| Authority | |||
|---|---|---|---|
| 30 March 2015 | Penyusunan Feasibility Study Dan Design Engineering Detail Pltmh | Unit Layanan Pengadaan Pemprov. Kaltim | Rp 400,000,000 |
| 11 August 2015 | Detail Engineering Design (Ded) Pltmh Di Kp. Teluk Sumbang, Kp. Long Duhunh Dan Kp. Long Suluy | Rp 375,000,000 | |
| 21 March 2018 | Master Plan Penerangan Jalan Umum (Pju) Ksb | Kab. Sumbawa Barat | Rp 300,000,000 |
| 12 April 2016 | Pengawasan Pembangunan Jaringan Distribusi Kab. Kutai Timur | Unit Layanan Pengadaan Pemprov. Kaltim | Rp 259,688,000 |
| 22 March 2017 | Pengawasan Plts Terpusat Offgrid Desa Kelian Luar Kec. Long Iram Kab. Kutai Barat | Unit Layanan Pengadaan Pemprov. Kaltim | Rp 171,659,000 |