| Reason | ||||
|---|---|---|---|---|
| 0020812814422000 | Rp 282,700,000 | 76 | - | |
| 0012362489651000 | Rp 289,630,000 | 78.85 | - | |
| 0016842239722000 | Rp 290,262,000 | 84.42 | - | |
| 0025037508722000 | - | - | hanya dibutuhkan tiga daftar pendek | |
| 0031498009722000 | - | - | hanya dibutuhkan tiga daftar pendek | |
| 0016933376604000 | - | - | - | |
| 0813874153912000 | - | - | - | |
| 0011186749441000 | - | - | - | |
| 0748130200623000 | - | - | - | |
| 0026747402913000 | - | - | - | |
| 0316609619432000 | - | - | - | |
| 0014751499915000 | - | - | - | |
| 0022400436623000 | - | - | - |
| Authority | |||
|---|---|---|---|
| 14 September 2015 | Belanja Detail Engineering Design (Ded) Plts Di Kamp. Long Ayan, Siduung Indah, Sido Bangen, Teluk Alulu, Teluk Semanting | Rp 600,000,000 | |
| 30 March 2015 | Penyusunan Feasibility Study Dan Design Engineering Detail Pltmh | Unit Layanan Pengadaan Pemprov. Kaltim | Rp 400,000,000 |
| 11 August 2015 | Detail Engineering Design (Ded) Pltmh Di Kp. Teluk Sumbang, Kp. Long Duhunh Dan Kp. Long Suluy | Rp 375,000,000 | |
| 12 April 2016 | Pengawasan Pembangunan Jaringan Distribusi Kab. Kutai Timur | Unit Layanan Pengadaan Pemprov. Kaltim | Rp 259,688,000 |
| 22 March 2017 | Pengawasan Plts Terpusat Offgrid Desa Kelian Luar Kec. Long Iram Kab. Kutai Barat | Unit Layanan Pengadaan Pemprov. Kaltim | Rp 171,659,000 |