| 0312927205437000 | Rp 263,778,707 | |
| 0931374300437000 | - | |
PT Pradipa Graha Construction | 06*3**5****37**0 | - |
| 0019849967437000 | - | |
| 0633935333437000 | - | |
| 0963170675437000 | - | |
| 0763446309438000 | - | |
Bersama Aneka Proaktif | 06*5**7****37**0 | - |
REKAPITULASI BILL OF QUANTITY (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : PEMBANGUNAN RUANG LABORATORIUM
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM BESERTA PERABOTNYA
UNTUK UPTD SDN 2 LEMPUYANG (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SDN 2 LEMPUYANG
JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A PEKERJAAN PERSIAPAN
JUMLAH A
B PEKERJAAN KONSTRUKSI
PEMBANGUNAN RUANG LABORATORIUM BESERTA PERABOTNYA
LANTAI 2
I PEKERJAAN PASANGAN
II PEKERJAAN BETON K. 175 SITE MIX
III PEKERJAAN KUSEN
IV PEKERJAAN PENUTUP ATAP
V PEKERJAAN PLAFOND
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
VII PEKERJAAN PENGECATAN
VIII PEKERJAAN LISTRIK DAN MEKANIKAL
IX PEKERJAAN PERLENGKAPAN DAN ACSESORIES
JUMLAH B
C PERABOT
JUMLAH A
a. JUMLAH TOTAL (A+B)
b. PPN 11% (a x 11%)
c. JUMLAH TOTAL (a+b)
b. DIBULATKAN
TERBILANG :
Penawar
PT/CV………………….
…………………………………
Direktur
Bill Of Quantity (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : PEMBANGUNAN RUANG LABORATORIUM
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM BESERTA PERABOTNYA
UNTUK UPTD SDN 2 LEMPUYANG (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SDN 2 LEMPUYANG
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1.00 Bh A.5
2 Biaya Administrasi Pelaporan & Dokumentasi 1.00 Ls -
3 Pengadaan Air + Listrik Selama Pekerjaan 1.00 Ls -
4 Biaya Penyelenggaraan Sistem Manajemen Keselamatan
dan kesehatan kerja (SMK3)
a Alat Pelindung Kerja dan pelindungan diri
- Topi Pelindung (Safety Helmet) 10.00 Bh -
- Rompi Keselamatan ( Safety Vest) 10.00 Bh -
b Rambu - rambu
- Rambu Petunjuk 1.00 Bh -
- Rambu Larangan 1.00 Bh -
- Rambu Peringatan 1.00 Bh -
c BPJS Ketenagakerjaan dan Kesehatan Kerja 1.00 Ls -
5 Pek. Pas. Stegger dengan Bambu 12.60 M2 A.7
JUMLAH PEKERJAAN A
B PEKERJAAN KONSTRUKSI
PEMBANGUNAN RUANG LABORATORIUM BESERTA PERABOTNYA
LANTAI 2
I PEKERJAAN PASANGAN
1 Pek. Pas. Dinding Bata Hebel 10x20x60 Cm 100.42 M2 D.8.2
2 Pek. Plesteran 1 Pc : 5 Psr 193.21 M2 E.3.2
3 Pek. Acian Dinding 193.21 M2 E.6.2
Sub. Total Pekerjaan I
II PEKERJAAN BETON K. 175 SITE MIX
1 Pek. Pasang Kolom 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .84 M3 G.2.2
- Besi beton terpasang U-24 1 40.00 Kg G.25.2
- Begisting Papan Terentang 1 1.20 M2 G.23.2
2 Pek. Pasang Kolom Teras 15/15 (211.25 Kg/m3)
- Beton Site Mix K. 175 0 .25 M3 G.2.2
- Besi beton terpasang U-24 3 3.08 Kg G.25.2
- Begisting Papan Terentang 6 .72 M2 G.23.2
3 Pek. Pasang Ring Balok 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 0 .88 M3 G.2.2
- Besi beton terpasang U-24 1 47.00 Kg G.25.2
- Begisting Papan Terentang 1 1.76 M2 G.23.2
4 Pek. Pasang Balok Selasar 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .24 M3 G.2.2
- Besi beton terpasang U-24 3 8.86 Kg G.25.2
- Begisting Papan Terentang 6 .00 M2 G.23.2
5 Pek. Pasang Balok Konsol 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 0 .18 M3 G.2.2
- Besi beton terpasang U-24 2 9.93 Kg G.25.2
- Begisting Papan Terentang 4 .84 M2 G.23.2
6 Pek. Pasang Balok Liufel 12/15 Cm (216,38 Kg/m3)
- Beton Site Mix K. 175 0 .27 M3 G.2.2
- Besi beton terpasang U-24 5 8.42 Kg G.25.2
- Begisting Papan Terentang 6 .30 M2 G.23.2
7 Pek. Pasang Balok Pengaman Selasar 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 .13 M3 G.2.2
- Besi beton terpasang U-24 4 1.28 Kg G.25.2
- Begisting Papan Terentang 2 .23 M2 G.23.2
8 Pek. Pasang Balok ampig 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 .15 M3 G.2.2
- Besi beton terpasang U-24 4 7.05 Kg G.25.2
- Begisting Papan Terentang 2 .54 M2 G.23.2
Sub. Total Pekerjaan II
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
III PEKERJAAN KUSEN
1 Pek. Pasang Kusen Alumunium Type. P. 1 (1 Unit)
- Frame Kusen Alumunium 4" Warna Coklat Kilap 9.10 M' F.8.2
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap 2.00 Unit F.27.2
- Pasang Kaca 5 mm 0.78 M2 L.8.2
2 Pek. Pasang Kusen + Jendela Alumunium type J1 (5 Unit)
- Frame Kusen Alumunium 4" Warna Coklat Kilap 66.70 M' F.8.2
- Daun Jendela + Engsel Casment + Kaca polos 5 mm 10.00 Unit F.28.2
- Pasang Kaca 5 mm 5.50 M2 L.8.2
3 Pek. Jalusi Ampig ky Set. Kls Kuat II 1.00 Unit Ls
Sub. Total Pekerjaan III
IV PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 106.24 M2 -
2 Pek. Pasang Atap Metal Berpasir 106.24 M2 H.30.2
3 Pek. Pasang Nok Atap Metal Berpasir 8.30 M' H.54.2
4 Pek. Pasang Lisplank GRC Tumpangsari (1/20 + 1/10) Cm 62.20 M' H.64.2
Sub. Total Pekerjaan IV
V PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 87.49 M2 I.23.2
2 Pek. Pasang Plafond PVC 87.49 M2 I.15.2
3 Pek. Pas. Rangka Plafond galvalume modul 60x60 Cm (Perpustakaan ) 100.19 M2 I.23.2
4 Pek. Pasang Plafond PVC (Perpustakaan) 100.19 M2 I.15.2
Sub. Total Pekerjaan V
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Granit 60x60 Cm 67.50 M2 M.14.2
Sub. Total Pekerjaan VI
VII PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 193.21 M2 P.12
2 Pek. Cat Listplank 12.44 M2 P.4
Sub. Total Pekerjaan VII
VIII PEKERJAAN LISTRIK DAN MEKANIKAL
1 Pek. Pasang Instalasi Titik Penerangan dan Stop Kontak 7.00 Titik -
2 Pek. Pasang Saklar Tunggal 1.00 Bh -
3 Pek. Pasang Saklar Double 1.00 Bh -
4 Pek. Pasang Stop Kontak 2.00 Bh -
5 Pas. Lampu TL 1x18 Watt berikut Kap 4.00 Bh -
6 Pas. Lampu LED 9 Watt 1.00 Bh -
Sub. Total Pekerjaan VIII
IX PEKERJAAN PERLENGKAPAN DAN ACSESORIES
1 Pek. Pasang Stainless Steel 2" pengaman Selasar 9.30 M' -
2 Pek. Pasang Prasasti Granit Uk. P. 30 Cm L. 20 Cm 1.00 Bh -
Sub. Total Pekerjaan IX
JUMLAH B
C PERABOT
1 Png. Lemari Simpan 1.00 Bh Ls
2 Png. Kursi komputer Guru 1.00 Bh Ls
3 Png. Kursi komputer Siswa 28.00 Bh Ls
4 Png. Meja Guru 1.00 Bh Ls
5 Png. Meja Komputer Siswa 28.00 Bh Ls
6 Png. Meja Proyektor 1.00 Bh Ls
JUMLAH C
JUMLAH TOTAL PEKERJAAN (A+B+C)
Penawar
PT/CV………………….
…………………………………
Direktur