| Reason | |||
|---|---|---|---|
| 0027594795112000 | Rp 1,123,238,717 | - | |
| 0210006383122000 | Rp 939,820,028 | Tidak menghadiri undangan klarifikasi penawaran | |
| 0929018588125000 | - | - | |
| 0838698439117000 | - | - | |
| 0025020322113000 | - | - | |
| 0020815908117000 | - | - | |
Jogi Pratama Makmur | 09*3**3****21**0 | - | - |
| 0763876570121000 | - | - | |
| 0958687311121000 | - | - | |
| 0633428511128000 | - | - | |
| 0018518464117000 | - | - | |
| 0916336340117000 | - | - | |
| 0737823963127000 | - | - | |
| 0022599435127000 | - | - | |
| 0421344649127000 | - | - | |
| 0940713555127000 | - | - | |
| 0317423002117000 | - | - | |
| 0314124371117000 | - | - | |
| 0848653291122000 | - | - | |
CV Asa Citra Persada | 05*4**6****15**0 | - | - |
| 0710311242127000 | - | - | |
| 0016515835122000 | - | - | |
| 0842799587121000 | - | - | |
| 0018516872117000 | - | - | |
| 0616912325115000 | - | - | |
| 0720248475124000 | - | - | |
| 0733159453331000 | - | - | |
| 0316172832124000 | - | - | |
| 0838347979212000 | - | - |
Jenis Barang/ Jasa Satuan Volume
I. Pek. Pendahuluan -
1 Pembersihan Trase Pipa - Ls Lot 1.00
2 Pematokan/Pengukuran - Ls Lot 1.00
3 Papan nama proyek - Ls Lot 1.00
4 Sewa Gudang/Pondok Kerja - Ls Lot 1.00
5 Commisioning Test & Pembersihan Akhir - Ls Lot 1.00
II. Penerapan Sistem Manajemen Dan Keselamatan
Kerja (SMKK)
1 Alat Pelindung Kerja dan Alat Pelindung Diri - Ls Set 1.00
2 Personel Keselamatan Konstruksi - Ls Set 1.00
3 Fasilitas Sarana, Prasarana dan Alat Kesehatan - Ls Set 1.00
4 Rambu dan Perlengkapan Lalu Lintas yang Diperlukan
Set 1.00
atau Manajemen Lalu Lintas - Ls
III. Pekerjaan Utama -
A Pek. Rerservoir -
1 Pekerjaan Galian Tanah - A.2.3.1.4 M3 12.6
2 Pek Pas. Batu Padas 1:4 TPT - M3 9.64
3 Pek. Beton Lantai Kerja K-100 (Site Mix) - A.4.1.1.8 M3 0.9
4 Pek. Beton Tapak Pondasi - A.4.1.1.17
- Beton Cor K-250 (Site Mix) - M3 2.70
- Pembesian - A.4.1.1.8 Kg 257.27285
5 Pek. Beton Pedestal Pondasi - A.4.1.1.17
- Beton Cor K-250 (Site Mix) - A.4.1.1.25 (a) M3 1.15
- Pembesian - Kg 11.52
- Bekisting - A.4.1.1.8 M2 54.530658
6 Pek. Beton Sloof Bawah - A.4.1.1.17
- Beton Cor K-250 (Site Mix) - M3 2.66
- Pembesian - A.4.1.1.8 Kg 215.96
7 Pek. Beton Sloof Atas - A.4.1.1.17
- Beton Cor K-250 (Site Mix) - A.4.1.1.24 M3 1.78
- Pembesian - A.8.4.1.37 Kg 207.20318
- Bekisting - Ls M2 17.76
8 Pek. Beton Lantai - Ls
- Beton Cor K-250 (Site Mix) - A.8.4.2.21.7 (a) M3 4.00
- Pembesian - Ls Kg 246.60
9 Pek. Beton Kolom - A.8.4.2.40.5
- Beton Cor K-250 (Site Mix) - M3 4.03
- Pembesian - A.2.3.1.4 Kg 188.21
- Bekisting - M2 31.36
10 Pek. Beton Dinding - A.4.1.1.8
- Beton Cor K-250 (Site Mix) - A.4.1.1.17 M3 10.66
- Pembesian - Kg 370.89
- Bekisting - A.4.1.1.8 M2 71.04
11 Pek. Beton Balok - A.4.1.1.17
- Beton Cor K-250 (Site Mix) - M3 1.02
- Pembesian - Kg 207.20318
- Bekisting - A.4.1.1.17 M2 14.208
12 Pek. Beton Plat Penutup - A.4.1.1.25 (a)
- Beton Cor K-250 (Site Mix) - M3 3.40
- Pembesian - A.4.1.1.8 Kg 246.60
- Bekisting - A.4.1.1.17 M2 20.00
13 Pek. Pengecatan - A.4.1.1.24 M2 61.20
14 Urugan Tanah Dibawah Lantai - M3 10.752
15 Beton Cor Tangga K-175 Site Mix - Ls M3 0.09
- Pekerjaan Tangga Besi - Ls M' 4.00
16 Pipa Gip Ø 3" - A.8.4.2.40.5 M' 6.00
17 Pipa Gip Ø 2" - A.8.4.2.40.3 M' 5.00
18 Pipa Gip Ø 1,5" - A.8.4.2.40.2 M' 4.50
19 Bend Gip Ø 3" - A.4.7.1.10 Buah 4
20 Bend Gip Ø 2" - Buah 2.00
21 Bend Gip Ø 1,5" - Buah 3.00
22 Bend PVC Ø 3" - A.8.4.1.37 Buah 2.00
23 Tee stuck Gip Ø 2" - A.8.4.1.5 Buah 1
24 Gate Valve Ø 3" - A.8.4.2.21.7 (a) Buah 2.00
25 Gate Valve Ø 2" - Ls Buah 1.00
26 Flens Spigot PVC Ø 3" - A.8.4.2.16.5 Buah 2.00
B Pek. Rumah Pompa - A.2.3.1.1
1 Pek. Galian Tanah Biasa - A.2.3.1.9 M3 0.77
2 Pek. Pas. Batu Padas 1:4 - M3 0.64
3 Pek. Pas. Batu Bata 1:4 - A.8.4.1.36 M2 9.19
4 Pek. Beton Lantai K-175 (Site Mix) - A.8.4.1.4 M3 0.256
5 Pek. Plat Penutup - A.8.4.2.21.7
- Beton Cor K-250 (Site Mix) untuk Plat Penutup - Ls M3 0.48
- Pembesian Plat Penutup - A.8.4.2.16.4 Kg 20.52
- Bekisting Plat Penutup - Ls M2 4.00
6 Pekerjaan Plesteran 1:4 - A.2.3.1.1 M2 18.38
7 Pekerjaan Pengecatan Tembok - A.2.3.1.9 M' 22.24
8 Pintu Besi 1,5x0,7 - M2 1.05
9 Jalusi Beton 40x20cm - A.8.4.1.35 Bh 3.00
C Pek. Pompa dan Listrik - A.8.4.1.3
1 Pengeboran Sumur - A.8.4.2.21.7 (b) M' 120.00
2 Pipa PVC Ø 6" Mantel - A.8.4.2.16.3 M' 60
3 Pipa PVC Ø 1,5" Dorong - M' 90.00
4 Pompa Summersible 5Hp 3Phase (complit) - Ls Unit 1.00
5 Kabel TIC 4x2,5 - A.2.3.1.1 m' 150.00
6 Tiang Listrik Pipa Hitam Ø 3", 2" 1,5" - A.2.3.1.9 Titik 3.00
7 Izin Pemasukan Listrik PLN 10.000 Watt 3 Phase - Unit 1.00
8 Pengadaan Kabel Power dan Tali - A.8.4.1.34 M' 92.00
D Pek. Box Gate Valve - A.8.4.1.33
1 Galian Tanah - A.8.4.1.1 M3 0.82
2 Beton cor - A.8.4.2.21.7 (d) M3 0.63
E Pek. Pipa Distribusi - A.8.4.2.16.1
I Pipa Ø 3" - Ls
1 Pipa PVC Ø 3" - Ls M' 1502.00
2 Galian Tanah Biasa - M3 112.65
3 Timbunan Kembali - A.2.3.1.1 M3 105.80
4 Teestuck PVC 3"x3"x3" - Buah 2.00
5 Teestuck PVC 3"x3"x1,5" - A.4.1.1.8 Buah 6.00
6 Reducer PVC 3" x 2" - A.4.1.1.17 Buah 4.00
7 Flange Spigot PVC 3" - Buah 4.00
II Pipa Ø 2" -
1 Pipa PVC Ø 2" - M' 1240.00
2 Galian Tanah Biasa - M3 49.60
3 Timbunan Kembali - A.4.1.1.8 M3 48.19
4 Teestuck PVC 2"x2"x1,5" - A.4.1.1.17 Ttk 6.00
5 Reducer PVC 2" x 1,5" - A.4.1.1.25 (a) Buah 3.00
6 Dop PVC 2" - Bh 2
7 Pipa Hitam 2" Mantel - A.4.1.1.8 m' 6.00
III Pipa Ø 1,5" -
1 Pipa PVC Ø 1,5" - M' 2249.80
2 Galian Tanah Biasa - M3 89.99
3 Timbunan Kembali - M3 88.85
4 Teestuck PVC 1,5"x1,5"x1,5" - Buah 1.00
5 Dop PVC 1,5" - Bh 16.00
F Pekerjaan Pemasangan Sambungan Rumah (SR) -
1 Pekerjaan Sambungan Rumah - Unit 155.00