| 0926281692061000 | Rp 1,313,573,600 | |
| 0868222126009000 | Rp 1,313,573,600 | |
| 0017784174429000 | Rp 1,313,573,600 | |
| 0021616552421000 | Rp 1,313,573,600 | |
CV Putra Zhafran Arthajaya | 03*1**1****12**0 | - |
| 0903624096023000 | Rp 1,370,545,795 | |
| 0750185050445000 | Rp 1,393,480,945 | |
| 0753129303009000 | - | |
| 0022931661009000 | - | |
| 0757803234436000 | - | |
| 0924720600009000 | - | |
| 0800975997101000 | - | |
CV Kagungan Abadi Pratama | 03*4**1****23**0 | - |
CV Torgabe Artha Nugraha | 0818185761432000 | - |
| 0803771245429000 | - | |
| 0418999686401000 | - | |
Widia Chandra Jaya | 04*9**8****02**0 | - |
| 0822906400403000 | - | |
PT Bangun Tegak Lurus | 06*1**4****09**0 | - |
| 0408721819444000 | - | |
Hasea Benedict | 06*9**5****47**0 | - |
| 0758095327121000 | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - |
| 0210543088443000 | - | |
CV Janur | 0020642948445000 | - |
| 0032769291009000 | - |
REKAP BILL OF QUANTITY (BOQ)
PROYEK : PEKERJAAN RENOVASI BANGUNAN MESS MPR
LOKASI : JL. DIPONEGORO, KEC. BANDUNG WETAN, KOTA BANDUNG
TA. : 2023
NO URAIAN PEKERJAAN JUMLAH BIAYA PEKERJAAN
I PEKERJAAN PENGGANTIAN ATAP BANGUNAN LAMA/HERRITAGE -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI ATAP -
II PEKERJAAN RENOVASI RUANG TAMU -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI RUANG TAMU -
III PEKERJAAN RENOVASI AREA KORIDOR LANTAI DASAR -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI AREA KORIDOR LANTAI DASAR -
IV PEKERJAAN RENOVASI RUANG PANTRY LANTAI DASAR -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI RUANG PANTRY LANTAI DASAR -
V PEKERJAAN RENOVASI TOILET PRIA LANTAI DASAR -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI TOILET PRIA LANTAI DASAR -
VI PEKERJAAN RENOVASI TOILET WANITA LANTAI DASAR -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI TOILET WANITA LANTAI DASAR -
VII PEKERJAAN RENOVASI RUANG RESEPSIONIS -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI RUANG RESEPSIONIS -
VIII PEKERJAAN PEMBUATAN TOILET OUTDOOR -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN PEMBUATAN TOILET OUTDOOR -
IX PEKERJAAN RENOVASI RUANG SERBAGUNA -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI RUANG SERBAGUNA -
X PEKERJAAN RENOVASI INFRASTRUKTUR KAWASAN -
A PEKERJAAN PERSIAPAN -
B PEKERJAAN RENOVASI INFRASTRUKTUR KAWASAN -
XI PEKERJAAN SMK3K -
A PEKERJAAN PERSIAPAN SMK3K -
JUMLAH PEKERJAAN -
PPN 11% -
JUMLAH TOTAL (JUMLAH PEKERJAAN + PPN 11%) -
DIBULATKAN -
Bandung, …............... 2023
Penyedia Jasa
Nama Penanggung Jawab
Jabatan
RINCIAN BILL OF QUANTITY (BOQ)
PROYEK : PEKERJAAN RENOVASI BANGUNAN MESS MPR
LOKASI : JL. DIPONEGORO, CITARUM KEC. BANDUNG WETAN, KOTA BANDUNG
TA. : 2023
HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA TOTAL
SATUAN
I PEKERJAAN PENGGANTIAN ATAP BANGUNAN LAMA/HERRITAGE
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Atap Sirap Existing m² 3 81,03 - -
2 Pek. Bongkaran Rangka atap bangunan m² 3 81,03 - -
3 Pek. Bongkaran Talang Jurai Existing m' 3 1,10 - -
4 Pek. Bongkaran Listplank Existing m' 1 10,24 - -
5 Pek. Bongkaran Penangkal Petir Existing bh 3 ,00 - -
SUB TOTAL PERSIAPAN -
B PEKERJAAN RENOVASI ATAP
1 Pek. Pasang Rangka Atap Kayu (Kaso-kaso & Reng) m² 3 81,03 - -
2 Pek. Pasang Penutup Atap Bitumen ex. IKO m² 3 81,03 - -
3 Pek. Pasang Nok Atap Bitumen ex. IKO m' 8 5,48 - -
4 Pek. Pasang Talang Jurai Seng BJLS t=0.03 mm m' 3 1,10 - -
5 Pek. Pasang Listplank Woodplank GRC l= 30 cm m' 1 10,24 - -
6 Pek. Pasang Penangkal Petir Splitzen Tembaga unit 3 ,00 - -
7 Pek. Pasang Kabel NYA 1 x 50 mm2 + Pipa Conduit m' 4 0,00 - -
8 Pek. Pasang Grounding BC 50 + Bak Grounding 65 x 65 cm bh 2 ,00 - -
SUB TOTAL RENOVASI ATAP -
JUMLAH TOTAL PEKERJAAN PENGGANTIAN ATAP BANGUNAN LAMA/HERRITAGE -
II PEKERJAAN RENOVASI RUANG TAMU
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Plafon gipsum m² 3 3,52 - -
2 Pek. Bongkaran Rangka Plafon m² 3 3,52 - -
3 Pek. Bongkaran Liss Propil Plafon m' 2 2,53 - -
4 Pek. Bongkaran Dinding bata Opening Pintu m³ 0 ,60 - -
5 Pek. Bongkaran Plin Kayu existing m' 9 ,64 - -
6 Pek. Bongkaran Saklar & Stop Kontak titik 2 ,00 - -
7 Pek. Bongkaran AC Standing Eksisting (Indoor & Outdoor Unit) set 1 ,00 - -
8 Pek. Pembersihan Kaca Eksisting m2 1 0,66 - -
SUB TOTAL PERSIAPAN -
B PEKERJAAN RENOVASI RUANG TAMU
1 Pek. Pasang Rangka Plafon, Besi hollow t=0,4mm m² 3 3,52 - -
2 Pek. Pasang Rangka Drop Ceiling, Besi hollow t=0,4mm m' 2 7,65 - -
3 Pek. Pasang Plafon Gypsum t=9mm m² 3 3,52 - -
4 Pek. Pasang Liss Propil besar gipsum m' 1 4,83 - -
5 Pek. Pasang Frame Pintu Kaca, plywood 12mm rangka besi hollow t=1,4mm m² 6 ,13 - -
fin. Veneer kayu cat melamik
6 Pek. Pasang Pintu Kaca Tempered t=12mm + Hardware unit 1 ,00 - -
7 Pek. Pengecatan Plafon gipsum ex. Cat Jotun Jotaplash putih m² 5 1,49 - -
8 Pek. Pasang Pelapis Dinding Panel Veneer Kayu Fin. Cat Melamic m² 9 ,42 - -
9 Pek. Pasang Pelapis Dinding WPC Panel Motif Kayu Lambresiring m² 1 4,95 - -
10 Pek. Pasang Lantai Parquet kayu jati fin. Cat Melamik m² 3 3,52 - -
11 Pek. Pasang Plin Kayu ex. Jati fin. Cat Melamik m' 9 ,64 - -
12 Pek. Pasang Lantai Homogenous Tile 30x30 ex. ROMAN dBatik Matt (Teras) m² 3 9,07 - -
13 Pek. Pasang Box Gorden Plywood 12 mm lapis Veneer kayu Fin. Melamic + Rel Gorden m' 1 0,63 - -
14 Pek. Instalasi Listrik ttk 8 ,00 - -
15 Pek. Instalasi Daya ttk 4 ,00 - -
16 Pek. Pasang Indirect Lamp LED Strip 5W, drop ceiling m' 2 7,65 - -
17 Pek. Pasang Lampu Hias Gantung kristal bn 1 ,00 - -
18 Pek. Pasang Lampu Philips LED Downlight 14W m' 8 ,00 - -
19 Pek. Pasang Saklar Ganda bh 2 ,00 - -
20 Pek. Pasang Stop Kontak Dinding bh 4 ,00 - -
21 Pek. Pasang AC Split Duct Grill Kap. 28.000 btu/h + Outdoor Unit + Wiring unit 1 ,00 - -
SUB TOTAL RENOVASI RUANG TAMU -
JUMLAH TOTAL RENOVASI RUANG TAMU -
HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA TOTAL
SATUAN
III PEKERJAAN RENOVASI AREA KORIDOR LANTAI DASAR
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Dinding bata m³ 1 ,66 - -
2 Pek. Bongkaran Lantai Keramik m² 8 ,27 - -
3 Pek. Bongkaran Plafon gipsum m² 1 5,32 - -
4 Pek. Bongkaran Rangka Plafon m² 1 5,32 - -
5 Pek. Bongkaran Liss Propil Plafon m' 2 5,44 - -
6 Pek. Bongkaran Fire Alarm di dinding bh 1 ,00 - -
7 Pek. Bongkaran Kusen pintu kayu m³ 0 ,08 - -
8 Pek. Bongkaran Daun Pintu Kayu existing m² 6 ,36 - -
SUB TOTAL PERSIAPAN -
B PEKERJAAN RENOVASI AREA KORIDOR LANTAI DASAR
1 Pek. Pasang Partisi Rangka Metal Stud Lapis Gypsum Board t=9 mm m² 2 1,01 - -
2 Pek. Pasang Rangka Plafon, Besi hollow t=0,4mm m² 1 5,32 - -
3 Pek. Pasang Plafon Gypsum t=9mm m² 1 5,32 - -
4 Pek. Pasang Liss Propil kecil gipsum m' 2 5,44 - -
5 Pek. Pasang Lantai Homogenous Tile 60x60 ex. ROMAN Metropolitan Polish m² 8 ,27 - -
6 Pek. Pengecatan dinding ex. Cat Jotun Majestic putih m² 2 1,01 - -
7 Pek. Pengecatan Plafon gipsum ex. Cat Jotun Jotaplash putih m² 1 5,32 - -
8 Pek. Pasang Kusen pintu, Alumunium 4" ex. Alexindo brown Powder coating m' 2 0,89 - -
9 Pek. Pasang Kaca polos t=8mm ex. Asahimas m² 8 ,02 - -
10 Pek. Pasang Sandblast 60% untuk pintu & partisi kaca m² 8 ,02 - -
11 Pek. Pasang Daun Pintu existing + Hardware unit 1 ,00 - -
12 Pek. Pasang Plin Kayu ex. Jati fin. Cat Melamik m' 6 ,43 - -
13 Pek. Pasang Fire Alarm existing di dinding unit 1 ,00 - -
SUB TOTAL RENOVASI AREA KORIDOR LANTAI DASAR -
JUMLAH TOTAL RENOVASI AREA KORIDOR LANTAI DASAR -
IV PEKERJAAN RENOVASI RUANG PANTRY LANTAI DASAR
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Kusen pintu kayu existing m³ 0 ,04 - -
2 Pek. Bongkaran Daun Pintu existing m² 3 ,73 - -
3 Pek. Bongkaran Kitchen Set existing m² 1 0,78 - -
4 Pek. Bongkaran Plafon gipsum m² 9 ,19 - -
5 Pek. Bongkaran Liss Plafon m² 1 2,14 - -
6 Pek. Bongkaran meja beton m³ 0 ,36 - -
7 Pek. Bongkaran Dinding keramik m² 8 ,60 - -
8 Pek. Bongkaran Lantai keramik m² 9 ,19 - -
SUB TOTAL PERSIAPAN -
B PEKERJAAN RENOVASI RUANG PANTRY LANTAI DASAR
1 Pek. Pasang dinding bata penutup opening pintu m² 1 ,91 - -
2 Pek. Plesteran dinding 1 : 5 m² 3 ,82 - -
3 Pek. Acian dinding m² 3 ,82 - -
4 Pek. Pengecatan Dinding ex. Cat Jotun Majestic putih m² 1 8,30 - -
5 Pek. Pasang Rangka Plafon, Besi hollow t=0,4mm m² 9 ,19 - -
6 Pek. Pasang Plafond gipsum t=9mm + shadow line keliling m² 9 ,19 - -
7 Pek. Pasang Lantai Homogenous Tile 60x60 ex. ROMAN Polish m² 9 ,19 - -
8 Pek. Pasang Kabinet 1 ( PTR 1) set 1 ,00 - -
HPL By. TACO 3mm Warna : Kompor Tanam By. Modenna BH0725, Cooker Hood By
Modenna PX 6001, Engsel Sendok Soft Close, Runner Laci Full Extension & Soft Close,
Back wall Solid surface motif marmer putih, Top Table solid surface putih
9 Pek. Pasang Kabinet 2 ( PTR 2) set 1 ,00 - -
HPL By. TACO 3mm Warna : TBA, Kitchen Zink By. Modenna Bolsena KS3101 Kran
Zink by TOTO TX 603 KCS, Engsel Sendok Soft Close, Runner Laci Full Extension &
Soft Close, Back splash glass yellow colour, top table solid surface
10 Pek. Pengecatan Plafon ex. Cat Jotun Jotaplash putih m² 9 ,19 - -
11 Pek. Pasang daun pintu kayu ( P1 ) unit 1 ,00 - -
Kusen Alumunium 4" By. Alexindo, Aksesoris By. Dekkson Lever Handle Solid Rose
LHSR 0406 PSS, Mortise Deluxe MTS IL DL 8685 SSS, Double Cylinder CYL DC DL
60mm SN, Hi-Grade Hinge NRP ESS 316 5x3x4mm 4BB SSS, Door Closer Hold Open
DCL 529 HO BA, Pintu Kayu Solid, Pelapis Pintu Warna disesuaikan
12 Pek. Pasang Instalasi Listrik titik 1 ,00 - -
13 Pek. Pasang Instalasi Daya titik 4 ,00 - -
14 Pek. Pasang Lampu Philips LED Downlight 14W bh 1 ,00 - -
HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA TOTAL
SATUAN
15 Pek. Pasang Exhaust Fan unit 1 ,00 - -
16 Pek. Pasang Smoke Detector unit 1 ,00 - -
17 Pek. Pasang Saklar bh 1 ,00 - -
18 Pek. Pasang Stop Kontak bh 4 ,00 - -
19 Pek. Instalasi Air bersih
- Pipa PVC Klas AW Dia. 1/2" m' 5 ,00 - -
- Pipa PVC Klas AW Dia. 1" m' 1 5,00 - -
20 Pek. Instalasi Air bekas
- Pipa PVC Klas AW Dia. 3" m' 2 5,00 - -
SUB TOTAL RENOVASI RUANG PANTRY LANTAI DASAR -
JUMLAH TOTAL RENOVASI RUANG PANTRY LANTAI DASAR -
V PEKERJAAN RENOVASI TOILET PRIA LANTAI DASAR
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Closet duduk unit 2 ,00 - -
2 Pek. Bongkaran Shower spray bh 2 ,00 - -
3 Pek. Bongkaran Paper Holder bh 2 ,00 - -
4 Pek. Bongkaran Urinoir unit 1 ,00 - -
5 Pek. Bongkaran Floor Drain bh 2 ,00 - -
6 Pek. Bongkaran Wastafel + Instalasi unit 1 ,00 - -
7 Pek. Bongkaran Pintu + Partisi m² 5 ,71 - -
8 Pek, Bongkaran Kusen pintu Kayu m³ 0 ,04 - -
9 Pek. Bongkaran Daun pintu kayu m² 1 ,70 - -
10 Pek. Bongkaran Lantai keramik m² 4 ,26 - -
11 Pek. Bongkaran Dinding keramik m² 2 2,34 - -
12 Pek. Bongkaran Lampu bh 1 ,00 - -
13 Pek. Bongkaran Smoke detector bh 1 ,00 - -
14 Pek. Bongkaran Plafon m² 4 ,26 - -
15 Pek. Bongkaran Rangka plafon m² 4 ,26 - -
SUB TOTAL PERSIAPAN -
B PEKERJAAN RENOVASI TOILET PRIA LANTAI DASAR
1 Pek. Pasang Rangka Plafon Besi hollow t=0,4mm m² 4 ,26 - -
2 Pek. Pasang Plafon gipsum water resistant t=9mm + shadow line keliling m² 4 ,26 - -
3 Pek. Pasang Lantai keramik 30x30 ex. Roman 33357RP dTriana Bone m² 4 ,26 - -
4 Pek. Pasang keramik dinding 30x60 ex. Roman 63357R dTriana Bone m² 2 2,34 - -
5 Pek. Pasang Partisi Kaca Tempered t=10mm + Accessories ex Dekkson m² 1 ,70 - -
Accessories : Stainless pipa 304 ø 1 inch, Glass Clamp GH 25-01 CP Dekkson, Glass
Clamp GH 25-02 CP Dekkson. Glass Clamp Holder GC U800 AL CP.
6 Pek. Pasang Pintu Kaca Tempered t=10mm + Accessories ex. Dekkson unit 1 ,00 - -
Accessories : Engsel H 7703 GG Dekkson, Handle DK 82803 CP Dekkson, Kunci IL
8600C CP + 8601C CP Keeper Dekkson, Clip Seal CSBS Dekkson.
7 Pek. Pasang Pintu kayu ( P2 ) unit 1 ,00 - -
Kusen By. Alexindo, Aksesoris By. Dekkson Lever Handle Solid Rose LHSR 0406 PSS,
Mortise Deluxe MTS IL DL 8685 SSS, Double Cylinder CYL DC DL 60mm SN, Hi-Grade
Hinge NRP ESS 316 5x3x4mm 4BB SSS, Door Closer Hold Open DCL 529 HO BA,
Pintu Kayu Solid, Pelapis Pintu Warna disesuaikan
8 Pek. Pasang Sandblast 60% untuk pintu & partisi kaca m² 2 ,55 - -
9 Pek. Pengecatan Plafon ex. Cat Jotun Jotaplash putih m² 4 ,26 - -
10 Pek. Pasang Meja Rangka Hollow fin. Solid Surface motif marmer m² 1 ,08 - -
11 Pek. Pasang Rak Kayu bawah wastafel set 1 ,00 - -
12 Pek. Pasang Cermin m² 0 ,88 - -
13 Pek. Pasang Floor Drain ex. TOTO TX 1C bh 1 ,00 - -
14 Pek. Pasang Closet Duduk ex. TOTO CW 660 NJ/SW 660 J unit 1 ,00 - -
15 Pek. Pasang Shower spray ex. TOTO TB 19CSMCR bh 1 ,00 - -
16 Pek. Pasang Wastafel ex. TOTO LW 247 CJ unit 1 ,00 - -
17 Pek. Pasang Kran Wastafel ex. TOTO TX 120LESN bh 1 ,00 - -
18 Pek. Pasang Urinoir ex. TOTO UW 447 JNM unit 1 ,00 - -
19 Pek. Pasang Paper Holder ex. TOTO S20 bh 1 ,00 - -
20 Pek. Pasang Instalasi Listrik titik 1 ,00 - -
21 Pek. Pasang Instalasi Daya ttk 1 ,00 - -
22 Pek. Pasang Lampu Philips LED Downlight 14W bh 1 ,00 - -
23 Pek. Pasang Smoke Detector unit 1 ,00 - -
24 Pek. Pasang Exhaust Fan unit 1 ,00 - -
25 Pek. Pasang Saklar tunggal bh 1 ,00 - -
26 Pek. Pasang Stop Kontak bh 1 ,00 - -
HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA TOTAL
SATUAN
27 Pek. Instalasi Air bersih
- Pipa PVC Klas AW Dia. 1/2" m' 5 ,00 - -
- Pipa PVC Klas AW Dia. 1" m' 2 0,00 - -
28 Pek. Instalasi Air bekas
- Pipa PVC Klas AW Dia. 3" m' 3 0,00 - -
29 Pek. Instalasi Air kotor
- Pipa PVC Klas AW Dia. 4" m' 3 0,00 - -
SUB TOTAL RENOVASI TOILET PRIA LANTAI DASAR -
JUMLAH TOTAL RENOVASI TOILET PRIA LANTAI DASAR -
VI PEKERJAAN RENOVASI TOILET WANITA LANTAI DASAR
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Closet duduk unit 2 ,00 - -
2 Pek. Bongkaran Shower spray bh 2 ,00 - -
3 Pek. Bongkaran Paper Holder bh 2 ,00 - -
4 Pek. Bongkaran Floor Drain bh 2 ,00 - -
5 Pek. Bongkaran Wastafel + Instalasi unit 1 ,00 - -
6 Pek. Bongkaran Pintu + Partisi m² 5 ,67 - -
7 Pek, Bongkaran Kusen pintu Kayu m³ 0 ,04 - -
8 Pek. Bongkaran Daun pintu kayu m² 1 ,70 - -
9 Pek. Bongkaran Lantai keramik m² 3 ,72 - -
10 Pek. Bongkaran Dinding keramik m² 2 4,30 - -
11 Pek. Bongkaran Lampu bh 1 ,00 - -
12 Pek. Bongkaran Smoke detector bh 1 ,00 - -
13 Pek. Bongkaran Plafon m² 3 ,72 - -
14 Pek. Bongkaran rangka plafon m² 3 ,72 - -
SUB TOTAL PERSIAPAN -
B PEKERJAAN RENOVASI TOILET WANITA LANTAI DASAR
1 Pek. Pasang Rangka Plafon, Besi hollow t=0,4mm m² 3 ,72 - -
2 Pek. Pasang Plafon gipsum water resistant t=9mm + shadow line keliling m² 3 ,72 - -
3 Pek. Pasang Lantai keramik 30x30 ex. Roman 33357RP dTriana Bone m² 3 ,72 - -
4 Pek. Pasang keramik dinding 30x60 ex. Roman 63357R dTriana Bone m² 2 4,30 - -
5 Pek. Pasang Partisi Kaca Tempered t=10mm + Accessories ex Dekkson m² 1 ,70 - -
Accessories : Stainless pipa 304 ø 1 inch, Glass Clamp GH 25-01 CP Dekkson, Glass
Clamp GH 25-02 CP Dekkson. Glass Clamp Holder GC U800 AL CP.
6 Pek. Pasang Pintu Kaca Tempered t=10mm + Accessories ex. Dekkson unit 1 ,00 - -
Accessories : Engsel H 7703 GG Dekkson, Handle DK 82803 CP Dekkson, Kunci IL
8600C CP + 8601C CP Keeper Dekkson, Clip Seal CSBS Dekkson.
7 Pek. Pasang Pintu kayu ( P2 ) unit 1 ,00 - -
Kusen By. Alexindo, Aksesoris By. Dekkson Lever Handle Solid Rose LHSR 0406 PSS,
Mortise Deluxe MTS IL DL 8685 SSS, Double Cylinder CYL DC DL 60mm SN, Hi-Grade
Hinge NRP ESS 316 5x3x4mm 4BB SSS, Door Closer Hold Open DCL 529 HO BA,
Pintu Kayu Solid, Pelapis Pintu Warna disesuaikan
8 Pek. Pasang Sandblast 60% untuk pintu & partisi kaca m² 2 ,55 - -
9 Pek. Pengecatan Plafon ex. Cat Jotun Jotaplash putih m² 3 ,72 - -
10 Pek. Pasang Meja Rangka Hollow fin. Solid Surface motif marmer m² 1 ,08 - -
11 Pek. Pasang Rak Kayu bawah wastafel set 1 ,00 - -
12 Pek. Pasang Cermin unit 1 ,00 - -
13 Pek. Pasang Floor Drain ex. TOTO TX 1C bh 1 ,00 - -
14 Pek. Pasang Closet Duduk ex. TOTO CW 660 NJ/SW 660 J unit 1 ,00 - -
15 Pek. Pasang Shower spray ex. TOTO TB 19CSMCR bh 1 ,00 - -
16 Pek. Pasang Wastafel ex. TOTO LW 247 CJ unit 1 ,00 - -
17 Pek. Pasang Kran Wastafel ex. TOTO TX 120LESN bh 1 ,00 - -
18 Pek. Pasang Paper Holder ex. TOTO S20 bh 2 ,00 - -
19 Pek. Pasang Instalasi listrik titik 2 ,00 - -
20 Pek. Pasang Instalasi Daya ttk 1 ,00 - -
21 Pek. Pasang Lampu Philips LED Downlight 14W bh 2 ,00 - -
22 Pek. Pasang Smoke Detector unit 1 ,00 - -
23 Pek. Pasang Exhaust Fan unit 1 ,00 - -
24 Pek. Pasang Saklar tunggal bh 1 ,00 - -
25 Pek. Pasang Stop Kontak bh 1 ,00 - -
26 Pek. Instalasi Air bersih
- Pipa PVC Klas AW Dia. 1/2" m' 5 ,00 - -
- Pipa PVC Klas AW Dia. 1" m' 2 0,00 - -
HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA TOTAL
SATUAN
27 Pek. Instalasi Air bekas
- Pipa PVC Klas AW Dia. 3" m' 3 0,00 - -
28 Pek. Instalasi Air kotor
- Pipa PVC Klas AW Dia. 4" m' 3 0,00 - -
SUB TOTAL RENOVASI TOILET WANITA LANTAI DASAR -
JUMLAH TOTAL RENOVASI TOILET WANITA LANTAI DASAR -
VII PEKERJAAN RENOVASI RUANG RESEPSIONIS
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Dinding Bata m³ 3 ,69 - -
2 Pek. Bongkaran Plafon m² 4 7,47 - -
3 Pek. Bongkaran Rangka Plafon m² 4 7,47 - -
4 Pek. Bongkaran Liss Propil Plafon m' 1 5,90 - -
5 Pek, Bongkaran Kusen pintu Kayu m³ 9 ,76 - -
6 Pek. Bongkaran Daun pintu kayu m² 3 ,02 - -
7 Pek. Bongkaran Lantai keramik m² 4 7,47 - -
8 Pek. Bongkaran Lampu bh 5 ,00 - -
9 Pek. Bongkaran Saklar & Stop Kontak bh 3 ,00 - -
10 Pek. Bongkaran Smoke detector, Fire Bell & Fire Alarm bh 3 ,00 - -
11 Pek. Bongkaran Fan Ceiling Eksisting bh 1 ,00 - -
12 Pek. Bongkaran AC Split Eksisting (Indoor & Outdoor Unit) set 1 ,00 - -
13 Pek. Bongkaran Wastafel Eksisting unit 1 ,00 - -
SUB TOTAL PERSIAPAN -
B PEKERJAAN RENOVASI RUANG RESEPSIONIS
1 Pek. Pasang Kabinet 3 ( PTR 3 ) unit 1 ,00 - -
HPL By. TACO 3mm Warna, Front wall Solid Surface Motif Marmer Putih & Panel
Veneer Kayu Fin. Melamic, Engsel Sendok Soft Close, Runner Laci Full Extension & Soft
Close, Back wall Solid surface motif marmer putih, Top Table Panel Veneer Kayu Fin.
Melamic
2 Pek. Pasang Pelapis Dinding WPC Panel Motif Kayu Lambresiring m² 1 4,78 - -
3 Pek. Pasang Pelapis Dinding Panel Plywood 12 mm Fin. HPL Motif Kayu m² 2 ,28 - -
4 Pek. Pasang Box Gorden Plywood 12 mm lapis Veneer kayu Fin. Melamic + Rel Gorden m' 3 ,29 - -
5 Pek. Pasang Rangka Plafon, Besi hollow t=0,4mm m² 4 7,47 - -
6 Pek. Pasang Rangka Drop Ceiling, Besi hollow t=0,4mm m² 4 7,47 - -
7 Pek. Pasang Plafon Gypsum t=9mm m' 1 5,90 - -
8 Pek. Pasang Liss Propil besar gipsum m' 2 1,60 - -
9 Pek. Pasang Lantai Homogenous Tile 60x60 ex. ROMAN Metropolitan Polish m² 8 4,50 - -
10 Pek. Pasang Lantai Homogenous Tile 60x60 ex. ROMAN Polaris Unpolish (Teras) m² 4 ,34 - -
11 Pek. Pasang Lantai Batu Koral Sikat m² 8 ,88 - -
12 Pek. Pasang Ornamen Kain Batik Jawa Barat + Frame Kayu + Kaca Polos 5 mm unit 1 ,00 - -
13 Pek. Pasang Logo Stainless Steel Finish Mirror MPR RI uk. 50 x 50 cm bh 1 ,00 - -
14 Pek. Pasang Tulisan Stainless Steel Finish Mirror "MESS MPR BANDUNG" t= 15 cm bh 1 4,00 - -
15 Pek. Pasang Tulisan Stainless Steel Finish Mirror "ADYAYANA VASABI" t= 15 cm bh 1 4,00 - -
16 Pek. Pasang Dinding Multipleks Lapis HPL ex. TACO Type Stainless Steel TH611AL m² 3 ,43 - -
17 Pek. Pasang Instalasi listrik ttk 6 ,00 - -
18 Pek. Pasang Indirect Lamp LED Strip 5W, drop ceiling m' 1 1,44 - -
19 Pek. Pasang Lampu Philips LED Downlight 14W bh 6 ,00 - -
20 Pek. Pasang Saklar tunggal bh 2 ,00 - -
21 Pek. Pasang Unit Fire Alarm Eksisting bh 3 ,00 - -
22 Pek. Bongkaran dan Pasang Ulang CCTV bh 1 ,00 - -
SUB TOTAL RENOVASI RUANG RESEPSIONIS -
JUMLAH TOTAL RENOVASI RUANG RESEPSIONIS -
VIII PEKERJAAN PEMBUATAN TOILET OUTDOOR
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Paving Block Eksisting m² 5 ,50 - -
2 Pek. Pengukuran dan Pemasangan Bouwplank m' 1 3,40 - -
SUB TOTAL PERSIAPAN -
HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA TOTAL
SATUAN
B PEKERJAAN PEMBUATAN TOILET OUTDOOR
1 Pek. Galian Tanah Pondasi m³ 5 ,65 - -
2 Pek. Lantai Kerja t= 10 cm m³ 0 ,67 - -
3 Pek. Pasang Pondasi Batu Kali 1 : 5 m³ 2 ,28 - -
4 Pek. Pasangan Batu Kosong (Aanstamping m³ 1 ,00 - -
5 Pek. Urugan Tanah Kembali m³ 1 ,71 - -
6 Pek. Sloof 15 x 20 cm
- Beton Cor fc' 30 MPa m³ 0 ,29 - -
- Besi Beton Deformed BJTD 420 MPa kg 6 0,56 - -
- Bekisting Plat Lantai m² 3 ,80 - -
7 Pek. Meja Beton t= 12 cm
- Beton Cor fc' 30 MPa m³ 0 ,04 - -
- Besi Beton Deformed BJTD 420 MPa kg 1 ,96 - -
- Bekisting Plat Lantai m² 0 ,43 - -
8 Pek. Plat Dak Atap t= 13 cm
- Beton Cor fc' 30 MPa m³ 1 ,83 - -
- Besi Beton Deformed BJTD 420 MPa kg 6 6,54 - -
- Bekisting Plat Lantai m² 1 5,87 - -
9 Pek. Pasang Kolom Praktis 11 x 11 cm Beton 'fc 30 MPa m³ 0 ,21 - -
10 Pek. Pasang Ring Balk 15 x 20 cm Beton 'fc 30 MPa m³ 0 ,52 - -
11 Pek. Pasang dinding bata 1 : 5 m² 2 5,01 - -
12 Pek. Plesteran dinding 1 : 5 m² 5 0,01 - -
13 Pek. Acian dinding m² 2 1,47 - -
14 Pek. Pengecatan Dinding Eksterior ex. Cat Jotun Majestic putih m² 2 1,47 - -
15 Pek. Pasang Lantai keramik 30x30 ex. Roman 33357RP dTriana Bone m² 3 ,35 - -
16 Pek. Pasang keramik dinding 30x60 ex. Roman 63357R dTriana Bone m² 2 2,55 - -
17 Pek. Lantai Cor Beton fc' 7,4 MPa m³ 0 ,20 - -
18 Pek. Pasang Rangka Plafon, Besi hollow t=0,4mm m² 3 ,11 - -
19 Pek. Pasang Plafon gipsum water resistant t=9mm + shadow line keliling m² 3 ,11 - -
20 Pek. Kusen Pintu Alluminium Type P1 unit 1 ,00 - -
21 Pek. Kusen Jendela Alluminium Type BV1 unit 1 ,00 - -
22 Pek. Kusen Jendela Alluminium Type BV2 unit 1 ,00 - -
23 Pek. Pasang Waterproofing Coating Atap m² 1 2,21 - -
24 Pek. Pasang Screed Atap m² 1 2,21 - -
25 Pek. Pasang Instalasi listrik ttk 2 ,00 - -
26 Pek. Pasang Instalasi Daya ttk 1 ,00 - -
27 Pek. Pasang Lampu Philips LED Downlight 14W bh 2 ,00 - -
28 Pek. Pasang Saklar Ganda bh 1 ,00 - -
29 Pek. Pasang Stop Kontak bh 1 ,00 - -
30 Pek. Instalasi Air bersih
- Pipa PVC Klas AW Dia. 1/2" m' 5 ,00 - -
- Pipa PVC Klas AW Dia. 1" m' 2 5,00 - -
31 Pek. Instalasi Air bekas
- Pipa PVC Klas AW Dia. 3" m' 1 5,00 - -
32 Pek. Instalasi Air kotor
- Pipa PVC Klas AW Dia. 4" m' 1 5,00 - -
33 Pek. Pasang Floor Drain ex. TOTO TX 1C bh 1 ,00 - -
34 Pek. Pasang Closet Duduk ex. TOTO CW 660 NJ/SW 660 J unit 1 ,00 - -
35 Pek. Pasang Shower spray ex. TOTO TB 19CSMCR bh 1 ,00 - -
36 Pek. Pasang Wastafel ex. TOTO LW 247 CJ bh 1 ,00 - -
37 Pek. Pasang Kran Wastafel ex. TOTO TX 120LESN bh 1 ,00 - -
38 Pek. Pasang Shower Set ex. TOTO Type TX 474 SVN bh 1 ,00 - -
39 Pek. Pasang Soap Holder ex. TOTO Type AW80J bh 1 ,00 - -
40 Pek. Pasang Cermin m² 0 ,57 - -
41 Pek. Pasang Bio Septic Tank Kap. 3 m3 + Resapan unit 1 ,00 - -
SUB TOTAL PEMBUATAN TOILET POS JAGA -
JUMLAH TOTAL PEMBUATAN TOILET POS JAGA -
IX PEKERJAAN RENOVASI RUANG SERBAGUNA
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Plafon m² 1 52,33 - -
2 Pek. Bongkaran Rangka Plafon m² 1 52,33 - -
3 Pek. Bongkaran Liss Propil Plafon m' 5 3,60 - -
4 Pek. Bongkaran Lampu ttk 1 0,00 - -
5 Pek. Bongkaran Smoke detector ttk 3 ,00 - -
6 Pek. Bongkaran AC Standing Eksisting (Indoor & Outdoor Unit) set 4 ,00 - -
SUB TOTAL PERSIAPAN -
HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA TOTAL
SATUAN
B PEKERJAAN RENOVASI RUANG SERBAGUNA
1 Pek. Pasang Rangka Plafon, Besi hollow t=0,4mm m² 1 52,33 - -
2 Pek. Pasang Rangka Drop Ceiling, Besi hollow t=0,4mm m' 3 0,64 - -
3 Pek. Pasang Plafon Gypsum t=9mm m² 1 52,33 - -
4 Pek. Pasang Liss Propil besar gipsum m' 3 0,64 - -
5 Pek. Pengecatan Plafon gipsum ex. Cat Jotun Jotaplash putih m² 1 52,33 - -
6 Pek. Pasang Pelapis Dinding WPC Panel Motif Kayu Lambresiring m² 7 ,22 - -
7 Pek. Pasang Pelapis Dinding Panel Veneer Kayu Fin. Cat Melamic m² 8 5,21 - -
8 Pek. Pasang Ornamen Kain Batik Jawa Barat + Frame Kayu + Kaca Polos 5 mm + Akrilik unit 1 ,00 - -
9 Pek. Pasang Kabinet 3 ( PTR 3 ) unit 1 ,00 - -
HPL By. TACO 3mm Warna, Front wall Solid Surface Motif Marmer Putih & Panel
Veneer Kayu Fin. Melamic, Engsel Sendok Soft Close, Runner Laci Full Extension & Soft
Close, Back wall Solid surface motif marmer putih, Top Table Panel Veneer Kayu Fin.
Melamic
10 Pek. Pasang Instalasi listrik ttk 2 7,00 - -
11 Pek. Pasang Instalasi Daya ttk 7 ,00 - -
12 Pek. Pasang Instalasi MATV ttk 1 ,00 - -
13 Pek. Pasang Indirect Lamp LED Strip 5W, drop ceiling m' 3 3,60 - -
14 Pek. Pasang Lampu Hias Gantung kristal bh 2 ,00 - -
15 Pek. Pasang Lampu Philips LED Downlight 14W bh 2 4,00 - -
16 Pek. Pasang Saklar Ganda bh 3 ,00 - -
17 Pek. Pasang Stop Kontak bh 7 ,00 - -
18 Pek. Pasang Outlet TV bh 1 ,00 - -
SUB TOTAL RENOVASI RUANG SERBAGUNA -
JUMLAH TOTAL RENOVASI RUANG SERBAGUNA -
X PEKERJAAN RENOVASI INFRASTRUKTUR KAWASAN
A PEKERJAAN PERSIAPAN
1 Pek. Striping Aspal Eksisting m² 3 96,43 - -
2 Pek. Bongkaran Kansteen Eksisting m³ 4 ,95 - -
SUB TOTAL PERSIAPAN -
B PEKERJAAN RENOVASI INFRASTRUKTUR KAWASAN
1 Pek. Urugan LPA Sirtu m³ 5 9,46 - -
2 Pek. Urugan Pasir t= 5 cm m³ 0 ,58 - -
3 Pek. Lapis Resap Perekat Aspal ltr 1 98,22 - -
4 Pek. Perkerasan Aspal Lapis Permukaan (AC-WC) t= 4 cm ton 3 8,85 - -
5 Pek. Pasang Kansteen Uk. 14 x 30 x 60 cm m' 8 2,44 - -
6 Pek. Pasang Saluran Gravel Dia. 20 cm m' 8 2,44 - -
SUB TOTAL RENOVASI INFRASTRUKTUR KAWASAN -
JUMLAH TOTAL RENOVASI INFRASTRUKTUR KAWASAN -
XI PEKERJAAN SMK3K
A PEKERJAAN PERSIAPAN SMK3K
PENYIAPAN RK3K
Pembuatan Dokumen Rencana Keselamatan Konstruksi, Pembuatan Prosedur,Intruksi
1 Kerja dan Penyiapan Formulir/Ijin Kerja set 1 ,00 - -
SOSIALISASI, PROMOSI DAN PELATIHAN
1 Induksi K3 (Safety Induction) org 4 0,00 - -
2 Pengarahan K3 (Safety Briefing) org 4 0,00 - -
3 Pertemuan Keselamatan (Safety Talk / Tool Box Meeting) org 4 0,00 - -
4 Pelatihan K3 :
- Bekerja di Ketinggian org 5 ,00 - -
5 Simulasi K3 org 4 0,00 - -
6 Spanduk (Banner) bh 3 ,00 - -
7 Poster bh 3 ,00 - -
8 Papan Informasi K3 bh 1 ,00 - -
ALAT PELINDUNG DIRI
1 Topi Pelindung (Safety Helmet) bh 5 0,00 - -
2 Pelindung Pernafasan dan Mulut (Masker) box 5 ,00 - -
3 Sarung Tangan (Safety Gloves) psg 4 0,00 - -
4 Sepatu Keselamatan (Safety Shoes), untuk staf bh 1 5,00 - -
5 Sepatu Keselamatan (Rubber Safety Shoes_and toe cap) bh 2 0,00 - -
6 Penunjang Seluruh Tubuh (Full Body Harness) bh 5 ,00 - -
7 Rompi Keselamatan (Safety Vest) bh 5 0,00 - -
HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA TOTAL
SATUAN
FASILITAS SARANA, PRASARANA DAN ALAT KESEHATAN
1 Peralatan P3K (Kotak P3K,Tandu,Obat Luka,Perban) ls 1 ,00 - -
ASURANSI KESELAMATAN KERJA
1 BPJS Ketenagakerjaan ls 1 ,00 - -
RAMBU-RAMBU
1 Rambu Petunjuk bh 5 ,00 - -
2 Rambu Larangan bh 5 ,00 - -
3 Rambu Peringatan bh 5 ,00 - -
4 Rambu Kewajiban bh 5 ,00 - -
5 Rambu Informasi bh 5 ,00 - -
KEGIATAN DAN PERALATAN TERKAIT PENGENDALIAN RESIKO KESELAMATAN KONSTRUKSI
1 Alat Pemadam Api Ringan (APAR) 6 kg bh 2 ,00 - -
2 Pembuatan Kartu Identitas Pekerja (KIP) lbr 4 0,00 - -
SUB TOTAL PERSIAPAN SMK3K -
JUMLAH TOTAL SMK3K -
JUMLAH TOTAL RENOVASI BANGUNAN MESS MPR (I+II+III+IV+V+VI+VII+VIII+IX) -
DAFTAR HARGA SATUAN PEKERJAAN
No. Uraian Harga Satuan
I PEKERJAAN PERSIAPAN
1.1 PENGUKURAN DAN PEMASANGAN 1 M' BOWPLANK (Analisa PUPR No.1 2022 1.1.d (c)) (Bagian Umum) -
1.2 1 M2 PEMBERSIHAN DAN PENGUPASAN PERMUKAAN TANAH (STRIPING) S.D. TANAMAN Ø 2 CM (Analisa PUPR No.1 2022 1.1.f (c)) (Bagian Umum) -
1.3 PEMBONGKARAN 1 M3 DINDING TEMBOK BATA (Analisa PUPR No.1 2022 1.1.h (a)) (Bagian Umum) -
1.4 BONGKAR 1 M3 BETON DENGAN JACK HAMMER (Analisa PUPR No.1 2022 2.2.10.a.(a)) (Bagian Umum) -
1.5 BONGKAR 1 M2 RANGKA ATAP EKSISTING -
1.6 BONGKAR 1 M2 PENUTUP ATAP EKSISTING -
1.7 BONGKAR 1 M' LISTPLANK EKSISTING -
1.8 BONGKAR 1 M' TALANG DATAR/JURAI EKSISTING -
1.9 BONGKAR 1 M2 RANGKA PLAFOND EKSISTING -
1.10 BONGKAR 1 M2 PENUTUP PLAFOND EKSISTING -
1.11 BONGKAR 1 M' LIST PLAFOND EKSISTING -
1.12 BONGKAR 1 M2 PELAPIS LANTAI -
1.13 BONGKAR 1 M' PLINT KAYU EKSISTING -
1.14 BONGKAR 1 M3 KUSEN KAYU EKSISTING -
1.15 BONGKAR 1 M2 DAUN PINTU EKSISTING -
1.16 BONGKAR 1 UNIT/BH SANITARY UNIT EKSISTING -
1.17 BONGKAR 1 TITIK INSTALASI & ARMATUR PENERANGAN -
1.18 BONGKAR 1 UNIT/BH ARMATUR FIRE ALARM -
1.19 BONGKAR 1 TITIK PENANGKAL PETIR KONVENSIONAL -
1.20 PENGGALIAN 1 M3 TANAH BIASA SEDALAM > 1 M S.D 2 M UNTUK VOLUME 200 S.D 2000 M3 (Analisa PUPR No.1 2022 1.7.7.1.1.d (a)) (Bagian Umum) -
1.21 PENGURUGAN KEMBALI 1 M3 GALIAN TANAH (Analisa PUPR No.1 2022 1.7.2.a (c)) (Bagian Umum) -
1.22 PEMASANGAN 1 M3 PONDASI BATU BELAH MORTAR TIPE O (2,4 MPa) (Analisa PUPR No.1 2022 2.1.1.c.(a)) (Bagian Umum) -
1.23 PEMASANGAN 1 M3 BATU KOSONG / AANSTAMPING (Analisa PUPR No.1 2022 1.5.1.1.b.(a)) (Bagian Umum) -
II PEKERJAAN BETON
4.1 1 M3 BETON UNTUK LANTAI KERJA (BEDDING) BETON fc' = 7,4 s.d. 9,8 MPa (K-100 s.d. K-125) (Analisa PUPR No.1 2022 2.2.1.1.a.(a)) (Bagian Umum) -
4.2 1 M3 PENGECORAN BETON MENGGUNAKAN READY-MIX DAN POMPA BETON (K-250) (Analisa PUPR No.1 2022 2.2.3.a.(a)) (Bagian Umum) -
4.3 PENULANGAN 1 KG DENGAN BESI SIRIP (Analisa PUPR No.1 2022 2.2.6.1.b.(c)) (Bagian Umum) -
4.4 PEMBESIAN 1 KG JARING KAWAT (WIREMESH M7) UNTUK PELAT ATAU DINDING ATAU FERROCEMENT (Analisa PUPR No.1 2022 2.2.7.a.(a)) (Bagian Umum) -
4.5 PEMASANGAN 1 M2 BEKISTING UNTUK PLAT LANTAI BETON BANGUNAN GEDUNG 4X PAKAI (Analisa PUPR No.1 2022 A.4.1.1.22.) (Bagian Cipta Karya) -
II PEKERJAAN PASANGAN DINDING
2.1 PEMASANGAN 1 M2 DINDING BATA MERAH(5X11X22) CM, T. 1/2 BATU DENGAN MORTAR TIPE O, Fc’ 2,4 Mpa (SETARA CAMPURAN 1SP : 5PP) (Analisa PUPR No.1 20 2 2 A . 4 . 4 . 1 . 1 0 ) ( B a g i a n C i p t a -Karya)
2.2 PEMASANGAN 1 M2 PELESTERAN 1SP : 5PP TEBAL 15 MM (Analisa PUPR No.1 2022 3.2.2.2.16.(c)) (Bagian Umum) -
2.3 1 M2 PEKERJAN ACIAN (Analisa PUPR No.1 2022 3.2.2.2.35.(a)) (Bagian Umum) -
III PEKERJAAN PENUTUP LANTAI DAN DINDING
3.1 PEMASANGAN 1 M2 LANTAI KERAMIK 30X30CM UNPOLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.7.) (Bagian Cipta Karya) -
3.2 PEMASANGAN 1 M1 PLINT KAYU TEBAL 2 CM LEBAR 10 CM (Ref. Analisa PUPR No.1 2022 A.4.4.3.62.) (Bagian Cipta Karya) -
3.3 PEMASANGAN 1 M2 LANTAI HOMOGENOUS 60X60CM POLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.13.) (Bagian Cipta Karya) -
3.4 PEMASANGAN 1 M2 LANTAI PARQUET KAYU SOLID ( Analisa PUPR No.1 2022 A.4.4.3.45.) (Bagian Cipta Karya) -
3.5 PEMASANGAN 1 M2 DINDING BATU ANDESIT 20X20 CM (Ref. Analisa PUPR No.1 2022 A.4.4.3.2.) (Bagian Cipta Karya) -
3.6 PEMASANGAN 1 M2 DINDING KERAMIK TILE 30X60CM POLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.53.) (Bagian Cipta Karya) -
3.7 PEMASANGAN 1 M1 KANSTEEN JALAN 60X14X30 CM (Ref. Analisa PUPR No.1 2022 A.5.1.1.38.) (Bagian Cipta Karya) -
3.8 PEMASANGAN 1 M1 SALURAN GRAVEL BETON Ø 20 CM (Ref. Analisa PUPR No.1 2022 A.5.1.1.38.) (Bagian Cipta Karya) -
3.9 PEMASANGAN 1 M2 LANTAI HOMOGENOUS 30X30CM POLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.13.) (Bagian Cipta Karya) -
3.10 PEMASANGAN 1 M2 KARPET TILE (Ref. Analisa PUPR No.1 2022 A.4.4.3.43.) (Bagian Cipta Karya) -
3.11 PEMASANGAN 1 M2 LANTAI HOMOGENOUS 60X60CM UNPOLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.13.) (Bagian Cipta Karya) -
IV PEKERJAAN LANGIT-LANGIT (PLAFOND)
4.1 PEMASANGAN 1 M2 RANGKA BESI HOLLOW GALVANIS 40.40 MM, MODUL 60X60, UNTUK PLAFOND (Analisa PUPR No.1 2022 A.4.2.1.21.) (Bagian Cipta Karya) -
4.2 PEMASANGAN 1 M2 LANGIT-LANGIT PAPAN GYPSUM WATER RESISTANT TEBAL 9MM, (Analisa PUPR No.1 2022 A.4.5.1.7.) (Bagian Cipta Karya) -
4.3 PEMASANGAN 1 M2 LANGIT-LANGIT PAPAN GYPSUM TEBAL 9MM, (Analisa PUPR No.1 2022 A.4.5.1.7.) (Bagian Cipta Karya) -
4.4 1 M1 PEMASANGAN DROP CELLING TINGGI 10 CM -
4.5 PEMASANGAN 1 M1 LIST LANGIT-LANGIT l=30 CM, (Analisa PUPR No.1 2022 A.4.5.1.10.) (Bagian Cipta Karya) -
4.6 PEMASANGAN 1 M1 LIST LANGIT-LANGIT l=15 CM, (Analisa PUPR No.1 2022 A.4.5.1.10.) (Bagian Cipta Karya) -
V PEKERJAAN KUSEN PINTU & JENDELA ALUMINIUM
5.1 PEMASANGAN 1 M1 KUSEN ALUMUNIUM (Analisa PUPR No.1 2022 A.4.2.1.24.) (Bagian Cipta Karya) -
5.2 PEMASANGAN 1 M2 KACA POLOS 5 MM (Analisa PUPR No.1 2022 A.4.6.2.17.) (Bagian Cipta Karya) -
5.3 PEMASANGAN 1 M2 KACA CERMIN TEBAL 5 mm (Analisa PUPR No.1 2022 A.4.6.2.20.) (Bagian Cipta Karya) -
5.4 PEMASANGAN 1 UNIT PINTU KACA TEMPERED GLASS t=12 mm + ACCESSORIES -
5.5 PEMASANGAN 1 UNIT KUSEN ALLUMINIUM + PINTU KAYU SOLID TYPE P1 -
5.6 PEMASANGAN 1 UNIT KUSEN ALLUMINIUM + PINTU KAYU SOLID TYPE P2 -
5.7 PEMASANGAN 1 UNIT PINTU KACA TEMPERED GLASS t=10 mm + ACCESSORIES -
5.8 PEMASANGAN 1 UNIT PARTISI KACA TEMPERED GLASS t=10 mm + ACCESSORIES -
VI PEKERJAAN PENGECATAN DAN LABURAN
6.1 PENGECATAN 1 M2 TEMBOK BARU INTERIOR (2x Cat Penutup) ( Analisa PUPR No.1 2022 3.3.10.(c)) (Bagian Umum) -
6.2 PENGECATAN 1 M2 TEMBOK BARU EXTERIOR (2x Cat Penutup) ( Analisa PUPR No.1 2022 3.3.10.(c)) (Bagian Umum) -
6.3 PENGECATAN 1 M2 PLAFOND (2x Cat Penutup) (Ref. Analisa PUPR No.1 2022 3.3.10.(c)) (Bagian Umum) -
6.4 PEMASANGAN 1 M2 WATERPROOFING COATING -
6.5 PEMASANGAN 1 M2 SCREED LANTAI T 2 CM -
6.6 PLITURAN 1 M2 DENGAN PLITUR MELAMIC (Ref. Analisa PUPR No.1 2022 3.3.20.(c)) (Bagian Umum) -
6.7 PEMASANGAN 1 M2 SANDBLASTED STICKER 60% (Ref. Analisa PUPR No.1 2022 A.4.4.3.59.) (Bagian Cipta Karya) -
VII PEKERJAAN PENUTUP ATAP
7.1 PEMASANGAN 1 M2 RANGKA ATAP KAYU (RENG) ( Analisa PUPR No.1 2022 A.4.2.1.23.) (Bagian Cipta Karya) -
7.2 PEMASANGAN 1 M2 GENTENG ASPAL UK. 1038 x 349 mm (Analisa PUPR No.1 2022 A.4.5.2.33.) (Bagian Cipta Karya) -
7.3 PEMASANGAN 1 M1 NOK/BUBUNG GENTENG ASPAL (Analisa PUPR No. 1 2022 A.4.5.2.37) (Bagian Cipta Karya) -
7.4 PEMASANGAN 1 M1 LISTPLANK UKURAN 30 CM (Ref. Analisa PUPR No.1 2022 A.4.6.1.22.) (Bagian Cipta Karya) -
7.5 PEMASANGAN 1 M’ TALANG DATAR/ JURAI SENG BJLS 28 LEBAR 90 CM (Analisa PUPR No.1 2022 A.4.2.1.18.) (Bagian Cipta Karya) -
VIII PEKERJAAN SANITARY UNIT
8.1 PEMASANGAN 1 BH KLOSET DUDUK/MONOBLOCK (Analisa PUPR No.1 2022 A.5.1.1.1.) (Bagian Cipta Karya) -
8.2 PEMASANGAN 1 BH JET WASHER -
8.3 PEMASANGAN 1 BH WASTAFEL (Analisa PUPR No.1 2022 A.5.1.1.5.) (Bagian Cipta Karya) -
8.4 PEMASANGAN 1 BH URINOIR (Analisa PUPR No.1 2022 A.5.1.1.4.) (Bagian Cipta Karya) -
8.5 PEMASANGAN 1 BH FLOORDRAIN (Analisa PUPR No.1 2022 A.5.1.1.36.) (Bagian Cipta Karya) -
8.6 PEMASANGAN 1 BH KRAN WASTAFEL -
No. Uraian Harga Satuan
8.7 PEMASANGAN 1 BH PAPER HOLDER -
8.8 PEMASANGAN 1 BH SHOWER SET -
8.9 PEMASANGAN 1 BH SOAP HOLDER -
IX PEKERJAAN MEKANIKAL
9.1 PEMASANGAN 1 M' PIPA PVC KLAS AW DIAMETER 1/2” (Analisa PUPR No. 1 Tahun 2022 Bagian Cipta Karya Kode A.5.1.1.25.) -
9.2 PEMASANGAN 1 M' PIPA PVC KLAS AW DIAMETER 1” (Analisa PUPR No. 1 Tahun 2022 Bagian Cipta Karya Kode A.5.1.1.27.) -
9.3 PEMASANGAN 1 M' PIPA PVC KLAS AW DIAMETER 3” (Analisa PUPR No. 1 Tahun 2022 Bagian Cipta Karya Kode A.5.1.1.31.) -
9.4 PEMASANGAN 1 M' PIPA PVC KLAS AW DIAMETER 4” (Analisa PUPR No. 1 Tahun 2022 Bagian Cipta Karya Kode A.5.1.1.32.) -
X PEKERJAAN ELEKTRIKAL
10.1 PEMASANGAN 1 BUAH TITIK LAMPU (Analisa PUPR No.1 2022 A.6.2.1.1.) -
10.2 PEMASANGAN 1 BUAH TITIK DAYA (Analisa PUPR No.1 2022 A.6.2.1.1.) -
10.3 PEMASANGAN 1 M' KABEL NYA 1 x 50 mm2 -
10.4 PEMASANGAN 1 BH LAMPU DOWNLIGHT LED 13 WATT -
10.5 PEMASANGAN 1 M' LAMPU LED STRIP 5 WATT -
10.6 PEMASANGAN 1 BH LAMPU GANTUNG KRISTAL DIA. 80 CM -
10.7 PEMASANGAN 1 BH STOP KONTAK DINDING -
10.8 PEMASANGAN 1 BH SAKLAR SINGLE -
10.9 PEMASANGAN 1 BH SAKLAR DOUBLE -
10.10 PEMASANGAN 1 BH EXHAUST FAN 100 CFM -
10.11 PEMASANGAN 1 BH SPLITZEN COPPER -
10.11 PEMASANGAN 1 UNIT AC CASSETTE 360 KAP. 18.000 BTU/H -
10.12 PEMASANGAN 1 BUAH TITIK MATV (Analisa PUPR No.1 2022 A.6.2.1.1.) -
10.13 PEMASANGAN 1 BH OUTLET MATV -
XI PEKERJAAN INTERIOR
11.1 PEMASANGAN 1 M2 PELAPIS DINDING PLYWOOD 12 MM, RANGKA HOLLOW 20X40, FIN. VENEER KAYU CAT MELAMIC -
11.2 PEMASANGAN 1 M2 DINDING PLYWOOD 12 MM, RANGKA HOLLOW 20X40, FIN. CAT DUCO -
11.3 PEMASANGAN 1 M2 ORNAMEN DINDING MULTIPLEKS 6 MM + 15 MM, RANGKA HOLLOW 20X40, FIN. CAT DUCO -
11.4 PEMASANGAN 1 M' BOX GORDEN PLYWOOD 12 MM, RANGKA HOLLOW 20X40, FIN. VENEER KAYU LAPIS CAT MELAMIC -
11.5 PEMASANGAN 1 UNIT KABINET PANTRY PTR1 -
11.6 PEMASANGAN 1 UNIT KABINET PANTRY PTR2 -
11.7 PEMASANGAN 1 UNIT KABINET PANTRY PTR3 -
11.8 PEMASANGAN 1 M2 DINDING WPC MOTIF LAMRESIRING KAYU, RANGKA HOLLOW 20X40 -
11.9 PEMASANGAN 1 M2 PELAPIS DINDING PLYWOOD 12 MM, RANGKA HOLLOW 20X40, FIN. HPL MOTIF KAYU -
XII PEKERJAAN INFRASTRUKTUR
12.1 PEMASANGAN 1 M3 LAPISAN PONDASI AGREGAT A (Analisa PUPR No.1 Tahun 2022 El-511) (Bagian Bina Marga) -
12.2 PENGURUGAN 1 M3 DENGAN PASIR URUG (Analisa PUPR No.1 2022 1.7.2.d (c)) (Bagian Umum) -
12.3 PEMASANGAN 1 LITER LAPIS PEREKAT (Analisa PUPR No.1 Tahun 2022 El-611) (Bagian Bina Marga) -
12.4 PEMASANGAN 1 M3 LAPISAN ASPAL AC/WC (Analisa PUPR No.1 Tahun 2022 El-635.a) (Bagian Bina Marga) -
12.5 PEMASANGAN 1 M2 GRASSBLOCK TEBAL 8 cm (Analisa PUPR No.1 Tahun 2022 A.4.4.3.64) (Bagian Umum) -
12.6 PEMASANGAN 1 M1 KANSTEEN JALAN 60X14X21 CM (Ref. Analisa PUPR No.1 2022 A.5.1.1.38.) (Bagian Cipta Karya) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
I PEKERJAAN PERSIAPAN
1.1 PENGUKURAN DAN PEMASANGAN 1 M' BOWPLANK (Analisa PUPR No.1 2022 1.1.d (c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,1000 - -
Tukang OH 0,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,0050 - -
B Bahan:
Kayu Balok 5/7 M3 0,0120 - -
Paku Biasa 2" - 3" Kg 0,0200 - -
Kayu Papan 3/20 M3 0,0070 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.2 1 M2 PEMBERSIHAN DAN PENGUPASAN PERMUKAAN TANAH (STRIPING) S.D. TANAMAN Ø 2 CM (Analisa PUPR No.1 2022 1.1.f (c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,1000 - -
Mandor OH 0,0050 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.3 PEMBONGKARAN 1 M3 DINDING TEMBOK BATA (Analisa PUPR No.1 2022 1.1.h (a)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,6670 - -
Mandor OH 0,0330 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.4 BONGKAR 1 M3 BETON DENGAN JACK HAMMER (Analisa PUPR No.1 2022 2.2.10.a.(a)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,2000 - -
Mandor OH 0,0200 - -
B Bahan:
-
C Peralatan:
Jack Hammer 12 HP Hari 0,0500 - -
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.5 BONGKAR 1 M2 RANGKA ATAP EKSISTING
A Tenaga:
Pekerja OH 0,5625 - -
Mandor OH 0,0938 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.6 BONGKAR 1 M2 PENUTUP ATAP EKSISTING
A Tenaga:
Pekerja OH 0,3750 - -
Mandor OH 0,0625 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.7 BONGKAR 1 M' LISTPLANK EKSISTING
A Tenaga:
Pekerja OH 0,1000 - -
Tukang OH 0,2000 - -
Kepala Tukang OH 0,0200 - -
Mandor OH 0,0050 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.8 BONGKAR 1 M' TALANG DATAR/JURAI EKSISTING
A Tenaga:
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
Pekerja OH 0,2000 - -
Tukang OH 0,2000 - -
Kepala Tukang OH 0,0200 - -
Mandor OH 0,0010 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
1.9 BONGKAR 1 M2 RANGKA PLAFOND EKSISTING
A Tenaga:
Pekerja OH 0,2500 - -
Mandor OH 0,0375 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.10 BONGKAR 1 M2 PENUTUP PLAFOND EKSISTING
A Tenaga:
Pekerja OH 0,1313 - -
Mandor OH 0,0263 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.11 BONGKAR 1 M' LIST PLAFOND EKSISTING
A Tenaga:
Pekerja OH 0,0500 - -
Tukang OH 0,0500 - -
Kepala Tukang OH 0,0050 - -
Mandor OH 0,0030 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.12 BONGKAR 1 M2 PELAPIS LANTAI
A Tenaga:
Pekerja OH 0,2625 - -
Mandor OH 0,0525 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.13 BONGKAR 1 M' PLINT KAYU EKSISTING
A Tenaga:
Pekerja OH 0,1200 - -
Tukang OH 0,1200 - -
Kepala Tukang OH 0,0120 - -
Mandor OH 0,0060 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.14 BONGKAR 1 M3 KUSEN KAYU EKSISTING
A Tenaga:
Pekerja OH 6,0000 - -
Tukang OH 18,0000 - -
Kepala Tukang OH 1,8000 - -
Mandor OH 0,3000 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.15 BONGKAR 1 M2 DAUN PINTU EKSISTING
A Tenaga:
Pekerja OH 0,7000 - -
Tukang OH 2,1000 - -
Kepala Tukang OH 0,2100 - -
Mandor OH 0,0350 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
1.16 BONGKAR 1 UNIT/BH SANITARY UNIT EKSISTING
A Tenaga:
Pekerja OH 0,5000 - -
Tukang OH 1,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,1600 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.17 BONGKAR 1 TITIK INSTALASI & ARMATUR PENERANGAN
A Tenaga:
Pekerja OH 0,5000 - -
Mandor OH 0,1250 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.18 BONGKAR 1 UNIT/BH ARMATUR FIRE ALARM
A Tenaga:
Pekerja OH 0,1750 - -
Mandor OH 0,0438 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.19 BONGKAR 1 TITIK PENANGKAL PETIR KONVENSIONAL
A Tenaga:
Pekerja OH 0,5625 - -
Mandor OH 0,1313 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.20 PENGGALIAN 1 M3 TANAH BIASA SEDALAM > 1 M S.D 2 M UNTUK VOLUME 200 S.D 2000 M3 (Analisa PUPR No.1 2022 1.7.7.1.1.d (a)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,6750 - -
Mandor OH 0,0675 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.21 PENGURUGAN KEMBALI 1 M3 GALIAN TANAH (Analisa PUPR No.1 2022 1.7.2.a (c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,5000 - -
Mandor OH 0,0500 - -
B Bahan:
-
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
1.22 PEMASANGAN 1 M3 PONDASI BATU BELAH MORTAR TIPE O (2,4 MPa) (Analisa PUPR No.1 2022 2.1.1.c.(a)) (Bagian Umum)
A Tenaga:
Pekerja OH 1,5000 - -
Tukang OH 0,7500 - -
Kepala Tukang OH 0,0750 - -
Mandor OH 0,0750 - -
B Bahan:
Batu Belah M3 1,2000 - -
Portland Semen Kg 136,0000 - -
Pasir Pasang M3 0,5440 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
1.23 PEMASANGAN 1 M3 BATU KOSONG / AANSTAMPING (Analisa PUPR No.1 2022 1.5.1.1.b.(a)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,7800 - -
Tukang OH 0,3900 - -
Kepala Tukang OH 0,0390 - -
Mandor OH 0,0390 - -
B Bahan:
Batu Belah M3 1,2000 - -
Pasir Urug M3 0,4320 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
II PEKERJAAN BETON
4.1 1 M3 BETON UNTUK LANTAI KERJA (BEDDING) BETON fc' = 7,4 s.d. 9,8 MPa (K-100 s.d. K-125) (Analisa PUPR No.1 2022 2.2.1.1.a.(a)) (Bagian Umum)
A Tenaga:
Pekerja OH 1,2000 - -
Tukang OH 0,2000 - -
Kepala Tukang OH 0,0200 - -
Mandor OH 0,1200 - -
B Bahan:
Semen Portland Kg 227,0000 - -
Pasir Beton Kg 869,0000 - -
Kerikil Kg 1000,0000 - -
Air Ltr 215,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4.2 1 M3 PENGECORAN BETON MENGGUNAKAN READY-MIX DAN POMPA BETON (K-250) (Analisa PUPR No.1 2022 2.2.3.a.(a)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,4000 - -
Tukang OH 0,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,0400 - -
B Bahan:
Ready-Mix K - 250 M3 1,0200 - -
C Peralatan:
Pompa Ø 3" M3 1,0200 - -
Vibrator M3 1,0200 - -
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4.3 PENULANGAN 1 KG DENGAN BESI SIRIP (Analisa PUPR No.1 2022 2.2.6.1.b.(c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,0070 - -
Tukang OH 0,0070 - -
Kepala Tukang OH 0,0007 - -
Mandor OH 0,0004 - -
B Bahan:
Baja Tulangan Ulir Kg 1,0500 - -
Kawat beton Kg 0,0150 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4.4 PEMBESIAN 1 KG JARING KAWAT (WIREMESH M7) UNTUK PELAT ATAU DINDING ATAU FERROCEMENT (Analisa PUPR No.1 2022 2.2.7.a.(a)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,0025 - -
Tukang OH 0,0025 - -
Kepala Tukang OH 0,0003 - -
Mandor OH 0,0003 - -
B Bahan:
Wiremesh M7 Kg 1,0200 - -
Kawat beton Kg 0,0050 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4.5 PEMASANGAN 1 M2 BEKISTING UNTUK PLAT LANTAI BETON BANGUNAN GEDUNG 4X PAKAI (Analisa PUPR No.1 2022 A.4.1.1.22.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,6600 - -
Tukang OH 0,3300 - -
Kepala Tukang OH 0,0330 - -
Mandor OH 0,0330 - -
B Bahan:
Kayu Kelas Kuat III M3 0,0100 - -
Paku ukuran 4cm-12cm Kg 0,1000 - -
Minyak Bekisting Ltr 0,0500 - -
Balok Kayu Kelas Kuat II M3 0,0038 - -
Plywood 9 mm, uk. 1,20 x 2,40 Lbr 0,0875 - -
Dolken dia 8 s/d 10 cm Btg 1,5000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
II PEKERJAAN PASANGAN DINDING
2.1 PEMASANGAN 1 M2 DINDING BATA MERAH(5X11X22) CM, T. 1/2 BATU DENGAN MORTAR TIPE O, Fc’ 2,4 Mpa (SETARA CAMPURAN 1SP : 5PP) (Analisa PUPR No.1 2022 A.4.4.1.10) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,3000 - -
Tukang OH 0,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,0150 - -
B Bahan:
Bata Merah Bakar Kelas 1 Bh 70,0000 - -
Portland Cement (1 zak = 50 kg) Kg 9,6800 - -
Pasir Pasang M3 0,0450 - -
C Peralatan:
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2.2 PEMASANGAN 1 M2 PELESTERAN 1SP : 5PP TEBAL 15 MM (Analisa PUPR No.1 2022 3.2.2.2.16.(c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,3000 - -
Tukang OH 0,1500 - -
Kepala Tukang OH 0,0150 - -
Mandor OH 0,0150 - -
B Bahan:
Portland Cement (1 zak = 50 kg) Kg 5,1840 - -
Pasir Pasang M3 0,0260 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
2.3 1 M2 PEKERJAN ACIAN (Analisa PUPR No.1 2022 3.2.2.2.35.(a)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,1000 - -
Tukang OH 0,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,0100 - -
B Bahan:
Semen Portland Kg 3,2500 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
III PEKERJAAN PENUTUP LANTAI DAN DINDING
3.1 PEMASANGAN 1 M2 LANTAI KERAMIK 30X30CM UNPOLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.7.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,2500 - -
Tukang OH 0,1250 - -
Kepala Tukang OH 0,0125 - -
Mandor OH 0,0125 - -
B Bahan:
Lantai Keramik Matt Bh 6,6300 - -
Semen Portland Kg 9,8000 - -
Pasir Pasang M3 0,0450 - -
Semen Warna Kg 1,3000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3.2 PEMASANGAN 1 M1 PLINT KAYU TEBAL 2 CM LEBAR 10 CM (Ref. Analisa PUPR No.1 2022 A.4.4.3.62.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,1200 - -
Tukang OH 0,1200 - -
Kepala Tukang OH 0,0120 - -
Mandor OH 0,0060 - -
B Bahan:
Kayu Papan 3/20 Kelas II m3 0,0030 - -
Paku 5 cm s/d 10 cm Kg 0,0500 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
3.3 PEMASANGAN 1 M2 LANTAI HOMOGENOUS 60X60CM POLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.13.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,2400 - -
Tukang OH 0,1200 - -
Kepala Tukang OH 0,0120 - -
Mandor OH 0,0120 - -
B Bahan:
Lantai Homogenous Bh 3,1000 - -
Semen Portland Kg 9,6000 - -
Pasir Pasang M3 0,0450 - -
Semen Warna Kg 1,5000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3.4 PEMASANGAN 1 M2 LANTAI PARQUET KAYU SOLID ( Analisa PUPR No.1 2022 A.4.4.3.45.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,7000 - -
Tukang OH 0,3500 - -
Kepala Tukang OH 0,0350 - -
Mandor OH 0,0350 - -
B Bahan:
Parquet M2 1,0500 - -
Lem Karet Kg 0,3500 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3.5 PEMASANGAN 1 M2 DINDING BATU ANDESIT 20X20 CM (Ref. Analisa PUPR No.1 2022 A.4.4.3.2.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,2500 - -
Tukang OH 0,1250 - -
Kepala Tukang OH 0,0130 - -
Mandor OH 0,0130 - -
B Bahan:
Batu Andesit M2 1,1000 - -
Semen Portland Kg 11,7500 - -
Pasir Pasang M3 0,0350 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3.6 PEMASANGAN 1 M2 DINDING KERAMIK TILE 30X60CM POLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.53.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,9000 - -
Tukang OH 0,4500 - -
Kepala Tukang OH 0,0450 - -
Mandor OH 0,0450 - -
B Bahan:
Dinding Keramik Polished Bh 6,2000 - -
Semen Portland Kg 9,3000 - -
Pasir Pasang M3 0,0180 - -
Semen Warna Kg 1,9400 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3.7 PEMASANGAN 1 M1 KANSTEEN JALAN 60X14X30 CM (Ref. Analisa PUPR No.1 2022 A.5.1.1.38.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,0600 - -
Tukang OH 0,0300 - -
Kepala Tukang OH 0,0030 - -
Mandor OH 0,0030 - -
B Bahan:
Kansteen Jalan 60x14x30 M' 1,6600 - -
Semen Portland Kg 0,9300 - -
Pasir Pasang M3 0,0130 - -
Pasir Beton M3 0,0110 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3.8 PEMASANGAN 1 M1 SALURAN GRAVEL BETON Ø 20 CM (Ref. Analisa PUPR No.1 2022 A.5.1.1.38.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,0600 - -
Tukang OH 0,0300 - -
Kepala Tukang OH 0,0030 - -
Mandor OH 0,0030 - -
B Bahan:
Gravel Ø 30 Cm M' 1,6600 - -
Semen Portland Kg 0,9300 - -
Pasir Pasang M3 0,0130 - -
Pasir Beton M3 0,0110 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3.9 PEMASANGAN 1 M2 LANTAI HOMOGENOUS 30X30CM POLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.13.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,2400 - -
Tukang OH 0,1200 - -
Kepala Tukang OH 0,0120 - -
Mandor OH 0,0120 - -
B Bahan:
Lantai Homogenous Bh 11,1111 - -
Semen Portland Kg 9,6000 - -
Pasir Pasang M3 0,0450 - -
Semen Warna Kg 1,5000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
3.10 PEMASANGAN 1 M2 KARPET TILE (Ref. Analisa PUPR No.1 2022 A.4.4.3.43.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,1700 - -
Tukang OH 0,1700 - -
Kepala Tukang OH 0,0170 - -
Mandor OH 0,0090 - -
B Bahan:
Karpet Tile m2 1,0500 - -
Underlayer Karpet m2 1,0500 - -
Lem Kuning Kg 0,3500 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
3.11 PEMASANGAN 1 M2 LANTAI HOMOGENOUS 60X60CM UNPOLISHED (Ref. Analisa PUPR No.1 2022 A.4.4.3.13.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,2400 - -
Tukang OH 0,1200 - -
Kepala Tukang OH 0,0120 - -
Mandor OH 0,0120 - -
B Bahan:
Lantai Homogenous Bh 3,1000 - -
Semen Portland Kg 9,6000 - -
Pasir Pasang M3 0,0450 - -
Semen Warna Kg 1,5000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
IV PEKERJAAN LANGIT-LANGIT (PLAFOND)
4.1 PEMASANGAN 1 M2 RANGKA BESI HOLLOW GALVANIS 40.40 MM, MODUL 60X60, UNTUK PLAFOND (Analisa PUPR No.1 2022 A.4.2.1.21.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,3500 - -
Tukang OH 0,3500 - -
Kepala Tukang OH 0,0350 - -
Mandor OH 0,0175 - -
B Bahan:
Hollow Galvanis untuk Plafond 40x40mm, t = 0,4 mm m1 4,0000 - -
Accessories (Perkuatan, Penggantung, Las, dll) % 1,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4.2 PEMASANGAN 1 M2 LANGIT-LANGIT PAPAN GYPSUM WATER RESISTANT TEBAL 9MM, (Analisa PUPR No.1 2022 A.4.5.1.7.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,1000 - -
Tukang OH 0,0500 - -
Kepala Tukang OH 0,0050 - -
Mandor OH 0,0050 - -
B Bahan:
Gypsumboard 120x240 tebal 9 mm (Water Resistant) Lbr 0,3640 - -
Paku Skrup Kg 0,1100 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4.3 PEMASANGAN 1 M2 LANGIT-LANGIT PAPAN GYPSUM TEBAL 9MM, (Analisa PUPR No.1 2022 A.4.5.1.7.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,1000 - -
Tukang OH 0,0500 - -
Kepala Tukang OH 0,0050 - -
Mandor OH 0,0050 - -
B Bahan:
Gypsumboard 120x240 tebal 9 mm Lbr 0,3640 - -
Paku Skrup Kg 0,1100 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4.4 1 M1 PEMASANGAN DROP CELLING TINGGI 10 CM
A Tenaga:
Pekerja OH 0,1500 - -
Tukang OH 0,1500 - -
Kepala Tukang OH 0,0230 - -
Mandor OH 0,0110 - -
B Bahan:
Hollow Galvanis untuk Plafond 40x40mm, t = 0,4 mm m1 2,5000 - -
Papan Gypsum m1 1,0500 - -
Paku Skrup Kg 0,1100 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
4.5 PEMASANGAN 1 M1 LIST LANGIT-LANGIT l=30 CM, (Analisa PUPR No.1 2022 A.4.5.1.10.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,0500 - -
Tukang OH 0,0500 - -
Kepala Tukang OH 0,0050 - -
Mandor OH 0,0030 - -
B Bahan:
List Profil Gypsum 30 cm M1 1,0500 - -
Paku Skrup Kg 0,0100 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
4.6 PEMASANGAN 1 M1 LIST LANGIT-LANGIT l=15 CM, (Analisa PUPR No.1 2022 A.4.5.1.10.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,0500 - -
Tukang OH 0,0500 - -
Kepala Tukang OH 0,0050 - -
Mandor OH 0,0030 - -
B Bahan:
List Profil Gypsum 15 cm M1 1,0500 - -
Paku Skrup Kg 0,0100 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
V PEKERJAAN KUSEN PINTU & JENDELA ALUMINIUM
5.1 PEMASANGAN 1 M1 KUSEN ALUMUNIUM (Analisa PUPR No.1 2022 A.4.2.1.24.) (Bagian Cipta Karya)
A Tenaga:
Pekerja oh 0,0430 - -
Tukang oh 0,0430 - -
Kepala Tukang oh 0,0043 - -
Mandor oh 0,0021 - -
B Bahan:
Profil Alluminium 4" m¹ 1,1000 - -
Skrup Pisher Bh 2,0000 - -
Sealent Tube 0,0600 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5.2 PEMASANGAN 1 M2 KACA POLOS 5 MM (Analisa PUPR No.1 2022 A.4.6.2.17.) (Bagian Cipta Karya)
A Tenaga:
Pekerja oh 0,0150 - -
Tukang oh 0,1500 - -
Kepala Tukang oh 0,0150 - -
Mandor oh 0,0008 - -
B Bahan:
Kaca Polos 5 mm m2 1,1000 - -
Sealent Tube 0,0500 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5.3 PEMASANGAN 1 M2 KACA CERMIN TEBAL 5 mm (Analisa PUPR No.1 2022 A.4.6.2.20.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,0150 - -
Tukang OH 0,1500 - -
Kepala Tukang OH 0,0150 - -
Mandor OH 0,0075 - -
B Bahan:
Kaca Cermin 5 mm M1 1,1000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5.4 PEMASANGAN 1 UNIT PINTU KACA TEMPERED GLASS t=12 mm + ACCESSORIES
A Tenaga:
Pekerja OH 2,5000 - -
Tukang OH 1,5000 - -
Kepala Tukang OH 0,7000 - -
Mandor OH 0,5000 - -
B Bahan:
Kaca Tempered 12 mm ( ASAHI ) m2 1,9080 - -
Path Fitting PT2220, PT2210, PT2240 set 1,0000 - -
Floor Hinge FH 08323 bh 1,0000 - -
Patch Lock US 2210 bh 1,0000 - -
Pull Handle GHD0031 psg 1,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
5.5 PEMASANGAN 1 UNIT KUSEN ALLUMINIUM + PINTU KAYU SOLID TYPE P1
A Tenaga:
Pekerja OH 2,5000 - -
Tukang OH 1,5000 - -
Kepala Tukang OH 0,7000 - -
Mandor OH 0,5000 - -
B Bahan:
Kusen Alumunium m' 5,1200 - -
Daun Pintu Kayu Solid Lap. Veneer Kayu Walnut unit 1,0000 - -
Hinge Dekkson ESS EL 5X3X3MM 4BB SSS M3 3,0000 - -
Handle Solid Rose LHSR 0406 PSS M3 1,0000 - -
Pengunci MTS IL DL 8685 SSS + CYL DC DL 60mm SN M3 1,0000 - -
Door Closer Hold Open DCL 529 HO BA M3 1,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5.6 PEMASANGAN 1 UNIT KUSEN ALLUMINIUM + PINTU KAYU SOLID TYPE P2
A Tenaga:
Pekerja OH 2,5000 - -
Tukang OH 1,5000 - -
Kepala Tukang OH 0,7000 - -
Mandor OH 0,5000 - -
B Bahan:
Kusen Alumunium m' 5,0200 - -
Daun Pintu Kayu Solid Lap. Veneer Kayu Walnut unit 1,0000 - -
Hinge Dekkson ESS EL 5X3X3MM 4BB SSS psg 3,0000 - -
Handle Solid Rose LHSR 0406 PSS psg 1,0000 - -
Pengunci MTS IL DL 8685 SSS + CYL DC DL 60mm SN bh 1,0000 - -
Door Closer Hold Open DCL 529 HO BA set 1,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5.7 PEMASANGAN 1 UNIT PINTU KACA TEMPERED GLASS t=10 mm + ACCESSORIES
A Tenaga:
Pekerja OH 2,5000 - -
Tukang OH 1,5000 - -
Kepala Tukang OH 0,7000 - -
Mandor OH 0,5000 - -
B Bahan:
Kaca Tempered 10 mm ( ASAHI ) m2 1,4840 - -
Engsel H 7703 GG psg 2,0000 - -
Handle DK 82803 CP psg 1,0000 - -
Kunci IL 8600C CP + 8601C CP Keeper psg 1,0000 - -
Clip Seal CSBS m' 2,1200 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
5.8 PEMASANGAN 1 UNIT PARTISI KACA TEMPERED GLASS t=10 mm + ACCESSORIES
A Tenaga:
Pekerja OH 2,5000 - -
Tukang OH 1,5000 - -
Kepala Tukang OH 0,7000 - -
Mandor OH 0,5000 - -
B Bahan:
Kaca Tempered 10 mm ( ASAHI ) m2 1,6960 - -
Glass Clamp GH 25-01 CP bh 2,0000 - -
Glass Clamp GH 25-02 CP bh 2,0000 - -
Glass Clamp Holder GC U800 AL CP bh 3,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
VI PEKERJAAN PENGECATAN DAN LABURAN
6.1 PENGECATAN 1 M2 TEMBOK BARU INTERIOR (2x Cat Penutup) ( Analisa PUPR No.1 2022 3.3.10.(c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,0200 - -
Tukang OH 0,0630 - -
Kepala Tukang OH 0,0063 - -
Mandor OH 0,0030 - -
B Bahan:
Plamir Kg 0,1000 - -
Cat Dasar Kg 0,1000 - -
Cat Dinding Interior Kg 0,2600 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
6.2 PENGECATAN 1 M2 TEMBOK BARU EXTERIOR (2x Cat Penutup) ( Analisa PUPR No.1 2022 3.3.10.(c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,0200 - -
Tukang OH 0,0630 - -
Kepala Tukang OH 0,0063 - -
Mandor OH 0,0030 - -
B Bahan:
Plamir Kg 0,1000 - -
Cat Dasar Kg 0,1000 - -
Cat Dinding Exterior Kg 0,2600 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6.3 PENGECATAN 1 M2 PLAFOND (2x Cat Penutup) (Ref. Analisa PUPR No.1 2022 3.3.10.(c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,0200 - -
Tukang OH 0,0630 - -
Kepala Tukang OH 0,0063 - -
Mandor OH 0,0030 - -
B Bahan:
Cat Dasar Kg 0,1000 - -
Cat Dinding Interior Kg 0,2600 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6.4 PEMASANGAN 1 M2 WATERPROOFING COATING
A Tenaga:
Pekerja OH 0,0200 - -
Tukang OH 0,0630 - -
Kepala Tukang OH 0,0063 - -
Mandor OH 0,0030 - -
B Bahan:
Waterproofing Coating Kg 3,0000 - -
C Peralatan:
Alat Bantu % 0,1000 - -
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6.5 PEMASANGAN 1 M2 SCREED LANTAI T 2 CM
A Tenaga:
Pekerja OH 0,3000 - -
Tukang OH 0,1500 - -
Kepala Tukang OH 0,0150 - -
Mandor OH 0,0150 - -
B Bahan:
MSP Kg 33,3333 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6.6 PLITURAN 1 M2 DENGAN PLITUR MELAMIC (Ref. Analisa PUPR No.1 2022 3.3.20.(c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,2000 - -
Tukang OH 1,2000 - -
Kepala Tukang OH 0,1200 - -
Mandor OH 0,0100 - -
B Bahan:
Wood Filler kg 0,1500 - -
Woodstain kg 0,1500 - -
Sanding kg 0,1500 - -
Melamic kg 0,2400 - -
Thinner ltr 0,2000 - -
Ampelas lbr 0,6000 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
6.7 PEMASANGAN 1 M2 SANDBLASTED STICKER 60% (Ref. Analisa PUPR No.1 2022 A.4.4.3.59.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,3500 - -
Tukang OH 0,1750 - -
Kepala Tukang OH 0,0170 - -
Mandor OH 0,0020 - -
B Bahan:
Sandblasted Sticker 60% m2 1,0500 - -
C Peralatan:
Accsesories % 0,1000 - -
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
VII PEKERJAAN PENUTUP ATAP
7.1 PEMASANGAN 1 M2 RANGKA ATAP KAYU (RENG) ( Analisa PUPR No.1 2022 A.4.2.1.23.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,1000 - -
Tukang OH 0,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,0050 - -
B Bahan:
Kayu Balok 6/12 Kelas II m3 0,0176 - -
Paku 5 cm s/d 10 cm kg 0,2500 - -
C Peralatan:
Accsesories % 0,0100 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7.2 PEMASANGAN 1 M2 GENTENG ASPAL UK. 1038 x 349 mm (Analisa PUPR No.1 2022 A.4.5.2.33.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,2000 - -
Tukang OH 0,3000 - -
Kepala Tukang OH 0,0300 - -
Mandor OH 0,0100 - -
B Bahan:
Genteng Bitumen Shingle tipe Cambridge 30 Uk. 1038 x 349 mm M2 1,1000 - -
Underlayer Armourbase Pro 1 mm Roll 0,0333 - -
Paku Bitumen Kg 0,2500 - -
Lem Bitumen Kg 0,1000 - -
Flashing Galvanis m' 1,0000 - -
Plywood 9 mm m2 1,1000 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7.3 PEMASANGAN 1 M1 NOK/BUBUNG GENTENG ASPAL (Analisa PUPR No. 1 2022 A.4.5.2.37) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,1250 - -
Tukang OH 0,2500 - -
Kepala Tukang OH 0,0250 - -
Mandor OH 0,0060 - -
B Bahan:
Nok Bitumen Cambridge 30 M1 1,1000 - -
Paku Bitumen Kg 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7.4 PEMASANGAN 1 M1 LISTPLANK UKURAN 30 CM (Ref. Analisa PUPR No.1 2022 A.4.6.1.22.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,1000 - -
Tukang OH 0,2000 - -
Kepala Tukang OH 0,0200 - -
Mandor OH 0,0050 - -
B Bahan:
Wood Plank Lebar 30 Cm M1 1,0500 - -
Paku ukuran 4cm-12cm kg 0,0500 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
7.5 PEMASANGAN 1 M’ TALANG DATAR/ JURAI SENG BJLS 28 LEBAR 90 CM (Analisa PUPR No.1 2022 A.4.2.1.18.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,2000 - -
Tukang OH 0,2000 - -
Kepala Tukang OH 0,0200 - -
Mandor OH 0,0010 - -
B Bahan:
Plat Seng BJLS M1 1,0500 - -
Paku ukuran 4cm-12cm kg 0,0150 - -
C Peralatan:
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
VIII PEKERJAAN SANITARY UNIT
8.1 PEMASANGAN 1 BH KLOSET DUDUK/MONOBLOCK (Analisa PUPR No.1 2022 A.5.1.1.1.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,5000 - -
Tukang OH 1,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,1600 - -
B Bahan:
Kloset Duduk Type CW823NJ Unit 1,0000 - -
Perlengkapan % 0,0600 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
8.2 PEMASANGAN 1 BH JET WASHER
A Tenaga:
Pekerja OH 0,0100 - -
Tukang OH 0,4000 - -
Kepala Tukang OH 0,0400 - -
Mandor OH 0,0050 - -
B Bahan:
Jet Washer Type TB 19CSMCR Unit 1,0000 - -
Perlengkapan % 0,0600 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8.3 PEMASANGAN 1 BH WASTAFEL (Analisa PUPR No.1 2022 A.5.1.1.5.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 1,2000 - -
Tukang OH 1,4500 - -
Kepala Tukang OH 0,1500 - -
Mandor OH 0,0600 - -
B Bahan:
Wastafel Dinding Type LW 523NU bh 1,2000 - -
Semen Portland Kg 6,0000 - -
Pasir pasang M3 0,0100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8.4 PEMASANGAN 1 BH URINOIR (Analisa PUPR No.1 2022 A.5.1.1.4.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 1,0000 - -
Tukang OH 1,0000 - -
Kepala Tukang OH 0,1000 - -
Mandor OH 0,0500 - -
B Bahan:
Urinoir Type U 57 M bh 1,0000 - -
Semen Portland Kg 6,0000 - -
Pasir pasang M3 0,0100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8.5 PEMASANGAN 1 BH FLOORDRAIN (Analisa PUPR No.1 2022 A.5.1.1.36.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,0100 - -
Tukang OH 0,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,0050 - -
B Bahan:
Floordrain Type TX 1C bh 1,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8.6 PEMASANGAN 1 BH KRAN WASTAFEL
A Tenaga:
Pekerja OH 0,0100 - -
Tukang OH 0,4000 - -
Kepala Tukang OH 0,0400 - -
Mandor OH 0,0050 - -
B Bahan:
Kran Wastafel Type TX 120LESN bh 1,0000 - -
Sealtape bh 0,0250 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8.7 PEMASANGAN 1 BH PAPER HOLDER
A Tenaga:
Pekerja OH 0,0100 - -
Tukang OH 0,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,0050 - -
B Bahan:
Paper Holder Type S20 bh 1,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
8.8 PEMASANGAN 1 BH SHOWER SET
A Tenaga:
Pekerja OH 0,0100 - -
Tukang OH 0,4000 - -
Kepala Tukang OH 0,0400 - -
Mandor OH 0,0050 - -
B Bahan:
Shower Set - Type TX 474 SVN bh 1,0000 - -
Sealtape bh 0,0250 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
8.9 PEMASANGAN 1 BH SOAP HOLDER
A Tenaga:
Pekerja OH 0,0100 - -
Tukang OH 0,1000 - -
Kepala Tukang OH 0,0100 - -
Mandor OH 0,0050 - -
B Bahan:
Soap Holder - Type AW80J bh 1,0000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
XI PEKERJAAN INTERIOR
11.1 PEMASANGAN 1 M2 PELAPIS DINDING PLYWOOD 12 MM, RANGKA HOLLOW 20X40, FIN. VENEER KAYU CAT MELAMIC
A Tenaga:
Pekerja OH 0,5625 - -
Tukang OH 0,3750 - -
Kepala Tukang OH 0,1313 - -
Mandor OH 0,0938 - -
B Bahan:
Plywood 12 mm m2 1,2000 - -
Hollow Besi 20 x 40 cm m' 4,2000 - -
Ramset bh 15,0000 - -
Veneer Kayu Walnut m2 1,2000 - -
Cat Melamic m2 1,2000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11.2 PEMASANGAN 1 M2 DINDING PLYWOOD 12 MM, RANGKA HOLLOW 20X40, FIN. CAT DUCO
A Tenaga:
Pekerja OH 1,1250 - -
Tukang OH 0,7500 - -
Kepala Tukang OH 0,2625 - -
Mandor OH 0,1875 - -
B Bahan:
Plywood 12 mm m2 1,2000 - -
Hollow Besi 20 x 40 cm m' 4,2000 - -
Ramset bh 15,0000 - -
Profil Kayu m2 1,2000 - -
Cat Duco m2 1,2000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11.3 PEMASANGAN 1 M2 ORNAMEN DINDING MULTIPLEKS 6 MM + 15 MM, RANGKA HOLLOW 20X40, FIN. CAT DUCO
A Tenaga:
Pekerja OH 1,1250 - -
Tukang OH 0,7500 - -
Kepala Tukang OH 0,2625 - -
Mandor OH 0,1875 - -
B Bahan:
Multiplek 6 mm lbr 0,4167 - -
Multiplek 15 mm lbr 0,4167 - -
Hollow Besi 20 x 40 cm m' 4,2000 - -
Ramset bh 15,0000 - -
Cat Duco m2 1,2000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11.4 PEMASANGAN 1 M' BOX GORDEN PLYWOOD 12 MM, RANGKA HOLLOW 20X40, FIN. VENEER KAYU LAPIS CAT MELAMIC
A Tenaga:
Pekerja OH 1,1250 - -
Tukang OH 0,7500 - -
Kepala Tukang OH 0,2625 - -
Mandor OH 0,1875 - -
B Bahan:
Plywood 12 mm m2 0,8000 - -
Hollow Besi 20 x 40 cm m' 3,0000 - -
Ramset bh 15,0000 - -
Veneer Kayu Walnut m2 0,8000 - -
Cat Melamic m2 0,8000 - -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
Rel Gorden m' 1,2000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11.5 PEMASANGAN 1 UNIT KABINET PANTRY PTR1
A Tenaga:
Pekerja OH 3,7500 - -
Tukang OH 1,8750 - -
Kepala Tukang OH 1,2500 - -
Mandor OH 0,6250 - -
B Bahan:
Multiplek 18 mm lbr 23,3455 - -
HPL Sheet 3 mm lbr 23,3455 - -
Kompor Tanam BH0725 unit 1,0000 - -
Cooker Hood PX 6001 unit 1,0000 - -
Engsel Sendok Soft Close psg 14,0000 - -
Runner Laci Full Extension & Soft Close psg 12,0000 - -
Solid Surface Motif Marmer m2 1,2000 - -
Solid Surface Putih m2 1,0380 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
11.6 PEMASANGAN 1 UNIT KABINET PANTRY PTR2
A Tenaga:
Pekerja OH 3,7500 - -
Tukang OH 1,8750 - -
Kepala Tukang OH 1,2500 - -
Mandor OH 0,6250 - -
B Bahan:
Multiplek 18 mm lbr 37,2344 - -
HPL Sheet 3 mm lbr 37,2344 - -
Kitchen Zink Bolsena KS3101 unit 1,0000 - -
Kran Kitchen Zink Type TX 603 KCS unit 1,0000 - -
Engsel Sendok Soft Close psg 18,0000 - -
Runner Laci Full Extension & Soft Close psg 16,0000 - -
Solid Surface Motif Marmer m2 1,2000 - -
Solid Surface Putih m2 1,0380 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11.7 PEMASANGAN 1 UNIT KABINET PANTRY PTR3
A Tenaga:
Pekerja OH 3,7500 - -
Tukang OH 1,8750 - -
Kepala Tukang OH 1,2500 - -
Mandor OH 0,6250 - -
B Bahan:
Multiplek 18 mm lbr 9,4566 - -
HPL Sheet 3 mm lbr 9,4566 - -
Engsel Sendok Soft Close psg 6,0000 - -
Runner Laci Full Extension & Soft Close psg 4,0000 - -
Solid Surface Putih m2 1,0380 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11.8 PEMASANGAN 1 M2 DINDING WPC MOTIF LAMRESIRING KAYU, RANGKA HOLLOW 20X40
A Tenaga:
Pekerja OH 1,1250 - -
Tukang OH 0,7500 - -
Kepala Tukang OH 0,2625 - -
Mandor OH 0,1875 - -
B Bahan:
Plywood 12 mm m2 1,2000 - -
Hollow Besi 20 x 40 cm m' 4,2000 - -
Ramset bh 15,0000 - -
Wood Panel Composite Motif Kayu Lambresiring m2 1,2000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
11.9 PEMASANGAN 1 M2 PELAPIS DINDING PLYWOOD 12 MM, RANGKA HOLLOW 20X40, FIN. HPL MOTIF KAYU
A Tenaga:
Pekerja OH 0,5625 - -
Tukang OH 0,3750 - -
Kepala Tukang OH 0,1313 - -
Mandor OH 0,0938 - -
B Bahan:
Plywood 12 mm m2 1,2000 - -
Hollow Besi 20 x 40 cm m' 4,2000 - -
Ramset bh 15,0000 - -
HPL Sheet 3 mm lbr 0,4167 - -
Lem Kuning kg 1,5000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
XII PEKERJAAN INFRASTRUKTUR
12.1 PEMASANGAN 1 M3 LAPISAN PONDASI AGREGAT A (Analisa PUPR No.1 Tahun 2022 El-511) (Bagian Bina Marga)
A Tenaga:
Pekerja OJ 0,0494 - -
Mandor OJ 0,0071 - -
B Bahan:
Agregat Kelas A m3 1,2608 - -
C Peralatan:
WHEEL LOADER 1.0-1.6 M3 unit/jam 0,0071 - -
DUMP TRUCK KAP. 8-10 TON unit/jam 0,1893 - -
MOTOR GRADER >100 HP unit/jam 0,0106 - -
VIBRATORY ROLLER 5-8 T. unit/jam 0,0136 - -
Alat Bantu ls 0,0100 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
HARGA SATUAN JUMLAH HARGA JUMLAH
NO. URAIAN SATUAN INDEKS BAHAN/ UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
12.2 PENGURUGAN 1 M3 DENGAN PASIR URUG (Analisa PUPR No.1 2022 1.7.2.d (c)) (Bagian Umum)
A Tenaga:
Pekerja OH 0,3000 - -
Mandor OH 0,0100 - -
B Bahan:
Pasir Urug M3 1,2000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12.3 PEMASANGAN 1 LITER LAPIS PEREKAT (Analisa PUPR No.1 Tahun 2022 El-611) (Bagian Bina Marga)
A Tenaga:
Pekerja OJ 0,0189 - -
Mandor OJ 0,0047 - -
B Bahan:
Aspal Emulsi ltr 1,7895 - -
C Peralatan:
ASPHALT DISTRIBUTOR unit/jam 0,0000 - -
COMPRESSOR 4000-6500 L\M unit/jam 0,0047 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12.4 PEMASANGAN 1 M3 LAPISAN ASPAL AC/WC (Analisa PUPR No.1 Tahun 2022 El-635.a) (Bagian Bina Marga)
A Tenaga:
Pekerja OJ 0,2410 - -
Mandor OJ 0,0201 - -
B Bahan:
Aspal Hotmix AC/WC ton 1,0500 - -
C Peralatan:
WHEEL LOADER 1.0-1.6 M3 unit/jam 0,0128 - -
ASPHALT MIXING PLANT KAP. ≤ 30 TON/JAM unit/jam 0,0201 - -
GENERATOR SET > 250 KVA unit/jam 0,0201 - -
DUMP TRUCK KAP. 8-10 TON unit/jam 0,0945 - -
ASPHALT FINISHER unit/jam 0,0125 - -
TANDEM ROLLER 6-8 T. unit/jam 0,0286 - -
TIRE ROLLER 8-10 T. unit/jam 0,0229 - -
Alat Bantu ls 0,0100 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12.5 PEMASANGAN 1 M2 GRASSBLOCK TEBAL 8 cm (Analisa PUPR No.1 Tahun 2022 A.4.4.3.64) (Bagian Umum)
A Tenaga:
Pekerja OH 0,5000 - -
Tukang OH 0,5000 - -
Kepala Tukang OH 0,0500 - -
Mandor OH 0,0013 - -
B Bahan:
Grass Block m2 1,0100 - -
Pasir Beton m3 0,0800 - -
C Peralatan:
Peralatan (10% dari bahan) % 0,1000 - -
D Jumlah (A+B+C) - - -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
12.6 PEMASANGAN 1 M1 KANSTEEN JALAN 60X14X21 CM (Ref. Analisa PUPR No.1 2022 A.5.1.1.38.) (Bagian Cipta Karya)
A Tenaga:
Pekerja OH 0,0600 - -
Tukang OH 0,0300 - -
Kepala Tukang OH 0,0030 - -
Mandor OH 0,0030 - -
B Bahan:
Kansteen Jalan 60x14x21 M' 1,6600 - -
Semen Portland Kg 0,9300 - -
Pasir Pasang M3 0,0130 - -
Pasir Beton M3 0,0110 - -
C Peralatan:
-
D Jumlah (A+B+C) 0,00 0,00 -
E Over Head & Profit, 10% x D 0,1000 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
BAHAN/ UPAH BAHAN UPAH HARGA
NO. URAIAN SATUAN INDEKS
(RP) (RP) (RP) (RP)
IX PEKERJAAN MEKANIKAL
9.1 PEMASANGAN 1 M' PIPA PVC KLAS AW DIAMETER 1/2” (Analisa PUPR No. 1 Tahun 2022 Bagian Cipta Karya Kode A.5.1.1.25.)
A Tenaga:
Pekerja OH 0,036 - -
Tukang OH 0,060 - -
Kepala Tukang OH 0,006 - -
Mandor OH 0,002 - -
B Bahan:
Pipa PVC AW Ø 1/2 " m' 1,200 - -
Perlengkapan ls 0,350 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9.2 PEMASANGAN 1 M' PIPA PVC KLAS AW DIAMETER 1” (Analisa PUPR No. 1 Tahun 2022 Bagian Cipta Karya Kode A.5.1.1.27.)
A Tenaga:
Pekerja OH 0,036 - -
Tukang OH 0,060 - -
Kepala Tukang OH 0,006 - -
Mandor OH 0,002 - -
B Bahan:
Pipa PVC AW Ø 1 " M1 1,200 - -
Perlengkapan ls 0,350 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9.3 PEMASANGAN 1 M' PIPA PVC KLAS AW DIAMETER 3” (Analisa PUPR No. 1 Tahun 2022 Bagian Cipta Karya Kode A.5.1.1.31.)
A Tenaga:
Pekerja OH 0,081 - -
Tukang OH 0,135 - -
Kepala Tukang OH 0,014 - -
Mandor OH 0,004 - -
B Bahan:
Pipa PVC AW Ø 3" M' 1,200 - -
Perlengkapan ls 0,350 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
9.4 PEMASANGAN 1 M' PIPA PVC KLAS AW DIAMETER 4” (Analisa PUPR No. 1 Tahun 2022 Bagian Cipta Karya Kode A.5.1.1.32.)
A Tenaga:
Pekerja OH 0,081 - -
Tukang OH 0,135 - -
Kepala Tukang OH 0,014 - -
Mandor OH 0,004 - -
B Bahan:
Pipa PVC AW Ø 4" m' 1,200 - -
Perlengkapan ls 0,350 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
X PEKERJAAN ELEKTRIKAL
10.1 PEMASANGAN 1 BUAH TITIK LAMPU (Analisa PUPR No.1 2022 A.6.2.1.1.)
A Tenaga:
Upah 100% dari bahan ls 1,000 - -
B Bahan:
Pipa Conduit 5/8" btg 3,000 - -
Kabel NYM 2x2,5 mm2 m' 24,000 - -
Tee Doos bh 3,000 - -
Las Dop bh 3,000 - -
Klem Pipa bh 24,000 - -
Isolasi Ban bh 1,000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
BAHAN/ UPAH BAHAN UPAH HARGA
NO. URAIAN SATUAN INDEKS
(RP) (RP) (RP) (RP)
10.2 PEMASANGAN 1 BUAH TITIK DAYA (Analisa PUPR No.1 2022 A.6.2.1.1.)
A Tenaga:
Upah 100% dari bahan ls 1,000 - -
B Bahan:
Pipa Conduit 5/8" btg 3,000 - -
Kabel NYM 3x2,5 mm2 m' 24,000 - -
Tee Doos bh 3,000 - -
Las Dop bh 3,000 - -
Klem Pipa bh 24,000 - -
Isolasi Ban bh 1,000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.3 PEMASANGAN 1 M' KABEL NYA 1 x 50 mm2
A Tenaga:
Pekerja OH 0,033 - -
Tukang OH 0,033 - -
Mandor OH 0,017 - -
B Bahan:
Pipa Conduit 5/8" btg 0,300 - -
Kabel NYA 1 x 50 mm2 m' 1,200 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.4 PEMASANGAN 1 BH LAMPU DOWNLIGHT LED 13 WATT
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Lampu Downlight LED 14 Watt bh 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.5 PEMASANGAN 1 M' LAMPU LED STRIP 5 WATT
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Lampu LED Strip 5 Watt bh 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.6 PEMASANGAN 1 BH LAMPU GANTUNG KRISTAL DIA. 80 CM
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Lampu Gantung Kristal Dia. 80 cm bh 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.7 PEMASANGAN 1 BH STOP KONTAK DINDING
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Stop Kontak Dinding bh 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
BAHAN/ UPAH BAHAN UPAH HARGA
NO. URAIAN SATUAN INDEKS
(RP) (RP) (RP) (RP)
10.8 PEMASANGAN 1 BH SAKLAR SINGLE
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Saklar Single bh 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.9 PEMASANGAN 1 BH SAKLAR DOUBLE
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Saklar Double bh 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.10 PEMASANGAN 1 BH EXHAUST FAN 100 CFM
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Exhaus Fan 100 Cpm 16 Watt / 220 V/ 1 Phasa / 50 Hz bh 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.11 PEMASANGAN 1 BH SPLITZEN COPPER
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Splitzen Copper bh 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.11 PEMASANGAN 1 UNIT AC CASSETTE 360 KAP. 18.000 BTU/H
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
AC Split Duct Grill Kap. 28.000 btu/h (Indoor & Outdoor Unit) unit 1,000 - -
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.12 PEMASANGAN 1 BUAH TITIK MATV (Analisa PUPR No.1 2022 A.6.2.1.1.)
A Tenaga:
Upah 100% dari bahan ls 1,000 - -
B Bahan:
Pipa Conduit 5/8" btg 3,000 - -
Kabel RG6 m' 24,000 - -
Tee Doos bh 3,000 - -
Las Dop bh 3,000 - -
Klem Pipa bh 24,000 - -
Isolasi Ban bh 1,000 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
10.13 PEMASANGAN 1 BH OUTLET MATV
A Tenaga:
Pekerja OH 0,067 - -
Tukang OH 0,067 - -
Mandor OH 0,033 - -
B Bahan:
Outlet TV bh 1,000 - -
BAHAN/ UPAH BAHAN UPAH HARGA
NO. URAIAN SATUAN INDEKS
(RP) (RP) (RP) (RP)
Perlengkapan ls 0,100 - -
C Peralatan:
-
D Jumlah (A+B+C) - - -
E Over Head + Profit, 10% x D 0,100 x D -
F Jumlah (D+E) -
G Dibulatkan (F) -
DAFTAR INDEK HARGA SATUAN DASAR
ALAT DAN BAHAN BANGUNAN
TAHUN 2023
HARGA SATUAN
NO JENIS ALAT DAN BAHAN BANGUNAN MERK UKURAN SAT. KETERANGAN
(Rp)
A BAHAN ATAP
1 Genteng Bitumen Shingle tipe Cambridge 30 IKO Uk. 1038 x 349 mm m2
2 Nok Bitumen Cambridge 30 IKO m'
3 Underlayer Armourbase Pro 1 mm IKO roll
4 Paku Bitumen IKO kg
5 Lem Bitumen IKO kg
6 Flashing Galvanis m'
7 Talang Seng BJLS 30 m'
B MATERIAL ALAM
1 Bata Merah Biasa Lokal bh Kepgub Jabar 2022
2 Bata Ringan Leibel 10x20x60 cm m3
3 Bata Ringan Leibel 10x20x60 cm bh
4 Rooster Beton Cisangkan 20x20x10 cm bh
5 Batu Belah m3 Kepgub Jabar 2022
6 Batu Split Pecah Mesin 1/2 m3 Kepgub Jabar 2022
7 Batu Split Pecah Mesin 3/5 m3 Kepgub Jabar 2022
8 Batu Koral m3 Kepgub Jabar 2022
9 Pasir Beton m3 Kepgub Jabar 2022
10 Pasir Pasang m3 Kepgub Jabar 2022
11 Pasir Urug m3 Kepgub Jabar 2022
12 Tanah Urug m3 Kepgub Jabar 2022
13 Sirtu m3 Kepgub Jabar 2022
14 Air ltr
C MATERIAL PEREKAT
1 Semen (50 Kg) Tiga Roda Zak
2 Semen Warna Kg
3 Semen Perekat Bata Ringan Mortar Utama (MU - 380) Kg
4 Semen Plesteran Mortar Utama (MU - 301) Kg
5 Semen Acian Mortar Utama (MU - 200) Kg
6 Semen Grouting Sika Kg Kepgub Jabar 2022
D MATERIAL READY-MIX
1 Beton K – 250 (ready mix) Adhimix M3
2 Beton K – 300 (ready mix) Adhimix M3
3 Beton K – 350 (ready mix) Adhimix M3
E MATERIAL BAJA
1 Besi Beton Polos Lautan Steel Kg
2 Besi Beton Ulir Lautan Steel Kg
3 Wiremes M6 Kg
4 Wiremes M7 Kg
5 Wiremes M8 Kg
6 Wiremes M10 Kg
7 Baja Profil Rata - Rata Lautan Steel Kg
8 Seng Gelombang Lbr
9 Plat Bondeks Lbr
10 Kawat Beton Kg
11 Hollow Besi 20 x 40 cm m'
12 Kuda-kuda Atap Baja Ringan Profil Z (Terpasang) GIGASTEEL m2
HARGA SATUAN
NO JENIS ALAT DAN BAHAN BANGUNAN MERK UKURAN SAT. KETERANGAN
(Rp)
F MATERIAL KAYU
1 Kayu Balok 6/12 Kelas II M3
2 Kayu Papan 3/20 Kelas II M3
3 Kayu Balok 6/12 Kelas III M3
4 Kayu Papan 3/20 Kelas III M3
5 Kayu Balok 5 s/d 7 Btg
6 Dolken 5 s/d 10 Btg
7 Multiplek 6 mm Lbr
8 Multiplek 9 mm Lbr
9 Multiplek 12 mm Lbr
10 Multiplek 15 mm Lbr
11 Multiplek 18 mm Lbr
12 Plywood 9 mm M2
13 Plywood 12 mm M2
14 Wood Plank Btg
15 Veneer Kayu Walnut m2
16 Wood Panel Composite Motif Kayu Lambresiring Nelson 16,5 x 290 cm m2
G MATERIAL ALLUMUNIUM DAN PENGUNCI
1 Kusen Alumunium Alexindo M
2 Rangka Jendela Alumunium Alexindo M
3 Rangka Pintu Alumunium Alexindo M
4 Hinge Dekkson ESS EL 5X3X3MM 4BB SSS Dekkson psg
5 Handle Solid Rose LHSR 0406 PSS Dekkson psg
6 Pengunci MTS IL DL 8685 SSS + CYL DC DL 60mm SN Dekkson bh
7 Door Closer Hold Open DCL 529 HO BA Dekkson set
8 Pengunci Pintu Geser set [KS J5K ONE SIDE] Dekkson set
9 Engsel H 7703 GG Dekkson psg
10 Handle DK 82803 CP Dekkson psg
11 Kunci IL 8600C CP + 8601C CP Keeper Dekkson psg
12 Clip Seal CSBS m'
13 Glass Clamp GH 25-01 CP Dekkson bh
14 Glass Clamp GH 25-02 CP Dekkson bh
15 Glass Clamp Holder GC U800 AL CP Dekkson bh
16 Path Fitting PT2220, PT2210, PT2240 KEND set
17 Floor Hinge FH 08323 KEND bh
18 Patch Lock US 2210 KEND bh
19 Pull Handle GHD0031 KEND psg
20 Friction Stay FS S/S 12" Dekkson psg
21 Casement handle [CHW 4 WH R/H, stainless/white] Dekkson bh
22 Daun Pintu Kayu Solid Lap. Veneer Kayu Walnut 80 x 207 cm unit
23 Daun Pintu Kayu Solid Lap. Veneer Kayu Walnut 90 x 207 cm unit
24 Pipa Stainless Steel SS304 Dia. 1" Fin. Mirror m'
25 Sandblasted Sticker 60% M2
G MATERIAL PELAPIS DINDING DAN LANTAI
1 Homogenous Tile Corak Polished ROMAN Granite 60x60 cm dus
2 Homogenous Tile Motif Vintage Polished ROMAN Granite 30x30 cm dus
3 Homogenous Tile Corak Matt ROMAN Granite 60x60 cm dus
4 Dinding Keramik Polished ROMAN Ceramic 30x60 cm Dus
5 Lantai Keramik Matt ROMAN Ceramic 30x30 cm Dus
6 Lantai Keramik Polished Platinum 40x40 cm Dus
7 Batu Alam Andesit Polos Bakar 20x40x1 Cm M2
8 Batu Alam Andesit Polos Bakar 20x20x1 Cm M2
9 Batu Alam Andesit Polos Bakar 40x60x1,3 Cm M2
10 Paving Block Natural Cisangkan 6x10x20 cm m2
11 Paving Block Warna Cisangkan 6x10x20 cm m2
12 Paving Block Natural Cisangkan 8x10x20 cm m2
13 Paving Block Warna Cisangkan 8x10x20 cm m2
14 Grass Block Cisangkan 8x40x40 cm m2
15 Karpet Tile m2
16 Underlayer Karpet m2
17 Parquet Kayu Solid M2
18 Vinyl Sintetis TACO tebal 3 mm m2
HARGA SATUAN
NO JENIS ALAT DAN BAHAN BANGUNAN MERK UKURAN SAT. KETERANGAN
(Rp)
H MATERIAL KACA
1 Kaca Polos 3 mm Asahimas M2
2 Kaca Polos 5 mm Asahimas M2
3 Kaca Polos 8 mm Asahimas M2
4 Kaca Polos 10 mm ( ASAHI ) Asahimas M2
5 Kaca Tempered 8 mm ( ASAHI ) Asahimas M2
6 Kaca Tempered 10 mm ( ASAHI ) Asahimas M2
7 Kaca Tempered 12 mm ( ASAHI ) Asahimas M2
8 Kaca Cermin 3 mm ( ASAHI ) Asahimas M2
9 Kaca Cermin 5 mm ( ASAHI ) Asahimas M2
10 Sealant Tube
11 Sunblast M2
12 List Karet M1
I MATERIAL PAKU DAN MUR BAUT
1 Paku 1 cm s/d 3 cm Kg
2 Paku 5 cm s/d 10 cm Kg
3 Paku 8 cm s/d 12 cm Kg
4 Paku Beton 2 - 5 cm Bh
J MATERIAL FINISHING
1 Cat Kayu/Besi Mowilex Solvent Base Kg
2 Plamir Kayu Kg
3 Meni Kayu Kg
4 Wood Filer Kg
5 Tinner Ltr
6 Amplas Kayu Lbr
7 Kwas Cat Bh
8 Cat Tembok Interior Mowilex Emulsion Kg
9 Cat Tembok Exterior Mowilex Weathercoat Kg
10 Cat Kanstin Mowilex Acrilyc Gloss Enamel Kg
11 Plamir Tembok Kg
12 Lem Kayu Kg
13 Lem Kuning Kg
14 Semen Compound Adhesive, @20kg kg
15 Joint Tape @75 m roll
16 Seal Tape Bh
17 Minyak Bekisting Ltr
18 Roll Cat Bh
19 Waterproofing Coating Kg
20 Clear coating Kg
21 Wood Filler MOWILEX kg
22 Woodstain MOWILEX kg
23 Sanding MOWILEX kg
24 Melamic MOWILEX kg
25 Thinner MOWILEX ltr
26 Ampelas lbr
K MATERIAL SANITARY
1 Closet Duduk Type CW 660 NJ/SW 660 J TOTO Unit
2 Closet Jongkok Type CE 7 TOTO Unit
3 Urinoir Type UW 447 JNM TOTO Unit
4 Penyekat Poslin Urinoir Type A 100 TOTO Bh
5 Wastafel Type LW 247 CJ Complete Set TOTO Bh Dinding
6 Wastafel Type L 521 V1A Complete Set TOTO Bh Meja
7 Jet Washer - Type TB 19CSMCR TOTO Unit
8 Kitchen Zink Stainless Steell (Complete Set) SB9 Unit
9 Kran Wastafel - Type TX 120LESN TOTO Bh
10 Kran Dinding TX130L TOTO Bh
11 Floor Drain - Type TX 1C TOTO Unit
12 Paper Holder - Type S20 TOTO Bh
13 Shower Set - Type TX 474 SVN TOTO Unit
14 Tissue Holder - Type TX 703 AG TOTO Bh
15 Soap Holder - Type AW80J TOTO Bh
16 Waterdrain Bh
HARGA SATUAN
NO JENIS ALAT DAN BAHAN BANGUNAN MERK UKURAN SAT. KETERANGAN
(Rp)
L MATERIAL PLAFOND
1 Rangka Metal Hollow 40.40.0,4 KENCANA btg
2 Rangka Metal Hollow 20.40.0,4 KENCANA btg
3 Rangka Alluminium "T" btg
4 Ramset bh
5 Rod Drat / Penggantung bh
6 Angle Clip bh
7 U-Clamp Chanel bh
8 Gypsumboard 120x240 tebal 9 mm APLUS lbr
9 Gypsumboard 120x240 tebal 12 mm APLUS lbr
10 Gypsumboard 120x240 tebal 9 mm (Water Resistant) APLUS lbr
11 Accoustic Board 60 x 120 tebal 12 mm APLUS lbr
12 Shadowline (Tali Air) APLUS m'
13 Main Tee 3.65x0.20x0.05 Putih APLUS btg
14 Cross Tee 1.25x0.20x0.06 Putih APLUS bh
15 Wall Angle Tee 3.05x0.11x0.04 APLUS btg
16 Angle Clip 1.2 mm APLUS bh
17 Clip Per 3,5 APLUS bh
18 Suspension Rod M5 (4,5 mm) APLUS btg
19 Paku tembak dan Mesiu APLUS bh
20 List Profil Gypsum 30 cm m'
21 List Profil Gypsum 15 cm m'
M MATERIAL KABEL
1 NYA 1x1,5 mm Supreme m'
2 NYA 1x2,5 mm Supreme m'
3 NYA 1x4 mm Supreme m'
4 NYA 1x6 mm Supreme m'
5 NYA 1x10 mm Supreme m'
6 NYA 1x16 mm Supreme m'
7 NYA 1x25 mm Supreme m'
8 NYA 1x35 mm Supreme m'
9 NYA 1x50 mm Supreme m'
10 NYA 1x70 mm Supreme m'
11 NYA 1x95 mm Supreme m'
12 NYA 1x120 mm Supreme m'
1 NYFGBY 3x16 mm Supreme m'
2 NYFGBY 3x25 mm Supreme m'
3 NYFGBY 3x35 mm Supreme m'
4 NYFGBY 3x50 mm Supreme m'
5 NYFGBY 3x70 mm Supreme m'
6 NYFGBY 3x95 mm Supreme m'
7 NYFGBY 3x120 mm Supreme m'
8 NYFGBY 3x150 mm Supreme m'
9 NYFGBY 3x185 mm Supreme m'
10 NYFGBY 3x240 mm Supreme m'
11 NYFGBY 4x16 mm Supreme m'
12 NYFGBY 4x25 mm Supreme m'
13 NYFGBY 4x35 mm Supreme m'
14 NYFGBY 4x50 mm Supreme m'
15 NYFGBY 4x70 mm Supreme m'
16 NYFGBY 4x95 mm Supreme m'
17 NYFGBY 4x120 mm Supreme m'
18 NYFGBY 4x150 mm Supreme m'
19 NYFGBY 4x185 mm Supreme m'
20 NYFGBY 4x240 mm Supreme m'
21 NYFGBY 4x300 mm Supreme m'
1 NYM 2x1,5 mm Supreme m'
2 NYM 2x2,5 mm Supreme m'
3 NYM 3x1,5 mm Supreme m'
4 NYM 3x2,5 mm Supreme m'
5 NYM 3x4 mm Supreme m'
6 NYM 4x1,5 mm Supreme m'
7 NYM 4x2,5 mm Supreme m'
8 NYM 4x4 mm Supreme m'
9 NYM 4x6 mm Supreme m'
1 NYY 1x16 mm Supreme m'
2 NYY 1x25 mm Supreme m'
3 NYY 1x35 mm Supreme m'
4 NYY 1x50 mm Supreme m'
HARGA SATUAN
NO JENIS ALAT DAN BAHAN BANGUNAN MERK UKURAN SAT. KETERANGAN
(Rp)
5 NYY 1x70 mm Supreme m'
6 NYY 1x95 mm Supreme m'
7 NYY 1x120 mm Supreme m'
8 NYY 1x150 mm Supreme m'
9 NYY 1x185 mm Supreme m'
10 NYY 1x240 mm Supreme m'
11 NYY 1x300 mm Supreme m'
12 NYY 1x400 mm Supreme m'
13 NYY 1x500 mm Supreme m'
14 NYY 2x1,5 mm Supreme m'
15 NYY 2x2,5 mm Supreme m'
16 NYY 3x1,5 mm Supreme m'
17 NYY 3x2,5 mm Supreme m'
18 NYY 3x4 mm Supreme m'
19 NYY 3x16 mm Supreme m'
20 NYY 3x25 mm Supreme m'
21 NYY 3x35 mm Supreme m'
22 NYY 3x50 mm Supreme m'
23 NYY 3x70 mm Supreme m'
24 NYY 3x95 mm Supreme m'
25 NYY 3x120 mm Supreme m'
26 NYY 3x150 mm Supreme m'
27 NYY 3x185 mm Supreme m'
28 NYY 3x240 mm Supreme m'
29 NYY 4x1,5 mm Supreme m'
30 NYY 4x2,5 mm Supreme m'
31 NYY 4x4 mm Supreme m'
32 NYY 4x6 mm Supreme m'
33 NYY 4x10 mm Supreme m'
34 NYY 4x16 mm Supreme m'
35 NYY 4x25 mm Supreme m'
36 NYY 4x35 mm Supreme m'
37 NYY 4x50 mm Supreme m'
38 NYY 4x70 mm Supreme m'
39 NYY 4x95 mm Supreme m'
40 NYY 4x120 mm Supreme m'
41 NYY 4x150 mm Supreme m'
42 NYY 4x185 mm Supreme m'
43 NYY 4x240 mm Supreme m'
44 NYY 4x300 mm Supreme m'
1 Lampu Down Light LED Slim 14 Watt 6" Philips bh
2 Track Ligth MR 16 LED 3 x 8 Watt Philips bh
3 Lampu Down Light LED Slim 7 Watt 4" Philips bh
4 Lampu Emergency LED 20 Watt Philips bh
5 Lampu Exit 8 W ACR (Dua muka) c/w nicad battery Philips bh
6 Lampu Baret LED Kotak SLIM 23 W Philips bh
7 Lampu Gantung Kristal Dia. 80 cm bh
8 Lampu LED Strip 5 W Philips Roll
9 Saklar Tunggal Iluminasi ( Warna Metalik) BOSS bh
10 Saklar Ganda Iluminasi ( Warna Metalik) BOSS bh
11 Stop Kontak AC 16 Ampere BOSS bh
12 Stop kontak Lantai Tunggal Cover Metal daya 16 Amp BOSS bh
13 Stop kontak Outdoor with Cover IP 55 BOSS bh
14 Stop kontak Proyektor BOSS bh
15 Stop kontak dinding daya 16 Amp BOSS bh
16 Exhaus Fan 100 Cpm 16 Watt / 220 V/ 1 Phasa / 50 Hz FEIJN unit
17 Splitzen Copper bh
18 Pipa Conduit Legrand btg
19 Socket Pipa bh
20 Tee Doos bh
21 Klem Pipa bh
22 Fhiser bh
23 Las Doop bh
24 Isolasi ban bh
HARGA SATUAN
NO JENIS ALAT DAN BAHAN BANGUNAN MERK UKURAN SAT. KETERANGAN
(Rp)
N MATERIAL PLUMBING
1 Pipa PVC AW Ø 1/2 " RUCIKA Standard m'
2 Pipa PVC AW Ø 1 " RUCIKA Standard m'
3 Pipa PVC AW Ø 1 1/2" RUCIKA Standard m'
4 Pipa PVC AW Ø 2" RUCIKA Standard m'
5 Pipa PVC AW Ø 3" RUCIKA Standard m'
6 Pipa PVC AW Ø 4" RUCIKA Standard m'
7 Pipa PVC AW Ø 6" RUCIKA Standard m'
8 Pipa PVC D Ø 2" RUCIKA Standard m'
9 PPR-PN 10 Ø 1/2" RUCIKA Kelen Green m'
10 PPR-PN 10 Ø 3/4" RUCIKA Kelen Green m'
11 PPR-PN 10 Ø 1" RUCIKA Kelen Green m'
12 PPR-PN 10 Ø 1 1/4" RUCIKA Kelen Green m'
13 PPR-PN 10 Ø 1 1/2" RUCIKA Kelen Green m'
14 PPR-PN 10 Ø 2 1/2" RUCIKA Kelen Green m'
15 PPR-PN 10 Ø 3" RUCIKA Kelen Green m'
16 PPR-PN 10 Ø 4" RUCIKA Kelen Green m'
17 Gate Valve PPR Dia. 20 mm Bh
18 Gate Valve PPR Dia. 25 mm Bh
19 Gate Valve PPR Dia. 40 mm Bh
20 Bio Septic Tank Kap. 1 m3 Bio - Tech Unit
21 AC Split Duct Grill Kap. 28.000 btu/h (Indoor & Outdoor Unit) DAIKIN unit
O SEWA ALAT DAN KENDARAAN
1 ASPHALT FINISHER unit/jam
2 AIR COMPRESSOR unit/jam
3 ASPHALT MIXING PLANT KAP. > 30 TON/JAM unit/jam
4 ASPHALT MIXING PLANT KAP. ≤ 30 TON/JAM unit/jam
5 ASPHALT SPRAYER unit/jam
6 BULLDOZER 100-150 HP unit/jam
7 CAT SPRAYER unit/jam
8 COMPRESSOR 4000-6500 L\M unit/jam
9 CONCRETE MIXER 0.3-0.6 M3 unit/jam
10 CONCRETE MIXING PLANT KAP. ≥ 30 TON/JAM unit/jam
11 CONCRETE PAVER unit/jam
12 CONCRETE VIBRATOR unit/jam
13 CRANE 10-15 TON unit/jam
14 DUMP TRUCK 3-4 M3 unit/jam
15 DUMP TRUCK KAP. 4-6 TON unit/jam
16 DUMP TRUCK KAP. 6-8 TON unit/jam
17 DUMP TRUCK KAP. 8-10 TON unit/jam
18 EXCAVATOR 80-140 HP unit/jam
19 GENERATOR SET > 250 KVA unit/jam
20 GENERATOR SET ≤ 250 KVA unit/jam
21 JACK HAMMER unit/jam
22 MESIN LAS unit/jam
23 MOTOR GRADER >100 HP unit/jam
24 PEDESTRIAN ROLLER unit/jam
25 PICK UP unit/jam
26 STAMPER unit/jam
27 STONE CRUSHER ≤ 60 TON/JAM unit/jam
28 TANDEM ROLLER 6-8 T. unit/jam
29 THREE WHEEL ROLLER 6-8 T unit/jam
30 TIRE ROLLER 8-10 T. unit/jam
31 TRUCK CONCRETE MIXER unit/jam
32 TRUCK READY MIX unit/jam
33 VIBRATORY ROLLER 5-8 T. unit/jam
34 WATER PUMP 70-100 mm unit/jam
35 WATER TANKER 3000-4500 L unit/jam
36 WHEEL LOADER 1.0-1.6 M3 unit/jam
HARGA SATUAN
NO JENIS ALAT DAN BAHAN BANGUNAN MERK UKURAN SAT. KETERANGAN
(Rp)
P MATERIAL INTERIOR
1 HPL Sheet 3 mm TACO lbr
2 Kompor Tanam BH0725 Modenna unit
3 Cooker Hood PX 6001 Modenna unit
4 Kitchen Zink Bolsena KS3101 Modenna unit
5 Kran Kitchen Zink Type TX 603 KCS TOTO unit
6 Engsel Sendok Soft Close Hafele psg
7 Runner Laci Full Extension & Soft Close Hafele psg
8 Solid Surface Motif Marmer m2
9 Solid Surface Putih m2
10 Lem Kuning FOX kg
DAFTAR HARGA STANDAR UPAH KERJA
KOTA BANDUNG - JAWA BARAT
TAHUN 2023
REFERENSI HARGA SATUAN : KEPUTUSAN GUBERNUR JAWA BARAT
No. 910/Kep.356-BPKAD/2022
HARGA
NO JENIS KEAHLIAN PEKERJA BANGUNAN
SATUAN (Rp) SATUAN WAKTU
1 Pekerja Orang / Hari
2 Tukang Orang / Hari
3 Kepala Tukang Orang / Hari
4 Mandor Orang / Hari
5 Mekanik Orang / Hari
6 Operator Orang / Hari
7 Pembantu Operator Orang / Hari
8 Sopir Truk Orang / Hari
9 Kenek Truk Orang / Hari
10 Penjaga Malam Orang / Hari