| 0012591210113000 | Rp 2,171,277,931 | |
| 0015321524113000 | - | |
| 0740046834215000 | - |
KOMANDO OPERASI UDARA I
PANGKALAN TNI AU HANG NADIM
TERM OF REFERENCE (TOR)
PENINGKATAN/PEMBANGUNAN FASILITAS DAN SARPRAS
MATRA UDARA LANUD HANG NADIM
DIPA 2024
Daftar Isi
1. Kode bagan akun standar belanja modal .......................................... 2
2. TOR (1 kode akun dan 1 kode belanja) ............................................. 4
3. Lampiran RAB dan Gambar............................................................... 10
4. Lampiran Lay Out Lokasi ................................................................... 21
5. Lampiran KIB ..................................................................................... 22
Kode Bagan Akun Standart Belanja Moda
012.24.21 Program Modernisasi Alutsista Dan Non Alutsista Serta Pengembangan
Fasilitas Dan Sarpras Matra Udara
1532 Peningkatan/Pembangunan Fasilitas dan Sarpras Matra Udara
1532.001 Gedung dan Bangunan
051 Melaksanakan pembangunan fasilitas pendidikan, penerbangan,
pengamanan, perkantoran, fasilitas pendukung, dan prasarana pendukung
A Dukungan Kegiatan
533111 Belanja Modal Gedung dan Bangunan (Pemb. baru)
533121 Belanja Penambahan Nilai Gedung dan Bangunan (Renovasi)
012.24.22 Program Peningkatan Profesionalisme Personel Matra Udara
1538 Pembangunan Sarana-Prasarana Kesejahteraan Personel Matra Udara
1538.002 Rumah Dinas
1538.002.00 Rumah Dinas
2
051 Rumah Dinas
A Dukungan Kegiatan
533111 Belanja Modal Gedung dan Bangunan (Pemb. baru)
533121 Belanja Penambahan Nilai Gedung dan Bangunan (Renovasi)
012.24.22 Program Peningkatan Profesionalisme Personel Matra Udara
1538 Pembangunan Sarana-Prasarana Kesejahteraan Personel Matra Udara
1538.001 Gedung dan Bangunan
051 Melaksanakan pembangunan/peningkatan mess dan fasilitas dan kesehatan
533111 Belanja Modal Gedung dan Bangunan (Pemb. baru)
533121 Belanja Penambahan Nilai Gedung dan Bangunan (Renovasi)
Contoh RKA DIPA Satker sbb :
1 kode kegiatan DENMA KOOPSAU I
1 kode belanja
1532 533121 1 Renovasi berat shelter Sarban 1 Paket
1532 533121 2 Penggantian jaringan pipa air bersih 1 Paket
1532 533121 3 Penggantian mesin pendorong air bersih dan instalasi 1 Paket
LANUD HALIM PERDANAKUSUMA
1 kode kegiatan 1532 533121 1 Renovasi Berat Kantor Staf Logistik dan Dinas Khusus 1.500 M²
1532 533121 2 Penggantian Lampu Taxy Way LED Lanjutan 5 4 Ttk
2 kode belanja
1532 533121 3 Renovasi Berat Kantor Senjata 133 m²
1532 533111 4 Pembangunan Gudang Amonisi
1532 533111 a Pembangunan Gudang Amonisi 7 2 m²
1532 533111 b Pembangunan Tanggul Gudang Amonisi 8 5 m'
1532 533111 c Sarana Prasarana 1 Ls
2 kode kegiatan
LANUD SUPADIO
2 kode belanja
1532 533111 1 Pembangunan pagar keliling komplek Garuda 1.006 M'
1532 533111 2 Pemb. Lanjutan Skadron 51 PTTA 1 Pkt
1538.001 533121 3 Renovasi Mess Murdono 510 M2
1538.001 533121 4 Renovasi Mess Adolf Mail 420 M2
KOMANDO OPERASI UDARA I
PANGKALAN TNI AU HANG NADIM
TERM OF REFERENCE ( TOR )
PENINGKATAN/PEMBANGUNAN FASILITAS DAN SARPRAS MATRA UDARA
(1532)
Kementerian Negara/Lembaga : Kementerian Pertahanan
Unit Eselon I : TNI Angkatan Udara
Program : Peningkatan/Pembangunan Fasilitas dan Sarpras
Matra Udara dan Pembangunan Sarana-Prasarana
Kesejahteraan Personel Matra Udara (533111)
Hasil : Meningkatnya kedisiplinan dan profesionalisme
personel, kelancaran penyelenggaraan operasional
perkantoran akuntabilitas dan optimalisasi kerja serta
laporan keuangan
Unit Eselon II/Satker : Koopsau I / Lanud Hang Nadim
Kegiatan : Melaksanakan pembangunan fasilitas pendidikan,
penerbangan, pengamanan, perkantoran, fasilitas
pendukung, dan prasarana pendukung. (533111)
Indikator Kinerja Kegiatan : Peningkatan kemampuan dan penambahan fasilitas
dan Sarpras untuk kelancaran dan optimalisasi kerja.
Satuan Ukur dan Jenis Keluaran : Volume dan Paket
Volume : 240 M² dan 1 Paket
1. Latar Belakang
a. Dasar Hukum Tugas Fungsi/Kebijakan
1) Peraturan Kepala Staf Angkatan Udara Nomor 47 Tahun 2015 Tentang
Kelanjutan Pembangunan Kekuatan Pokok Minimum (Minimum Essential
Force) TNI AU tahun 2015-2024.
2) Program Kerja dan Anggaran Lanud Hang Nadim TA. 2024.
3) Kebutuhan Satuan Kerja di Lanud Hang Nadim
b. Gambaran Umum
Pelaksanaan Pembangunan Fasilitas dan Konstruksi ini melalui beberapa
proses kegiatan, diantaranya:
1) Uraian belanja 1532. 533111
1. Pembangunan Gudang GPL dan Sarpras
2) Administrasi Proyek
- Administrasi Perencanaan, Pengendalian dan Pengawasan Proyek.
c. Alasan Kegiatan Dilaksanakan
1) Dalam rangka meningkatkan kemampuan mengembangkan,
merumuskan dan menyiapkan petunjuk-petunjuk penyelenggaraan pembinaan
bangfas.
2) Tercapainya ketersediaan sarana pendukung operasi penerbangan
sehingga tercapai peningkatan kemampuan dan kesejahteraan bagi personil
TNI AU dalam pelaksanaan tugas pada tiap-tiap satker.
3) Tercapainya pemenuhan kebutuhan bangfas bidang sarana pendukung
untuk meningkatkan kinerja Lanud Hang Nadim.
2. Penerima Manfaat : Personel Militer TNI AU dan PNS TNI AU
3. Strategi Pencapaian Keluaran
a. Metode Pelaksanaan. Berdasarkan masing-masing pekerjaan yang akan
dilaksanakan.
b. Tahapan dan Waktu Pelaksanaan.
1) Inventarisasi data rencana kegiatan.
2) Survey dan koordinasi ke obyek kegiatan.
3) Perancangan untuk menghasilkan dokumen teknis perancangan dan
dokumen pemilihan.
4) Pemilihan untuk calon penyedia jasa.
5) Pelaksanaan fisik di lapangan diikuti dengan pengawasan pekerjaan oleh
tim direksi.
6) Laporan dan evaluasi hasil pelaksanaan kegiatan.
4. Waktu Pencapaian Keluaran.
Kegiatan Pengembangan bangfas akan dilaksanakan pada TW I s/d TW IV TA 2024
dan direncanakan selesai pada pertengahan bulan Desember 2024.
5. Biaya yang Diperlukan.
Biaya penyelenggaraan kegiatan pengembangan bangfas direncanakan sebesar
Rp. 2.240.000.000,- didukung dari APBN TA 2024, untuk setiap kegiatan adalah sebagai
berikut:
1. Pembangunan Gudang GPL dan Sarpras Rp. 2.240.000.000,-
6. Penutup.
Demikian Term of Reference (TOR) yang dibuat untuk digunakan sebagaimana
mestinya.
2 6
Batam, September 2023
Komandan Pangkalan TNI AU Hang Nadim,
Betya Lukman Madyana, S.E., M.Han.
Letkol Pnb NRP 528669
Lampiran ’1’ TOR Bangfas
Nomor : B / 264 / IX / 2023
Tanggal 26 September 2023
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GUDANG GPL DAN SARPRAS
PENDEKATAN ADMINISTRASI PROYEK ( 3% DARI PAGU RKAKL )
LANUD HANG NADIM
DIPA 2024
NO KODE BELANJA KEGIATAN PAKET 1 KETERANGAN
A PERENCANAAN
1 533111 ATK 1.500.000 Biaya belanja alat tulis
kantor, kertas, tinta,
copy dokumen dan
penjilitan
2 533111 Biaya Rapat 1.340.000 Dukungan konsumsi
rapat, dll
3 533111 Jasa Konsultasi 44.800.000 Proses pelelangan
jasa konsultasi dengan
jasa swakelola
penyedia
4 533111 Honor Dibawah 100 juta,
a. PP 210.000 pejabat pengadaan (1)
b. PPHP 300.000 : 210.000, PPHP (1) :
c. PPSPM 250.000 300.000, PPSPM (1) :
d. UKPBJ 300.000 250.000, UKPBJ (1) :
e. KPA 500.000 300.000, KPA (1) :
f. PPK 500.000 500.000, PPK (1) :
500.000
Jumlah 54.040.000
B PENGELOLAAN
1 533111 ATK 500.000
2 533111 Biaya Rapat 500.000
3 533111 Honor Antara 2,5M-5M,
a. PP 1.200.000 Pejabat Pengadaan
b. PPSPM ( x 4 Bulan ) 1.200.000 (1) : 1.200.000,
c. BP ( x 4 Bulan ) 1.200.000 PPSPM (1) : 400.000,
d. UKPBJ 1.000.000 Bendara Pengeluaran
e. KPA ( x 4 Bulan ) 1.200.000 (1). 400.000 UKPBJ
f. PPK ( x 4 Bulan ) 1.200.000 (1) : 1.000.000, KPA
g. Poklih 1.000.000 (1) : 400.000, PPK (1)
: 400.000, Poklih (3) :
1.000.000
Jumlah 9.000.000
C PENGAWASAN
1 533111 ATK 500.000
2 533111 Biaya Rapat 660.000
3 533111 Honor Antara 2,5M-5M,
a. Direksi ( 3x4 Bulan ) 3.000.000 Direksi Pengawas
(3)x1.000.000,
JUMLAH 4.160.000
RENCANA ANGGARAN BIAYA
JASA KONSULTASI PERENCANAAN
PEMBANGUNAN KANTOR SARBAN
DI LANUD HANG NADIM
DIPA 2024
A. BIAYA LANGSUNG PERSONEL
BIAYA PERSONEL
NO PERSONEL JUMLAH SAT WAKTU SAT HARSAT JUMLAH
1 Pimp. Proyek 1 Org 5 hr 1.250.000 6.250.000
2 Ahli Teknik Sipil 1 Org 4 hr 1.000.000 4.000.000
3 Ahli Teknik Arsitektur 1 Org 4 hr 1.000.000 4.000.000
4 Ahli Instalasi 1 Org 4 hr 900.000 3.600.000
5 Cost Estimator 1 Org 4 hr 875.000 3.500.000
6 Juru Gambar 1 Org 4 hr 800.000 3.200.000
7 Team Survey 2 Org 2 hr 800.000 1.600.000
8 Pembantu Umum 2 Org 2 hr 700.000 1.400.000
Jumlah 27.550.000
B. BIAYA LANGSUNG NON PERSONEL
Biaya Pelaksanaan Survey
NO KEGIATAN JUMLAH SAT WAKTU SAT HARSAT JUMLAH
1 Transportasi Lokal 1 Mbl 2 hr 900.000 1.800.000
2 Akomodasi 1 Org 4 hr 752.500 3.009.000
Jumlah 4.809.000
Biaya Peralatan
NO KEGIATAN JUMLAH SAT WAKTU SAT HARSAT JUMLAH
1 Komputer 5 Unit 2 Hr 750.000 1.500.000
2 Alat Kantor 1 Set 4 ls 500.000 2.000.000
Jumlah 3.500.000
Biaya Pengadaan Dokumen
NO PERSONEL JUMLAH SAT WAKTU SAT HARSAT JUMLAH
1 Dokumen Pelaksanaan
a. Gambar 3 Set 500.000 1.500.000
b. RKS, RAB, BQ 3 Set 500.000 1.500.000
c. Perhitungan Utilitas 3 Set 500.000 1.500.000
Jumlah 4.500.000
Jumlah 40.359.000
Jumlah Total 40.359.000
PPN 11% 4.439.490
Jumlah 44.798.490
Dibulatkan 44.800.000
RENCANA PENGGUNAAN ANGGARAN BANGFAS RKAKL 2023
DI LANUD HANG NADIM
KODE KODE
NO ADM PROYEK
KEGIATAN BELANJ URAIAN KEGIATAN NILAI RKAKL NILAI PAGU FISIK
( 3% )
A
1 1532 533111 Pemb. Gudang GPL dan Sarpras 2.240.000.000 67.200.000 2.120.007.750
JUMLAH 2.240.000.000 67.200.000 2.172.800.000
Komandan Pangkalan TNI AU Hang Nadim,
Betya Lukman Madyana, S.E., M.Han.
Letkol Pnb NRP 528669
Lampiran ’2’ TOR Bangfas
Nomor : B / 264 / IX / 2023
Tanggal 26 September 2023
RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN GUDANG GPL DAN SARPRAS
DI LANUD HANG NADIM
DIPA 2024
HARGA JUMLAH
NO MACAM PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
A PEMBANGUNAN GUDANG GPL
I PERSIAPAN
1 Pek. Bowplank 72,00 M' 6 3.909,21 4.601.462,82
4.601.462,82
II PEK. TANAH DAN PASIR
1 Pekerjaan Galian tanah 45,30 M3 9 3.844,08 4.251.136,82
2 Urugan Tanah kembali 15,10 M3 3 1.281,36 472.348,54
3 Urugan Pasir Pondasi 2,11 M3 2 47.417,63 522.051,20
4 Urugan Tanah Peninggian Pail Lantai 120,00 M3 1 50.861,35 18.103.361,76
23.348.898,32
III PEK. BETON DAN PASANGAN
1 Pek. Lean concrete beton t=5 cm ad. 1:3:5 pondasi 2,11 M3 9 48.106,36 1.995.763,89
2 Tapak Pondasi
a Beton K-300 6,47 M3 1 .308.429,78 8.465.540,66
b Pembesian 1.048,32 kg 2 3.948,57 25.105.763,78
c Begisting 30,80 M2 2 07.275,32 6.384.079,85
2 Beton Pedestal
a Beton K-300 2,17 M3 1 .308.429,78 2.839.292,62
b Pembesian 550,68 kg 2 3.948,57 13.187.997,94
c Begisting 30,80 M2 2 07.275,32 6.384.079,85
3 Sloof 20 x 30
a Beton K-300 6,33 M3 1 .308.429,78 8.282.360,49
b Besi Ulir U-39, 6D12, 10-20 1.042,97 kg 2 3.948,57 24.977.638,94
c Begisting 72,4 m2 2 18.174,67 15.795.846,08
4 Kolom 30 x 40 cm
a Beton K-300 8,64 m3 1 .308.429,78 11.304.833,28
b Besi Ulir U-39 956,41 kg 2 3.948,57 22.904.650,81
c Begesting 100,80 m2 4 92.539,96 49.648.027,75
Kolom 25 x 25 cm
a Beton K-300 0,50 m3 1 .308.429,78 654.214,89
b Besi Ulir U-39 77,74 kg 2 3.948,57 1.861.761,75
c Begesting 8,00 m2 4 92.539,96 3.940.319,66
5 Balok Lintel 15 x 20, 4Ø12, 10-20
a Beton K-300 8,25 m3 1 .308.429,78 10.794.545,67
b Besi Ulir U-39 1.768,62 kg 2 3.948,57 42.355.838,15
c Bagesting 82,50 m2 3 87.834,29 31.996.329,21
6 Balok Gantung 15 x 35
a Beton K-300 0,53 m3 1 .308.429,78 686.925,63
b Besi Ulir U-39 22,02 kg 2 3.948,57 527.434,50
c Begesting 7 m2 3 87.834,29 2.714.840,05
7 Pek. Pasang 1/2 bata tela 281,25 m2 1 66.758,24 46.900.754,38
8 Pek. Plesteran 590,63 m2 9 5.397,54 56.344.169,23
9 Pek. Acian 590,63 m2 4 8.888,28 28.874.638,49
10 Buis Beton saluran air hujan 1/2 0 30 cm 72,00 m1 1 99.793,95 14.385.164,62
11 Pek. Rabat Beton k-125 50,40 m3 1 .087.420,39 54.805.987,68
494.118.799,85
IV PEK. LANTAI DAN KERAMIK
1 Pek. Lean concrete lantai, t = 5 cm 12,00 m3 9 48.106,36 11.377.276,33
2 Beton K-225 ready mix t = 20 cm 53,50 m3 1.901.439,60 101.727.018,45
3 Wire mesh M-8 2.613,60 Kg 30.507,38 79.734.096,08
4 Pasang Lantai Keramik Ukuran (60 x 60) cm eks granit indogress (bianco t r a v e 2r6ti,n0o0) m2 4 61.877,24 12.008.808,18
5 Pasang Plint 29,00 m' 2 76.384,40 8.015.147,60
212.862.346,64
V PEK. BAJA, ATAP DAN PLAFOND
1 Kuda2 overstek 150.75.5.7 310,00 Kg 4 0.296,33 12.491.862,14
2 Kup 1/2 WF 150.75.5.7 84,00 Kg 4 0.296,33 3.384.891,68
3 Portal WF 200.100.5,5.8 1.365,33 kg 4 0.296,33 55.017.921,85
4 Kolom dan Kuda2 WF 250.125.6.9 4.680,08 Kg 4 0.296,33 188.590.179,99
5 Kup 1/2 WF 250.125.6.9 497,00 Kg 4 0.296,33 20.027.275,75
6 Gording C 150.65.20.3,2 2.420,37 kg 2 7.390,03 66.293.913,02
7 Stifner tebal 8 mm 173,28 Kg 2 3.948,57 4.149.808,02
8 Trekstang Ø 12 mm 79,92 kg 2 3.948,57 1.913.969,63
9 Ikatan angin Ø 16 mm 255,10 kg 2 3.948,57 6.109.373,96
10 Rangka listplank L 40.40.4 368,94 kg 2 7.390,03 10.105.297,09
11 Lisplank spandek Colourbond TCT 0.45 mm 38,17 M² 2 80.453,33 10.703.860,88
15 Pas. Atap spandek Colourbond TCT 0.45 mm 355,66 M² 2 80.453,33 99.745.526,80
16 Pas. Nok spandek Colourbond TCT 0.45 mm 22,00 M' 2 80.453,33 6.169.973,30
17 Pasang Rangka Pembagi Hollow Struktural 75x75x3,2 3.773,44 Kg 3 1.486,04 118.810.697,61
18 Plafond kalsiboard rangka hollow 26,00 M² 2 06.922,90 5.379.995,36
19 Pas. List plafond 29,00 M' 4 1.943,25 1.216.354,23
610.110.901,32
VI PEK. KUSEN, PINTU DAN JENDELA
1 Pek. Kusen Alumunium Color 181,00 m' 1 79.960,10 32.572.777,61
2 Pasang Daun Pintu WPC DUMA 2,00 m2 2 .154.461,25 4.308.922,51
3 Pasang Pintu besi plat baja tebal 2 mm rangkap 41,60 m2 1 .305.258,71 54.298.762,37
4 Pek. Kaca tebal 5mm polos 30,42 m2 2 60.418,27 7.921.923,66
99.102.386,15
VII PEK. PENGECATAN
1 Pek. Cat tembok dalam weathershield 443,40 m2 5 7.183,96 25.355.369,24
2 Pek. Cat tembok luar weathershield 298,40 m2 6 9.167,36 20.639.541,15
3 Pek. Cat Plafond 26,00 m2 3 9.045,07 1.015.171,76
Jumlah …. 47.010.082,15
VIII PEK. ALAT PENGGANTUNG
1 Pas. Kunci tanam 2 slaag 2,00 bh 2 24.035,91 448.071,82
2 Pas. Engsel Pintu 6,00 bh 4 9.502,86 297.017,15
3 Pas. Engsel Jendela 20,00 bh 4 9.502,86 990.057,17
4 Pas. Hak angin 20,00 bh 4 9.502,86 990.057,17
5 Pas. Handle Jendela 10,00 bh 4 9.282,86 492.828,58
6 Pas. Handel Pintu 2,00 psg 4 67.638,40 935.276,80
7 Pas. Grendel Jendela 10,00 bh 4 9.282,86 492.828,58
Jumlah …. 4.646.137,27
IX PEK. INTALASI LISTRIK HI
1 Pekerjaan Intalasi Penerangan 18,00 ttk 6 12.067,98 11.017.223,63
2 Pekerjaan Intalasi stop kontak 3,00 ttk 5 30.137,71 1.590.413,12
3 Pas. Box Panel uk. 30x20x15 1,00 bh 4 11.845,40 411.845,40
4 MCB 16 A 1 Phase 1,00 bh 1 44.957,30 144.957,30
5 MCB 6 A 1 Phase 3,00 bh 1 44.957,30 434.871,90
6 Aksesoris + Wiring 1,00 ls 2 .000.000,00 2.000.000,00
7 Saklar Tunggal 2,00 bh 3 8.706,45 77.412,90
8 Saklar Seri 2,00 bh 3 9.693,30 79.386,60
9 Stop Kontak 3,00 bh 4 6.162,65 138.487,95
10 Fitting Lampu SL 18 Watt 10,00 bh 5 0.000,40 500.004,00
11 Lampu TL 2x20 lengkap 8,00 bh 1 82.238,30 1.457.906,40
12 Lampu SL 18 Watt 10,00 bh 5 0.000,40 500.004,00
Jumlah …. 18.352.513,20
X PEKERJAAN INTALASI AIR HA
1 Pas. Pipa PVC Ø 1/2" 70,00 m' 2 9.496,17 2.064.732,24
2 Pas. Pipa PVC Ø 3/4" 150,00 m' 3 5.020,37 5.253.056,23
3 Pas. Pipa PVC Ø 1" 30,00 m' 4 2.504,77 1.275.143,25
4 Kran Air Ø 1/2" 2,00 bh 5 8.493,26 116.986,51
5 Stop Kran 1 1/2" 1,00 bh 3 78.507,50 378.507,50
6 Perbaikan Pompa Air 1,00 ls 5 0.000.000,00 50.000.000,00
Jumlah …. 59.088.425,72
XI PEKERJAAN SEPTITANK DAN RESAPAN
1 Pek. Galian Tanah 7,50 m3 9 3.844,08 703.830,60
2 Beton K - 225 0,95 m3 1 .242.624,60 1.176.516,97
3 Wiremesh M-6 15cmx15cm 9,00 m2 3 0.507,38 274.566,45
4 Begisting 9,00 m2 3 87.834,29 3.490.508,64
Jumlah …. 5.645.422,65
Jumlah A 1.578.887.376,10
B SARPRAS
I Pembangunan Saluran Batu kali 91,00 M'
1 Pek. Bowplank 91,00 M' 6 3.909,21 5.815.737,73
2 Pek. Galian tanah 36,00 M³ 9 3.844,08 3.378.386,88
3 Pek. Urugan tanah kembali 12,00 M³ 3 1.281,36 375.376,32
4 Pek. Urugan pasir t=10 cm 7,20 M³ 2 47.417,63 1.781.406,95
5 Pekerjaan Saluran Batu Kali 91,00 M' 1 .249.802,87 113.732.060,88
Jumlah ….. 125.082.968,76
II Pembangunan Box Culvert (Uk. Dalam 0,7x1 M) 8,00 M'
1 Pek. Bowplank 8,00 M' 6 3.909,21 511.273,65
2 Pek. Galian tanah pondasi 6,00 M³ 9 3.844,08 563.064,48
3 Pek. Urugan tanah kembali 1,50 M³ 3 1.281,36 46.922,04
4 Pek. Urugan pasir t=10 cm 0,56 M³ 2 47.417,63 138.553,87
5 Pek. Box culvert beton bertulang 20 cm -
a Beton K- 275 ready mix 5,28 M³ 2 .055.632,10 10.853.737,47
b Pembesian 792,00 Kg 2 3.948,57 18.967.266,59
c Bekisting 67,20 M² 207275,3197 13.928.901,48
Jumlah ….. 45.626.409,22
III Pek. Kamar mandi samping gudang
1 Pek. Pengukuran dan bowplank 16,00 M' 6 3.909,21 1.022.547,29
2 Pek. Galian Tanah Pondasi Foot Plate dan Sloof 4,42 M³ 9 3.844,08 414.790,83
3 Pek. Urugan pasir bawah pondasi, lantai 0,80 M³ 2 47.417,63 197.934,11
4 Pek. Rabat beton keliling bangunan 10 cm K-100 site mix 1,20 M³ 1 .039.743,74 1.247.692,49
5 Pas. Saluran air keliling buis ½ beton Ø 20 cm dengan 20,00 M' 1 88.327,12 3.766.542,44
dengan pasangan dinding bata ad. 1:4 -
6 Pek. Lean concrete 5 cm 0,36 M³ 9 48.106,36 341.318,29
7 Pek. Beton Pondasi Foot Plate FP1 110x110 cm -
a Beton K 225 (Sitemix) 0,49 M³ 1 .242.624,60 608.886,05
b Besi U-24 113,55 Kg 2 3.659,82 2.686.619,76
c Bekisting 5,76 M² 2 07.275,32 1.193.905,84
8 Balok Sloof 20x30 cm -
a Beton K 225 (Sitemix) 0,54 M³ 1 .242.624,60 666.046,78
b Besi U-24 70,49 Kg 2 3.659,82 1.667.780,64
c Bekisting 4,80 M² 2 07.275,32 994.921,53
9 Kolom praktis KP beton bertulang 15x15 cm -
a Beton K 225 (Sitemix) 0,36 M³ 1 .242.624,60 447.344,85
b Besi U-24 52,53 Kg 2 3.659,82 1.242.866,06
c Bekisting 2,40 M² 2 07.275,32 497.460,77
10 Ring Balok 15/20 beton bertulang 15x15 cm -
a Beton K 225 (Sitemix) 0,24 M³ 1 .242.624,60 298.229,90
b Besi U-24 34,86 Kg 2 3.659,82 824.875,93
c Bekisting 3,20 M² 2 07.275,32 663.281,02
11 Balok Latai 12/15 beton bertulang 15x15 cm -
a Beton K 225 (Sitemix) 0,07 M³ 1 .242.624,60 89.468,97
b Besi U-24 15,34 Kg 2 3.659,82 362.910,08
c Bekisting 1,20 M² 2 07.275,32 248.730,38
12 Pek. Pasangan B. Bata -
a Pasangan 1/2 Bata Spesi 1:2 3,20 M² 1 74.399,28 558.077,69
b Pasangan 1/2 Bata Spesi 1:4 26,86 M² 1 62.336,68 4.360.687,84
13 Pek. Plesteran + Acian -
a Plesteran Spesi 1:2 6,40 M² 1 35.832,53 869.328,20
b Plesteran Spesi 1:4 53,72 M² 1 32.153,69 7.099.296,33
14 Pek. Granite tile lantai 60/60 Unpolish 4,00 M² 4 61.877,24 1.847.508,95
15 Pek. Granite Dinding 60/60 Polish 22,06 M² 4 61.877,24 10.189.935,62
16 Klosed Duduk 1,00 Bh 4 .918.461,90 4.918.461,90
17 Jet Washer 1,00 Bh 4 78.100,00 478.100,00
18 Shower Included 1,00 Bh 8 50.000,00 850.000,00
19 Kran 1/2" 1,00 Bh 5 8.493,26 58.493,26
20 Floor Drain 1,00 Bh 1 47.118,06 147.118,06
21 Tempat Sabun 1,00 Bh 1 64.011,42 164.011,42
22 Pas. Kusen allumunium colour tebal min. 1 mm 7,26 M' 1 94.480,10 1.411.925,51
23 Pintu PVC Inluded 1,00 BH 4 50.000,00 450.000,00
24 BV 0,30 M2 4 89.283,81 146.785,14
25 Pas. Spandeks zincallum TCT 0,4 mm colourbond 19,89 M2 2 80.453,33 5.577.491,35
26 Pekerjaan Pemasangan Rangka Atap Baja Ringan Main Truss C-75-75 19,89 M2 2 80.260,22 5.573.650,90
27 Pasang nok spandeks zincallum TCT 0,4 mm colorbond 12,40 M' 1 65.464,16 2.051.755,64
28 Pasang Lisplank Kalsiplank 1,2 x 20 cm 16,00 M' 7 4.722,54 1.195.560,60
29 Pek. Plafond gypsum board 9 mm + Rangka dan peng- 16,00 M2 2 06.922,90 3.310.766,38
gantung hollow 4/4, 2/4 cm -
30 Pek. Cat Dinding Weathersield Eksterior 26,86 M2 6 9.167,36 1.857.973,71
31 Pek. Cat Plafond 16,00 M2 3 9.045,07 624.721,08
32 Pek. Cat Listplank 3,20 M2 3 9.045,07 124.944,22
33 Pek. Instalasi lampu penerangan 2,00 ttk 6 12.067,98 1.224.135,96
34 Pas. Lampu LED 11 Watt essential smart bright eks philips/setara 2,00 bh 2 45.000,00 490.000,00
35 Pas. Saklar Seri 1,00 bh 3 6.924,00 36.924,00
Jumlah ….. 75.101.807,77
IV Instalasi Listrik HA
1 MCB 20 A 1,00 Bh 3 88.051,35 388.051,35
2 Kabel NYGBY 3x6 mm2 100,00 M' 9 4.847,25 9.484.725,00
Jumlah … 9.872.776,35
V Pekerjaan Jalan masuk akses Gudang
1234567
8
PPPPPPP
P
eeeeeee
e
kkkkkkk
k
.......
.
PPGPBBP
A
eeaeaar
T
n g u k u r a n
m b e r s ih a n
lia n t a n a h d
m a d a t a n t a
s e c o a r s e B
s e c o a r s e A
im e c o a t
B 4 c m
g n
n a
3
1
h55
a lb e
d a s
c m
c m
r ta
r
1
1
2
2
324
6
7
12
2
0040988
8
, 0
, 0
, 1,
0
, 8
, 0
, 0
, 0
0000000
0
MMMMMMM
M
'²³³³³²
²
T
J
J
O
u
u
m
m
T
l a
l a
A L
6
1
5
3
5 2
5 5
1
2 3
h …
h B
A +
3266965
4
B
.......
.
9908961
1
0073634
4
9321828
9
,,,,,,,
,
2583009
8
1607008
4
1
3
1 . 9
4
1
52
7
5
1
1
8
220
3
32
8
7
. 9
. 5
. 0
. 2
. 2
. 0.
4
. 3
. 9
. 5
. 4
1470915
80
9
7
7899193
66
0
7
. 2
. 4
. 8
. 8
. 4
. 3.
9
. 1
. 4
. 3
. 7
7268476
60
6
4
6762667
35
7
3
, 1
, 3
, 1
, 2
, 4
, 0,
6
, 6
, 7
, 8
, 9
7277829
23
3
A
I
I I
I I I
I V
V
V I
V I I
V I I I
I X
X
X I
B
I
I I
I I I
I V
V
P
P
P
P
P
P
P
P
P
P
P
P
S
P
P
P
I
P
E
n
E
E
E
E
E
E
E
E
E
E
E
A
e
e
e
s
e
M
R
K
K
K
K
K
K
K
K
K
K
R
m
m
k
t
k
.
a
e
B
S
.
.
.
.
.
.
.
.
E
E
P
b
b
K
l a
r
A N G
I A P
T A N
B E T
L A N
B A J
K U S
P E N
A L A
I N T A
R J A
R J A
R A S
a n g
a n g
a m
s i L
j a a n
U N A N
A N
A H D A N
O N D A N
T A I D A N
A , A T A P
E N , P I N
G E C A T
T P E N G
L A S I L I S
A N I N T A
A N S E P
u n a n S a
u n a n B o
a r m a n d
i s t r i k H A
J a l a n m
G U
P
P
K
D
T U
A N
G A
T
L A
T I
l u r
x C
i s
a s
D A
A S I R
A S A
E R A
A N P
D A
N T U
R I K
S I A
T A N
a n B
u l v e
a m p
u k a
N
N
M
L
N
N
H
I R
K
a
r
i n
k
G
G
I K
A
J
G
I
D
t u
t (
g
s e
G
A
F
E
H
A
k
U
g
s
N
O
N
A
N
a
k
u
P
N
D
l i
.
d
G
L
R
D
a
u
D
E
E
a
n
d
L A
S
l a
g
a n
A
m
g
P
0
A
,
N
7 x 1 M )
J
P
J
D
u
P
u
i
m
m
b
N
u
l a
1
l a
l a
h
1
h
t
%
k
…
…
a
. .
n
. .
. . .
. .
. . .
1
2
2
.
.
.
4
2
6
1
1
9
2
1
1
2
9
1
1
9
4
1
5
2
4
7
2
5
1
7
7
4
3
4
2
0
9
7
4
8
9
5
5
5
5
9
2
7
5
2
2
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
6
3
1
8
1
1
0
6
3
0
6
0
6
1
8
9
4
3
8
8
0
4
1
6
1
0
1
4
5
8
4
8
2
0
7
0
7
2
0
0
1
8
8
2
0
2
0
6
2
8
5
2
6
1
2
6
7
2
0
0
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4
8
7
3
9
3
0
1
5
4
4
9
4
8
7
4
7
5
2
0
6
9
9
4
0
8
8
3
1
2
2
6
0
0
7
0
4
5
9
0
2
8
9
6
1
6
2
7
3
5
2
8
9
7
6
5
3
1
5
0
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
8
3
8
6
3
1
1
2
2
7
6
7
2
7
3
7
9
8
7
0
2
2
5
4
2
5
5
7
0
2
5
6
2
7
5
3
3
3
6
0
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN KANTOR SARBAN
DI LANUD HANG NADIM
DIPA 2024
Terbilang : Dua Milyar Seratus Tujuh Puluh Dua Juta Delapan Ratus Ribu Rupiah
Komandan Pangkalan TNI AU Hang Nadim,
Betya Lukman Madyana, S.E., M.Han.
Letkol Pnb NRP 528669
Lampiran ’3’ TOR Bangfas
Nomor : B / 264 / IX / 2023
Tanggal 26 September 2023
GAMBAR GUDANG GPL DAN SARPRAS
Komandan Pangkalan TNI AU Hang Nadim,
Betya Lukman Madyana, S.E., M.Han.
Letkol Pnb NRP 528669
Komandan Pangkalan TNI AU Hang Nadim,
Betya Lukman Madyana, S.E., M.Han.
Letkol Pnb NRP 528669
Lampiran ’4’ TOR Bangfas
Nomor : B / 264 / IX / 2023
Tanggal 26 September 2023
LOKASI RENCANA PEMBANGUNAN GUDANG GPL DAN SARPRAS
Komandan Pangkalan TNI AU Hang Nadim,
Betya Lukman Madyana, S.E., M.Han.
Letkol Pnb NRP 528669
Lampiran ’5’ TOR Bangfas
Nomor : B / 264 / IX / 2023
Tanggal 26 September 2023
Kartu Inventaris Bangunan
Komandan Pangkalan TNI AU Hang Nadim,
Betya Lukman Madyana, S.E., M.Han.
Letkol Pnb NRP 528669