Rehab Kantor Dan Penataan Halaman Kantor 1 Atap

Basic Information
Type: Public Tender
Tender Code: 5900510
Date: 13 June 2023
Year: 2023
KLPD: Kab. Murung Raya
Work Unit: Sekretariat Daerah
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Gabungan Lumsum dan Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 1,535,000,000
Estimated Value (Nilai HPS): Rp 1,535,000,000
Winner (Pemenang): CV Muara Tuhup Makmur
NPWP: 732540919714000
RUP Code: 40693036
Work Location: Puruk Cahu - Murung Raya (Kab.)
Participants: 9
Applicants
0732540919714000Rp 1,528,000,000
0418807137711000-
0838362754711000-
0029448263714000-
0026762401711000-
CV Tarip Jaya Perkasa
06*5**3****11**0-
0861772341701000-
0029172970713000-
CV Chezii Jaya Mandiri
06*5**9****11**0-
Attachment
PEMERINTAH      KABUPATEN     MURUNG     RAYA                  
                                                                0          
                      SEKRETARIAT      DAERAH                              
                 Jl. Letjend Soeprapto No. Tlp (0528) Fax.(0528) Kode Pos 73911
                               PURUK CAHU                                  
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
             URAIAN      SINGKAT        PEKERJAAN                          
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
     PEKERJAAN     : Rehab Kantor dan Penataan Halaman Kantor 1 Atap       
                                                                1          
                                                                           
                                                                           
                                                                           
                                                                           
   1. INFORMASI PROYEK                                                     
      a. Lokasi   : Puruk Cahu Kabupaten Murung Raya                       
                                                                           
      b. Bangunan yang Direncanakan/Direhabilitasi :                       
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                           Gambar 1. Foto Existing                         
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                     Gambar 2. Gambar Desain Pelaksanaan                   
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                2          
                                                                           
   2. RUANG LINGKUP PEKERJAAN                                              
                                                                           
                                               METODE / CARA               
 NO.                 URAIAN                    PENGUKURAN /                
                   PEKERJAAN                       MATA                    
                                                PEMBAYARAN                 
 A.  PEKERJAAN PENDAHULUAN                                                 
                                                                           
  1        Spanduk Nama Kegiatan                    Bh                     
                                                                           
  2        Penerapan Biaya SMKK                     Bh                     
                                                                           
  3        Pek. Pengukuran                          Ke                     
                                                     g                     
  4        Pek. Bangsal Kerja                       Ke                     
                                                     g                     
  5        Sewa Scafolding                          Set                    
                                                                           
 B.  PEKERJAAN PEMBONGKARAN                                                
                                                                           
  1        Pek. Pembongkaran Plafond Existing       M2                     
                                                                           
  2        Pek. Pembongkaran Kramik WC LT.2         M2                     
                                                                           
  3        Pek. Pembongkaran/Perbaikan Closet Saluran Air Uni              
           Kotor LT.II                               t                     
  4        Pek. Pembersihan WC.LT.1 Dengan Cairan Khusus Uni               
                                                     t                     
                                                                           
 C.  PEKERJAAN PERBAIKAN / REHABILITASI WC                                 
           Pek.Lapisan I Cat No Drop Waterproofing                         
  1                                                 M2                     
           Permukaan Lantai Dan (Dinding t=0,8m) 2                         
           Lapis                                                           
           Pek.Lapisan II Membrane Serat Waterproofing                     
  2                                                 M'                     
           Anti Bocor 10cm Merk.No Drop (Dinding t=0,3m                    
           & Lobang Pipa)                                                  
           Pek. Lapisan Lantai Dan Dinding                                 
  3                                                 M2                     
           Menggunakan Aspal Cair 2 lapis Merk                             
           asphalt emulsion waterproofing                                  
  7        Pek. Perbaikan / Pasangan Pipa PVC Ǿ 4" Saluran Closet M'       
           Pek. Perbaikan / Pasangan Pipa PVC Ǿ 2" Saluran Air             
  8                                                 M'                     
           Kotor                                                           
  9        Pek. Pasangan Pipa PVC Ǿ 3/4" Saluran Air Bersih M'             
 10        Pek. Pasangan Kembali Closet             Bh                     
 11        Pek. Pasangan Kembali Wastafel LT.II     Bh                     
                                                                           
 12        Pek. Pasangan Granit Lantai WC + R.Wastafel M2                  
                                                                           
 13        Pek. Pasangan Granite Dinding WC +       M2                     
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                3          
           R.Wastafel                                                      
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                4          
                                                                           
 D.  PEKERJAAN REHABILITASI PLAFOND & PERBAIKAN ATAP                       
                                                                           
  1        Pek. Pemasangan Plafond PVC Ruangan      M2                     
                                                                           
  2        Pek. Pemasangan Plafond PVC Luar LT.3    M2                     
                                                                           
  3        Pek. Pemasangan List Plafond PVC Dalam   M'                     
                                                                           
  4        Pek. Pemasangan List Plafond PVC Luar Lt.3 M'                   
                                                                           
  5        Pek. Perbaikan/Pebaikan Plafond Gibsum   M2                     
           Koridor                                                         
  6        Pek. Perbaikan Kebocoran Atap            Titik                  
                                                                           
  7        Pek. Pergantian Listplank 2/18 & 2/10 Kayu Kls.I + M'           
           Pengecattan                                                     
                                                                           
                                                                           
                                                                           
 E.  REHABILITASI RUANGAN                                                  
                                                                           
  1        Pek. Pemasangan Rangka Hollow Partisi    M2                     
                                                                           
  2        Pek. Pemasangan Dinding Gibsum 9mm       M2                     
                                                                           
  3        Pek. Papan Molding List Bawah Dinding 10cm M'                   
                                                                           
  4        Pek. Papan Molding List Pintu 5cm        M'                     
                                                                           
                                                                           
 F.  REHABILITASI PINTU DAN JENDELA                                        
                                                                           
  1        Pek. Kusen Pintu Jendela Aluminium       M'                     
                                                                           
  2        Pek. Daun Pintu Dauble Teakwood + HPL    M2                     
                                                                           
  3        Pek. Kaca Bening 5mm                     M2                     
                                                                           
  4        Pek. Engsel Pintu Geser                  Unit                   
                                                                           
  5        Pek. Kunci Tanam                         Bh                     
                                                                           
  6        Pek. Pergantian/Perbaikan Daun Jendela   Unit                   
  7        Pek. Teralis Jendela AULA                M2                     
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                5          
                                                                           
                                                                           
                                                                           
 G.  REHABILITASI JARINGAN LISTRIK                                         
  1        Pek. Instalasi baru Jaringan Titik Lampu Titik                  
                                                                           
  2        Pek. Instalasi Stop Kontak               Titik                  
                                                                           
  2        Pek. Instalasi Stop Kontak AC            Titik                  
                                                                           
  3        Pek. Fitting lampu                       Bh                     
                                                                           
  4        Pek. Lampu LED 11 Watt Terpasang         Bh                     
                                                                           
  5        Pek. Saklar Lampu                        Bh                     
                                                                           
  6        Pek. Stopkontak                          Bh                     
                                                                           
  7        Perbaikan Kembali (Dinding Dan Plafond) Bekas Keg               
           Jaringan                                                        
                                                                           
  8        Commissioning test & SLO (Sertifikat Laik Wat                   
           Operasi)                                  t                     
                                                                           
                                                                           
 H.  PENATAAN HALAMAN / PEMBUATAN TEMPAT PARKIR                            
  1        Pek. Galian Tanah Pondasi                m3                     
                                                                           
  2        Pek. Urugan Tanah Kembali                m3                     
                                                                           
  3        Pek. Pondasi Footplate                                          
                                                                           
   -       Pembesian                                Kg                     
                                                                           
   -       Begisting                                M2                     
                                                                           
   -       Cor Beton                                M3                     
                                                                           
  4        Pek. Cor Beton Lantai Parkir             M3                     
                                                                           
   -       Begisting                                M2                     
                                                                           
  5        Pek. Tiang Pipa Galfanis Ø 4" (Terpasang) + Kg                  
           Angkur + cat                                                    
                                                                           
  6        Pek. Lengan Tiang + Rangka Ø2"           Kg                     
                                                                           
  7        Pek.Rangka Atap Besi Hollow Galvanis     M2                     
                                                                           
  8        Pek. Atap Galvalume                      M2                     
                                                                           
  9        Pek. Listplank GRC Lebar 30cm + Pengecattan M'                  
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                6          
 I.  PEKERJAAN PENGECATTAN, PERBAIKAN DAN ORNAMEN                          
                                                                           
  1        Pek. Ornamen Besi Galvanis + Cat Anti Karat M'                  
           (Terpasang)                                                     
  2        Pek. Ornamen Timbul Telabang (Terpasang) M2                     
                                                                           
                                                                           
  3        Pek. Ornamen Frame ACP Warna Gelap       M2                     
           (Terpasang)                                                     
  4        Pek. Ornamen ACP Fased Laser Cutting     M2                     
           (Terpasang)                                                     
                                                                           
  5        Pek.Perbaikan dan Pengikisan Cat Dinding Luar M2                
           Existing                                                        
                                                                           
  6        Pek. Cat Dinding Dalam                   M2                     
                                                                           
                                                                           
 J.  PEKERJAAN PEMBERSIHAN                                                 
                                                                           
                                                                           
  1        Pek. Pembersihan & Perapian              Keg                    
                                                                           
                                                                           
                                                                           
                                                                           
   A. PERIZINAN                                                            
        Persyaratan Kualifikasi dan Kalsifikasi/Subkalisifikasi Penyedia Jasa
                                                                           
         Kualifikasi : Kecil                                               
                                                                           
         Klasifikasi : Bangunan Gedung                                     
                                                                           
         Subklasifikasi : Jasa Pelaksana Konstruksi Bangunan Komersial (BG004)
                       atau Konstruksi Gedung Perkantoran (BG002),         
                       KBLI 41012.                                         
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                6          
                                                                           
                                                                           
      B. PERSYARATAN PERSONEL  DAN STRUKTUR ORGANISASI                     
        PELAKSANAAN                                                        
        Personel Manajerial :                                              
                Nama                                                       
          No.                   Keahlian        Jumlah  Pengalaman         
               Jabatan                                                     
          1   Pelaksana  Pelaksana Bangunan     1 Orang 2 Tahun            
              Lapangan   Gedung/ Pekerjaan Gedung                          
                         (TA 022) atau SKK                                 
                         Pelaksana Lapangan                                
                                                                           
                         Pekerjaan Gedung Muda                             
                         Jenjang 4 (SIP.01.001.4)                          
                                                                           
          2   Ahli K3    SKK Ahli Muda K3 Konstruksi 1 Orang 3 Tahun       
              Konstruksi Jenjang 7                                         
                                                                           
        Personel Pendukung :                                               
        1. Mandor                                                          
                                                                           
        2. Kepala Tukang                                                   
        3. Tukang                                                          
        4. Pekerja                                                         
                                                                           
                 STRUKTUR  ORGANISASI PELAKSANAAN  PEKERJAAN               
                                                                           
                                                                           
                                   Kontraktor Pelaksana                    
                                                                           
                                                                           
                                                     Pekerjaan Listrik     
                   Ahli K3        Pelaksana Lapangan                       
                                                       Tenaga Dari         
                                                         PLN               
                                                                           
                                       Mandor                              
                                                                           
                                                                           
                                                                           
                                                                           
                                     Kepala Tukang                         
                                                                           
                             Item Pekerjaan Terkait :                      
                               1. Kepala Tukang                            
                               2. Tukang                                   
                               3. Pekerja/pembantu/sopir/pembantu sopir    
                               ( Menyesuaikan Item Pekerjaan )             
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                7          
                                                                           
                                                                           
      C. PERALATAN UTAMA                                                   
         NO        NAMA ALAT         KAPASITAS      JUMLAH                 
                                                                           
          1  Concrete Mixer             0,3 M3        1 Unit               
          2  Dump Truck                  3 M3        1 Unit                
                                                                           
          3  Cutting Whell             14 Inchi       1 Unit               
          4  Welding Mechine           900 Watt       1 Unit               
                                                                           
          5  Scaffolding                  -           70Set                
                                                                           
                                                                           
      D. MASA PELAKSANAAN  DAN PEMELIHARAAN                                
        Masa Pelaksanaan : 90 (sembilan puluh) Hari Kalender               
                                                                           
        Masa Pemeliharaan : 180 (seratus delapan puluh) Hari Kalender      
                                                                           
      E. OUTPUT PERFORMENCE                                                
                                                                           
        Penyedia wajib melengkapi administrasi berupa :                    
        1. Laporan Harian, Mingguan dan Bulanan;                           
        2. Laporan Penerapan SMKK;                                         
        3. Dokumentasi Foto Pekerjaan;                                     
        4. Back Up Data; dan                                               
        5. Asbuilt Drawing;                                                
        Seluruh produk di atas terlebih dahulu diperiksa dan ditandatangani oleh konsultan
        pengawas.                                                          
                                                                           
                                                                           
      F. TATA CARA PENGUKURAN  DAN PEMBAYARAN                              
        1. Tata cara pengukuran meliputi :                                 
           A. Pengukuran Awal                                              
                Dilakukan setelah penandatangan kontarak dan saat akan     
                melaksanaakan pekerjaan.                                   
                Pengukuran dilakukan bersama-sama dengan penyedia jasa, konsultan
                pengawas serta direksi dari DPUPR.                         
                                                                           
           B. Pengukuran Akhir                                             
                Dilakukan setelah pekerjaan selesai 100% dan penydia jasa mengirimkan
                surat permohonan ke pada direksi untuk melakukan pengukuran.
                Pengukuran dilakukan bersama-sama dengan penyedia jasa, konsultan
                pengawas serta direksi                                     
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                8          
                                                                           
                                                                           
        2. Tata cara pembayaran :                                          
           Pembayaran prestasi pekerjaan dilakukan dengan cara Termin, dengan
           ketentuan tahapan pembayaran sebagai berikut:                   
                                                                           
             No   Tahapan    Besaran %           Keterangan                
                 pembayaran pembayaran                                     
                 (milestone) dari Harga                                    
                              Kontrak                                      
                                                                           
             1  Pembayaran sebesar 50%  [Dibayarkan kepada PIHAK KEDUA     
                Pertama   / (lima  puluh setelah prestasi pekerjaan mencapai
                Termyn    I persen)     nilai 55% (lima puluh lima persen) 
                (pertama)               dikurangi Angsuran Uang Muka       
                                        sebesar 15% (lima belas            
                                        persen)/apabila ada, dilampiri Berita
                                                                           
                                        Acara Kemajuan Pekerjaan beserta   
                                        lampirannya.                       
                                                                           
             2  Pembayaran sebesar  95% Dibayarkan kepada PENYEDIA         
                Kedua    / (sembilan puluh setelah prestasi pekerjaan mencapai
                Termyn   II lima persen) nilai 100% (seratus persen) dikurangi
                (kedua)                 Termyn I (Pertama) sebesar 50% (lima
                                        puluh persen) dan Angsuran Uang    
                                        Muka ke 2 sebesar 15% (lima belas  
                                        persen) serta dilampiri Berita Acara
                                                                           
                                        Serah Terima I (pertama) hasil     
                                        pekerjaan.                         
                                                                           
             3  Pembayaran sebesar  5%  Dibayarkan kepada PENYEDIA         
                Terakhir / (lima persen) setelah selesai Masa Pemeliharaan 
                Retensi                 dan dilampiri Berita Acara Serah   
                (pemeliharaa            Terima II (kedua) hasil pekerjaan, dan
                n)                      apabila melewati tahun anggaran    
                                        berjalan masa pemeliharaannya dapat
                                        membuat jaminan pemeliharaan yang  
                                        dikeluarkan oleh BANK UMUM.        
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap                         
                                                                9          
                                                                           
Demikian uraian singkat ini disampaikan semoga dapat menjadi informasi terhadap pekerjaan
                                                                           
Rehab Kantor dan Penataan Halaman Kantor 1 Atap.                           
                                                                           
                                                                           
                                           Puruk Cahu, 4 Agustus 2023      
                                                                           
                                               Ditetapkan                  
                                        Pejabat Pembuat Komitmen           
                                           (PPK) SEKRETARIAT               
                                                DAERAH                     
                                          Kabupaten Murung Raya            
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                              MOHAMMAD                     
                                             ROFIQ,S.T,M.T                 
                                        NIP.19760820 200501 1 013          
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
                                                                           
   SPESIFIKASI TEKNIS                                                      
   Rehab Kantor dan Penataan Halaman Kantor 1 Atap
Tenders also won by CV Muara Tuhup Makmur
Authority
7 June 2022Pembangunan Kantor KpuKab. Murung RayaRp 4,882,000,000
27 February 2023Pembangunan Kantor Makodim Murung Raya (Lanjutan)Kab. Murung RayaRp 4,726,000,000
1 May 2021Pendirian/Revitalisasi Gedung ProduksiKab. Murung RayaRp 2,067,700,000
10 June 2021Aula Pertemuan/Admin Puskesmas Muara TuhupKab. Murung RayaRp 1,700,000,000
30 July 2024Lanjutan Pembangunan Puskesmas Km 30 Kecamatan BaturaKab. Murung RayaRp 1,543,134,000
15 February 2023Pembangunan Gudang Logistik Dan Aula Kantor KpuKab. Murung RayaRp 1,485,000,000
1 July 2023Fisik Pembangunan Puskesmas Km 30 Kecamatan BaturaKab. Murung RayaRp 1,196,923,000
26 July 2016Pembangunan Rawat Inap Puskesmas Muara TuhupMurung RayaRp 624,000,000
19 September 2024Pembangunan Tempat Parkir TerminalKab. Murung RayaRp 319,460,000
2 June 2016Peningkatan Jalan Lingkungan Desa Mangkahui (Cor Beton)(percepatan)Murung RayaRp 295,890,000