrol
2 Booster Pump Kap. (Package)/Otomatis Rp - /set
Pompa Kap. ...Liter/Menit (3 Unit Pompa 1 stan by 2 operation)
Gate Valve Dimensi Sesuai Gambar
Check Valve Dimensi Sesuai Gambar
Strainer Dimensi Sesuai Gambar
Presure Gauge Dimensi Sesuai Gambar
Flexible Joint Dimensi Sesuai Gambar
Flow Swicth
Pressure Swicth
Water Level Kontrol
Panel Kontrol
Kabel Kontrol
3 Tanki Air FRP 1 m3 (Ground Water Tank) Rp - /m3
4 Tanki Air FRP 1 m3 (Roof Water Tank) Rp - /m3
5 Heat Pump Kap. 1x14 KW (Package) Rp - /set
Lengkap Dengan:
-Mixing Tank Air Panas Kap. 4x1000 liter
-Mixing Pump Panas . Kap. 100 liter/menit
-Booster Pump Air Panas Kap. 100 liter/menit
-Gate Valve (Sesuai Dengan Gambar)
-Check Valve (Sesuai Dengan Gambar)
-Strainer (Sesuai Dengan Gambar)
-Presure Gauge (Sesuai Dengan Gambar)
-Flow Swicth (Sesuai Dengan Gambar)
-Header (Sesuai Dengan Gambar)
-Flexible Joint (Sesuai Dengan Gambar)
-Instalasi Pemipaan PPRPN-20 Peralatan Utama Heat Pump
-Water Level Control
-Thermo Swict
-Panel Kontrol
-Kabel Kontrol
-Kabel Unit Pompa
6 ELECTRIC Water Heater, kapasitas 50 liter. Rp - /set
7 Electric Water Heater Kap. Rp - /unit
8 Flow Meter Rp - /buah
9 Water Hammer Rp - /buah
10 Water Level Kontrol Rp - /buah
11 AVV Rp - /buah
12 Sight Glass 5K Dia. 50 mm Rp - /buah
Pipa PPRPN 10
1 Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" Rp - /m'
2 Pipa PPr PN10 Dia. 25 mm Setara Dia. 3/4" Rp - /m'
3 Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" Rp - /m'
4 Pipa PPr PN10 Dia. 40 mm Setara Dia. 1.1/4" Rp - /m'
5 Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" Rp - /m'
Upah dan Bahan Pek. Mekanikal Plumbing - page 1 of 3
a. b. c. d.
Pipa PPRPN 20
1 Pipa PPr PN20 Dia. 20 mm Setara Dia. 1/2" Rp - /m'
Gate Valve 5K
1 Gate Valve 5K Dia. 20 mm Setara Dia. 1/2" Rp - /buah
2 Gate Valve 5K Dia. 25 mm Setara Dia. 3/4" Rp - /buah
3 Gate Valve 5K Dia. 32 mm Setara Dia. 1" Rp - /buah
4 Gate Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Rp - /buah
5 Gate Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Rp - /buah
6 Gate Valve 5K Dia. 65 mm Setara Dia. 2" Rp - /buah
Floating Valve
1 Floating Valve 5K Dia. 40 mm Setara Dia. 1.1/4" Rp - /buah
2 Floating Valve 5K Dia. 50 mm Setara Dia. 1.1/2" Rp - /buah
3 Floating Valve 5K Dia. 63 mm Setara Dia. 2" Rp - /buah
4 Floating Valve 5K Dia. 75 mm Setara Dia. 2.1/2" Rp - /buah
5 Floating Valve 5K Dia. 90 mm Setara Dia. 3" Rp - /buah
6 Floating Valve 5K Dia. 120 mm Setara Dia. 4" Rp - /buah
Check Valve
1 Check Valve Dia. 20 mm Setara Dia. 1/2" Rp - /buah
2 Check Valve Dia. 25 mm Setara Dia. 3/4" Rp - /buah
3 Check Valve Dia. 32 mm Setara Dia. 1" Rp - /buah
4 Check Valve Dia. 40 mm Setara Dia. 1.1/4" Rp - /buah
5 Check Valve Dia. 50 mm Setara Dia. 1.1/2" Rp - /buah
6 Check Valve Dia. 63 mm Setara Dia. 2" Rp - /buah
7 Check Valve Dia. 65 mm Setara Dia. 2.1/2" Rp - /buah
8 Check Valve Dia. 90 mm Setara Dia. 3" Rp - /buah
9 Check Valve Dia. 110 mm Setara Dia. 4" Rp - /buah
Pipa Galvanis
1 Pipa Galvanis Dia. 1/2" Rp - /m'
2 Pipa Galvanis Dia. 3/4" Rp - /m'
3 Pipa Galvanis Dia. 1" Rp - /m'
4 Pipa Galvanis Dia. 1.1/4" Rp - /m'
5 Pipa Galvanis Dia. 1.1/2" Rp - /m'
6 Pipa Galvanis Dia. 2" Rp - /m'
7 Pipa Galvanis Dia. 2.1/2" Rp - /m'
8 Pipa Galvanis Dia. 3" Rp - /m'
9 Pipa Galvanis Dia. 4" Rp - /m'
10 Pipa Galvanis Dia. 6" Rp - /m'
11 Pipa Galvanis Dia. 8" Rp - /m'
PEKERJAAN AIR KOTOR DAN BEKAS
1 STP Kap. 4 m3 Rp - /unit
2 STP Kap. 0,8 m3 Rp - /unit
3 Sumpit Pump Package 1 (Lengkap) Rp - /unit
Pompa : 2 unit
Type Submercible Pump
Kap. 150 lpm
Head 10 m
Power : 1,5 Kw
Panel Kontrol
Kabel Kontrol
Material Bantu & Aksesories
4 Grease trap Rp - /unit
5 Floor Clean Out Dia. 3" Rp - /buah
6 Floor Clean Out Dia. 4" Rp - /buah
7 Roof Drain Dia. 3" Rp - /buah
8 Roof Drain Dia. 4" Rp - /buah
9 Floor Drain Rp - /buah
Pipa PVC AW
1 Pipa PVC AW Dia. 1/2" Rp - /m'
2 Pipa PVC AW Dia. 3/4" Rp - /m'
3 Pipa PVC AW Dia. 1" Rp - /m'
4 Pipa PVC AW Dia. 1.1/4" Rp - /m'
5 Pipa PVC AW Dia. 1.1/2" Rp - /m'
6 Pipa PVC AW Dia. 2" Rp - /m'
7 Pipa PVC AW Dia. 2.1/2" Rp - /m'
8 Pipa PVC AW Dia. 3" Rp - /m'
9 Pipa PVC AW Dia. 4" Rp - /m'
10 Pipa PVC AW Dia. 6" Rp - /m'
Upah dan Bahan Pek. Mekanikal Plumbing - page 2 of 3
a. b. c. d.
PEKERJAAN HYDRANT DAN SPRINKLER
1 Diesel Fire Pump, Lengkap Panel Kontrol Standart NFPA20 Rp - /unit
Type Horizontal Split Case Rp -
Kap. 750 GPM /220 meter Rp -
2 Electric Fire Pump, Lengkap Panel kontrol standart NFPA20 Rp - /unit
Type Horizontal Split Case Rp -
Kap. 750 GPM 200kW/220 meter Rp -
3 Jockey Fire Pump, Lengkap Panel Kontrol standart NFPA20 Rp - /unit
Type : Vertical Segment Rp -
Kap. 25 GPM/6 kW/240m Rp -
4 Presure Tank 1000 liter lengkap dengan aksesories Rp - /unit
5 Siamese Dia. 100 mm Rp - /buah
6 Pilar Hydrant 20K Dia. 100 mm Rp - /buah
7 Outdoor Hydrant Box Rp - /unit
8 Indoor Hydrant Box Rp - /unit
9 Sprinkler Head Rp - /buah
10 Thermatic Suppression / Hallon 3 kg Rp - /buah
11 Flow Swicth Rp - /buah
12 Orifice Dia.150 mm Rp - /buah
13 Sight Glass Dia. 150 mm Rp - /buah
14 Presure Gauge Rp - /buah
15 Fire Extinguiser 3kg Rp - /buah
16 Branch Control Valve Rp - /set
Gate Valve 20K
1 Gate Valve 20K Dia. 1.1/4" Rp - /buah
2 Gate Valve 20K Dia. 1.1/2" Rp - /buah
3 Gate Valve 20K Dia. 2" Rp - /buah
4 Gate Valve 20K Dia. 2.1/2" Rp - /buah
5 Gate Valve 20K Dia. 3" Rp - /buah
6 Gate Valve 20K Dia. 4" Rp - /buah
7 Gate Valve 20K Dia. 6" Rp - /buah
8 Gate Valve 20K Dia. 8" Rp - /buah
STAINER 10K
1 Strainer 10K Dia. 2" Rp - /buah
PEKERJAAN TATA UDARA
1 Outdoor Unit Variable Refrigenrant Kap. 10200 Btu/h Rp - /unit
2 Outdoor Unit Variable Refrigenrant Kap. 17070 Btu/h Rp - /unit
3 Outdoor Unit Variable Refrigenrant Kap. 24000 Btu/h Rp - /unit
4 Wall Mounted Type Kap. 5000 Btu/h (Lengkap Dengan Bracket) Rp - /unit
5 Wall Mounted Type Kap. 7000 Btu/h (Lengkap Dengan Bracket) Rp - /unit
6 Wall Mounted Type Kap. 9000 Btu/h (Lengkap Dengan Bracket) Rp - /unit
7 Wall Mounted Type Kap. 18000 Btu/h (Lengkap Dengan Bracket) Rp - /unit
8 Ceilling Cassete Type Kap. 17100 Btu/h (Lengkap Dengan Bracket) Rp - /unit
9 Ceilling Cassete Type Kap. 24200 Btu/h (Lengkap Dengan Bracket) Rp - /unit
10 FAN Coil Unit Kap. 17.100 Btu/h (Lengkap Dengan Bracket) Rp - /unit
11 Ceilling Cassete Type Kap.34100 Btu/h (Lengkap Dengan Bracket) Rp - /unit
12 Pipa Refrigerant+Insulasi Rp - /m'
13 Pipa Drain+Insulasi Rp - /m'
14 Rafnet Joint Rp - /buah
15 Rafnet Reducer Rp - /buah
16 Plenum Rp - /buah
17 Volume Damper Rp - /buah
18 Ducting Polyurethane Rp - /m'
19 Flexible Joint Rp - /m'
20 Supply Air Diffuser (SAD) Rp - /inc
21 Return Air Grill (RAG) Rp - /inc
22 Fresh Air Grill (FAG) Rp - /inc
23 Exhaust Fan Ceiling Mounted Type Kap. 100 cfm Rp - /unit
24 Exhaust Fan Ceiling Mounted Type Kap. 200 cfm Rp - /unit
25 Exhaust Fan Ceiling Mounted Type Kap. 300 cfm Rp - /unit
26 Exhaust Fan Ceiling Mounted Type Kap. 700 cfm Rp - /unit
26 Exhaust Fan Wall Type Kap. 100 cfm Rp - /unit
27 Exhaust Fan Wall Type Kap. 300 cfm Rp - /unit
28 Exhaust Fan Wall Type Kap. 500 cfm Rp - /unit
29 Exhaust Axial Fan Type Kap. 350 cfm Rp - /unit
30 Exhaust Axial Fan Type Kap. 700 cfm Rp - /unit
31 Exhaust Axial Fan Type Kap. 1500 cfm Rp - /unit
32 Exhaust Axial Fan Type Kap. 3100 cfm Rp - /unit
33 Exhaust Axial Fan Type Kap. 22000 cfm Rp - /unit
34 Exhaust Axial Fan Type Kap. 24000 cfm Rp - /unit
35 Wall Fan Dia. Propeller 16 Inch Rp - /unit
Upah dan Bahan Pek. Mekanikal Plumbing - page 3 of 3
DAFTAR HARGA SATUAN UPAH KERJA
TAHUNA TIMUR-KABUPATEN SANGIHE
TAHUN 2022 - 2023
HARGA SAT
NO URAIAN SATUAN WAKTU
Rp.
1 Pekerja - 1 ORANG/HR/ 7 JAM
2 Tukang Gali Tanah - 1 ORANG/HR/ 7 JAM
3 Tukang Batu - 1 ORANG/HR/ 7 JAM
4 Tukang Kayu - 1 ORANG/HR/ 7 JAM
5 Tukang Besi - 1 ORANG/HR/ 7 JAM
6 Tukang Cat - 1 ORANG/HR/ 7 JAM
7 Tukang Plitur - 1 ORANG/HR/ 7 JAM
8 Tukang Aspal - 1 ORANG/HR/ 7 JAM
9 Tukang Las - 1 ORANG/HR/ 7 JAM
10 Tukang Pipa - 1 ORANG/HR/ 7 JAM
11 Kepala Tukang Gali Tanah - 1 ORANG/HR/ 7 JAM
12 Kepala Tukang Batu - 1 ORANG/HR/ 7 JAM
13 Kepala Tukang Kayu - 1 ORANG/HR/ 7 JAM
14 Kepala Tukang Besi - 1 ORANG/HR/ 7 JAM
15 Kepala Tukang Cat - 1 ORANG/HR/ 7 JAM
16 Kepala Tukang Listrik - 1 ORANG/HR/ 7 JAM
17 Kepala Tukang Pipa - 1 ORANG/HR/ 7 JAM
12 Mandor - 1 ORANG/HR/ 7 JAM
13 Operator - 1 ORANG/HR/ 7 JAM| Authority | |||
|---|---|---|---|
| 13 August 2024 | Sarana Lingkungan Gedung Kantor,penataan Halaman Dan Pos Jaga | Mahkamah Agung | Rp 4,608,000,000 |
| 6 September 2024 | Sarana Lingkungan Gedung Kantor | Mahkamah Agung | Rp 3,736,370,000 |
| 3 February 2023 | Pekerjaan Sarana Lingkungan Gedung Kantro Pengadilan Negeri Belopa Tahun Anggaran 2023 | Mahkamah Agung | Rp 3,040,000,000 |
| 19 April 2016 | Pemeliharaan Jalan (Hotmix) + Pelebaran Jalan Kassi Data Kec. Maros Baru Kab. Maros (Lelang Ulang) | LPSE Pemerintah Kabupaten Maros | Rp 2,000,000,000 |
| 15 April 2025 | Pembangunan Sarana Lingkungan Gedung Kantor Pengadilan Agama Tahuna | Mahkamah Agung | Rp 1,000,000,000 |
| 15 June 2022 | Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang Beserta Perabotnya Smp Muhammadiyah Lakea | Kab. Buol | Rp 510,000,000 |
| 20 May 2021 | Pendirian Pusat Promosi Nata De Coco | Kab. Buol | Rp 499,931,049 |
| 29 April 2015 | Pembuatan Jalan Lingkar Gedung Kantor Pengadilan Negeri Masamba Tahun Anggaran 2015 | Mahkamah Agung | Rp 306,670,000 |