| 0017951914833000 | Rp 978,850,000 | |
| 0025732363831000 | - | |
CV Star Utama Konstruksi | 01*8**9****31**0 | - |
PT Indo Trans Konstruksi | 08*8**7****07**0 | - |
| 0032931883822000 | - | |
| 0769269879831000 | - | |
CV Mega Taro Bouw | 09*5**9****05**0 | - |
| 0030613368821000 | - |
Uraian
No. Mata
Pembayaran
a b
DIVISI 1. UMUM
1.2 Mobilisasi
1.2 Mobilisasi
SKh-1.1.22.(2g) Spanduk (Banner )
SKh-1.1.22.(2i) Papan Informasi Keselamatan Konstruksi
SKh-
1.1.22.(3b1) Topi pelindung (Safety Helmet )
SKh-
1.1.22.(3b2) Pelindung mata (Goggles, Spectacles )
SKh-
1.1.22.(3b6) Pelindung pernafasan dan mulut (masker,masker respirator)
SKh-
1.1.22.(3b7) Sarung tangan (Safety Gloves )
SKh- Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe
1.1.22.(3b8) cap )
SKh-
1.1.22.(3b11) Rompi keselamatan (Safety Vest )
SKh-1.1.22.(6a) Peralatan P3K
SKh-1.1.22.(7a) Rambu petunjuk
SKh-1.1.22.(7b) Rambu larangan
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(5) Galian Struktur dengan kedalaman 2 - 4 meter
DIVISI 7. STRUKTUR
7.1 (7a) Beton strukur, fc’20 MPa
Abutmen
Isian Sumuran
7.1 (9) Beton Siklop, fc’15 Mpa
7.3 (2) Baja Tulangan Sirip BjTS 280+
7.7.(1)
Dinding Sumuran Silinder terpasang| Authority | |||
|---|---|---|---|
| 21 October 2024 | Pembungan Talud Penahan Tebing Halaman Kantor Kejaksaan | Kab. Morowali | Rp 6,835,240,000 |
| 16 January 2025 | Lann Clearing Dan Pematangan Lahan Kawasan Olahraga Kecamatan Bungku Tengah | Kab. Morowali | Rp 2,459,634,800 |
| 18 March 2019 | Pekerjaan Landscape | Kementerian Perhubungan | Rp 2,200,000,000 |
| 23 December 2023 | Pembuatan Resa Pada Ujung Runway 21 Dan Pemenuhan Standar Runway Strip | Kementerian Perhubungan | Rp 2,000,000,000 |
| 23 December 2016 | Pekerjaan Penimbunan Area Parkir Kendaraan | Kementerian Perhubungan | Rp 1,836,483,000 |
| 21 May 2018 | Saluran Pembuang | Kab. Morowali Utara | Rp 1,485,000,000 |
| 18 December 2020 | Pembuatan Rumah Pompa Termasuk Instalasi Air Bersih | Kementerian Perhubungan | Rp 1,253,706,000 |
| 29 July 2025 | Pematangan Lahan (Pengadilan Negeri) | Kab. Morowali | Rp 1,000,000,000 |
| 14 March 2024 | Pembangunan Tanggul Belakang Mesjid Desa Tandoyondo Kec. Soyo Jaya | Kab. Morowali Utara | Rp 1,000,000,000 |
| 20 March 2015 | Pembuatan Bronjong Ex Sungai Puna | Rp 752,956,000 |