REKAPITULASI BILL OF QUANTITY (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : PEMBANGUNAN RUANG PERPUSTAKAAN
PEKERJAAN : PEMBANGUNAN RUANG PERPUSTAKAAN BESERTA PERABOTNYA
UNTUK UPTD SDN 2 KERTASEMAYA (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SDN 2 KERTASEMAYA
JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A PEKERJAAN PERSIAPAN
JUMLAH A
B PEKERJAAN KONSTRUKSI
PEMBANGUNAN RUANG PERPUSTAKAAN BESERTA PERABOTNYA
LANTAI 1
I PEKERJAAN TANGGA DAN PENAMBAHAN DAK TERAS
LANTAI 2
I PEKERJAAN PASANGAN
II PEKERJAAN BETON K. 175 SITE MIX
III PEKERJAAN KUSEN
IV PEKERJAAN PENUTUP ATAP
V PEKERJAAN PLAFOND
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
VII PEKERJAAN PENGECATAN
VIII PEKERJAAN LISTRIK DAN MEKANIKAL
IX PEKERJAAN PERLENGKAPAN DAN ACSESORIES
JUMLAH B
C PERABOT
JUMLAH A
a. JUMLAH TOTAL (A+B)
b. PPN 11% (a x 11%)
c. JUMLAH TOTAL (a+b)
b. DIBULATKAN
TERBILANG :
Penawar
PT/CV………………….
…………………………………
Direktur
Bill Of Quantity (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : PEMBANGUNAN RUANG PERPUSTAKAAN
PEKERJAAN : PEMBANGUNAN RUANG PERPUSTAKAAN BESERTA PERABOTNYA
UNTUK UPTD SDN 2 KERTASEMAYA (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SDN 2 KERTASEMAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1 .00 Bh A.5
2 Biaya Administrasi Pelaporan & Dokumentasi 1 .00 Ls -
3 Pengadaan Air + Listrik Selama Pekerjaan 1 .00 Ls -
4 Biaya Penyelenggaraan Sistem Manajemen Keselamatan
dan kesehatan kerja (SMK3)
a Alat Pelindung Kerja dan pelindungan diri
- Topi Pelindung (Safety Helmet) 1 0.00 Bh -
- Rompi Keselamatan ( Safety Vest) 1 0.00 Bh -
b Rambu - rambu
- Rambu Petunjuk 1 .00 Bh -
- Rambu Larangan 1 .00 Bh -
- Rambu Peringatan 1 .00 Bh -
c BPJS Ketenagakerjaan dan Kesehatan Kerja 1 .00 Ls -
5 Pek. Pas. Stegger dengan Bambu 1 0.64 M2 A.7
JUMLAH PEKERJAAN A
B PEKERJAAN KONSTRUKSI
PEMBANGUNAN RUANG PERPUSTAKAAN BESERTA PERABOTNYA
LANTAI 1
I PEKERJAAN TANGGA DAN PENAMBAHAN DAK TERAS
1 Pek. Galian tanah pondasi 2 .88 M3 B.1
2 Pek. Urugan tanah bekas galian 0 .96 M3 B.9
3 Pek. Lapisan pasir bawah pondasi t. 5 cm 0 .10 M3 B.12
4 Pek. Pasang Pondasi Tapak 80x80
- Beton Site Mix K. 225 0 .38 M3 G.3
- Besi beton terpasang U-24 6 1.44 Kg G.25
5 Pek. Pasang Kolom 20/30
- Beton Site Mix K. 225 0 .48 M3 G.3
- Besi beton terpasang U-24 8 6.40 Kg G.25
- Begisting Papan Terentang 4 .32 M2 G.23
6 Pek. Balok 20/30 K. 225
- Beton Site Mix K. 225 0 .26 M3 G.3
- Besi beton terpasang U-24 4 6.44 Kg G.25
- Begisting Papan Terentang 2 .32 M2 G.23
7 Pek. Balok dan kolom pengaman tangga 12/12 K. 175
- Beton Site Mix K. 175 0 .19 M3 G.3
- Besi beton terpasang U-24 3 3.96 Kg G.25
- Begisting Papan Terentang 1 .70 M2 G.23
8 Pek. Plat Tangga dan Bordes T. 12 cm
- Beton Site Mix K. 225 3 .11 M3 G.3
- Besi beton terpasang U-24 4 66.08 Kg G.25
- Begisting Papan Terentang 2 7.96 M2 G.23
9 Pek. Plat Dak penambahan teras T. 12 cm
- Beton Site Mix K. 225 0 .27 M3 G.3
- Besi Wiermesh M. 10 2 .25 M2 G.25
- Bondex 0,75 mm 2 .25 M2 G.23
10 Pek. Pasangan Bata Hebel pengaman tangga 1 4.05 M2 D.8
11 Pek. Plesteran 1 Pc : 5 Psr 2 8.09 M2 E.3
12 Pek. Acian Dinding 2 8.09 M2 E.6
13 Pek. Pasang Keramik 30x30 Cm Unpholished (Kasar) 1 1.91 M2 M.20
14 Pek. Cat dinding tembok baru 2 8.09 M2 P.12
Sub. Total Pekerjaan I
LANTAI 2
I PEKERJAAN PASANGAN
1 Pek. Pas. Dinding Bata Hebel 10x20x60 Cm 106.84 M2 D.8.2
2 Pek. Plesteran 1 Pc : 5 Psr 198.41 M2 E.3.2
3 Pek. Acian Dinding 198.41 M2 E.6.2
Sub. Total Pekerjaan I
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
II PEKERJAAN BETON K. 175 SITE MIX
1 Pek. Pasang Kolom 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .84 M3 G.2.2
- Besi beton terpasang U-24 1 40.00 Kg G.25.2
- Begisting Papan Terentang 1 1.20 M2 G.23.2
2 Pek. Pasang Kolom Teras 15/15 (211.25 Kg/m3)
- Beton Site Mix K. 175 0 .25 M3 G.2.2
- Besi beton terpasang U-24 3 3.08 Kg G.25.2
- Begisting Papan Terentang 6 .72 M2 G.23.2
3 Pek. Pasang Ring Balok 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 0 .88 M3 G.2.2
- Besi beton terpasang U-24 1 47.00 Kg G.25.2
- Begisting Papan Terentang 1 1.76 M2 G.23.2
4 Pek. Pasang Balok Selasar 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .24 M3 G.2.2
- Besi beton terpasang U-24 3 8.86 Kg G.25.2
- Begisting Papan Terentang 6 .00 M2 G.23.2
5 Pek. Pasang Balok Konsol 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 0 .18 M3 G.2.2
- Besi beton terpasang U-24 2 9.93 Kg G.25.2
- Begisting Papan Terentang 4 .84 M2 G.23.2
6 Pek. Pasang Balok Liufel 12/15 Cm (216,38 Kg/m3)
- Beton Site Mix K. 175 0 .27 M3 G.2.2
- Besi beton terpasang U-24 5 8.42 Kg G.25.2
- Begisting Papan Terentang 6 .30 M2 G.23.2
7 Pek. Pasang Balok Teras Pengaman Selasar 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 .13 M3 G.2.2
- Besi beton terpasang U-24 4 1.28 Kg G.25.2
- Begisting Papan Terentang 2 .23 M2 G.23.2
8 Pek. Pasang Balok ampig 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 .31 M3 G.2.2
- Besi beton terpasang U-24 9 4.10 Kg G.25.2
- Begisting Papan Terentang 5 .09 M2 G.23.2
Sub. Total Pekerjaan II
III PEKERJAAN KUSEN
1 Pek. Pasang Kusen Alumunium Type. P. 1 (1 Unit)
- Frame Kusen Alumunium 4" Warna Coklat Kilap 9 .10 M' F.8.2
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap 2 .00 Unit F.27.2
- Pasang Kaca 5 mm 0 .78 M2 L.8.2
2 Pek. Pasang Kusen + Jendela Alumunium type J1 (5 Unit)
- Frame Kusen Alumunium 4" Warna Coklat Kilap 6 6.70 M' F.8.2
- Daun Jendela + Engsel Casment + Kaca polos 5 mm 1 0.00 Unit F.28.2
- Pasang Kaca 5 mm 5 .50 M2 L.8.2
3 Pek. Jalusi Ampig ky Set. Kls Kuat II 1 .00 Unit Ls
Sub. Total Pekerjaan III
IV PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 114.66 M2 -
2 Pek. Pasang Atap Metal Berpasir 114.66 M2 H.30
3 Pek. Pasang Nok Atap Metal Berpasir 9 .10 M' H.54
4 Pek. Pasang Lisplank GRC Tumpangsari (1/20 + 1/10) Cm 4 3.40 M' H.64
Sub. Total Pekerjaan IV
V PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 9 7.41 M2 I.23
2 Pek. Pasang Plafond Gypsum (bagian dalam) 5 4.00 M2 I.14
3 Pek. Pasang Plafond GRC (Bagian teras dan tritisan) 4 3.41 M2 I.11
Sub. Total Pekerjaan V
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Keramik putih 40x40 Cm 6 7.50 M2 M.7.2
Sub. Total Pekerjaan VI
VII PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 198.41 M2 P.12
2 Pek. Cat Plafond 9 7.41 M2 P.16
3 Pek. Cat Listplank 8 .68 M2 P.4
Sub. Total Pekerjaan VII
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
VIII PEKERJAAN LISTRIK DAN MEKANIKAL
1 Pek. Pasang Instalasi Titik Penerangan dan Stop Kontak 7 .00 Titik -
2 Pek. Pasang Saklar Tunggal 1 .00 Bh -
3 Pek. Pasang Saklar Double 1 .00 Bh -
4 Pek. Pasang Stop Kontak 2 .00 Bh -
5 Pas. Lampu TL 1x18 Watt berikut Kap 4 .00 Bh -
6 Pas. Lampu LED 9 Watt 1 .00 Bh -
Sub. Total Pekerjaan VIII
IX PEKERJAAN PERLENGKAPAN DAN ACSESORIES
1 Pek. Pasang Prasasti Granit Uk. P. 30 Cm L. 20 Cm 1 .00 Bh -
Sub. Total Pekerjaan IX
JUMLAH B
C PERABOT
1 Png. Karpet 2 .00 Bh Ls
2 Png. Kursi Kerja 1 .00 Bh Ls
3 Png. Meja 1/2 Biro 1 .00 Bh Ls
4 Png. Meja Baca Siswa 1 2.00 Bh Ls
5 Png. Lemari / Rak Buku 1 2.00 Bh Ls
JUMLAH C
JUMLAH TOTAL PEKERJAAN (A+B+C)
Penawar
PT/CV………………….
0.00
…………………………………
Direktur