| Reason | ||||
|---|---|---|---|---|
PT Arcsindo Karya Utama | 00*7**8****22**0 | Rp 162,525,000 | 71.73 | Penyedia yang bersangkutan tidak dapat memperlihatkan SIUJK dan SBU yang sesuai |
| 0016842239722000 | Rp 162,662,000 | 73.78 | - | |
CV Pilar Nusantara Consultant | 00*1**8****22**0 | Rp 166,842,500 | 73.38 | - |
PT Blantika Multi Engineer | 0021956446722000 | Rp 168,437,500 | 72.93 | - |
| 0023156904722000 | - | - | - | |
PT Sinar Berkat Energi | 07*6**9****05**0 | - | - | - |
PT Guna Elektro | 00*3**5****38**0 | - | - | - |
| 0021961768722000 | - | - | - | |
| 0027564384722000 | - | - | - | |
| 0025475690728000 | - | - | - | |
PT Arista Gemilang Konsulindo | 0805898392722000 | - | - | - |
CV Menara | 0012502191725000 | - | - | - |
| 0719389231722000 | - | - | - | |
PT Indo Renewable Energy | 03*4**6****34**0 | - | - | - |
Maju Bersama Bangsa | 00*0**2****28**0 | - | - | - |
| 0021964309722000 | - | - | - |
| Authority | |||
|---|---|---|---|
| 14 September 2015 | Belanja Detail Engineering Design (Ded) Plts Di Kamp. Long Ayan, Siduung Indah, Sido Bangen, Teluk Alulu, Teluk Semanting | Rp 600,000,000 | |
| 30 March 2015 | Penyusunan Feasibility Study Dan Design Engineering Detail Pltmh | Unit Layanan Pengadaan Pemprov. Kaltim | Rp 400,000,000 |
| 11 August 2015 | Detail Engineering Design (Ded) Pltmh Di Kp. Teluk Sumbang, Kp. Long Duhunh Dan Kp. Long Suluy | Rp 375,000,000 | |
| 21 March 2018 | Master Plan Penerangan Jalan Umum (Pju) Ksb | Kab. Sumbawa Barat | Rp 300,000,000 |
| 12 April 2016 | Pengawasan Pembangunan Jaringan Distribusi Kab. Kutai Timur | Unit Layanan Pengadaan Pemprov. Kaltim | Rp 259,688,000 |