| Reason | |||
|---|---|---|---|
| 0813785045311000 | Rp 1,155,654,216 | - | |
CV Buana Indo Perkasa | 09*9**5****11**0 | Rp 1,096,558,209 | Tidak Menyampaikan bukti kepemilikan peralatan mobil 1500 cc |
| 0024773160327000 | - | - | |
CV Cahaya Ratu Emas | 05*4**8****11**0 | - | - |
| 0817487366328000 | - | - | |
| 0016336620311000 | - | - | |
| 0849496674311000 | - | - | |
| 0669509648311000 | - | - | |
| 0964005938311000 | - | - | |
CV Mitra Pprima Engineer | 05*7**9****41**0 | - | - |
CV Barometer Indo Perkasa | 00*5**9****28**0 | - | - |
| 0504892449311000 | - | - | |
| 0824639108311000 | - | - | |
PT Raudah Nusantara Berkah | 04*5**3****28**0 | - | - |
| 0016338907311000 | - | - | |
| 0601398316311000 | - | - | |
CV Js Brother | 01*5**7****11**0 | - | - |
| 0033103300311000 | - | - | |
CV Pandu Raja | 05*6**3****11**0 | - | - |
PEMERINTAH PROVINSI BENGKULU
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Mayjend S. Parman No. 07 Telp 21620-21623 Fax (0736) 22117 Bengkulu
URAIAN SINGKAT PEKERJAAN (USP)
PEKERJAAN
PEMBANGUNAN RUANG PRAKTIK SISWA DESAIN
KOMUNIKASI VISUAL SMK IT KHOIRU UMMAH
TAHUN ANGGARAN
2024
URAIAN SINGKAT PEKERJAAN
PEKERJAAN PEMBANGUNAN RUANG PRAKTIK SISWA
DESAIN KOMUNIKASI VISUAL SMK IT KHOIRU UMMAH
Adapun lingkup pekerjaan yang harus dilaksanakan oleh penyedia jasa dalam pekerjaan ini meliputi :
I DIVISI 1. PERSIAPAN LAPANGAN
I.A UMUM
1 Pembersihan lokasi
2 Pek. Papan nama pekerjaan
3 Pasangan Bowplank
4 Sewa Direksi Keet + Gudang
5 Pengadaan listrik dan Air kerja
6 Pengadaan Plakat
7 Desain DMF, JMF dan Uji Beton
8 Sistem Manajemen Keselamatan Konstruksi
Alat Pelindung Kerja dan Alat Pelindung Diri
Topi Pelindung
Sepatu Keselamatan
Rompi keselamatan
Asuransi dan Perizinan Terkait Keselamatan Konstruksi
Asuransi
Fasilitas, Sarana dan Prasarana Kesehatan
Peralatan P3K
I.B PEKERJAAN TANAH
1 Galian tanah pondasi
2 Urugan tanah kembali
3 Urugan didatangkan
4 Pemadatan tanah manual
5 Urugan pasir bawah lantai
II DIVISI 2. STRUKTUR
II.A PEKERJAAN PASANGAN PONDASI
1 Pas Batu Kosong
2 Pas Batu gunung
3 Cor lantai kerja f'c 10
II.B PEKERJAAN BETON
1 Pondasi plat 60.60
- Cor Beton plat f'c 17
- Besi Polos Ø 8
2 Sloof 20.25
- Cor Beton sloof f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 10
- Besi Polos Ø 12
- Bekisting sloof
3 Kolom 20.20
- Cor Kolom f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 12
- Bekisting Kolom 20.20
4 Kolom Praktis 11.11
- Cor Kolom praktis f'c 17
- Besi Polos Ø 6
- Besi Polos Ø 10
- Bekisting Kolom Praktis
5 Balok Latey 11.15
- Cor Balok Latey f'c 17
- Besi Polos Ø 6
- Besi Polos Ø 8
- Bekisting Balok Latey
6 Balok 15.20 (BL.1)
- Cor Balok BL1 f'c 17
- Besi Polos Ø 6
- Besi Polos Ø 10
- Bekisting Balok BL
7 Beton Dak Beton t : 10 Cm
- Cor Dak f'c 17
- Besi Polos Ø 8
- Bekisting Dak Beton
II.C PEKERJAAN PAS KUDA-KUDA
1 Pas. Kuda-kuda baja ringan C.75.75 R.32.45
III DIVISI 3. ARSITEKTUR
III.A PEKERJAAN DINDING
1 Pas dinding batu bata 1:2
2 Pas dinding batu bata 1:4
3 Plesteran 1:2
4 Plesteran 1:4
5 Pas dinding partisi GRC
6 Dinding keramik 20.40
III.B PEKERJAAN LANTAI
1 Cor beton lantai f'c 15
2 Pas Keramik Lantai 40.40
3 Pas Plint Keramik 10.40
III.C PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Kusen P1
2 Kusen PW
3 Ventilasi
4 Kusen J1
5 Kusen J2
6 Kusen J3
7 Teralis jendela
III.D PEKERJAAN ATAP DAN PLAFOND
1 Rangka Plafond
2 Pas plafond PVC
3 Pas List plafond PVC
4 Pas Atap Seng Gelombang Warna
5 Nok seng plat warna
6 Lisplank GRC 20 Cm
7 Jalusi atap baja ringan
III.E PEKERJAAN FASAT BANGUNAN
1 Pek. Almunium Composite Panel (ACP)
III.F PEKERJAAN FINISHING CAT
1 Cat kayu
2 Cat Besi
3 Cat Tembok
III.G PEKERJAAN SANITASI
1 Pas Closed jongkok
2 Pas kran air 1/2"
3 Pas wastafel
4 Pas Floor drain
5 Pek.Septick tank
IV DIVISI 4. LANSEKAP
V DIVISI 5. MEKANIKAL DAN ELEKTRIKAL
1 Pasangan kabel TC
2 Pas box MCB
3 Pas saklar tunggal
4 Pas saklar ganda
5 Pas stop kontak
6 Pas titik instalasi stop kontak
7 Pemasangan Kwh 3 Fase
8 Instalasi titik lampu
9 Pas. Fitting E27 + 10 Watt LED
10 Pas. Fitting E27 + 19 Watt LED
11 Pas Apar 5 Kg
VI DIVISI 6. PLAMBING
1 Pas. Tangki air Kap 1,5 m3
2 Pas. Pompa Air
3 Pas Pipa PVC AW 3/4"
4 Pas Pipa PVC AW 1/2"
VII PEKERJAAN LAIN-LAIN
1 Administrasi dan pelaporan
2 Pembersihan akhir pekerjaan
Bengkulu, Mei 2024
Pengguna Anggaran (PA)
Dinas Pendidikan dan Kebudayaan
Provinsi Bengkulu
SAIDIRMAN, SE, M.Si.
NIP. 19750201 200604 1 007