Penyiapan Kawasan Inti Pusat Pemerintahan (Kipp) Tahap II

Basic Information
Type: Public Tender
Tender Code: 80719064
Date: 4 July 2022
Year: 2022
KLPD: Kementerian Pekerjaan Umum dan Perumahan Rakyat
Work Unit: Pelaksanaan Prasarana Permukiman Provinsi Kalimantan Timur
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 374,735,437,000
Estimated Value (Nilai HPS): Rp 374,735,437,000
Winner (Pemenang): PT Pembangunan Perumahan (Persero) Tbk
NPWP: 010016137093000
RUP Code: 36192055
Work Location: Kecamatan Sepaku - Penajem Paser Utara (Kab.)
Participants: 121
Applicants
Reason
0010016137093000Rp 310,940,397,772-
0010600039093000Rp 337,431,816,924-
0010016103093000Rp 343,057,177,668-
0010016111093000Rp 346,423,120,000-
0010016129093000--
Surya Bakti Group. PT
00*1**9****22**0--
0010016152093000Rp 344,756,602,040GUGUR TEKNIS - Rencana Keselamatan Konstruksi: Tidak memenuhi elemen Perencanaan Keselamatan Konstruksi karena tidak mengisi kolom pengendalian lanjutan tabel B.1 Identifikasi bahaya, Penilaian risiko, Pengendalian dan Peluang sesuai dengan ketentuan dalam Dokumen Pemilihan IKP 28.14. e).
0024092504024000Rp 299,788,432,161GUGUR TEKNIS - Metode pelaksanaan: Pekerjaan yang disampaikan dalam pekerjaan lapis pondasi agregat kelas B proses blending dengan menggunakan wheel loader/excavator dimana sesuai spesifikasi umum Bina Marga Revisi 2 Seksi 5.1 Lapis Pondasi Agregat Pasal 5.1.2.6) "pencampuran bahan untuk memenuhi ketentuan yang disyaratkan harus dikerjakan di lokasi instalasi pemecah batu atau pencampur yang disetujui dengan menggunakan pemasok mekanis (mechanical feeder) yang telah dikalibrasi untuk memperoleh aliran yang menerus dari komponen-komponen campuran dengan proporsi yang benar. Dalam keadaan apaun tidak dibenarkan melakukan pencampuran di lapangan. ".
0017230905631000Rp 341,646,038,626GUGUR TEKNIS - Rencana Keselamatan Konstruksi: Tidak memenuhi elemen Perencanaan Keselamatan Konstruksi karena tidak menyampaikan tabel B.1 Identifikasi bahaya, Penilaian risiko, Pengendalian dan Peluang sesuai dengan ketentuan dalam Dokumen Pemilihan IKP 28.14. e).
0011342144812000Rp 296,997,188,896GUGUR TEKNIS - Personil Manajerial: Berdasarkan hasil klarifikasi kepada pengguna jasa, salah satu personel manajerial tidak memenuhi ketentuan dalam Dokumen Pemilihan IKP poin 4.1. - Metode pelaksanaan: Pekerjaan yang disampaikan dalam pekerjaan lapis pondasi agregat kelas B proses blending dengan menggunakan wheel loader/excavator dimana sesuai spesifikasi umum Bina Marga Revisi 2 Seksi 5.1 Lapis Pondasi Agregat Pasal 5.1.2.6) "pencampuran bahan untuk memenuhi ketentuan yang disyaratkan harus dikerjakan di lokasi instalasi pemecah batu atau pencampur yang disetujui dengan menggunakan pemasok mekanis (mechanical feeder) yang telah dikalibrasi untuk memperoleh aliran yang menerus dari komponen-komponen campuran dengan proporsi yang benar. Dalam keadaan apaun tidak dibenarkan melakukan pencampuran di lapangan. "
0018067546007000Rp 318,525,135,999GUGUR TEKNIS Berdasarkan hasil klarifikasi kepada pengguna jasa, salah satu personel manajerial tidak memenuhi ketentuan dalam Dokumen Pemilihan IKP poin 4.1
0027847185656000Rp 299,788,349,600GUGUR TEKNIS - Metode pelaksanaan: Pekerjaan yang disampaikan dalam pekerjaan lapis pondasi agregat kelas B proses blending dengan menggunakan wheel loader dimana sesuai spesifikasi umum Bina Marga Revisi 2 Seksi 5.1 Lapis Pondasi Agregat Pasal 5.1.2.6) "pencampuran bahan untuk memenuhi ketentuan yang disyaratkan harus dikerjakan di lokasi instalasi pemecah batu atau pencampur yang disetujui dengan menggunakan pemasok mekanis (mechanical feeder) yang telah dikalibrasi untuk memperoleh aliran yang menerus dari komponen-komponen campuran dengan proporsi yang benar. Dalam keadaan apaun tidak dibenarkan melakukan pencampuran di lapangan. ".
0010602506062000Rp 299,788,349,600GUGUR TEKNIS - Personil Manajerial: Berdasarkan hasil klarifikasi kepada pengguna jasa, salah satu personel manajerial tidak memenuhi ketentuan dalam Dokumen Pemilihan IKP poin 4.1
0013703509054000--
PT Varia Usaha Beton
00*4**2****41**0--
0010016145093000--
0013085246091000--
0010000198093000--
0024913956034000--
0937903367616000--
0016147449722000--
0029828100722000--
0033127887077000--
0011193026441000--
0010610525062000--
PT Hein Global Utama
07*6**7****19**0--
0011148269941000--
0025084492941000--
0012094488722000--
0013654421071000--
0026107631216000--
PT Indo Super Traktor
08*6**2****22**0--
0660392770086000--
Pubagot Jaya Konstruksi
00*3**3****45**0--
0012100772941000--
0314480963526000--
CV Makmur Jaya
07*3**0****25**0--
0013045208046000--
0032544553017000--
PT Daya Turangga Sarana Bangun
00*3**9****71**0--
0740192729618000--
Bonatua Silalahi
04*5**9****05**0--
PT Langgeng Makmur Perkasa
00*8**5****09**0--
0029322518101000--
0818512931427000--
Ahli Dunia
09*1**1****04**0--
0025865676604000--
0011034741073000--
PT Gada Elang Perkasa
03*5**6****08**0--
0722343167611000--
0720500255801000--
0011492048007000--
0019049246722000--
0010610350093000--
0765734447104000--
PT Mortio Maglane
0013931605003000--
0315441527002000--
Roy Abadi Sejahtera
05*8**1****25**0--
0023010739405000--
Alsterindo Mahesa Pratama
08*9**2****76**0--
PT Pelita Putra Pratama
09*4**7****08**0--
0032646622815000--
0021956305725000--
0032065542039000--
CV Sari Indo Tehnik
00*4**9****24**0--
0016310807123000--
0012094959722000--
0833489636326000--
PT Tanggul Sindayu Bahagia
03*3**6****45**0--
0731682647322000--
0013050828073000--
PT Patra Geoteksindo Jaya
09*6**1****35**0--
0752962001005000--
PT Idhanpower Alkautsar
03*3**6****21**0--
0010611549093000--
0012151676812000--
CV Arman
00*7**7****35**0--
0021958855728000--
0014104376812000--
0021968946722000--
0026804245002000--
0020713491101000--
CV Mukti Yasa
00*2**3****11**0--
0417954971601000--
CV Mutiara Angkasa
0727032807831000--
0014965222218000--
PT Permata Sari Jaya
0021471727212000--
0748569969801000--
0844098681701000--
0747702611622000--
0012398186331000--
0722429966331000--
0029579075048000--
PT Catrabuana Geoteknik Mandiri
07*3**4****51**0--
0013473681007000--
Navaratna Utama Mandiri
06*8**5****07**0--
0025658303951000--
PT Indo Mandiri Nusantara
09*0**6****48**0--
0841174691307000--
0019367101016000--
CV Dayma Totalindo
07*0**6****05**0--
Era Global Perkasa
07*6**6****24**0--
0725268718831000--
0010613651093000--
0633912290726000--
PT Grand Asia Resources
00*1**8****22**0--
0942270737807000--
0013626437054000--
0033279290727000--
CV Bintang Anugrah Raya
00*2**7****11**0--
0014940423727000--
PT Royal Inti Mahiro
07*6**9****09**0--
0211359930542000--
0019186485952000--
0939973889723000--
0032613937804000--
0027568898722000--
0017149378812000--
0011227204641000--
PT Agung Rahayu
0210944146412000--
0021972666722000--
Tenders also won by PT Pembangunan Perumahan (Persero) Tbk
Authority
29 September 2023Pemenuhan Sebagian Kebutuhan Pembangunan Bandara Vvip (Sisi Landasan Udara): Paket Konstruksi FisikKementerian Pekerjaan Umum dan Perumahan RakyatRp 4,286,668,930,000
26 June 2024Pembangunan Jalan Tol Ikn Seksi 1B Segmen Bandara Sepinggan – Tol BalsamKementerian Pekerjaan Umum dan Perumahan RakyatRp 3,803,632,270,000
31 October 2022Konstruksi Fisik Dan Bangunan Rs Upt Vertikal MakassarKementerian KesehatanRp 2,189,846,251,764
21 September 2023Pembangunan Jalan Tol Serang – Panimbang Seksi III (Cileles – Panimbang) Fase 2 Paket 3Kementerian Pekerjaan Umum dan Perumahan RakyatRp 2,134,258,270,000
17 June 2022Pembangunan Bangunan Gedung Kantor Presiden Pada Kawasan Istana Kepresidenan Di Ibu Kota NegaraKementerian Pekerjaan Umum dan Perumahan RakyatRp 1,936,191,000,000
6 March 2023Pembangunan Bendungan Cibeet Paket II; Jawa Barat; Kab. Bogor; 0 Unit; 0 Juta M3; F; K; MycKementerian Pekerjaan Umum dan Perumahan RakyatRp 1,870,000,000,000
22 September 2025Pembangunan Bangunan Gedung Dan Kawasan Sidang Paripurna Di Ibu Kota NusantaraOtorita Ibu Kota Nusantara (OIKN)Rp 1,755,900,000,000
18 April 2023Konstruksi Terintegrasi Rancang Dan Bangun Pembangunan Rumah Susun Asn 1Kementerian Pekerjaan Umum dan Perumahan RakyatRp 1,734,520,000,000
5 April 2024Pembangunan Bangunan Gedung Dan Kawasan Perkantoran Kementerian Pertahanan Di Ibu Kota NegaraKementerian Pekerjaan Umum dan Perumahan RakyatRp 1,707,968,600,000
4 September 2023Pembangunan Jalan Seksi 6C-1: Sp. 3 Itci Simpang 1B Sumbu Kebangsaan Timur KippKementerian Pekerjaan Umum dan Perumahan RakyatRp 1,681,586,886,000