REKAPITULASI
BILL OF QUANTITY (BOQ)
PROGRAM : PROGRAM PENGELOLAAN PENDIDIKAN
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
SUB KEGIATAN : PEMBANGUNAN RUANG KELAS BARU
PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU PAKET 3
LOKASI : UPTD SDN PANGGANGJERO , KEC.KRANGKENG, KAB. INDRAMAYU
JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A PEMBANGUNAN 1 RUANG KELAS BARU
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH DAN PASIR
III PEKERJAAN PASANGAN
IV PEKERJAAN BETON
V PEKERJAAN KUSEN ALUMUNIUM
VI PEKERJAAN PENUTUP ATAP
VII PEKERJAAN PLAFOND
VIII PEKERJAAN PENUTUP LANTAI DAN DINDING
IX PEKERJAAN PENGECATAN
X PEKERJAAN ELEKTRIKAL
a. JUMLAH TOTAL (A)
b. PPN 11% (a x 11%)
c. JUMLAH TOTAL (a+b)
d. DIBULATKAN
Terbilang :
Indramayu, ….......................2025
Dibuat
Penawar
PT/CV …...............................
…......................................
DIREKTUR
BILL OF QUANTITY
(BOQ)
PROGRAM : PROGRAM PENGELOLAAN PENDIDIKAN
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
SUB KEGIATAN : PEMBANGUNAN RUANG KELAS BARU
PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU PAKET 3
LOKASI : UPTD SDN PANGGANGJERO , KEC.KRANGKENG, KAB. INDRAMAYU
HARGA
JUMLAH TOTAL
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN
(Rp.)
(Rp.)
a b c d e f g
A PEMBANGUNAN 1 RUANG KELAS BARU
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Ulang / Bowmplank 42.00 M' A.1
2 Pek. Papan Nama Kegiatan Digital Printing 1.00 Bh A.5
3 Prasasti KegiatanUk. 30x40 cm 1.00 Ls -
4 Biaya Administrasi Pelaporan & Dokumentasi 1.00 Ls -
5 Pengadaan Air + Listrik Selama Pekerjaan 1.00 Ls -
6 Pek. Sewa Kantor Sementara Direksikeet 1.00 Ls -
7 Biaya Penyelenggaraan Sistem Manajemen Keselamatan dan kesehatan ker ja ( S M K 3 -)
KELENGKAPAN SMK3 -
8 Alat Pelindung Diri -
- Helm Pelindung 6.00 BH -
- Sarung Tangan 6.00 PSG -
- Sepatu Keselamatan 6.00 PSG -
- Rompi Pelindung 6.00
9 Rambu Rambu -
- Rambu Petunjuk 1.00 BH -
- Rambu Larangan 1.00 BH -
- Rambu Peringatan 1.00 BH -
- Rambu Kewajiban 1.00 BH -
- Rambu Informasi 1.00 BH -
- Bendera K3 1.00 BH -
Biaya BPJS Kesehatan dan Keselamatan Kerja 1.00 Ls -
JUMLAH I ….........................................
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian tanah Pondasi 24.30 M3 B.1
2 Pek. Cerucuk Bambu Ø 8 CM - 10 CM, Uk. P. 1 M - 1,5 M 104.00 TtK A.16.Rob.1.a
3 Pek. Urg. Kembali bekas galian pondasi 3.16 M3 B.20
4 Pek. Urg. Sirtu 25.58 M3 B.24
6 Pek. Urg. Pasir alas lantai T .10 cm 6.82 M3 B.22
6 Pek. Urg. Pasir alas Rabat T .10 cm 3.42 M3 B.22
7 Pek. Urg. Pasir alas pondasi T. 10 cm 2.80 M3 B.22
JUMLAH II ….........................................
HARGA
JUMLAH TOTAL
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN
(Rp.)
(Rp.)
a b c d e f g
III PEKERJAAN PASANGAN
1 Pas Batu kosong ( Aanstamping ) 4.80 M3 C.7
2 Pek. Pondasi batu belah 1Pc : 5 Ps ( batu kali ) 7.80 M3 C.4
4 Pek. Pasangan dinding 1/2 bata 1 Pc : 5 Psr 122.48 M2 D.3
5 Pek. Plesteran 1 Pc : 5 Psr 193.32 M2 E.3
6 Pek. Acian Dinding 193.32 M2 E.9
7 Tali Air L.3 cm 6.40 M' -
JUMLAH III ….........................................
IV PEKERJAAN BETON
1 Pek. Lantai Kerja Pondasi Plat 1Pc:3Ps:5Kr T. 10 cm 0.40 M3 G.1
2 Pek. Alas Lantai 1Pc:3Ps:5Kr T. 5cm 3.41 M3 G.1
3 Pek. Rabat Beton 1Pc:3Ps:5Kr t.5 cm 1.90 M3 G.1
4 Pek. Profil Kolom 1Pc:3Ps:5Kr 0.06 M3 G.1
5 Pek. Pondasi Plat/ Tapak 80x80x20 cm -
- Beton SiteMix K-175 0.51 M3 G.5
- Besi beton terpasang U-24 Polos 49.23 Kg G.42
- Begisting Papan Multiplex 2.56 M2 G.18.Rob
-
7 Pek. Sloof Beton 15/20 cm -
- Beton SiteMix K-175 2.10 M3 G.5
- Besi beton terpasang U-24 Polos 226.44 Kg G.42
- Begisting Papan Multiplex 16.80 M2 G.18.Rob
-
8 Pek. Kolom 20/20 cm Badan -
- Beton SiteMix K-175 1.37 M3 G.5
- Besi beton terpasang U-24 Polos 175.38 Kg G.42
- Begisting Papan Multiplex 17.10 M2 G.18.Rob
-
9 Pek. Kolom 20/20 cm Teras -
- Beton SiteMix K-175 0.44 M3 G.5
- Besi beton terpasang U-24 Polos 56.41 Kg G.42
- Begisting Papan Multiplex 8.80 M2 G.18.Rob
-
10 Pek. Kolom 15/15 cm -
- Beton SiteMix K-175 0.17 M3 G.5
- Besi beton terpasang U-24 Polos 34.05 Kg G.42
- Begisting Papan Multiplex 2.22 M2 G.18.Rob
-
11 Pek. Kolom Ampig 12/12 Cm -
- Beton SiteMix K-175 0.06 M3 G.5
- Besi beton terpasang U-24 Polos 17.14 Kg G.42
- Begisting Papan Multiplex 0.96 M2 G.18.Rob
-
12 Pek. Ring Balok 15/20 cm -
- Beton SiteMix K-175 0.90 M3 G.5
- Besi beton terpasang U-24 Polos 145.94 Kg G.42
- Begisting Papan Multiplex 12.00 M2 G.18.Rob
-
HARGA
JUMLAH TOTAL
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN
(Rp.)
(Rp.)
a b c d e f g
13 Pek. Balok Teras 15/20 Cm -
- Beton SiteMix K-175 0.23 M3 G.5
- Besi beton terpasang U-24 Polos 36.63 Kg G.42
- Begisting Papan Multiplex 6.40 M2 G.18.Rob
-
14 Pek. Balok Konsol 15/20 Cm -
- Beton SiteMix K-175 0.25 M3 G.5
- Besi beton terpasang U-24 40.86 Kg G.42
- Begisting Papan Multiplex 4.62 M2 G.18.Rob
-
15 Pek. Balok Ampig 12/12 cm -
- Beton SiteMix K-175 0.12 M3 G.5
- Besi beton terpasang U-24 34.54 Kg G.42
- Begisting Papan Multiplex 1.93 M2 G.18.Rob
-
16 Pek. Balok Latei 10/10 Cm -
- Beton SiteMix K-175 0.13 M3 G.5
- Besi beton terpasang U-24 42.75 Kg G.42
- Begisting Papan Multiplex 3.91 M2 G.18.Rob
-
17 Pek. Pasang Gravel Beton 1/2 d.20 cm 42.00 J.43.Rob
JUMLAH IV ….........................................
V PEKERJAAN KUSEN ALUMUNIUM
1 Pek. Pasang Kusen Alumunium + Pintu Type. P1. (1 Unit)
- Frame Kusen Alumunium 4" Warna 7.82 M' F.12
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap dengan aksesoris Uk. 60x20 0 c m 2.00 Unit -
- Pasang Kaca Polos t. 5 mm 0.42 Bh L.14
- Pasang Door Closer 2.00 L.12
- Pasang Door Holder 1.00 L.11
-
2 Pek. Pasang Kusen + Jendela Alumunium type J1 (4 Unit) -
- Frame Kusen Alumunium 4" Warna 43.24 M' F.12
- Daun Jendela + Engsel Casment + Kaca polos 5 mm + Karet Tepi Uk.65x70 c m 8.00 Unit -
- Pasang Kaca Polos t. 5 mm 2.50 Bh L.14
-
3 Pek. Pasang Kusen Alumunium type BV1 (1 Unit) -
- Frame Kusen Alumunium 4" Warna 5.90 M' F.12
- Pasang Kaca 5 mm 0.62 M2 L.14
JUMLAH V ….........................................
VI PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 120.90 M2 H.18
2 Pek. Pasang Atap Zigzag 120.90 M2 H.34.Rob.a
3 Pek. Pasang Nok 9.75 M' H.59
4 Pek. Pasang Listplank Grc (1/30 )+ (1/10) CM 34.55 M' H.72
JUMLAH VI ….........................................
HARGA
JUMLAH TOTAL
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN
(Rp.)
(Rp.)
a b c d e f g
VII PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 101.25 M2 I.23
2 Pek. Pasang Plafond PVC urat Jati 101.25 M2 I.17
3 List Plafond PVC 7 cm 136.58 M2 I.29
JUMLAH VII ….........................................
VIII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Granit Unpolish 60x60 cm 68.18 M2 M.22
2 Pek. Pasang dingding Granit 60x60 cm 20.84 M2 N.6
JUMLAH VIII ….........................................
IX PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 198.13 M2 P.13
2 Pek. Cat Lisplang 10.37 M2 P.6
JUMLAH IX ….........................................
X PEKERJAAN ELEKTRIKAL
1 MCB 6 Ampere 1.00 Bh -
2 Pek. Pasang Instalasi Titik Lampu Penerangan 5.00 Ttk Q.1
3 Pek. Pasang Instalasi Titik Stop Kontak 4.00 Ttk. Q.2
4 Pas. Stop kontak 4.00 Bh Q.8
5 Pas. Saklar Tunggal 1.00 Bh Q.4
6 Pas. Saklar Ganda 1.00 Bh Q.5
7 Pas. Lampu ramp TL 2X18 Watt 4.00 Bh Q.12
8 Lamp Downligt LED Panel 10 Watt 1.00 Bh Q.13
JUMLAH X ….........................................
JUMLAH TOTAL ….........................................