| 0934601923418000 | Rp 2,446,584,189 | |
| 0013977178021000 | - | |
PT Parlan Pra Muda Mudi | 06*4**3****16**0 | - |
| 0011360575451000 | - | |
| 0022395214416000 | - | |
| 0417427226416000 | - | |
| 0022888242451000 | - | |
| 0535436976418000 | - | |
CV Anugrah Dwimitra Abadi | 00*1**3****86**0 | - |
| 0020935433418000 | - | |
PT Karyamas Prima Sempurna | 06*8**7****16**0 | - |
Pulau Intan Sejahtera | 06*5**3****16**0 | - |
| 0835260829411000 | - | |
| 0722947751034000 | - | |
| 0614948222009000 | - | |
| 0026908566437000 | - | |
| 0838477875402000 | - | |
| 0313609950416000 | - | |
| 0316606961451000 | - | |
| 0926257130711000 | - | |
| 0827115353444000 | - | |
| 0022878391451000 | - | |
| 0658077227418000 | - |
RENCANA ANGGARAN BIAYA (BLANK)
JUDUL KEGIATAN : Lanjutan Rehab Gedung Asrama dan GSG Diklat Kitri Bakti
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
KODE HARGA SATUAN JUMLAH HARGA PPN 11%
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA PEKERJAAN
(a) (b)
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek
A.2.2.1.0 1,00 Unit
2 Biaya Operasional Listrik & Air Kerja Proyek 1,00 ls
3 Mobilisasi 1,00 ls
4 Biaya Penyelenggaraan K3 (Biaya Iuran BPJS Ketenagakerjaan, APD, & Penanganan Covid)
- Helm Proyek SNI - 30,00 bh
- Sarung Tangan Pelindung - 30,00 bh
- Masker Mulut - 30,00 bh
- Rompi Jaring - 30,00 bh
- BPJS Ketenagaketjaan dan kesehatan kerja - 1,00 Paket
5 Pek. Bongkaran Keramik Existing BOW L 6 1.057,70 m2
B PEKERJAAN PLAFOND
1 Pek. Plafon Spanrell Almunium + Rangka - 795,80 m2
2 Pek. Plafon PVC Shunda (Polos/Alur) + Rangka A.4.5.1.8.a 443,04 m2
3 Stegger / Schafolding F.1 103,68 m2
C PEKERJAAN PENUTUP LANTAI & DINDING
Aula Utama dan Lantai Tangga
1 Pas. Lantai Granit, (Polished/Teksture), Uk. 80 x 80 cm A.4.4.3.43. 973,20 m2
2 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 84,50 m2
3 Pas. Plint/Step Nosing Ubin Granit, Ukuran 10 x 60 cm A.4.4.3.75 94,20 m1
Area KM/WC
1 Pas. Dinding Granit Double Loading (Polished), Uk. 60/60 cm A.4.4.3.74 250,74 m2
2 Pas. Lantai Granit Double Loading (Polished), Uk. 60 x 60 cm A.4.4.3.66 51,60 m2
Area Panggung
1 Pas. Lantai Parquet Kayu A.4.4.3.46. 69,30 m2
2 Pek. Dinding Wood Panel WPC / 3D Wall Panel + Rangka Empiris . 6 14,82 m2
3 Pek. Backdrop HPL Profil - Lapis Multiplek/MDF/Plywood + Rangka Empiris . 3 118,13 m2
Area Trap Tribun
1 Pek. Epoxy Lantai 1000 Micron A.4.4.3.61.c 687,66 m2
2 Perbaikan Acian Beton Tribun A.4.4.2.30. 206,30 m2
Kolom/Pilar Keliling Aula Dalam
1 Pas. ACP Interior, Coating Primer + Rangka + Stegger (Schafolding) Empiris . 8a 246,40 m2
2 Pek. Perforasi/Cutting ACP Empiris . 9 246,40 m2
D PEKERJAAN PINTU & JENDELA
1 Pek. Pintu P1 Terlampir 2,00 unit
2 Pek. Pintu P2 (KM/WC) - 12,00 unit
3 Pas. Dinding Terawang Rooster/Breeze Block Natural, 20x20 A.4.4.1.23. 61,44 m2
E PEKERJAAN INSTALASI LISTRIK
1 Pengadaan dan Pemasangan Panel Grouping (AC, Stop Kontak, PeneranLg.1a0n) 1,00 Unit
2 Pas. Box Sikring (MCB), Standard L.11 1,00 Unit
3 Pek. Instalasi Kabel NYM 2 x 2,5 mm A.6.2.1.1.b 50,00 titik
4 Pas. Saklar Lampu - Seri/Double A.6.2.1.7. 4,00 bh
5 Pek. Instalasi Kabel NYM 3 x 2,5 mm (Untuk Stop Kontak) A.6.2.1.1.c 6,00 titik
6 Pas. Stop Kontak Tanam/Timbul, setara BROCO A.6.2.1.9.a 6,00 bh
7 Pas. Lampu downlight LED Flat 15 Watt, setara phillips A.6.2.1.20.b 50,00 Unit
F PEKERJAAN FINISHING
1 Pek. Pengecatan Tralis Tangga & Tribun - 1,00 ls
2 Pekerjaan Perapihan & Pembersihan - 1,00 ls
JUMLAH
TOTAL
DIBULATKAN
Tigaraksa, .................................. 2024
PT/CV ….............
…......................................
Direktur
REKAPITULASI TOTAL
JUDUL KEGIATAN : Lanjutan Rehab Gedung Asrama dan GSG Diklat Kitri Bakti
ANGGARAN : APBD Th. 2024
LOKASI : Kab. Tangerang
NO URAIAN JUMLAH HARGA (Rp) PPN 11%
A PEKERJAAN PERSIAPAN
B PEKERJAAN PLAFOND
C PEKERJAAN PENUTUP LANTAI & DINDING
D PEKERJAAN PINTU & JENDELA
E PEKERJAAN INSTALASI LISTRIK
F PEKERJAAN FINISHING
JUMLAH
TOTAL
DIBULATKAN